We are pleased to offer customers a comprehensive Preventive Maintenance Program carried out by our
Service Engineers. Protect your investment and maximize your productivity by utilizing locally available
technicians to keep your machine in the best possible condition. The following items indicate the many key
points addressed at every preventive inspection:
PREVENTIVE MAINTENANCE PROGRAM
Mechanical System
Check machine level
Verify spindle sweep
Check gear shift operation*
Check spindle lube and air blast
Check spindle orientation alignment
Check shot pin operation*
Change gearbox oil
Inspect drive belt
Inspect and adjust tool changer system
Inspect spindle taper condition
Inspect way cover wipers
Check draw bar height
Inspect rigid tap encoder operation*
Check tool change operation
Clean/lubricate tool changer
Inspect counterbalance system Inspect
lines, hoses and cables
Check bib adjustment
Check backlash in X, Y, and Z Axis
Hydraulic/Way Lube System
Clean filters
Inspect lines and fittings
Check operation
Verify lube/pump operation
Change Oil (customer must provide)
Coolant System
Remove/check pump and motor
Air System
Clean filters
Check pressure/adjust regulator
Inspect system for leaks
Electrical System
Clean electrical cabinet
Check voltages
Inspect connections/terminals
Tighten all terminals
Inspect grounds
Check limit switches/safety locks
Clean brush dust*
Lathe Only
Verify turret/spindle alignment
Verify tailstock alignment
Optional Special Services:
Ball Bar Calibration – Tests circularity
and verifies the positioning accuracy.
Vibration Analyzer – Verifies machine
vibration against established criteria.* If applicable
Model Price
All Models.............................................$ 125.00/hour
Optional Services
** When done at same time as PM.
*** When done without PM.
Through the Spindle
Coolant Maintenance**...............................$ 395.00
Vertical Pallet Changer Maintenance**......$ 395.00
Recharge Counterbalance** ......................$ 100.00
Ball Bar Calibration (with PM**)..................$ 295.00
Vibration Analyzer Test**............................$ 295.00
Check backlash in X, Y and Z Axis**..........$ 100.00
Any additional service, repairs and parts for repairs must be scheduled and will be subject to our standard service rates.
Revised 04/14/15
Ball Bar Calibration (without PM***)...........$ 495.00
• The cost of this program is on a per visit basis (see the price list on front page).
• The cost does not include any additional parts, labor or shipping cost that may be incurred for actual repairs.
If any repairs are necessary the customer will be advised in advance for the issuance of a purchase order to
cover parts and labor. Standard travel will and per diem if applicable.
• PM’s are scheduled in advance by Machine Tools Texas, LLC.
• It is recommended that PM be performed every 1000 hours of run time.
• Customer to dispose of all fluids.
• All chips must be removed prior to service.
• All fixtures and tooling are to be removed by customer prior to service. If not removed, the items that can not
be completed will be noted and the service will be considered completed.
• The service performed does not guarantee the machine will not require service in the future. Warranty is
neither implied nor will it be upheld. There is no warranty against future machine failures.
Customer Acceptance:
Company Name: ____________________________________________________________________
Address: ____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
Customer contact for scheduling service: __________________________________
Machine Model: ________________
Machine Serial # ________________
PM frequency ________________ visits per year.
PM contract will be reissued for renewal on an annual basis. Payment terms – Net 30 days from order placement.
Total $____________
Purchase Order Number: _________________________________________________
_______________________________________ ____________
Authorized Signature Date
_________________________________________________
Machine Tools Texas, LLC Acceptance Date

More Related Content

What's hot

2016 Edwin L Collins Jr Job
2016 Edwin L Collins Jr Job2016 Edwin L Collins Jr Job
2016 Edwin L Collins Jr JobEdwin Collins Jr
 
Rhombus General Information 2009
Rhombus General Information 2009Rhombus General Information 2009
Rhombus General Information 2009mikehersh
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.EngJulian Kalac P.Eng
 
David Smart's current resume
David Smart's current resumeDavid Smart's current resume
David Smart's current resumeDavid Smart
 
Resume -Vinod Sharma 20.05.2016
Resume -Vinod Sharma 20.05.2016Resume -Vinod Sharma 20.05.2016
Resume -Vinod Sharma 20.05.2016vinod sharma
 
Customer Service Model
Customer Service ModelCustomer Service Model
Customer Service ModelAni Yusriana
 
Electric motors
Electric motorsElectric motors
Electric motorsTomAtwood
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filterFilter Expert Co.,Ltd.
 
