SlideShare a Scribd company logo
Levels of Detail for Traffic Signal Modelling Jonathan Slason (Beca)  Presented: SNUG 16 November 2010. Wellington, NZ The views expressed are those of the author and do not necessarily reflect those of Beca or any other organisation or agency.  Further detail behind the issues raised is available by contacting jonathan.slason@beca.com
Traffic Modelling Concept Regional travel demands (public and private) for network/project planning; Travel costs for economic evaluation; and Transport demands and effects of specific infrastructure; Traffic flows for design of infrastructure; Transport demands and effects of specific land use development. Operations and Optimisation Accuracy Detail
Guidance on Techniques for Modellers
Relative Benefits   Microsimulation- Stochastic Micro - Deterministic Deterministic- Isolated
Source of our Data Regional Models ,[object Object]
Most project evaluations require shorter-term forecasts, typically 5-25 years.  For example, assessment of environment effects on major infrastructure (such as noise and emissions), require travel forecasts for opening and 10-years post-opening. Analysis Flows Development of design flows from model forecasts is a distinct process that should be recognised in the study process.  That process should consider other data (such as counts), additional model output (such as validation data and path analysis) in determining appropriate design flows from model forecasts.   Wherever possible, intersection design should be based on surveyed flows, modified based on the change predicted by the models, rather than based directly on raw model forecasts (i.e. Pivoting)
PM Peak Data – Kopu SH25a TelemetryAnnual (Seasonal) Variation
Seasonal Variation – month average
15min variation in flowsInter and Intra Hour Variation AM & PM Peak Hour Factor = 0.88
Traffic Engineer Role The development of design flows for the operational assessment and design of roading facilities should be recognised as a distinct task from travel forecasting.  That is, there is a distinct and crucial process involved in taking data from various sources (such as model forecasts and count data), and creating a set of flows suitable for the design process. It should be the responsibility of the person doing the operational assessment and/or design to prepare those design flows, rather than simply adopting outputs from traffic models without consideration of the model type, detail, age and level of local validation.
Traffic Engineer: Flow analysis tasks While design flows for new facilities will generally require input from models, available survey data and data from similar locations should also be considered. In using traffic model outputs to create  design flows the following should be considered: The level of network detail in the model.  Specifically, if the zone and network detail is low, than forecast turning movements may not be accurate, even if link flows are considered appropriate.  Judgements should be made about the precision of turning flows, especially where the modelled flows appear unrealistically low; The age and level of local validation.  Additional data or information form the model should be obtained to estimate the likely impact of any material validation discrepancies; The choice of design horizon and design-hour, and how these relate to the modelled years and periods; The time periods being represented, and what peaking factors should be applied to the forecast flows; What upstream/downstream constraints may influence the forecast flows; What level of delay is predicted at the facility being designed, and hence if predicted flows are likely to be influenced by those modelled delays. For example, if the model has high delays at the facility of interest, then the predicted flows could be lower than is likely to occur if the final design has reduced those delays; The sensibility of the flows, when considering existing travel patterns.  Various outputs from the models can be requested to gauge the sensibility of the forecasts, including select-link analysis, flow difference plots, delay and/or Volume/Capacity ratio plots etc. As a general rule, survey data should be used wherever practical to validate the forecast flows.  Wherever appropriate, local survey data should be used directly, with design flows created by pivoting off those flows using the predicted change in behaviour forecast by the model (i.e. the models are used to predict the change in flows, rather than the absolute design flows).
When to use what Model: Planning Purpose & Need: Enable project designations to be established. Create long-term project price estimates, scale of work, etc..  ,[object Object]
Can assume certain sub-groups are operating (tidal flows?)Input: Planning flows into the future (10+ years). Can assume similar seasonal peaking as today. Use PHF of 1.0.  Analysis: ,[object Object]
Variation or lack of small confidence intervals in inputs suggest little real value in other stochastic or micro models,[object Object]

More Related Content

Similar to Modelling For Signals

Traffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & ProceduresTraffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & Procedures
gscplanning
 
Classification Approach for Big Data Driven Traffic Flow Prediction using Ap...
Classification Approach for Big Data Driven Traffic  Flow Prediction using Ap...Classification Approach for Big Data Driven Traffic  Flow Prediction using Ap...
Classification Approach for Big Data Driven Traffic Flow Prediction using Ap...
IRJET Journal
 
