NUS-ISS 4th Agile Community of Practice (CoP): Agile Development with Agile Contract, by Mr Steven Koh, Assistant Director (Agile Coach), IDA-Government Digital Services (GDS)
Renewable Energy Feed-in Tarriff presentationJerry Sakala
The Energy Regulation Board (ERB), with the support of the USAID Trade Hub Southern Africa (SATH) has developed the draft Renewable Energy Feed in Tariffs (REFiT) Regulatory Framework. The REFiT Regulatory Framework was developed in line with REFiT Policy of 2015 developed by the Ministry of Mines Energy and Water Development. The REFiT regulatory framework was presented to stakeholders on Tuesday 22nd September 2015.
The REFiT Regulatory framework outlines the following:
REFiT Indicative Tariffs for solar projects;
Rules and Guidelines for RE projects to be implemented under the REFiT Policy of 2015; and
Guidelines for REFiT Power Purchase Agreements, and application procedures for project developers.
These rules and guidelines are only applicable to small scale renewable energy systems as defined in the REFiT Policy of 2015.
It is the economic consideration like cost estimation,capital investment,profitability and total product cost. It also includes various types of each, calculation and ratios
NUS-ISS 4th Agile Community of Practice (CoP): Agile Development with Agile Contract, by Mr Steven Koh, Assistant Director (Agile Coach), IDA-Government Digital Services (GDS)
Renewable Energy Feed-in Tarriff presentationJerry Sakala
The Energy Regulation Board (ERB), with the support of the USAID Trade Hub Southern Africa (SATH) has developed the draft Renewable Energy Feed in Tariffs (REFiT) Regulatory Framework. The REFiT Regulatory Framework was developed in line with REFiT Policy of 2015 developed by the Ministry of Mines Energy and Water Development. The REFiT regulatory framework was presented to stakeholders on Tuesday 22nd September 2015.
The REFiT Regulatory framework outlines the following:
REFiT Indicative Tariffs for solar projects;
Rules and Guidelines for RE projects to be implemented under the REFiT Policy of 2015; and
Guidelines for REFiT Power Purchase Agreements, and application procedures for project developers.
These rules and guidelines are only applicable to small scale renewable energy systems as defined in the REFiT Policy of 2015.
It is the economic consideration like cost estimation,capital investment,profitability and total product cost. It also includes various types of each, calculation and ratios
Construction equipment need and factors-nrcnarayanch1979
Need of construction, standard equipment, special equipment,Depreciation cost and methods, Factors affecting selection of CE, Factors affecting cost of owning and operating equipment, Factors affecting performance of CE.
Presentation on practical approach of costing in construction industry has been prepared with the objective of spreading and sharing knowledge of flow of costing and key areas among industry, professionals and other related people.
it may be very useful to understand the basic concepts and approach of costing of this fastest growing industry.
RFP1. Project Initiation Phase The purpose of the RFP document.docxhealdkathaleen
RFP
1. Project Initiation Phase
The purpose of the RFP document is to define all procurement related activities for implementing Oracle for Tesla motors. This document will outline all the procurement management activities and resources that are required for implementing the software.
2. Procurement Statement
Below are the list of items that must be procured in order to successfully start the project.
Item/Service
Justification
Needed By
Cost
Rack server for the software implementation
This is an inventory item that needs to be procured for implementing the new software (Oracle R12) for the company
01/01/2018
$5000
Printer and scanner
Need printer/ scan to print out the documentation
01/5/2018
$2000
Table
Need computer tables for consultants to work on implementation
01/15/2018
$1000
Chair
Need desk chairs for consultants to implement the application
01/15/2018
$1000
Car
Need a car for consultant’s usage
01/15/2018
$10,000
Laptops
Laptops are needed for consultants to work on
01/15/2018
$5000
Office supplies
These are office supplies that are required by the implementation partner
01/15/2018
$2000
Consultants service
Consultant service is required to implement the Oracle software.
01/15/2018
$404,617.60
Vendor selection: The vendor selection process is very straight forward as most of the vendors are have had good relations with real tech. The entire consultant team are offered by Real Tech itself. The office supplies are procured by the vendor name Staples. Finally, the laptops are procured by tech systems. The vendors are carefully analyzed by the buyers and are listed on the buyer’s approved vendor list of vendors. The vendors are rated based on the price, delivery time and quality of the products.
3. Selection Process & Criteria
The hardware and office supplies are based on the planned purchase order contract with the vendor. The consultants are interviewed before hand before onboarding the resources into the team.
4. Project Procurement Team
All procurement activities must initially get approval from the immediate manager and then the approval of the project manager. The project manager must document justify the need in a form of a document and present it to the project sponsors.
