Republic of the Philippines
                                                       Department of Environment & Natural Resources
                                                          MINES & GEOSCIENCES BUREAU
                                                      MINING INDUSTRY STATISTICS
                                                             (RELEASE DATE: 6 March 2012)
                                                                       2007               2008                2009                2010              2011+
Gross Production Value In Mining (MGB)
 Large Scale Metallic Mining                                      P 49.2 Billion      P 29.5 Billion     P 42.8 Billion       P 69.1 Billion    P 88.0 Billion
 Small Scale Gold Mining                                           32.2 Billion        33.9 Billion         36.8 Billion        42.9 Billion      34.1 Billion
 Non-metallic mining                                                20.8 Billion       23.5 Billion         26.5 Billion        33.3 Billion         nya
        TOTAL                                                     P 102.2 Billion     P 86.9 Billion     P 106.1 Billion     P145 .3 Billion    P122.1 Billion
Total Mining Investment Data from the Revitalization             $ 708.4 Million      $604.2 Million     $ 719.5 Million     $ 955.8 Million         nya
 Program under EO 270 (MGB)
Gross Value Added In Mining At Current Prices (NSCB):             P 60.0 Billion      P 53.6 Billion     P 65.8 Billion      P 88.2 Billion     P 99.2 Billion
 Mining Contribution To GDP                                           0.9%                0.7%               0.8%                1.0%               1.0%
Total Exports of Minerals & Mineral Products (BSP)                $2,605 Million      $2,498 Million     $1,470 Million      $1,870 Million    $2,043 Million*
 Mining Contribution To Total Exports                                  5.3%               5.2%                3.9%                3.7%              5.6%
Total Exports of Non-Met. Mineral Manufactures (BSP)               $223 Million       $211 Million        $156 Million        $162 Million      $130 Million*
 Mining Contribution To Total Exports                                 0.4%               0.4%                0.4%                0.3%               0.4%
Employment In Mining and Quarrying (DOLE)                            149,000             158,000            169,000             197,000            210,000
 Mining Contribution To Total Employment                              0.4%                0.5%               0.5%                0.5%               0.6%
Taxes, Fees and Royalties From Mining
 Fees, Charges & Royalties Collected by DENR-MGB/LGUs            P 774.0 Million P 557.4 Million P 396.2 Million P 800.6 Million P 1,176.5 Million
 Excise Tax Collected by BIR                                       942.1 Million     660.3 Million    718.8 Million    1,299.7 Million       nya
 Taxes Collected by Nat'l. Gov't. Agencies                       8,371.7 Million   5,949.5 Million 10,272.5 Million 10,612.4 Million         nya
 Taxes and Fees Collected by LGUs                                  359.8 Million     522.2 Million    992.8 Million   1,113.0 Million      24.6 Million
       TOTAL                                                    P10,447.6 Million P7,689.4 Million P12,380.3 Million P13,825.7 Million P1,201.1 Million
Number of Operating Metallic Mines:
 Copper (with gold & silver)                                            1                   2                  3                   3                  3
 Copper (with gold, silver & zinc)                                      1                   1                  1                   1                  1
 Gold (with silver)                                                     7                   8                  8                   8                  5
 Metallurgical Chromite (ore & concentrate)                             2                   1                  1                   1                  2
 Refractory Chromite                                                    1
 Chemical Grade Chromite                                                1                   1
 Nickel                                                                11                  10                 10                  15                 18
 Iron                                                                _______             _______            _______             _______            ___1___
      Total Operating Metallic Mines                                   24                  23                 23                  28                  30
Number Of Operating Non-Metallic Mines:
 Sand and Gravel                                                              1,784              1,820               1,820        nya                nya
 Cement                                                                          16                 16                  15                16         nya
 Other Non-Metallics                                                            626                523                 523        nya                nya
     Total Operating Non-Metallic Mines                                       2,426              2,359               2,358
Number of Processing Plant/Smelter:
 Copper Smelter                                                         1                   1                  1                   1                  1
 Nickel Processing Plant                                              __1__               __1__              __1__               __1__              __1__
     Total Processing Plant/Smelter                                     2                   2                  2                   2                  2
Number of Approved and Registered(As of Current Yr.)
  MPSA                                                                 236                 264                275                 318                321
  FTAA                                                                  2                   2                  3                   6                  6
  EP                                                                    44                  39                 54                  99                106
  IP                                                                   185                 199                213                 202                231
  MPP                                                                   37                  41                 41                  54                 66
     TOTAL                                                             504                 545                586                 679               730**
Number of Applications Under Process(As of Current Yr.)