Distribution and services
Distribution and servicesDistribution and services
Distribution and servicesunitecfurey
 
CBN Short Presentation
CBN Short PresentationCBN Short Presentation
CBN Short PresentationCBN2014
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
Rebekah Greene - Resume 2
Rebekah Greene - Resume 2Rebekah Greene - Resume 2
Rebekah Greene - Resume 2Rebekah Greene
 

What's hot (19)

2016 Edwin L Collins Jr Job
2016 Edwin L Collins Jr Job2016 Edwin L Collins Jr Job
2016 Edwin L Collins Jr Job
 
2016 Edwin L Collins Jr 2
2016 Edwin L Collins Jr 22016 Edwin L Collins Jr 2
2016 Edwin L Collins Jr 2
 
Rhombus General Information 2009
Rhombus General Information 2009Rhombus General Information 2009
Rhombus General Information 2009
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
David Smart's current resume
David Smart's current resumeDavid Smart's current resume
David Smart's current resume
 
Resume -Vinod Sharma 20.05.2016
Resume -Vinod Sharma 20.05.2016Resume -Vinod Sharma 20.05.2016
Resume -Vinod Sharma 20.05.2016
 
Customer Service Model
Customer Service ModelCustomer Service Model
Customer Service Model
 
smed
smedsmed
smed
 
Electric motors
Electric motorsElectric motors
Electric motors
 
Fleet management software,Fleet management System - Odoo
Fleet management software,Fleet management System - Odoo Fleet management software,Fleet management System - Odoo
Fleet management software,Fleet management System - Odoo
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
Distribution and services
Distribution and servicesDistribution and services
Distribution and services
 
Raysume 2
Raysume 2Raysume 2
Raysume 2
 
Deepak- Resume
Deepak- ResumeDeepak- Resume
Deepak- Resume
 
CBN Short Presentation
CBN Short PresentationCBN Short Presentation
CBN Short Presentation
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Rebekah Greene - Resume 2
Rebekah Greene - Resume 2Rebekah Greene - Resume 2
Rebekah Greene - Resume 2
 
UpdateZACKAWTRESUME
UpdateZACKAWTRESUMEUpdateZACKAWTRESUME
UpdateZACKAWTRESUME
 

Viewers also liked

Maintenance Program
Maintenance ProgramMaintenance Program
Maintenance ProgramRobert Denk
 
Simple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance ProgramSimple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance ProgramTranscat
 
How To Build Preventive Maintenance Program
How To Build Preventive Maintenance ProgramHow To Build Preventive Maintenance Program
How To Build Preventive Maintenance ProgramIsmail Yusof
 
Preventive Maintenance Program – TabWare
Preventive Maintenance Program – TabWarePreventive Maintenance Program – TabWare
Preventive Maintenance Program – TabWareAsanHerio
 
ICPDAS - Machine current monitoring and preventive maintenance
ICPDAS - Machine current monitoring and preventive maintenanceICPDAS - Machine current monitoring and preventive maintenance
ICPDAS - Machine current monitoring and preventive maintenanceICPDAS
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenancePramod A
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentationimhoffm
 
Preventive maintenance final
Preventive maintenance finalPreventive maintenance final
Preventive maintenance finalgarfield Tulloch
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 

Viewers also liked (13)

Maintenance Program
Maintenance ProgramMaintenance Program
Maintenance Program
 
Simple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance ProgramSimple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance Program
 
How To Build Preventive Maintenance Program
How To Build Preventive Maintenance ProgramHow To Build Preventive Maintenance Program
How To Build Preventive Maintenance Program
 
PM PRESENTATION
PM PRESENTATIONPM PRESENTATION
PM PRESENTATION
 
Preventive Maintenance Program – TabWare
Preventive Maintenance Program – TabWarePreventive Maintenance Program – TabWare
Preventive Maintenance Program – TabWare
 
Design principles final
Design principles finalDesign principles final
Design principles final
 
ICPDAS - Machine current monitoring and preventive maintenance
ICPDAS - Machine current monitoring and preventive maintenanceICPDAS - Machine current monitoring and preventive maintenance
ICPDAS - Machine current monitoring and preventive maintenance
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentation
 
Preventive maintenance final
Preventive maintenance finalPreventive maintenance final
Preventive maintenance final
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 

