Introduction
Under ISO55000, a company must demonstrate that it is managing its assets from the project phase to
end of life.
For the assets, e.g. spare parts, a company must:
• Demonstrate that it is managing its data (cataloguing, issue, returns, receipts, etc)
• Have procedures in place (cataloguing, initial spares purchasing, inventory man)
• Demonstrate risk-based decisions
• Demonstrate continuous improvement
In our experience the creation of MRO Spare Parts Master Data is typically done very badly at the
project phase and continues into the asset ownership phase. See attached flyer, listing several case
studies.
Poor cataloguing leads to duplicate stock, loss of time trying to find spare parts, emergency purchases,
excess stocking and hence excess costs.
Depending how bad you currently are, there is a potential for significant savings.
RAMsoft have been conducting workshops to help companies optimise and reduce their inventory for
several years.
RAMsoft have developed several tools to support reductions in inventory.
• MRO-Strip, a tool to identify duplicate line items, most companies have between 10-15%
duplicates
• MRO-OPT, a tool to optimise stock levels and to show % cost savings
• MRO-BOM, a tool to support BOM building
• MRO-Auditor, for conducting MRO Spare Parts Master Data Audits very effectively
• MRO-CleanIT, to cleanse the spare part master data with standardised part descriptions and part
numbers
RAMsoft have also developed an inventory reduction process based on the following 6 phases:
Audit
Define Process & Guides
Cleanse
Rationalise
Optimise
Measure Effectiveness
Is Your MRO Spare Parts Improvement
Programme ISO55000 Compliant?
Maintenance, Reliability & MRO Spare Parts Specialists
Phase 1 Auditing
The first step for any inventory improvement programme is an understanding of the company’s issues.
The scope of an inventory management audit can cover the following areas:
• MRO Best Practices (a structured questionnaire is used to evaluate best practices in managing
spare parts effectively)
• MRO Written Procedures and Guides (the documents required for each phase of an item’s life)
• Master Data Review (short description formats, nouns and modifiers, Mfg. & Vendor P/Ns,
Vendor and Mfg. names, review of duplicates)
• Inventory replenishment control parameters (an evaluation of current ROP, OQ, Min-Max, etc)
In this document, we will mainly discuss activities related to spare parts master data.
A company’s downloaded inventory data is mapped and imported to our MRO-Auditor tool. MRO-
Auditor contains over 200 saved filters and queries to facilitate the master data review by noun, etc.
A report is issued detailing the findings good and bad - remember poor cataloguing represents potential
savings.
Typical findings from our audits are:
• Short descriptions have inconsistent formatting
• Qualifiers or Modifiers are not identified
• Vendors’ names included in the short description
• Lack of attribute data in the short description, and inconsistent sequencing
• MPNs have inconsistent formatting
• MPNs fields are a mix of Vendors and MPNs
• 10-15% duplicate line items
• Inconsistent abbreviations used
• Abbreviations are not used when they should be
• Multiple suppliers for the similar material
Comments on poor cataloguing will be supported by screen shots from the MRO-Auditor tool, a typical
example is:
The above is an example of the poor cleansing delivered by a consultant.
RAMsoft do not guarantee to find all types of inconsistencies, but the most common. Only during
master data cleansing will all issues be identified.
Phase 2 Procedures and Guides
ISO55000 states that a high level strategic plan (known as a SAMP) needs to be developed. The structure
of the SAMP varies between consultants and the various maintenance associations, this is because the
ISO55000 is not prescriptive.
The SAMP developed by Ramsoft, includes two elements relative to MRO Spare Parts:
• Initial MRO Spare Parts Planning (Project phase)
• MRO Spare Parts Management (Ownership phase)
The main reason for poor cataloguing, is that the cataloguing process is not documented in the project
phase, which includes CMMS population.
Even when a so called consultant has carried out the cataloguing or the cleansing the final quality is
poor. Unless you document all the rules and build criteria the cataloguing will not achieve a high quality.
Remember under ISO55000 you must demonstrate the management of data and that means how the
data is populated in the CMMS consistently
During the data cleansing phase, RAMsoft can prepare documentation that supports consistent
cataloguing in the future.
Documentation can include:
• Guides and rules used during the cleansing