  MPSA                                                                1,111               1,058               997                 839                628
  FTAA                                                                  54                  52                 52                  49                 40
  EP                                                                  1,074               1,496              1,575               1,545               957
  IP                                                                   288                 291                288                 294                160
  MPP                                                                   36                  40                 42                  44                 33
     TOTAL                                                            2,563               2,937              2,954               2,771             1,818**
Average world price of Copper (WMS/LME)                              $3.20 / lb          $3.16 / lb         $2.28 / lb         $3.40 / lb         $4.00 / lb
Average world price of Gold (WMS/BSP)                              $696.37 / oz        $871.52 / oz       $973.01 / oz       $1,222.02 / oz     $1,570.25 / oz
Average world price of Silver (WMS/BSP)                             $13.38 / oz         $15.00 / oz        $14.67 / oz        $20.13 / oz        $35.22 / oz
Average world price of Nickel (WMS/LME)                             $16.84 / lb          $9.58 / lb         $6.56 / lb         $9.82 / lb        $10.39 / lb
Peso to US Dollar Exchange Rate (BSP)                                   P46.15            P44.48              P47.64             P45.11              P43.31
+Preliminary; *As of Q3; **As of Q2; nya - not yet available
Note: Number of operating mines were based on production reports submitted. Metallic mines include the following:
       a) Copper (with gold & silver): Padcal Copper-Gold Project, Canatuan Mining Project, and Toledo Copper Project
       b) Copper (with gold, silver & zinc): Rapu-Rapu Polymetallic Project
       c) Gold (with silver): Victoria Gold Project, Masbate Gold Project, Paracale Gold Project, APEX Maco Operation, and Banahaw Gold Project,
      d) Metallurgical Chromite (Ore & Concentrate): Dinagat Chromite Project and Homonhon Chromite Project
      e) Nickel Ore: Sta. Cruz-Candelaria Proj.; Sta. Cruz Nickel Proj.; Rio Tuba Nickel Proj.; Toronto and Pulot Nickel Projs.; Berong Nickel Proj.;
          Tubay Nickel-Cobalt Proj.; Dinagat Chromite-Nickel Proj.; Cagdianao Nickel Proj.; Tagana-an Nickel Proj.; Nonoc Nickel Proj.; Cagdianao
          Nickel Proj. (PGMC); Taganito Nickel Proj.; Tandawa Nickel Proj.; Adlay Nickel Proj.; Dahican Nickel Proj.; Carrascal Nickel
          Proj.; Cantilan Nickel Proj.; and Bel-at Nickel Proj.
       Gross Value Added (GVA) - measures the contribution of a particular sector to the country's GNP; computed by subtracting the cost of production
          inputs from the gross output of a particular industry. Total GVA does not include crude oil. Data from 2007-present were adjusted due to
          NSCB's change of base year from 1985 to 2000.
ref: MIS(2011)/econ-ind/rvs/6Mar12

Mineral Industry Statistics

  • 1.
    Republic of thePhilippines Department of Environment & Natural Resources MINES & GEOSCIENCES BUREAU MINING INDUSTRY STATISTICS (RELEASE DATE: 6 March 2012) 2007 2008 2009 2010 2011+ Gross Production Value In Mining (MGB) Large Scale Metallic Mining P 49.2 Billion P 29.5 Billion P 42.8 Billion P 69.1 Billion P 88.0 Billion Small Scale Gold Mining 32.2 Billion 33.9 Billion 36.8 Billion 42.9 Billion 34.1 Billion Non-metallic mining 20.8 Billion 23.5 Billion 26.5 Billion 33.3 Billion nya TOTAL P 102.2 Billion P 86.9 Billion P 106.1 Billion P145 .3 Billion P122.1 Billion Total Mining Investment Data from the Revitalization $ 708.4 Million $604.2 Million $ 719.5 Million $ 955.8 Million nya Program under EO 270 (MGB) Gross Value Added In Mining At Current Prices (NSCB): P 60.0 Billion P 53.6 Billion P 65.8 Billion P 88.2 Billion P 99.2 Billion Mining Contribution