MIITE 
To train and certify annually one million college students/job-seekers/ 
PROFESSIONALS in IT/Soft Skills 
Prof. Harsha Kestur, Director, RIMSR, Education & Financial Services.
EFS - Education and Financial Services 
 Technology driven, skill enhancement center 
 Training at all levels in over 800 skill-sets 
 Hands-on exposure through simulations and tutorials 
Content Quality learning index 
No-cost basis 
Focu 
s: 
EFS, has teamed with NEF University, USA The State University of New 
York, USA and Dr. Appukuttan Foundation ( Appuji Scholarships), to 
achieve its objective providing Knowledge to all as, “Knowledge Is The 
Greatest Wealth”
National Education Foundation (NEF) 
Dr. Appu Kuttan, founder and chairman of the National Education Foundation 
(NEF) the U.S. national non-profit leader in STEM+ (Science, Engineering, 
Technology and Math, IT, Business, Management, Soft Skills) education, 
announced the APPUJI Scholarship program to meet India’s critical skilling 
challenge. 
 635 world-class Web-based e-learning courses 
 24/7 unlimited access 
 IT and Project Management certifications 
 Registration fee with NEF providing tuition scholarship 
 To get trained in MICROSOFT, SAP, ADOBE, ORACLE, IBM, VMWARE, 
CISCO, products and Courses Certification for Rs 2400 
register @ www.edufinserve.in
National Education Foundation (NEF) 
Headquartered in the Washington, DC Metro area. Formed in 1989 after 
consultations with national leaders including former President Bill Clinton and 
Intel founder Dr. Gordon Moore. 
NEF is the U.S. national non-profit leader in bridging the academic and job 
skills divides by providing world-class education in STEM (Science, Technology, 
Engineering, Math), English, test prep, digital literacy, IT, business, soft skills 
and management to millions of disadvantaged student and adults. 
 Offers more than 5500 high quality online courses and mentoring 
 Uses state-of-the-art LMS (Learning Management System) and interactive 
video platform 
 Motto: "High quality education for all."
Courses 
1. 635 courses consist of Business, Soft Skills, IT, 
and Desktop. These courses, offered at a very low 
cost, meet the Professional and Personal Training 
needs of Teachers, job seekers and others valid 
till Jan 2015 
2. 180 business  soft skills courses and simulations 
are divided into the following Solution Areas: 1. 
Professional Effectiveness 2. Management and 
Leadership 3. Project Effectiveness 4. Business 
Strategy and Operations 5. Sales and Customer- 
Facing Skills 6. Finance, HR and 
Administration...Rs 2400 . Our 180 business skills 
courses and simulations are divided into the 
following Solution Areas: 
1. Professional Effectiveness 
2. Management and Leadership 
3. Project Effectiveness 
4. Business Strategy and Operations 
5. Sales and Customer-Facing Skills 
6. Finance, HR, SCM and Administration 
• Bite-sized ‘How To’ demos for daily problem solving .3-5 
minute ‘how to’ video demonstrations 
• Covering the most popular tasks and topics needed by 
technology end-users and professional 
• Concise and targeted with live demonstration for quick 
answers to daily challenges - and easy orientation to key 
features and functions
Courses 
3. 500 Desktop Skills courseware titles are for professionals who rely upon 
standard desktop applications such as Microsoft Office, Crystal Reports, 
Adobe Acrobat and Lotus Notes. Our desktop solutions are ideal for day-to-day 
performance support, as well as supporting major corporate software 
migrations. In addition, our Desktop Skills Courseware Collection supports 
over 12 popular end user certifications including ECDL/ICDL and many 
Microsoft MOS certification exams (Rs 2400) 
4. 1,200 course offerings are divided into the following Solution Areas: 1. 
Software Development 2. Internet and Network Technologies 3. Web Design 
4. OS and Server Technologies 5. Enterprise Database Systems 6. Project 
Effectiveness The courseware in these Solution Areas address over 100 
current technical certifications sought by IT professionals and enterprises 
providing technical products and services to their customers, including: 1. 
Microsoft 2. ISC(2) 3. Cisco 4. Linux Professional Institute 5. Adobe 6. 