• A list of all abbreviations
• Type guides to cover the type of spares stocked and the naming convention
The screen shot below, shows a typical Type Guide for Shaft Bushes.
Phase 3 Cleansing Master Data
The scope of cleansing will vary from company to company and will be CMMS dependant. For example,
Maximo users typically describe their spare parts using up to 75 characters, while SAP users are limited
to 40 characters. This means a SAP user must use many more abbreviations to describe a spare part.
RAMsoft using their MRO-CleanIT tool can clean up your master data. Using standardised descriptions,
a) located in a look up table when matched to a MPN and b) a table containing template descriptions,
when that MPN is not an exact match.
One of the reasons for duplicate stock is manufacturers & vendors use different naming conventions,
e.g. see for stainless steel A2, 304, SS, they could be all the same but used in MPN then you would not
be able to identify these. Therefore Phase 2 is essential, you must clearly identify your naming
conventions.
Benefits of cleansed master data are the identification of potential duplicates, ease of finding spares,
identification of standardisation and rationalisation opportunities and hence inventory reduction.
The following example shows the current part description and the cleansed description.
Phase 4 Rationalisation
Rationalisation is about reviewing your material and seeking inventory or cost reduction opportunities
Companies who have proceeded to the cleansing and rationalisation phases have achieved up to 60-70
% reduction in line items (for some material) by:
• Standardising part descriptions and MPNs
• Removing duplicates
• Standardising on the material specification
• Reducing the number of manufacturers
• Removing stock that is not fit for purpose (wrong specification)
The screen shot below shows that this company stocked 23 different manufacturers of bearings.
Rationalisation covers many of the 30 tactics, we cover in our 3 day workshop, including:
• Classifying the criticality of each spare
• Assigning classifications for ABC, HML, XYZ and demand classes
• Identifying OPMs and APMs
• Reducing stocking locations
• Conducting RCA for A items
• Conducting Spend Analysis
• Challenge stocking of slow movers
• Etc.
Further cost savings may be possible by proceeding to Phase 5 MRO Optimisation
Phase 5 Optimisation
Optimisation supports ISO55000 by making decisions based on risk, we set a Stock-out risk for each
spare part based on the item’s criticality. Opportunities for reducing inventory are identified by
determining the optimum ROP and OQ and then the most appropriate replenishment strategy.
Optimum ROPs are determined by:
• Assigning a service level to each spare part based on its criticality
• Identifying the true lead time (company plus supplier)
• Determining the average demand rate
RAMsoft propose three main replenishment strategies:
• ROP a fixed ROP and OQ
• Min-Max, a variable OQ to bring the stock level to a maximum
• Constant Vendor Delivery, based on JIT concepts
Costs savings are identified by looking for potential cost savings. Prioritisation is based on differential
financial value between the current average stock level and optimum average stock level.
The case study below is an example, where the optimum values are not appropriate, the options are
then to a) increase one or more control parameters, so that they are not the optimum values or b) move
to a different replenishment strategy. In this example a) was the best option.
The Author
David Thompson holds a B.Sc. (Hons) in Mechanical Engineering and has spent his entire career over 50
years in maintenance, reliability and spare parts management.
David has been a certified trainer in both Reliability and RCA for leading USA companies.
David has worked in many industries Steel, Mining, Utilities, General Manufacturing, Food & Beverage,
and Oil & Gas and worked in over 36 countries
David has conducted over 40 workshops on MRO Optimisation and Inventory Reduction including
CMMS data builds. He has conducted numerous audits of MRO Master Data and conducted optimum
inventory parameter evaluations.
David has developed procedures and guides to support effective CMMS inventory build and
management.
Workshops offered
• MRO Spare Parts Optimisation and Inventory Reduction
• MRO Spare Parts Master Data Auditing & Cleansing
Contact details:
David Thompson
MRO Spares Parts Consultant/Trainer
Ramsoft (UK)
Summerseat, Bury, BL0 5QW, Manchester.
dave@ramsoftuk.com
www.ramsoftuk.com
http://uk.linkedin.com/in/davidthompsonreliability
Ramsoft (UK). 23 Waterside Road, Summerseat. Bury, Lancs, UK. BL9 5QW

