The document outlines the steps to migrate an IBM Cloud Orchestrator environment from version 2.4.0.2 to 2.5.0.1. The key steps include: 1) checking prerequisites and discovering the topology, 2) migrating images between the systems, 3) exporting OpenStack data from the original system, 4) importing the data into the new IBM Cloud Manager, and 5) verifying the migrated resources on both systems and ensuring resources are no longer available on the original system.