CompTIA 7. Oracle ( Rs 2400) 
5. The Digital Literacy courseware provides skills training and assessment for a 
broad range of computing concepts and techniques, including competency in 
computer hardware and software, operating systems, word processing and 
spreadsheet functions, networks and the Internet, electronic mail, and an 
• Over 1,700 
tasks/topics 
covered across the 
most popular 
applications: 
• Office 2010 
• Office 2013 
• Office 365 
• Office Online 
• Google Docs 
• Windows 8 
• Graphics & 
Design 
• Mobile Devices 
• Internet & Cloud 
Computing 
• End-User Security 
• …and others!
Cloud Infrastructure Support 
 Cloud Computing for IT professionals 
 Vmware Overview 
 Vmware Workstation 
 VMware: Datacenter Virtualization Design and Optimization with vSphere 5 
 VMware: Datacenter Virtualization with vSphere 5 - Part 1 
 VMware: Datacenter Virtualization with vSphere 5 - Part 2 
 EMC Information Storage and Management (ISM) v2 

Information Security Professionals 
 Certified Information Security Manager (CISM) 2012 
 Certified Information Security Manager (CISM) 2013 
 Certified Information Systems Security Professional (CISSP) 2012 
 Certified Information Systems Security Professional (CISSP) 2013 
 Certified Internet Security Auditor (CISA) 
 CompTIA Security+ 2011 
 Firewall 2.0 : Deploying Cisco ASA Firewall Solutions 
 IINS 2.0: Implementing Cisco IOS Network Security 
 IPS 7.0: Implementing Cisco Intrusion Prevention System 
 SECURE 1.0: Securing Networks with Cisco Routers and Switches 
 
Important links
Cisco Networking Professionals 
 CompTIA Network+ 2012 
 CompTIA Server+ 2009 
 DESGN 2.1: Designing for Cisco Internetwork Solutions 
 ROUTE 1.0: Implementing Cisco IP Routing 
 ROUTE 1.0: Implementing Cisco IP Routing (1) Test Prep 
 SWITCH 1.0: Implementing Cisco IP Switched Networks 
 SWITCH 1.0: Implementing Cisco IP Switched Networks (1) Test Prep 
 CAPPS 8.0: Integrating Cisco Unified Communications Applications 
 CIPT1 8.0: Implementing Cisco Unified Communications Manager Part 1 
 CIPT2 8.0: Implementing Cisco Unified Communications Manager Part 2 
 ICND1 2.0: Interconnecting Cisco Networking Devices Part 1 
 ICND2 2.0: Interconnecting Cisco Networking Devices Part 2 
 ICOMM 8.0: Introducing Cisco Voice and Unified Communications 
Administration 
 Implementing Cisco Voice Communications and QoS (CVOICE)
Unix/Linux Administration 
 UNIX Fundamentals 
 UNIX: Operating System Fundamentals 
 UNIX: System Administration 
 UNIX: The User Environment 
 Understanding and Evaluating RFID Technology for your Business 
 Linux Professional Institute: Advanced Level Linux Professional (LPIC-2) 
Exam 201 
 Linux Professional Institute: Advanced Level Linux Professional (LPIC-2) 
Exam 202 
 Linux Professional Institute: Junior Level Linux Professional (LPIC-1) Exam 
101 
 Linux Professional Institute: Junior Level Linux Professional (LPIC-1) Exam 
102 
 Sun Microsystems Solaris 9: System Administration I 
 Sun Microsystems Solaris 9: System Administration II 
 Perl Programming Fundamentals 
 UNIX: Shell Programming
Microsoft Server Administration 
 Microsoft Windows Server 2008 R2: Server Virtualization with Hyper-V 
 Microsoft Windows Server 2008: Configuring Active Directory 
 Microsoft Windows Server 2008: Configuring Applications Infrastructure 
 Microsoft Windows Server 2008: Configuring Network Infrastructure 
 Microsoft Windows Server 2008: Enterprise Administration 
 Microsoft Windows Server 2008: New Features 
 Microsoft Windows Server 2008: Server Administration 
 Microsoft Windows Server 2012: Administration 
 Microsoft Windows Server 2012: Configuring Advanced Services 
 Microsoft Windows Server 2012: Installing and Configuring 
 Microsoft Exchange Server 2010 SP1: Configuring 