IRJET- Management of Traffic at Road Intersection using Software Modelling
IRJET- Management of Traffic at Road Intersection using Software ModellingIRJET- Management of Traffic at Road Intersection using Software Modelling
IRJET- Management of Traffic at Road Intersection using Software Modelling
IRJET Journal
 
Shahzad Sikandaruk
Shahzad SikandarukShahzad Sikandaruk
Shahzad Sikandaruk
Shahzad Sikandar
 
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET Journal
 
Migration Decoded
Migration DecodedMigration Decoded
Migration Decoded
Cognizant
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
IRJET Journal
 
Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways
Texas A&M Transportation Institute
 
CBI Paper for ISEHP 2016
CBI Paper for ISEHP 2016CBI Paper for ISEHP 2016
CBI Paper for ISEHP 2016
David K. Hale, Ph.D.
 
Planning for operations 3-31-2011
Planning for operations 3-31-2011Planning for operations 3-31-2011
Planning for operations 3-31-2011
Kittelson Slides
 
Tilos for linear project
Tilos for linear projectTilos for linear project
Tilos for linear project
Thanh Hoang Lam
 
Project template for projects looks like this
Project template for projects looks like thisProject template for projects looks like this
Project template for projects looks like this
kaniuppu
 
Web Engineering - Web Effort Estimation
Web Engineering - Web Effort EstimationWeb Engineering - Web Effort Estimation
Web Engineering - Web Effort Estimation
Nosheen Qamar
 
BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
CCT International
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring System
IRJET Journal
 
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
Aravind NC
 
Project template for presenting it before the panel
Project template for presenting it before the panelProject template for presenting it before the panel
Project template for presenting it before the panel
AkshatMehrotra14
 
TILOS: Brochure
TILOS: BrochureTILOS: Brochure
TILOS: Brochure
Cisco
 
Road transport model in Malaysia
Road transport model in MalaysiaRoad transport model in Malaysia
Road transport model in Malaysia
Romain Pison
 
T rec-e.492-199602-i!!pdf-e
T rec-e.492-199602-i!!pdf-eT rec-e.492-199602-i!!pdf-e
T rec-e.492-199602-i!!pdf-e
Olivier Rostaing
 

Similar to Modelling For Signals (20)

Traffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & ProceduresTraffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & Procedures
 
Classification Approach for Big Data Driven Traffic Flow Prediction using Ap...
Classification Approach for Big Data Driven Traffic  Flow Prediction using Ap...Classification Approach for Big Data Driven Traffic  Flow Prediction using Ap...
Classification Approach for Big Data Driven Traffic Flow Prediction using Ap...
 
IRJET- Management of Traffic at Road Intersection using Software Modelling
IRJET- Management of Traffic at Road Intersection using Software ModellingIRJET- Management of Traffic at Road Intersection using Software Modelling
IRJET- Management of Traffic at Road Intersection using Software Modelling
 
Shahzad Sikandaruk
Shahzad SikandarukShahzad Sikandaruk
Shahzad Sikandaruk
 
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
 
Migration Decoded
Migration DecodedMigration Decoded
Migration Decoded
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
 
Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways
 
CBI Paper for ISEHP 2016
CBI Paper for ISEHP 2016CBI Paper for ISEHP 2016
CBI Paper for ISEHP 2016
 
Planning for operations 3-31-2011
Planning for operations 3-31-2011Planning for operations 3-31-2011
Planning for operations 3-31-2011
 
Tilos for linear project
Tilos for linear projectTilos for linear project
Tilos for linear project
 
Project template for projects looks like this
Project template for projects looks like thisProject template for projects looks like this
Project template for projects looks like this
 
Web Engineering - Web Effort Estimation
Web Engineering - Web Effort EstimationWeb Engineering - Web Effort Estimation
Web Engineering - Web Effort Estimation
 
BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring System
 
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
 
Project template for presenting it before the panel
Project template for presenting it before the panelProject template for presenting it before the panel
Project template for presenting it before the panel
 
TILOS: Brochure
TILOS: BrochureTILOS: Brochure
TILOS: Brochure
 
Road transport model in Malaysia
Road transport model in MalaysiaRoad transport model in Malaysia
Road transport model in Malaysia
 
T rec-e.492-199602-i!!pdf-e
T rec-e.492-199602-i!!pdf-eT rec-e.492-199602-i!!pdf-e
T rec-e.492-199602-i!!pdf-e
 