To GDP 0.9% 0.7% 0.8% 1.0% 1.0% Total Exports of Minerals & Mineral Products (BSP) $2,605 Million $2,498 Million $1,470 Million $1,870 Million $2,043 Million* Mining Contribution To Total Exports 5.3% 5.2% 3.9% 3.7% 5.6% Total Exports of Non-Met. Mineral Manufactures (BSP) $223 Million $211 Million $156 Million $162 Million $130 Million* Mining Contribution To Total Exports 0.4% 0.4% 0.4% 0.3% 0.4% Employment In Mining and Quarrying (DOLE) 149,000 158,000 169,000 197,000 210,000 Mining Contribution To Total Employment 0.4% 0.5% 0.5% 0.5% 0.6% Taxes, Fees and Royalties From Mining Fees, Charges & Royalties Collected by DENR-MGB/LGUs P 774.0 Million P 557.4 Million P 396.2 Million P 800.6 Million P 1,176.5 Million Excise Tax Collected by BIR 942.1 Million 660.3 Million 718.8 Million 1,299.7 Million nya Taxes Collected by Nat'l. Gov't. Agencies 8,371.7 Million 5,949.5 Million 10,272.5 Million 10,612.4 Million nya Taxes and Fees Collected by LGUs 359.8 Million 522.2 Million 992.8 Million 1,113.0 Million 24.6 Million TOTAL P10,447.6 Million P7,689.4 Million P12,380.3 Million P13,825.7 Million P1,201.1 Million Number of Operating Metallic Mines: Copper (with gold & silver) 1 2 3 3 3 Copper (with gold, silver & zinc) 1 1 1 1 1 Gold (with silver) 7 8 8 8 5 Metallurgical Chromite (ore & concentrate) 2 1 1 1 2 Refractory Chromite 1 Chemical Grade Chromite 1 1 Nickel 11 10 10 15 18 Iron _______ _______ _______ _______ ___1___ Total Operating Metallic Mines 24 23 23 28 30 Number Of Operating Non-Metallic Mines: Sand and Gravel 1,784 1,820 1,820 nya nya Cement 16 16 15 16 nya Other Non-Metallics 626 523 523 nya nya Total Operating Non-Metallic Mines 2,426 2,359 2,358 Number of Processing Plant/Smelter: Copper Smelter 1 1 1 1 1 Nickel Processing Plant __1__ __1__ __1__ __1__ __1__ Total Processing Plant/Smelter 2 2 2 2 2 Number of Approved and Registered(As of Current Yr.) MPSA 236 264 275 318 321 FTAA 2 2 3 6 6 EP 44 39 54 99 106 IP 185 199 213 202 231 MPP 37 41 41 54 66 TOTAL 504 545 586 679 730** Number of Applications Under Process(As of Current Yr.) MPSA 1,111 1,058 997 839 628 FTAA 54 52 52 49 40 EP 1,074 1,496 1,575 1,545 957 IP 288 291 288 294 160 MPP 36 40 42 44 33 TOTAL 2,563 2,937 2,954 2,771 1,818** Average world price of Copper (WMS/LME) $3.20 / lb $3.16 / lb $2.28 / lb $3.40 / lb $4.00 / lb Average world price of Gold (WMS/BSP) $696.37 / oz $871.52 / oz $973.01 / oz $1,222.02 / oz $1,570.25 / oz Average world price of Silver (WMS/BSP) $13.38 / oz $15.00 / oz $14.67 / oz $20.13 / oz $35.22 / oz Average world price of Nickel (WMS/LME) $16.84 / lb $9.58 / lb $6.56 / lb $9.82 / lb $10.39 / lb Peso to US Dollar Exchange Rate (BSP) P46.15 P44.48 P47.64 P45.11 P43.31 +Preliminary; *As of Q3; **As of Q2; nya - not yet available Note: Number of operating mines were based on production reports submitted. Metallic mines include the following: a) Copper (with gold & silver): Padcal Copper-Gold Project, Canatuan Mining Project, and Toledo Copper Project b) Copper (with gold, silver & zinc): Rapu-Rapu Polymetallic Project c) Gold (with silver): Victoria Gold Project, Masbate Gold Project, Paracale Gold Project, APEX Maco Operation, and Banahaw Gold Project, d) Metallurgical Chromite (Ore & Concentrate): Dinagat Chromite Project and Homonhon Chromite Project e) Nickel Ore: Sta. Cruz-Candelaria Proj.; Sta. Cruz Nickel Proj.; Rio Tuba Nickel Proj.; Toronto and Pulot Nickel Projs.; Berong Nickel Proj.; Tubay Nickel-Cobalt Proj.; Dinagat Chromite-Nickel Proj.; Cagdianao Nickel Proj.; Tagana-an Nickel Proj.; Nonoc Nickel Proj.; Cagdianao Nickel Proj. (PGMC); Taganito Nickel Proj.; Tandawa Nickel Proj.; Adlay Nickel Proj.; Dahican Nickel Proj.; Carrascal Nickel Proj.; Cantilan Nickel Proj.; and Bel-at Nickel Proj. Gross Value Added (GVA) - measures the contribution of a particular sector to the country's GNP; computed by subtracting the cost of production inputs from the gross output of a particular industry. Total GVA does not include crude oil. Data from 2007-present were adjusted due to NSCB's change of base year from 1985 to 2000. ref: MIS(2011)/econ-ind/rvs/6Mar12