Similar to MTT Preventive Maintenance Program

Fleet Control Secrets to Success
Fleet Control Secrets to SuccessFleet Control Secrets to Success
Fleet Control Secrets to SuccessJosh Turley
 
drive train maintenance management
drive train maintenance managementdrive train maintenance management
drive train maintenance managementMarcial Jr Militante
 
HH Technical Services, LLC
HH Technical Services, LLCHH Technical Services, LLC
HH Technical Services, LLCJerry York
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATIONUttam Misra
 
Servo Motors Adjust
Servo Motors Adjust Servo Motors Adjust
Servo Motors Adjust Marc Vendrell
 
Servo Motors Adjust-English
Servo Motors Adjust-EnglishServo Motors Adjust-English
Servo Motors Adjust-EnglishMarc Vendrell
 
BSI Fleet Services
BSI Fleet ServicesBSI Fleet Services
BSI Fleet ServicesGerry Locke
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Techniciansubbu manian
 
Maintenance Department of Hotels
Maintenance Department of HotelsMaintenance Department of Hotels
Maintenance Department of HotelsNishisarin
 
Final Presentation-2-23-12
Final Presentation-2-23-12Final Presentation-2-23-12
Final Presentation-2-23-12Keith Johnson
 
Assessment Criteria - Menegatti
Assessment Criteria - MenegattiAssessment Criteria - Menegatti
Assessment Criteria - MenegattiRobert Tilley
 
Motor Selection for Gearbox.pptx
Motor Selection for Gearbox.pptxMotor Selection for Gearbox.pptx
Motor Selection for Gearbox.pptxJeromeValeska5
 
2008 kawasaki kvf750 e8f service repair manual
2008 kawasaki kvf750 e8f service repair manual2008 kawasaki kvf750 e8f service repair manual
2008 kawasaki kvf750 e8f service repair manualfujsefkskemm
 
2008 kawasaki kvf750 f8f service repair manual
2008 kawasaki kvf750 f8f service repair manual2008 kawasaki kvf750 f8f service repair manual
2008 kawasaki kvf750 f8f service repair manualfujsekfkksemm
 
2008 kawasaki kvf750 e8fa service repair manual
2008 kawasaki kvf750 e8fa service repair manual2008 kawasaki kvf750 e8fa service repair manual
2008 kawasaki kvf750 e8fa service repair manualfhsjejfksemm
 
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdfBOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdfrdb770058
 
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdfBOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdffujskmdidjd3e
 

Similar to MTT Preventive Maintenance Program (20)

Fleet Control Secrets to Success
Fleet Control Secrets to SuccessFleet Control Secrets to Success
Fleet Control Secrets to Success
 
New E-Profile.pptx
New E-Profile.pptxNew E-Profile.pptx
New E-Profile.pptx
 
drive train maintenance management
drive train maintenance managementdrive train maintenance management
drive train maintenance management
 
HH Technical Services, LLC
HH Technical Services, LLCHH Technical Services, LLC
HH Technical Services, LLC
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATION
 
Servo Motors Adjust
Servo Motors Adjust Servo Motors Adjust
Servo Motors Adjust
 
Servo Motors Adjust-English
Servo Motors Adjust-EnglishServo Motors Adjust-English
Servo Motors Adjust-English
 
2013_motor_catalog
2013_motor_catalog2013_motor_catalog
2013_motor_catalog
 
BSI Fleet Services
BSI Fleet ServicesBSI Fleet Services
BSI Fleet Services
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
Maintenance Department of Hotels
Maintenance Department of HotelsMaintenance Department of Hotels
Maintenance Department of Hotels
 
Final Presentation-2-23-12
Final Presentation-2-23-12Final Presentation-2-23-12
Final Presentation-2-23-12
 
Assessment Criteria - Menegatti
Assessment Criteria - MenegattiAssessment Criteria - Menegatti
Assessment Criteria - Menegatti
 
Motor Selection for Gearbox.pptx
Motor Selection for Gearbox.pptxMotor Selection for Gearbox.pptx
Motor Selection for Gearbox.pptx
 
LECTURE 01.pptx
LECTURE 01.pptxLECTURE 01.pptx
LECTURE 01.pptx
 
2008 kawasaki kvf750 e8f service repair manual
2008 kawasaki kvf750 e8f service repair manual2008 kawasaki kvf750 e8f service repair manual
2008 kawasaki kvf750 e8f service repair manual
 