5.Contract Type:
The procurement strategy used by Tesla is called Fixed- Price Contract. This type of contract is also called Lump- sum contract. The reason for choosing this contract is that there is no uncertainty in the scope of the project. The purchasing module in the Oracle ERP software will help improve the procure to pay cycle in the organization. The ERP implementation partner is bound to finish the implementation within one year at the cost of $350,000.
6.Contract Standards:
All procurement must follow the ISO 9001:2015 standards.
7.Vandor Management/ Perforance
This section describes the metrics to be used for procurement activities associated with the project. These metrics may include but not be limited to: methods to ensure the p ...
The process of bidding and estimating, from MnDOT e-learning on website, to historical
Bidding data, where to find bids and guide to bidding.Search websites to bidding opportunities with different agencies. Presenter: George Costilla, MN Department of Transportation
Inforum 2014 Infor ERP differences training for Infor Ming.le, Infor Cloudsuites and Infor ERP LN. These presentations explain how to use new functionality enhancements in Infor LN 10.4 and other applications within the vertical industry Cloudsuites. There are Cloudsuites for Financials, Aerospace and Defense (A&D), Automotive, Industrial Machining and Equipment and other discrete manufacturing industries. If you still have Baan 4, FourthShift, Microsoft Dynamics GP, SAP R/3 or any other legacy ERP, then you might want to consider Infor LN. We specialize in Baan 4 to LN migrations but can handle upgrades from virtually any manufacturing ERP system to the new Infor CloudSuites. For more information and how-to content, visit http://inforln.com or contact Dan Aldridge, CEO of Performa Apps, at 703.251.4504.
Strategic Selection of FTZ for setting up a new manufacturing facility for a ...John William
This case study focuses on providing necessary information about the strategic selection of FTZ for setting up a new manufacturing facility for a global security systems company in China. To know more about China sourcing visit: https://www.dragonsourcing.com/china-sourcing-company/
Hotel management involves overseeing all aspects of a hotel's operations to ensure smooth functioning and exceptional guest experiences. This multifaceted role includes tasks such as managing staff, handling reservations, maintaining facilities, overseeing finances, and implementing marketing strategies to attract guests. Effective hotel management requires strong leadership, communication, organizational, and problem-solving skills to navigate the complexities of the hospitality industry and ensure guest satisfaction while maximizing profitability.
More Related Content
Similar to Muddddddddddddddddddddsssssddddddddddddd
Construction equipment need and factors-nrcnarayanch1979
Need of construction, standard equipment, special equipment,Depreciation cost and methods, Factors affecting selection of CE, Factors affecting cost of owning and operating equipment, Factors affecting performance of CE.
Presentation on practical approach of costing in construction industry has been prepared with the objective of spreading and sharing knowledge of flow of costing and key areas among industry, professionals and other related people.
it may be very useful to understand the basic concepts and approach of costing of this fastest growing industry.
RFP1. Project Initiation Phase The purpose of the RFP document.docxhealdkathaleen
RFP
1. Project Initiation Phase
The purpose of the RFP document is to define all procurement related activities for implementing Oracle for Tesla motors. This document will outline all the procurement management activities and resources that are required for implementing the software.
2. Procurement Statement
Below are the list of items that must be procured in order to successfully start the project.
Item/Service
Justification
Needed By
Cost
Rack server for the software implementation
This is an inventory item that needs to be procured for implementing the new software (Oracle R12) for the company
01/01/2018
$5000
Printer and scanner
Need printer/ scan to print out the documentation
01/5/2018
$2000
Table
Need computer tables for consultants to work on implementation
01/15/2018
$1000
Chair
Need desk chairs for consultants to implement the application
01/15/2018
$1000
Car
Need a car for consultant’s usage
01/15/2018
$10,000
Laptops
Laptops are needed for consultants to work on
01/15/2018
$5000
Office supplies
These are office supplies that are required by the implementation partner
01/15/2018
$2000
Consultants service
Consultant service is required to implement the Oracle software.
01/15/2018
$404,617.60
Vendor selection: The vendor selection process is very straight forward as most of the vendors are have had good relations with real tech. The entire consultant team are offered by Real Tech itself. The office supplies are procured by the vendor name Staples. Finally, the laptops are procured by tech systems. The vendors are carefully analyzed by the buyers and are listed on the buyer’s approved vendor list of vendors. The vendors are rated based on the price, delivery time and quality of the products.
3. Selection Process & Criteria
The hardware and office supplies are based on the planned purchase order contract with the vendor. The consultants are interviewed before hand before onboarding the resources into the team.
4. Project Procurement Team
All procurement activities must initially get approval from the immediate manager and then the approval of the project manager. The project manager must document justify the need in a form of a document and present it to the project sponsors.