More from Jonathan Slason

Slason Transition to Net Zero Energy in Burlington Vermont January 2019
Slason Transition to Net Zero Energy in Burlington Vermont January 2019Slason Transition to Net Zero Energy in Burlington Vermont January 2019
Slason Transition to Net Zero Energy in Burlington Vermont January 2019
Jonathan Slason
 
Multimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling ToolsMultimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling Tools
Jonathan Slason
 
VT Development conference presentation 2018
VT Development conference presentation 2018VT Development conference presentation 2018
VT Development conference presentation 2018
Jonathan Slason
 
Bikes on Buses at 2 Walkand Bike Presentation
Bikes on Buses at 2 Walkand Bike PresentationBikes on Buses at 2 Walkand Bike Presentation
Bikes on Buses at 2 Walkand Bike Presentation
Jonathan Slason
 
Changing People Changing Transport2040 Slason
Changing People Changing Transport2040 SlasonChanging People Changing Transport2040 Slason
Changing People Changing Transport2040 Slason
Jonathan Slason
 
Bikes on Buses - Rollout Auckland 17 March
Bikes on Buses -  Rollout Auckland 17 MarchBikes on Buses -  Rollout Auckland 17 March
Bikes on Buses - Rollout Auckland 17 March
Jonathan Slason
 
Cycle Detection At Signals
Cycle Detection At SignalsCycle Detection At Signals
Cycle Detection At Signals
Jonathan Slason
 
Snug 2010: Pedestrian Delay Presentation
Snug 2010: Pedestrian Delay PresentationSnug 2010: Pedestrian Delay Presentation
Snug 2010: Pedestrian Delay Presentation
Jonathan Slason
 
Nziht Nzta Jon Slason 21 Oct2010
Nziht Nzta Jon Slason 21 Oct2010Nziht Nzta Jon Slason 21 Oct2010
Nziht Nzta Jon Slason 21 Oct2010
Jonathan Slason
 
Shelburne Transition Town - Transportation
Shelburne Transition Town - TransportationShelburne Transition Town - Transportation
Shelburne Transition Town - Transportation
Jonathan Slason
 
Nz Mugs Jon Slason 16 Oct2009
Nz Mugs Jon Slason 16 Oct2009Nz Mugs Jon Slason 16 Oct2009
Nz Mugs Jon Slason 16 Oct2009
Jonathan Slason
 
Reaaa Jon Slason2009 17 August
Reaaa Jon Slason2009 17 AugustReaaa Jon Slason2009 17 August
Reaaa Jon Slason2009 17 August
Jonathan Slason
 

More from Jonathan Slason (12)

Slason Transition to Net Zero Energy in Burlington Vermont January 2019
Slason Transition to Net Zero Energy in Burlington Vermont January 2019Slason Transition to Net Zero Energy in Burlington Vermont January 2019
Slason Transition to Net Zero Energy in Burlington Vermont January 2019
 
Multimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling ToolsMultimodal Impact Fees - Using Advanced Modeling Tools
Multimodal Impact Fees - Using Advanced Modeling Tools
 
VT Development conference presentation 2018
VT Development conference presentation 2018VT Development conference presentation 2018
VT Development conference presentation 2018
 
Bikes on Buses at 2 Walkand Bike Presentation
Bikes on Buses at 2 Walkand Bike PresentationBikes on Buses at 2 Walkand Bike Presentation
Bikes on Buses at 2 Walkand Bike Presentation
 
Changing People Changing Transport2040 Slason
Changing People Changing Transport2040 SlasonChanging People Changing Transport2040 Slason
Changing People Changing Transport2040 Slason
 
Bikes on Buses - Rollout Auckland 17 March
Bikes on Buses -  Rollout Auckland 17 MarchBikes on Buses -  Rollout Auckland 17 March
Bikes on Buses - Rollout Auckland 17 March
 
Cycle Detection At Signals
Cycle Detection At SignalsCycle Detection At Signals
Cycle Detection At Signals
 
Snug 2010: Pedestrian Delay Presentation
Snug 2010: Pedestrian Delay PresentationSnug 2010: Pedestrian Delay Presentation
Snug 2010: Pedestrian Delay Presentation
 
Nziht Nzta Jon Slason 21 Oct2010
Nziht Nzta Jon Slason 21 Oct2010Nziht Nzta Jon Slason 21 Oct2010
Nziht Nzta Jon Slason 21 Oct2010
 
