240 BLACKFRIARS STAIR DESIGN COMPETITION
Matthew Powell – Ramboll, Leeds
“Minuscule”
An idea inspired by Ramboll’s Scandinavian vowel
Objectives… Create an idea, which:
 Would look out of place if it wasn’t in a Ramboll office.
 Avoids causing a “bottleneck”. Wide enough for 2 to pass, avoid an inefficient spiral
design, distribute pedestrian traffic efficiently, land and depart on same side.
 Is enhanced by people moving around it. Split levels, promotes interaction between
people, encourage visitors to take a detour to see how it works!
 Promotes us as a “Sustainable Energy Consultant”. Incorporate sustainable materials
such as timber, precast concrete, wind turbine space frame.
 Uses our contacts in industry. Laing O’Rourke Steetley Precast Plant.
The Approach The Minuscule Climbing the Accent
Inspiration
Channel 4 Television Idents Falling Water, F.L. Wright Ramboll Logo’s Minuscule
Main Materials
Timber Space Frame Clear Balustrade Precast Stair Sections
The drawings’ visual details how polyvinylchloride is proposed for the magenta corporate
cladding, and either steel decking or precast planks may be employed for the short
hanging steps section.
Load Path Explanation of Diagram in Drawings Section
Precast concrete beams span east to west and are simply supported at the structural
slab level at third floor. The existing slab can be checked for punching shear, and if
required Fibre Reinforced Polymer Reinforcements can strength the soffit of the slab.
These will be concealed from view within the clear zone (services and ceiling).
Fibre Reinforced Polymer:
External Reinforcement to Existing Slab
Falling Water Stairs: Two hangers at each step to
prevent twisting
The 2 beams are split into two sections with a joint running parallel to the stairs. This is
to facilitate a dowel joint between the precast beam support and the stair section.
Bearing ends of the beams can be incorporated into the office environment at one end
by balustrades and the other by the seating area. The central stair section is them
floating above the second floor to create the accent of the Scandinavian vowel. Lower
sections rest on the second floor slab which can be checked for punching shear and
allowable additional loads. The timber space frame is for visual effect.
Stability
The maximum void of 4500 x 4550 minus 100mm clear zone was utilised to create a
clearer visual connection between floors. The border of the void is braced by structural
hollow sections creating a box resisting longitudinal forces. Two precast beam sections
transfer the load from the hanging section into the third floor slab.
Modelling Loads Required Rebar Check Pattern Loading
Compliance with Building Regulations
Incorporating a landing required meeting a few regulations. The landing is wider than
the maximum internal width of the staircase. The finished floor level is 2 meters below
the minimum ceiling height as required. Generous going and risers for assembly building
level have been incorporated where 15 steps is the maximum run between landings.
Factors such as required overlap, the 100mm sphere rule, and minimum clearances have
been checked by modelling in 3D, and then incorporated into the proposed design.
Maintenance/Demotion
Individual component sizes are below 3 meters in length for delivery to site. Sections can
be reduced in size or cast in-situ if access is a problem. Connections are not concealed in
order to be inspected and maintained. Design can be remodelled for a future tenant.
Materials such as concrete, glass and steel can be recycled.
Minuscule
Minuscule

More Related Content

Similar to Minuscule

Portfolio NOV2016opt
Portfolio NOV2016optPortfolio NOV2016opt
Portfolio NOV2016opt
Manuel Cruz
 
portal-frame-160216003349.pdf
portal-frame-160216003349.pdfportal-frame-160216003349.pdf
portal-frame-160216003349.pdf
Anbarasan Sivaraj
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
Grace Henry
 
Colin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project WorkColin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project Work
Colin Harkin
 
Analysis of Truss Structure
Analysis of Truss StructureAnalysis of Truss Structure
Analysis of Truss Structure
Haiqal Ehlam
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
Prasad Thanthratey
 
Surface active systems
Surface active systems Surface active systems
Surface active systems
Rishikesh Kalal
 
Unit 3_Data Center Design in storage.pptx
Unit  3_Data Center Design in storage.pptxUnit  3_Data Center Design in storage.pptx
Unit 3_Data Center Design in storage.pptx
Rahul Borate
 
JohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdfJohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdf
YashawantSastikar
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slab
Vikas Mehta
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx
2022786965
 
Raised Floor Research.pptx
Raised Floor Research.pptxRaised Floor Research.pptx
Raised Floor Research.pptx
ssuser8634982
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
Zabihullah Nasiri
 
Large span structures
Large span structuresLarge span structures
Large span structures
aduiti
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
Rithika Ravishankar
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
CADmantra Technologies
 
Benchmark Black Book - Brochure
Benchmark Black Book - BrochureBenchmark Black Book - Brochure
Benchmark Black Book - Brochure
Justinas Grigaras
 
Butler Building Systems New Brochure Leed
Butler Building Systems New Brochure LeedButler Building Systems New Brochure Leed
Butler Building Systems New Brochure Leed
Victor Trocki
 
Rahul\'s PowerPoint Presentation of Key Corporate Interiors Projects
Rahul\'s PowerPoint Presentation of Key Corporate Interiors ProjectsRahul\'s PowerPoint Presentation of Key Corporate Interiors Projects
Rahul\'s PowerPoint Presentation of Key Corporate Interiors Projects
misterpathare
 