5.Contract Type:
The procurement strategy used by Tesla is called Fixed- Price Contract. This type of contract is also called Lump- sum contract. The reason for choosing this contract is that there is no uncertainty in the scope of the project. The purchasing module in the Oracle ERP software will help improve the procure to pay cycle in the organization. The ERP implementation partner is bound to finish the implementation within one year at the cost of $350,000.
6.Contract Standards:
All procurement must follow the ISO 9001:2015 standards.
7.Vandor Management/ Perforance
This section describes the metrics to be used for procurement activities associated with the project. These metrics may include but not be limited to: methods to ensure the p ...
The process of bidding and estimating, from MnDOT e-learning on website, to historical
Bidding data, where to find bids and guide to bidding.Search websites to bidding opportunities with different agencies. Presenter: George Costilla, MN Department of Transportation
Inforum 2014 Infor ERP differences training for Infor Ming.le, Infor Cloudsuites and Infor ERP LN. These presentations explain how to use new functionality enhancements in Infor LN 10.4 and other applications within the vertical industry Cloudsuites. There are Cloudsuites for Financials, Aerospace and Defense (A&D), Automotive, Industrial Machining and Equipment and other discrete manufacturing industries. If you still have Baan 4, FourthShift, Microsoft Dynamics GP, SAP R/3 or any other legacy ERP, then you might want to consider Infor LN. We specialize in Baan 4 to LN migrations but can handle upgrades from virtually any manufacturing ERP system to the new Infor CloudSuites. For more information and how-to content, visit http://inforln.com or contact Dan Aldridge, CEO of Performa Apps, at 703.251.4504.
Strategic Selection of FTZ for setting up a new manufacturing facility for a ...John William
This case study focuses on providing necessary information about the strategic selection of FTZ for setting up a new manufacturing facility for a global security systems company in China. To know more about China sourcing visit: https://www.dragonsourcing.com/china-sourcing-company/
Similar to Muddddddddddddddddddddsssssddddddddddddd (20)
Hotel management involves overseeing all aspects of a hotel's operations to ensure smooth functioning and exceptional guest experiences. This multifaceted role includes tasks such as managing staff, handling reservations, maintaining facilities, overseeing finances, and implementing marketing strategies to attract guests. Effective hotel management requires strong leadership, communication, organizational, and problem-solving skills to navigate the complexities of the hospitality industry and ensure guest satisfaction while maximizing profitability.
Food Processing and Preservation Presentation.pptxdengejnr13
The presentation covers key areas on food processing and preservation highlighting the traditional methods and the current, modern methods applicable worldwide for both small and large scale.
Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...IMARC Group
The Vietnam mushroom market size is projected to exhibit a growth rate (CAGR) of 6.52% during 2024-2032.
More Info:- https://www.imarcgroup.com/vietnam-mushroom-market
1. Background
• To support Mud Logging services for BUIC project.
• Target new contract in place: Oct-1, 2023.
• Qualified Bidders: PT. Geolog Indonesia, PT. Geoprolog Intiwijaya (SLB), & PT. DHI Excellence Logging.
Scope of Work
• Drill Cuttings Collection and Description
• Gas Monitoring and Analysis
• Coring Operation Support
• General Geologic Services
• Drilling Services
• General Engineering Services
• Real Time Data Transmission
• Reporting
• Daily Reporting
• Daily Log Products
• Final Well Log Products
Background & Scope of Work
Mud Logging Schematic Diagram
2. Overview New Tender
Description Previous Similar Contract No. 4600012065 – Provision of Mud Logging
Urip Development – PT. Weatherford Indonesia
New Tender
Pricing Structure • Mobilization-Demobilization: USD/trip; consisted of:
• Mobilization Fee Rig 1
• Demobilization Fee Rig 1
• Mobilization Fee Rig 2
• Demobilization Fee Rig 2
Total Mobilization / Demobilization charges shall not be more than
5% from Estimated Total Contract Value
• Personnel Charges: USD/Day
• Equipment Rental Charges: USD/Day
• Data Media Products: USD/ea
• Consumables: USD/Well
• Contract Additional Services: USD/Day
• Additional Goods and Services: Lump Sum
• Mobilization-Demobilization
• Change the pricing structure to be Lump Sum
(Mobilization/Demobilization Fee, Moving between Well Pads/Location)
with consideration as below
• Nature of Works Mud Logging unit always attached to rig
activity
• Wells & Well Pads Location:
• 2012 42 Wells, using 2 Rigs
• 2022 7 Wells, using 1 Rig, 2 Wells at Well Pad B & 5
Wells at Well Pad C
Total Mobilization / Demobilization charges shall not be more than 5%
from Estimated Total Contract Value, with consideration as follow:
• 2022 Market survey In average lower than 5%
• 2012 Average Bid Price, below 5%
• Personnel Charges: USD/Day
• Equipment Rental Charges: USD/Day
• Add pricing terms that Non Operating Rate shall not exceed 50% of
Operating Rate, with consideration as follow:
• 2022 Market Survey The lowest, Non-Operating Rate is 50%
from Operating Rate. We try to push the Bidder to Quote with
the same calculation.