More Related Content

Similar to MRO Spare Parts Improvement Programme Conforms to ISO55000

Smu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentsSmu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignments
solved_assignments
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
naveen kumar
 
3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)
David Thompson
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain Council
Sergio Grisa
 
Elcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMElcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAM
Sergio Grisa
 
MRO spare part case studies master data
MRO spare part case studies   master dataMRO spare part case studies   master data
MRO spare part case studies master data
David Thompson
 
C3 3 day spares optimisation rationalisation 2017 01
C3 3 day spares optimisation  rationalisation 2017 01C3 3 day spares optimisation  rationalisation 2017 01
C3 3 day spares optimisation rationalisation 2017 01
David Thompson
 
CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1Vincent Edwards
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
Leslie Schulte
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
smumbahelp
 
Lubrication Maturity Matrix
Lubrication Maturity MatrixLubrication Maturity Matrix
Lubrication Maturity Matrix
Ricky Smith CMRP, CMRT
 
Om 4 th
Om 4 thOm 4 th
Om 4 th
smumbahelp
 
SIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationSIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentation
cheldulceconstan28
 
Smu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignmentsSmu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignments
solved_assignments
 
Smu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignmentsSmu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignments
solved_assignments
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
Prashant Rasekar
 
PDM System for Automobile Assembly
PDM System for Automobile AssemblyPDM System for Automobile Assembly
PDM System for Automobile Assembly
IRJET Journal
 
Smu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignmentsSmu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignments
solved_assignments
 
A Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning PrototypingA Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning Prototyping
GH_Wijnants
 
07 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv207 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv2CAELUM-CMMI
 

Similar to MRO Spare Parts Improvement Programme Conforms to ISO55000 (20)

Smu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentsSmu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignments
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
 
3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain Council
 
Elcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMElcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAM
 
MRO spare part case studies master data
MRO spare part case studies   master dataMRO spare part case studies   master data
MRO spare part case studies master data
 
C3 3 day spares optimisation rationalisation 2017 01
C3 3 day spares optimisation  rationalisation 2017 01C3 3 day spares optimisation  rationalisation 2017 01
C3 3 day spares optimisation rationalisation 2017 01
 
CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
Lubrication Maturity Matrix
Lubrication Maturity MatrixLubrication Maturity Matrix
Lubrication Maturity Matrix
 
Om 4 th
Om 4 thOm 4 th
Om 4 th
 
SIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationSIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentation
 
Smu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignmentsSmu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignments
 
Smu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignmentsSmu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignments
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
PDM System for Automobile Assembly
PDM System for Automobile AssemblyPDM System for Automobile Assembly
PDM System for Automobile Assembly
 
Smu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignmentsSmu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignments
 
A Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning PrototypingA Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning Prototyping
 
07 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv207 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv2
 

More from David Thompson

Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
David Thompson
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
David Thompson
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
David Thompson
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
David Thompson
 
Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09
David Thompson
 
Sap mrp hb ex 2017 09 rev 4
Sap mrp hb ex 2017 09  rev 4Sap mrp hb ex 2017 09  rev 4
Sap mrp hb ex 2017 09 rev 4
David Thompson
 
All books
All booksAll books
All books
David Thompson
 
Reliability books
Reliability booksReliability books
Reliability books
David Thompson
 
Other books
Other booksOther books
Other books
David Thompson
 
Am books
Am booksAm books
Am books
David Thompson
 
Equip mgmt books
Equip mgmt booksEquip mgmt books
Equip mgmt books
David Thompson
 
Ramsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound GasketsRamsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound Gaskets
David Thompson
 
Reducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory LevelsReducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory Levels
David Thompson
 

More from David Thompson (13)

Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09
 
Sap mrp hb ex 2017 09 rev 4
Sap mrp hb ex 2017 09  rev 4Sap mrp hb ex 2017 09  rev 4
Sap mrp hb ex 2017 09 rev 4
 
All books
All booksAll books
All books
 
Reliability books
Reliability booksReliability books
Reliability books
 
Other books
Other booksOther books
Other books
 
Am books
Am booksAm books
Am books
 
Equip mgmt books
Equip mgmt booksEquip mgmt books
Equip mgmt books
 
Ramsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound GasketsRamsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound Gaskets
 
Reducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory LevelsReducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory Levels
 

Recently uploaded

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 

Recently uploaded (20)

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 

MRO Spare Parts Improvement Programme Conforms to ISO55000

  • 1. Introduction Under ISO55000, a company must demonstrate that it is managing its assets from the project phase to end of life. For the assets, e.g. spare parts, a company must: • Demonstrate that it is managing its data (cataloguing, issue, returns, receipts, etc) • Have procedures in place (cataloguing, initial spares purchasing, inventory man) • Demonstrate risk-based decisions • Demonstrate continuous improvement In our experience the creation of MRO Spare Parts Master Data is typically done very badly at the project phase and continues into the asset ownership phase. See attached flyer, listing several case studies. Poor cataloguing leads to duplicate stock, loss of time trying to find spare parts, emergency purchases, excess stocking and hence excess costs. Depending how bad you currently are, there is a potential for significant savings. RAMsoft have been conducting workshops to help companies optimise and reduce their inventory for several years. RAMsoft have developed several tools to support reductions in inventory. • MRO-Strip, a tool to identify duplicate line items, most companies have between 10-15% duplicates • MRO-OPT, a tool to optimise stock levels and to show % cost savings • MRO-BOM, a tool to support BOM building • MRO-Auditor, for conducting MRO Spare Parts Master Data Audits very effectively • MRO-CleanIT, to cleanse the spare part master data with standardised part descriptions and part numbers RAMsoft have also developed an inventory reduction process based on the following 6 phases: Audit Define Process & Guides Cleanse Rationalise Optimise Measure Effectiveness Is Your MRO Spare Parts Improvement Programme ISO55000 Compliant? Maintenance, Reliability & MRO Spare Parts Specialists
  • 2. Phase 1 Auditing The first step for any inventory improvement programme is an understanding of the company’s issues. The scope of an inventory management audit can cover the following areas: • MRO Best Practices (a structured questionnaire is used to evaluate best practices in managing spare parts effectively) • MRO Written Procedures and Guides (the documents required for each phase of an item’s life) • Master Data Review (short description formats, nouns and modifiers, Mfg. & Vendor P/Ns, Vendor and Mfg. names, review of duplicates) • Inventory replenishment control parameters (an evaluation of current ROP, OQ, Min-Max, etc) In this document, we will mainly discuss activities related to spare parts master data. A company’s downloaded inventory data is mapped and imported to our MRO-Auditor tool. MRO- Auditor contains over 200 saved filters and queries to facilitate the master data review by noun, etc. A report is issued detailing the findings good and bad - remember poor cataloguing represents potential savings. Typical findings from our audits are: • Short descriptions have inconsistent formatting • Qualifiers or Modifiers are not identified • Vendors’ names included in the short description • Lack of attribute data in the short description, and inconsistent sequencing • MPNs have inconsistent formatting • MPNs fields are a mix of Vendors and MPNs • 10-15% duplicate line items • Inconsistent abbreviations used • Abbreviations are not used when they should be • Multiple suppliers for the similar material Comments on poor cataloguing will be supported by screen shots from the MRO-Auditor tool, a typical example is: The above is an example of the poor cleansing delivered by a consultant. RAMsoft do not guarantee to find all types of inconsistencies, but the most common. Only during master data cleansing will all issues be identified. Phase 2 Procedures and Guides ISO55000 states that a high level strategic plan (known as a SAMP) needs to be developed. The structure of the SAMP varies between consultants and the various maintenance associations, this is because the ISO55000 is not prescriptive. The SAMP developed by Ramsoft, includes two elements relative to MRO Spare Parts: • Initial MRO Spare Parts Planning (Project phase) • MRO Spare Parts Management (Ownership phase)