Shelburne Transition Town - Transportation
Shelburne Transition Town - TransportationShelburne Transition Town - Transportation
Shelburne Transition Town - Transportation
 
Nz Mugs Jon Slason 16 Oct2009
Nz Mugs Jon Slason 16 Oct2009Nz Mugs Jon Slason 16 Oct2009
Nz Mugs Jon Slason 16 Oct2009
 
Reaaa Jon Slason2009 17 August
Reaaa Jon Slason2009 17 AugustReaaa Jon Slason2009 17 August
Reaaa Jon Slason2009 17 August
 

Modelling For Signals

  • 1. Levels of Detail for Traffic Signal Modelling Jonathan Slason (Beca) Presented: SNUG 16 November 2010. Wellington, NZ The views expressed are those of the author and do not necessarily reflect those of Beca or any other organisation or agency. Further detail behind the issues raised is available by contacting jonathan.slason@beca.com
  • 2. Traffic Modelling Concept Regional travel demands (public and private) for network/project planning; Travel costs for economic evaluation; and Transport demands and effects of specific infrastructure; Traffic flows for design of infrastructure; Transport demands and effects of specific land use development. Operations and Optimisation Accuracy Detail
  • 3. Guidance on Techniques for Modellers
  • 4. Relative Benefits Microsimulation- Stochastic Micro - Deterministic Deterministic- Isolated
  • 5.
  • 6. Most project evaluations require shorter-term forecasts, typically 5-25 years. For example, assessment of environment effects on major infrastructure (such as noise and emissions), require travel forecasts for opening and 10-years post-opening. Analysis Flows Development of design flows from model forecasts is a distinct process that should be recognised in the study process. That process should consider other data (such as counts), additional model output (such as validation data and path analysis) in determining appropriate design flows from model forecasts. Wherever possible, intersection design should be based on surveyed flows, modified based on the change predicted by the models, rather than based directly on raw model forecasts (i.e. Pivoting)
  • 7. PM Peak Data – Kopu SH25a TelemetryAnnual (Seasonal) Variation
  • 8. Seasonal Variation – month average
  • 9. 15min variation in flowsInter and Intra Hour Variation AM & PM Peak Hour Factor = 0.88
  • 10. Traffic Engineer Role The development of design flows for the operational assessment and design of roading facilities should be recognised as a distinct task from travel forecasting. That is, there is a distinct and crucial process involved in taking data from various sources (such as model forecasts and count data), and creating a set of flows suitable for the design process. It should be the responsibility of the person doing the operational assessment and/or design to prepare those design flows, rather than simply adopting outputs from traffic models without consideration of the model type, detail, age and level of local validation.
  • 11. Traffic Engineer: Flow analysis tasks While design flows for new facilities will generally require input from models, available survey data and data from similar locations should also be considered. In using traffic model outputs to create design flows the following should be considered: The level of network detail in the model. Specifically, if the zone and network detail is low, than forecast turning movements may not be accurate, even if link flows are considered appropriate. Judgements should be made about the precision of turning flows, especially where the modelled flows appear unrealistically low; The age and level of local validation. Additional data or information form the model should be obtained to estimate the likely impact of any material validation discrepancies; The choice of design horizon and design-hour, and how these relate to the modelled years and periods; The time periods being represented, and what peaking factors should be applied to the forecast flows; What upstream/downstream constraints may influence the forecast flows; What level of delay is predicted at the facility being designed, and hence if predicted flows are likely to be influenced by those modelled delays. For example, if the model has high delays at the facility of interest, then the predicted flows could be lower than is likely to occur if the final design has reduced those delays; The sensibility of the flows, when considering existing travel patterns. Various outputs from the models can be requested to gauge the sensibility of the forecasts, including select-link analysis, flow difference plots, delay and/or Volume/Capacity ratio plots etc. As a general rule, survey data should be used wherever practical to validate the forecast flows. Wherever appropriate, local survey data should be used directly, with design flows created by pivoting off those flows using the predicted change in behaviour forecast by the model (i.e. the models are used to predict the change in flows, rather than the absolute design flows).
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Pre-Emption: Micro-models include pre-emption effects
  • 20. Origin-Destination and Network Flows: micro-deterministic and stochastic programmes
  • 21. Visuals: often clients or stakeholders prefer visualisation techniques to communicate project