2008 kawasaki kvf750 f8f service repair manual
2008 kawasaki kvf750 f8f service repair manual2008 kawasaki kvf750 f8f service repair manual
2008 kawasaki kvf750 f8f service repair manual
 
2008 kawasaki kvf750 e8fa service repair manual
2008 kawasaki kvf750 e8fa service repair manual2008 kawasaki kvf750 e8fa service repair manual
2008 kawasaki kvf750 e8fa service repair manual
 
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdfBOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:517811001 & Above.pdf
 
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdfBOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdf
BOBCAT 320 322 COMPACT EXCAVATOR Service Repair Manual SN:562313001 & Above.pdf
 

MTT Preventive Maintenance Program

  • 1. • P.O. Box 92861, Lafayette, LA 70509• (337) 704-2884 • (855) 784-2884 • Fax: (337) 234-1245 • E-MAIL sales@machinetoolscnc.com • •www.machinetoolstexas.com• We are pleased to offer customers a comprehensive Preventive Maintenance Program carried out by our Service Engineers. Protect your investment and maximize your productivity by utilizing locally available technicians to keep your machine in the best possible condition. The following items indicate the many key points addressed at every preventive inspection: PREVENTIVE MAINTENANCE PROGRAM Mechanical System Check machine level Verify spindle sweep Check gear shift operation* Check spindle lube and air blast Check spindle orientation alignment Check shot pin operation* Change gearbox oil Inspect drive belt Inspect and adjust tool changer system Inspect spindle taper condition Inspect way cover wipers Check draw bar height Inspect rigid tap encoder operation* Check tool change operation Clean/lubricate tool changer Inspect counterbalance system Inspect lines, hoses and cables Check bib adjustment Check backlash in X, Y, and Z Axis Hydraulic/Way Lube System Clean filters Inspect lines and fittings Check operation Verify lube/pump operation Change Oil (customer must provide) Coolant System Remove/check pump and motor Air System Clean filters Check pressure/adjust regulator Inspect system for leaks Electrical System Clean electrical cabinet Check voltages Inspect connections/terminals Tighten all terminals Inspect grounds Check limit switches/safety locks Clean brush dust* Lathe Only Verify turret/spindle alignment Verify tailstock alignment Optional Special Services: Ball Bar Calibration – Tests circularity and verifies the positioning accuracy. Vibration Analyzer – Verifies machine vibration against established criteria.* If applicable Model Price All Models.............................................$ 125.00/hour Optional Services ** When done at same time as PM. *** When done without PM. Through the Spindle Coolant Maintenance**...............................$ 395.00 Vertical Pallet Changer Maintenance**......$ 395.00 Recharge Counterbalance** ......................$ 100.00 Ball Bar Calibration (with PM**)..................$ 295.00 Vibration Analyzer Test**............................$ 295.00 Check backlash in X, Y and Z Axis**..........$ 100.00 Any additional service, repairs and parts for repairs must be scheduled and will be subject to our standard service rates. Revised 04/14/15 Ball Bar Calibration (without PM***)...........$ 495.00
  • 2. • The cost of this program is on a per visit basis (see the price list on front page). • The cost does not include any additional parts, labor or shipping cost that may be incurred for actual repairs. If any repairs are necessary the customer will be advised in advance for the issuance of a purchase order to cover parts and labor. Standard travel will and per diem if applicable. • PM’s are scheduled in advance by Machine Tools Texas, LLC. • It is recommended that PM be performed every 1000 hours of run time. • Customer to dispose of all fluids. • All chips must be removed prior to service. • All fixtures and tooling are to be removed by customer prior to service. If not removed, the items that can not be completed will be noted and the service will be considered completed. • The service performed does not guarantee the machine will not require service in the future. Warranty is neither implied nor will it be upheld. There is no warranty against future machine failures. Customer Acceptance: Company Name: ____________________________________________________________________ Address: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Customer contact for scheduling service: __________________________________ Machine Model: ________________ Machine Serial # ________________ PM frequency ________________ visits per year. PM contract will be reissued for renewal on an annual basis. Payment terms – Net 30 days from order placement. Total $____________ Purchase Order Number: _________________________________________________ _______________________________________ ____________ Authorized Signature Date _________________________________________________ Machine Tools Texas, LLC Acceptance Date