 Microsoft Exchange Server 2013: Core Solutions 
 Microsoft System Center Essentials: Installation and Configuration
Microsoft SQL Server Administration 
 Microsoft SQL Server 2008 R2: Database Development 
 Microsoft SQL Server 2008 R2: Implementation and Maintenance 
 Microsoft SQL Server 2008: Business Intelligence Development and 
Maintenance 
 Microsoft SQL Server 2012: Database Administration 
 Microsoft SQL Server 2012: Implementing a Data Warehouse 
 Microsoft SQL Server 2012: Querying 
 Microsoft SharePoint 2010 SP1: Administration 
 Microsoft SharePoint 2010: Administration 
 Microsoft SharePoint 2010: Application Development 
 Microsoft SharePoint 2010: Configuring 
 Microsoft SharePoint Server 2010 SP1: Configuring 
Important links
Oracle Database Administration 
 Database Fundamentals, Database Design Fundamentals 
 Oracle Database 11g: Introduction to SQL 
 Oracle Database 11g: SQL Fundamentals I 
 Oracle Database 11g: SQL Fundamentals II 
 Oracle Database 11g: Administration Workshop I Release 2 
 Oracle Database 11g: Administration Workshop II Release 2 
 Oracle Database 11g: Develop PL/SQL Program Units 
 Oracle Database 11g: PL/SQL Fundamentals 
 Oracle Database 11g: Performance Tuning 
 Oracle Database 11g: Program with PL/SQL 
 Oracle Database 11g: RAC Administration 
 Oracle Database 11g: SQL Tuning 
 Oracle Database 11g: SQL and PL/SQL New Features 
 Oracle Database 11g: Secure Backup 
 Oracle Database 11g: Security
Java Programming 
 Introduction to Java EE 6 
 Introduction to Voice over IP 
 Java Programming with J2SE 5.0 
 Java Programming with Java SE 6.0 
 Java SE 7 New Features 
 Java SE7 Fundamentals 
 Java SE7 Professional 
 JavaScript Fundamentals
Oracle Application Support 
 Oracle 11i E-Business Suite: Essentials for Implementers 
 Oracle 11i E-Business Suite: System Administrator Fundamentals 
 Oracle 11i: Navigate Oracle Applications 
 Oracle 11i: Project Foundation Fundamentals 
 Oracle 12c: New Features for Administrators 
 Oracle Application Server 10g: Administration I 
 Oracle Application Server 10g: Administration II
WEB Design 
 Designing and Hosting a Web Site 
 Developing a User-Centered Software Design Approach 
 DHTML Basics 
 Programming in HTML5 with JavaScript 
 Working with HTML5 and CSS3 
Important links
AGILE Programming 
 Agile Practitioner - (PMI-ACP and Scrum Master) 
 Agile Software Development 
 Best Practices for Software Programming 
Important links
Microsoft Desktop & Office Productivity skills 
 Microsoft Office 2013: 
 Microsoft Office 2013: Advanced Excel 
 Microsoft Office 2013: Advanced Outlook 
 Microsoft Office 2013: Advanced PowerPoint 
 Microsoft Office 2010: Visio 
 Microsoft Office 2010: Advanced Access 
 Microsoft Office 2013: SharePoint 
 Microsoft Office Live Meeting 
 Microsoft OneNote 
 Microsoft Project 2013 
Important links
Database Administration 
 Database Design Fundamentals 
 Database Fundamentals 
Important links
SAP end user & BI skills 
 Overview of SAP for Project Teams 
 SAP Business Objects Business Intelligence 
 SAP Business One for End Users 
 SAP Business Suite for End Users 
Important links
ADOBE Skills 
 Adobe Dreamweaver CS5 
 Adobe Fireworks CS4 
 Adobe Flash CS5 
 Adobe Illustrator CS4 
 Adobe InDesign CS5 
 Adobe Photoshop CS5 
 Adobe AIR 
 Adobe AIR for Flash Developers 
 Adobe Acrobat 9 
 Adobe Captivate 4 
Important links
Advantages 
 Sea-change in contribution and team 
work 
 delivered on e-platform from SKILLSOFT 
one of the world leaders in eLearning & 
skill development 
 Acquire advanced IT and soft skills and 
knowledge in specialized areas 
 Become successful entrepreneurs and 
managers 
Important links 
www.appuji.org 
www.edufinserve.in 
www.cyberlearning.org 
www.rimsr.in
Preparing Managers for Success in A Changing World. 