• 2012 Average Bid Price, Non-Operating Rate is 68.96% of
Operating Rate.
• Data Media Products: USD/ea
• Consumables: USD/Well
• Contract Additional Services: USD/Day
• Additional Goods and Service change to be Transportation Cost: Lump Sum
3. Owner Estimate & Market Condition
• Total Owner Estimate is USD 2,728,892.00 for 5 years.
• The owner estimate is taken from the average market survey price from 3
potential bidders, then reduced by 10%. In terms of Unit Rate, it has been
reduced by 15%.
• Based on comparison with BU 2012 Contract with PT. Weatherford
Indonesia, the OE is 41.26% higher in average.
• Based on information from Category Specialist, we shall anticipate around
45.28% price increase from 2012 up to 2028 for Mud Logging Services in
Indonesia.
• Based on information from Global Sourcing team, the price trend for Mud
Logging Services in Indonesia increase between 42.00% - 55.00%.
• Mob-Demob charges decrease due to number
of wells for BUIC (7 wells) is lower than number
of wells at 2012 (BU Development).
• Personnel charge is significantly higher due to
Bidder plan to offer Higher Spec for Sample
Catcher personnel. They plan to utilize Bachelor
Degree holder, meanwhile EMCL requirement is
Senior High School graduates. If exclude
Sample Catcher personnel, price increase is
90.40% which is still under the price movement
(140.22%) for wage of energy industry
personnel based on IHS Markit.
• Equipment Rental is the main component of
Mud Logging services cost, the price increase is
tally with the price increase forecast from CS &
Global Sourcing.
• Data Media Products & Contract Additional
Services decrease due to Bidder already have
business process improvement for those
services.
Equipment 39% (Main component)
Operational 25%
Personnel 12%
Overhead 12%
Industry Margin 12%
4. Pricing Table (1/2)
Mobilization & Demobilization shall apply for one (1) mobilization & demobilization event is defined as one
mobilization from Contractor’s site to EMCL’s premises, local mobilization (intra-wellpad or intra-field) and
demobilization back to Contractor’s site.
Mobilization & Demobilization charges will be one time lump sum charges. Total Mob/Demob charges will
not be more than 5% from the Total Estimated Contract Value.
Daily rate shall apply when Contractor’s personnel arrive at Company work location and cease when
Contractor’s personnel leave Company work location. Daily rate shall include cost of Background Check, MCU,
and A&D Test.
Unit Operating Rate – Total unit operating rate shall apply once the equipment is fully rigged up and
operations commence. Total unit operating rate shall cease when the equipment rig-down operations begin.
Unit Non-Operating Rate - Total unit non-operating rate shall apply once the equipment arrives at
Company's work location in Cepu, and is being rigged-up, rigged-down, or moved within the field from one
location to another. Total unit non-operating rate shall cease when the equipment is fully rigged up or fully
rigged down at the end of the project.
Zero Rate is applicable when equipment is determined by Company to be not available for use, non-
functioning, or non-useable. If equipment is not available, non-functioning, or non-useable for more than four
(4) hours per 24 hour period then the Zero Rate will apply for that calendar day.
Data Media Products – Five copies of Final Well Reports, log prints, digital data, CD and/or DVD are
considered to be inclusive of the unit operating rate. Additional copies of media products above 5 (five) shall
be charge per item.
5. Pricing Table (2/2)
Consumables – Consumables shall be charged on a lump sum per well basis
Daily rate charges for applicable equipment shall be paid at full day rate for any part of a 24-hour period
that the rates apply.
These additional services need to be separated, due to not always needed in every mud logging job.
• Item No. 1 & 7 Extra wellsite analysis from Geoscience team, to check oil show and advance
geochemistry composition. Plan to use for appraisal well.
• Item No. 2,3,&8 Will be called once the wells condition classified as “high complexity to read” well.
• Item No. 4,5,&6 Will be called once Contractor need to transmit the logging data as instructed by
EMCL.
Transportation Cost
1. Transportation cost shall be charged for additional transport while in Company representative request to
test / deliver / inspect the cutting/sample on Contractor’s workshop.
2. This should include cutting/sample transportation to client's office / storage / laboratory.
3. Charges for Transportation Cost shall be negotiated prior to performing the work with said goods or
services.
Provisional Sum to cover any additional services or goods which not listed in pricing table, including to call
items which listed in Additional Price Book.
Charge per actual cost, without handling fee.