Wcma Product Awards_2018_All_Nominations
Wcma Product Awards_2018_All_NominationsWcma Product Awards_2018_All_Nominations
Wcma Product Awards_2018_All_Nominations
Timothy Bennett
 

Similar to Minuscule (20)

Portfolio NOV2016opt
Portfolio NOV2016optPortfolio NOV2016opt
Portfolio NOV2016opt
 
portal-frame-160216003349.pdf
portal-frame-160216003349.pdfportal-frame-160216003349.pdf
portal-frame-160216003349.pdf
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Colin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project WorkColin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project Work
 
Analysis of Truss Structure
Analysis of Truss StructureAnalysis of Truss Structure
Analysis of Truss Structure
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
Surface active systems
Surface active systems Surface active systems
Surface active systems
 
Unit 3_Data Center Design in storage.pptx
Unit  3_Data Center Design in storage.pptxUnit  3_Data Center Design in storage.pptx
Unit 3_Data Center Design in storage.pptx
 
JohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdfJohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdf
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slab
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx
 
Raised Floor Research.pptx
Raised Floor Research.pptxRaised Floor Research.pptx
Raised Floor Research.pptx
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Large span structures
Large span structuresLarge span structures
Large span structures
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
 
Benchmark Black Book - Brochure
Benchmark Black Book - BrochureBenchmark Black Book - Brochure
Benchmark Black Book - Brochure
 
Butler Building Systems New Brochure Leed
Butler Building Systems New Brochure LeedButler Building Systems New Brochure Leed
Butler Building Systems New Brochure Leed
 
Rahul\'s PowerPoint Presentation of Key Corporate Interiors Projects
Rahul\'s PowerPoint Presentation of Key Corporate Interiors ProjectsRahul\'s PowerPoint Presentation of Key Corporate Interiors Projects
Rahul\'s PowerPoint Presentation of Key Corporate Interiors Projects
 
Wcma Product Awards_2018_All_Nominations
Wcma Product Awards_2018_All_NominationsWcma Product Awards_2018_All_Nominations
Wcma Product Awards_2018_All_Nominations
 

Minuscule

  • 1. 240 BLACKFRIARS STAIR DESIGN COMPETITION Matthew Powell – Ramboll, Leeds “Minuscule” An idea inspired by Ramboll’s Scandinavian vowel Objectives… Create an idea, which:  Would look out of place if it wasn’t in a Ramboll office.  Avoids causing a “bottleneck”. Wide enough for 2 to pass, avoid an inefficient spiral design, distribute pedestrian traffic efficiently, land and depart on same side.  Is enhanced by people moving around it. Split levels, promotes interaction between people, encourage visitors to take a detour to see how it works!  Promotes us as a “Sustainable Energy Consultant”. Incorporate sustainable materials such as timber, precast concrete, wind turbine space frame.  Uses our contacts in industry. Laing O’Rourke Steetley Precast Plant. The Approach The Minuscule Climbing the Accent Inspiration Channel 4 Television Idents Falling Water, F.L. Wright Ramboll Logo’s Minuscule Main Materials Timber Space Frame Clear Balustrade Precast Stair Sections The drawings’ visual details how polyvinylchloride is proposed for the magenta corporate cladding, and either steel decking or precast planks may be employed for the short hanging steps section. Load Path Explanation of Diagram in Drawings Section Precast concrete beams span east to west and are simply supported at the structural slab level at third floor. The existing slab can be checked for punching shear, and if
  • 2. required Fibre Reinforced Polymer Reinforcements can strength the soffit of the slab. These will be concealed from view within the clear zone (services and ceiling). Fibre Reinforced Polymer: External Reinforcement to Existing Slab Falling Water Stairs: Two hangers at each step to prevent twisting The 2 beams are split into two sections with a joint running parallel to the stairs. This is to facilitate a dowel joint between the precast beam support and the stair section. Bearing ends of the beams can be incorporated into the office environment at one end by balustrades and the other by the seating area. The central stair section is them floating above the second floor to create the accent of the Scandinavian vowel. Lower sections rest on the second floor slab which can be checked for punching shear and allowable additional loads. The timber space frame is for visual effect. Stability The maximum void of 4500 x 4550 minus 100mm clear zone was utilised to create a clearer visual connection between floors. The border of the void is braced by structural hollow sections creating a box resisting longitudinal forces. Two precast beam sections transfer the load from the hanging section into the third floor slab. Modelling Loads Required Rebar Check Pattern Loading Compliance with Building Regulations Incorporating a landing required meeting a few regulations. The landing is wider than the maximum internal width of the staircase. The finished floor level is 2 meters below the minimum ceiling height as required. Generous going and risers for assembly building level have been incorporated where 15 steps is the maximum run between landings. Factors such as required overlap, the 100mm sphere rule, and minimum clearances have been checked by modelling in 3D, and then incorporated into the proposed design. Maintenance/Demotion Individual component sizes are below 3 meters in length for delivery to site. Sections can be reduced in size or cast in-situ if access is a problem. Connections are not concealed in order to be inspected and maintained. Design can be remodelled for a future tenant. Materials such as concrete, glass and steel can be recycled.