Train and Certify one million college students/job-seekers in IT/Soft Skills

IT\Soft skills Certification for Indian students, professionals from State University of New York USA

  • 1.
    MIITE To trainand certify annually one million college students/job-seekers/ PROFESSIONALS in IT/Soft Skills Prof. Harsha Kestur, Director, RIMSR, Education & Financial Services.
  • 2.
    EFS - Educationand Financial Services  Technology driven, skill enhancement center  Training at all levels in over 800 skill-sets  Hands-on exposure through simulations and tutorials Content Quality learning index No-cost basis Focu s: EFS, has teamed with NEF University, USA The State University of New York, USA and Dr. Appukuttan Foundation ( Appuji Scholarships), to achieve its objective providing Knowledge to all as, “Knowledge Is The Greatest Wealth”
  • 3.
    National Education Foundation(NEF) Dr. Appu Kuttan, founder and chairman of the National Education Foundation (NEF) the U.S. national non-profit leader in STEM+ (Science, Engineering, Technology and Math, IT, Business, Management, Soft Skills) education, announced the APPUJI Scholarship program to meet India’s critical skilling challenge.  635 world-class Web-based e-learning courses  24/7 unlimited access  IT and Project Management certifications  Registration fee with NEF providing tuition scholarship  To get trained in MICROSOFT, SAP, ADOBE, ORACLE, IBM, VMWARE, CISCO, products and Courses Certification for Rs 2400 register @ www.edufinserve.in
  • 4.
    National Education Foundation(NEF) Headquartered in the Washington, DC Metro area. Formed in 1989 after consultations with national leaders including former President Bill Clinton and Intel founder Dr. Gordon Moore. NEF is the U.S. national non-profit leader in bridging the academic and job skills divides by providing world-class education in STEM (Science, Technology, Engineering, Math), English, test prep, digital literacy, IT, business, soft skills and management to millions of disadvantaged student and adults.  Offers more than 5500 high quality online courses and mentoring  Uses state-of-the-art LMS (Learning Management System) and interactive video platform  Motto: "High quality education for all."
  • 5.
    Courses 1. 635courses consist of Business, Soft Skills, IT, and Desktop. These courses, offered at a very low cost, meet the Professional and Personal Training needs of Teachers, job seekers and others valid till Jan 2015 2. 180 business soft skills courses and simulations are divided into the following Solution Areas: 1. Professional Effectiveness 2. Management and Leadership 3. Project Effectiveness 4. Business Strategy and Operations 5. Sales and Customer- Facing Skills 6. Finance, HR and Administration...Rs 2400 . Our 180 business skills courses and simulations are divided into the following Solution Areas: 1. Professional Effectiveness 2. Management and Leadership 3. Project Effectiveness 4. Business Strategy and Operations 5. Sales and Customer-Facing Skills 6. Finance, HR, SCM and Administration • Bite-sized ‘How To’ demos for daily problem solving .3-5 minute ‘how to’ video demonstrations • Covering the most popular tasks and topics needed by technology end-users and professional • Concise and targeted with live demonstration for quick answers to daily challenges - and easy orientation to key features and functions
  • 6.
    Courses 3. 500Desktop Skills courseware titles are for professionals who rely upon standard desktop applications such as Microsoft Office, Crystal Reports, Adobe Acrobat and Lotus Notes. Our desktop solutions are ideal for day-to-day performance support, as well as supporting major corporate software migrations. In addition, our Desktop Skills Courseware Collection supports over 12 popular end user certifications including ECDL/ICDL and many Microsoft MOS certification exams (Rs 2400) 4. 1,200 course offerings are divided into the following Solution Areas: 1. Software Development 2. Internet and Network Technologies 3. Web Design 4. OS and Server Technologies 5. Enterprise Database Systems 6. Project Effectiveness The courseware in these Solution Areas address over 100 current technical certifications sought by IT professionals and enterprises providing technical products and services to their customers, including: 1. Microsoft 2. ISC(2) 3. Cisco 4. Linux Professional Institute 5. Adobe 6. CompTIA 7. Oracle ( Rs 2400) 5. The Digital Literacy courseware provides skills training and assessment for a broad range of computing concepts and techniques, including competency in computer hardware and software, operating systems, word processing and spreadsheet functions, networks and the Internet, electronic mail, and an • Over 1,700 tasks/topics covered across the most popular applications: • Office 2010 • Office 2013 • Office 365 • Office Online • Google Docs • Windows 8 • Graphics & Design • Mobile Devices • Internet & Cloud Computing • End-User Security • …and others!