  • 3. The main reason for poor cataloguing, is that the cataloguing process is not documented in the project phase, which includes CMMS population. Even when a so called consultant has carried out the cataloguing or the cleansing the final quality is poor. Unless you document all the rules and build criteria the cataloguing will not achieve a high quality. Remember under ISO55000 you must demonstrate the management of data and that means how the data is populated in the CMMS consistently During the data cleansing phase, RAMsoft can prepare documentation that supports consistent cataloguing in the future. Documentation can include: • Guides and rules used during the cleansing • A list of all abbreviations • Type guides to cover the type of spares stocked and the naming convention The screen shot below, shows a typical Type Guide for Shaft Bushes. Phase 3 Cleansing Master Data The scope of cleansing will vary from company to company and will be CMMS dependant. For example, Maximo users typically describe their spare parts using up to 75 characters, while SAP users are limited to 40 characters. This means a SAP user must use many more abbreviations to describe a spare part. RAMsoft using their MRO-CleanIT tool can clean up your master data. Using standardised descriptions, a) located in a look up table when matched to a MPN and b) a table containing template descriptions, when that MPN is not an exact match. One of the reasons for duplicate stock is manufacturers & vendors use different naming conventions, e.g. see for stainless steel A2, 304, SS, they could be all the same but used in MPN then you would not be able to identify these. Therefore Phase 2 is essential, you must clearly identify your naming conventions. Benefits of cleansed master data are the identification of potential duplicates, ease of finding spares, identification of standardisation and rationalisation opportunities and hence inventory reduction. The following example shows the current part description and the cleansed description.
  • 4. Phase 4 Rationalisation Rationalisation is about reviewing your material and seeking inventory or cost reduction opportunities Companies who have proceeded to the cleansing and rationalisation phases have achieved up to 60-70 % reduction in line items (for some material) by: • Standardising part descriptions and MPNs • Removing duplicates • Standardising on the material specification • Reducing the number of manufacturers • Removing stock that is not fit for purpose (wrong specification) The screen shot below shows that this company stocked 23 different manufacturers of bearings. Rationalisation covers many of the 30 tactics, we cover in our 3 day workshop, including: • Classifying the criticality of each spare • Assigning classifications for ABC, HML, XYZ and demand classes • Identifying OPMs and APMs • Reducing stocking locations • Conducting RCA for A items • Conducting Spend Analysis • Challenge stocking of slow movers • Etc. Further cost savings may be possible by proceeding to Phase 5 MRO Optimisation Phase 5 Optimisation Optimisation supports ISO55000 by making decisions based on risk, we set a Stock-out risk for each spare part based on the item’s criticality. Opportunities for reducing inventory are identified by determining the optimum ROP and OQ and then the most appropriate replenishment strategy. Optimum ROPs are determined by: • Assigning a service level to each spare part based on its criticality • Identifying the true lead time (company plus supplier)
  • 5. • Determining the average demand rate RAMsoft propose three main replenishment strategies: • ROP a fixed ROP and OQ • Min-Max, a variable OQ to bring the stock level to a maximum • Constant Vendor Delivery, based on JIT concepts Costs savings are identified by looking for potential cost savings. Prioritisation is based on differential financial value between the current average stock level and optimum average stock level. The case study below is an example, where the optimum values are not appropriate, the options are then to a) increase one or more control parameters, so that they are not the optimum values or b) move to a different replenishment strategy. In this example a) was the best option. The Author David Thompson holds a B.Sc. (Hons) in Mechanical Engineering and has spent his entire career over 50 years in maintenance, reliability and spare parts management. David has been a certified trainer in both Reliability and RCA for leading USA companies. David has worked in many industries Steel, Mining, Utilities, General Manufacturing, Food & Beverage, and Oil & Gas and worked in over 36 countries David has conducted over 40 workshops on MRO Optimisation and Inventory Reduction including CMMS data builds. He has conducted numerous audits of MRO Master Data and conducted optimum inventory parameter evaluations. David has developed procedures and guides to support effective CMMS inventory build and management. Workshops offered • MRO Spare Parts Optimisation and Inventory Reduction • MRO Spare Parts Master Data Auditing & Cleansing Contact details: David Thompson MRO Spares Parts Consultant/Trainer Ramsoft (UK) Summerseat, Bury, BL0 5QW, Manchester. dave@ramsoftuk.com www.ramsoftuk.com http://uk.linkedin.com/in/davidthompsonreliability Ramsoft (UK). 23 Waterside Road, Summerseat. Bury, Lancs, UK. BL9 5QW