  • 7.
    Cloud Infrastructure Support  Cloud Computing for IT professionals  Vmware Overview  Vmware Workstation  VMware: Datacenter Virtualization Design and Optimization with vSphere 5  VMware: Datacenter Virtualization with vSphere 5 - Part 1  VMware: Datacenter Virtualization with vSphere 5 - Part 2  EMC Information Storage and Management (ISM) v2 
  • 8.
    Information Security Professionals  Certified Information Security Manager (CISM) 2012  Certified Information Security Manager (CISM) 2013  Certified Information Systems Security Professional (CISSP) 2012  Certified Information Systems Security Professional (CISSP) 2013  Certified Internet Security Auditor (CISA)  CompTIA Security+ 2011  Firewall 2.0 : Deploying Cisco ASA Firewall Solutions  IINS 2.0: Implementing Cisco IOS Network Security  IPS 7.0: Implementing Cisco Intrusion Prevention System  SECURE 1.0: Securing Networks with Cisco Routers and Switches  Important links
  • 9.
    Cisco Networking Professionals  CompTIA Network+ 2012  CompTIA Server+ 2009  DESGN 2.1: Designing for Cisco Internetwork Solutions  ROUTE 1.0: Implementing Cisco IP Routing  ROUTE 1.0: Implementing Cisco IP Routing (1) Test Prep  SWITCH 1.0: Implementing Cisco IP Switched Networks  SWITCH 1.0: Implementing Cisco IP Switched Networks (1) Test Prep  CAPPS 8.0: Integrating Cisco Unified Communications Applications  CIPT1 8.0: Implementing Cisco Unified Communications Manager Part 1  CIPT2 8.0: Implementing Cisco Unified Communications Manager Part 2  ICND1 2.0: Interconnecting Cisco Networking Devices Part 1  ICND2 2.0: Interconnecting Cisco Networking Devices Part 2  ICOMM 8.0: Introducing Cisco Voice and Unified Communications Administration  Implementing Cisco Voice Communications and QoS (CVOICE)
  • 10.
    Unix/Linux Administration UNIX Fundamentals  UNIX: Operating System Fundamentals  UNIX: System Administration  UNIX: The User Environment  Understanding and Evaluating RFID Technology for your Business  Linux Professional Institute: Advanced Level Linux Professional (LPIC-2) Exam 201  Linux Professional Institute: Advanced Level Linux Professional (LPIC-2) Exam 202  Linux Professional Institute: Junior Level Linux Professional (LPIC-1) Exam 101  Linux Professional Institute: Junior Level Linux Professional (LPIC-1) Exam 102  Sun Microsystems Solaris 9: System Administration I  Sun Microsystems Solaris 9: System Administration II  Perl Programming Fundamentals  UNIX: Shell Programming
  • 11.
    Microsoft Server Administration  Microsoft Windows Server 2008 R2: Server Virtualization with Hyper-V  Microsoft Windows Server 2008: Configuring Active Directory  Microsoft Windows Server 2008: Configuring Applications Infrastructure  Microsoft Windows Server 2008: Configuring Network Infrastructure  Microsoft Windows Server 2008: Enterprise Administration  Microsoft Windows Server 2008: New Features  Microsoft Windows Server 2008: Server Administration  Microsoft Windows Server 2012: Administration  Microsoft Windows Server 2012: Configuring Advanced Services  Microsoft Windows Server 2012: Installing and Configuring  Microsoft Exchange Server 2010 SP1: Configuring  Microsoft Exchange Server 2013: Core Solutions  Microsoft System Center Essentials: Installation and Configuration
  • 12.
    Microsoft SQL ServerAdministration  Microsoft SQL Server 2008 R2: Database Development  Microsoft SQL Server 2008 R2: Implementation and Maintenance  Microsoft SQL Server 2008: Business Intelligence Development and Maintenance  Microsoft SQL Server 2012: Database Administration  Microsoft SQL Server 2012: Implementing a Data Warehouse  Microsoft SQL Server 2012: Querying  Microsoft SharePoint 2010 SP1: Administration  Microsoft SharePoint 2010: Administration  Microsoft SharePoint 2010: Application Development  Microsoft SharePoint 2010: Configuring  Microsoft SharePoint Server 2010 SP1: Configuring Important links
  • 13.
    Oracle Database Administration  Database Fundamentals, Database Design Fundamentals  Oracle Database 11g: Introduction to SQL  Oracle Database 11g: SQL Fundamentals I  Oracle Database 11g: SQL Fundamentals II  Oracle Database 11g: Administration Workshop I Release 2  Oracle Database 11g: Administration Workshop II Release 2  Oracle Database 11g: Develop PL/SQL Program Units  Oracle Database 11g: PL/SQL Fundamentals  Oracle Database 11g: Performance Tuning  Oracle Database 11g: Program with PL/SQL  Oracle Database 11g: RAC Administration  Oracle Database 11g: SQL Tuning  Oracle Database 11g: SQL and PL/SQL New Features  Oracle Database 11g: Secure Backup  Oracle Database 11g: Security
  • 14.
    Java Programming Introduction to Java EE 6  Introduction to Voice over IP  Java Programming with J2SE 5.0  Java Programming with Java SE 6.0  Java SE 7 New Features  Java SE7 Fundamentals  Java SE7 Professional  JavaScript Fundamentals
  • 15.
    Oracle Application Support  Oracle 11i E-Business Suite: Essentials for Implementers  Oracle 11i E-Business Suite: System Administrator Fundamentals  Oracle 11i: Navigate Oracle Applications  Oracle 11i: Project Foundation Fundamentals  Oracle 12c: New Features for Administrators  Oracle Application Server 10g: Administration I  Oracle Application Server 10g: Administration II
  • 16.
    WEB Design Designing and Hosting a Web Site  Developing a User-Centered Software Design Approach  DHTML Basics  Programming in HTML5 with JavaScript  Working with HTML5 and CSS3 Important links
  • 17.
    AGILE Programming Agile Practitioner - (PMI-ACP and Scrum Master)  Agile Software Development  Best Practices for Software Programming Important links
  • 18.
    Microsoft Desktop &Office Productivity skills  Microsoft Office 2013:  Microsoft Office 2013: Advanced Excel  Microsoft Office 2013: Advanced Outlook  Microsoft Office 2013: Advanced PowerPoint  Microsoft Office 2010: Visio  Microsoft Office 2010: Advanced Access  Microsoft Office 2013: SharePoint  Microsoft Office Live Meeting  Microsoft OneNote  Microsoft Project 2013 Important links
  • 19.
    Database Administration Database Design Fundamentals  Database Fundamentals Important links
  • 20.
    SAP end user& BI skills  Overview of SAP for Project Teams  SAP Business Objects Business Intelligence  SAP Business One for End Users  SAP Business Suite for End Users Important links
  • 21.
    ADOBE Skills Adobe Dreamweaver CS5  Adobe Fireworks CS4  Adobe Flash CS5  Adobe Illustrator CS4  Adobe InDesign CS5  Adobe Photoshop CS5  Adobe AIR  Adobe AIR for Flash Developers  Adobe Acrobat 9  Adobe Captivate 4 Important links
  • 22.
    Advantages  Sea-changein contribution and team work  delivered on e-platform from SKILLSOFT one of the world leaders in eLearning & skill development  Acquire advanced IT and soft skills and knowledge in specialized areas  Become successful entrepreneurs and managers Important links www.appuji.org www.edufinserve.in www.cyberlearning.org www.rimsr.in
  • 23.
    Preparing Managers forSuccess in A Changing World. Train and Certify one million college students/job-seekers in IT/Soft Skills