MGT 312 Assignment Practice Week 4 Knowledge Check
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 4 Practice: Week 4 Knowledge Check
Complete “Week 4 Knowledge Check” in Connect® by Day 5.
Note: You have unlimited attempts available to complete practice
assignments. The highest scored attempt will be recorded. These
assignments have earlier due dates, so plan accordingly. Grades must be
transferred manually to eCampus by your instructor. Don’t panic, this
might happen after your due date.
A group that gets together because of a common interest is an informal
group.
True or False
The 3 Cs of effective teams include charters and strategies, composition,
and conscientiousness.
True or False
A distributive negotiation usually involves a single issue in which one
person gains at the expense of another.
True or False
Trust of disclosure is _____ trust.
Multiple Choice
communication
competency
contractual
organizational
expertise
A _____ is a set of expected behaviors for members of the group as a
whole.
Multiple Choice
group norm
task role
group role
group competency
maintenance role
==============================================
MGT 312 Assignment Week 1 Apply To Tell or Not to Tell?
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 1 Apply To Tell or Not to Tell?
Review the Week 1 Knowledge Check to prepare for this assignment.
Complete the “To Tell or Not to Tell Assignment” in Connect®.
Note: You have only 1 attempt available to complete this assignment.
Grades must be transferred manually to eCampus by your instructor.
Don’t worry, this might happen after your due date.
Materials
Learn: Connect® Access
==============================================
MGT 312 Assignment Week 1 Practice Knowledge Check
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 1 PracticeKnowledge Check
Note: You have unlimited attempts available to complete practice
assignments. The highest scored attempt will be recorded.
These assignments have earlier due dates, so plan accordingly.
Grades must be transferred manually to eCampus by your instructor.
Don’t worry, this might happen after your due date.
Materials
Learn: Connect® Access
==============================================
MGT 312 Assignment Week 2 Apply Self-Assessment Reflection
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 2 Apply Self-Assessment Reflection
Review your results from the Week 1 and Week 2 Self-Assessments:
Self-Assessment: Assessing My Perspective on Ethics
Self-Assessment: What is My Big Five Personality Profile?
Self-Assessment: Assessing an Organization’s Diversity Climate
Consider how the information you’ve gathered can be used to solve a
problem, work on a team, and function within a business environment.
Determine how you can use your findings to get along with co-workers
that may have different assessment results.
Evaluate how you would handle stressful situations, manage change, and
stay motivated.
Complete “Apply: Self-Assessment Reflection” in Connect®. Do not
exceed 175 words.
Note: You have only 1 attempt available to complete this assignment.
Grades must be transferred manually to eCampus by your instructor.
Don’t worry, this might happen after your due date.
==============================================
MGT 312 Assignment Week 2 Practice Knowledge Check
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 2 Practice Knowledge Check
Complete “Practice: Week 2 Knowledge Check” in Connect® by Day 5
Note: You have unlimited attempts available to complete practice
assignments. The highest scored attempt will be recorded. These
assignments have earlier due dates, so plan accordingly. Grades must be
transferred manually to eCampus by your instructor. Don’t worry, this
might happen after your due date.
Materials
Learn: Connect® Access
The potential to learn and use spoken and written languages is known as
linguistic intelligence.
True or False
The internal dimensions of diversity
Multiple Choice
include personality.
include race and gender.
are viewed as changeable.
include external differences.
are not apparent to others.
Intelligence cannot be modified or altered.
True or False
Prejudice is one of the most common barriers to implementing
successful diversity programs.
True or False
A person who ___________ is relatively unconstrained by situational
forces and effects environmental change.
Multiple Choice
is emotionally intelligent
has an internal locus of control
has a proactive personality
is an introvert
is emotionally stable
==============================================
MGT 312 Assignment Week 3 Apply Perceptions, Motivation,
and Performance Management Practices
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 3 Apply: Perceptions, Motivation, and Performance
Management Practices
Review the Week 3 Knowledge Check to prepare for this assignment.
Complete “Apply: Perceptions, Motivation, and Performance
Management Practices” in Connect®.
Note: You have only 1 attempt available to complete this assignment.
Grades must be transferred manually to eCampus by your instructor.
Don’t worry, this might happen after your due date.
Arrow Furniture is a family-owned and operated manufacturer of high-
end furniture located in North Carolina. The furniture industry has
suffered from foreign competition over recent years. Nationwide, there
have been massive layoffs and several large companies have closed.
Arrow’s workers are feeling these pressures and have begun displaying
counterproductive behaviors. The HR manager recently told Mary
Baker, the family member serving as CEO, that employees are
threatening to unionize if they don’t get higher pay and more job
security. Mary is upset by this comment because the family has
supported employees with decent salaries and health benefits. Higher
wages are the last thing the company needs if they are to remain
competitive.
The Baker family wants to turn things around. They know they will have
to be more competitive price-wise. This might be achieved by finding
cheaper suppliers, lowering employee labor costs, or increasing
productivity. That said, the Baker’s strongly believe that it is important
to “take care of their people,” many of whom are lifelong employees.
A global car manufacturer is going to open a new facility in the
community. It is likely the company will offer higher salaries and better
benefits than offered by Arrow Furniture. The firm is known to offer
such benefits in an attempt to reduce the need for a union. Jobs at this
plant will be more technically advanced than those at Arrow and the
company is offering job training to those who are interested.
The Bakers are aware that the nature of work at Arrow results in
moderate levels of hygiene factors and low motivators.
Using the 3-Step Problem-Solving Approach and the Organizing
Framework, what should the Bakers do to motivate their employees and
get support for the company’s future plans?
Review the following conversation:
Marcy: Dana, can I talk to you for a couple of minutes? We’ve been
roommates for two years and I think I have a time management problem.
I just don’t get enough done in a day. What do you think?
Dana: Tell me more. How did you decide that you have a problem?
Marcy: I never get everything done on my to-do list. The more I get
done, the more I end up adding to the list.
Dana: What would solving the problem look like to you?
Marcy: Well, I’d get everything done on my list.
Dana: Is that realistic?
Marcy: It’s not, but what else am I going to do?
Dana: What else can you do that will help? Can you work with an
advisor? Use a scheduling program?
This is an example of coaching. Describe the process of coaching and
explain why is it important for managers to be effective coaches.
==============================================
MGT 312 Assignment Week 3 Practice Knowledge Check
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 3 Practice: Week 3 Knowledge Check
Complete “Practice: Week 3 Knowledge Check” in Connect® by Day 5.
Note: You have unlimited attempts available to complete practice
assignments. The highest scored attempt will be recorded. These
assignments have earlier due dates, so plan accordingly. Grades must be
transferred manually to eCampus by your instructor. Don’t worry, this
might happen after your due date.
Foundations of Motivation—Hot Topic
This video case provides valuable insights into Hot Topic, a music and
clothing retailer. The company has made Fortune’s 100 Best Companies
to Work For list, and interviews with the CEO and other employees
explain why. Hot Topic has a unique organizational culture with an
accompanying and similarly unique performance management and
motivation program. Opting for an open, no-walls corporate office, CEO
Betsy McLaughlin hopes to foster communication, motivation, and
increased performance by removing many of the barriers to cooperation
and creativity found in many corporations today. This case will allow
you to see how Hot Topic employees are motivated and some of the
incentives the company uses in their performance management system.
Click play to start the video and answer the questions that appear below.
NOTE—You must answer every question. After all questions are
answered, you can review and change your answers before submitting.
Hot Topic CEO Betsy McLaughlin, describes a clear and consistent
message communicated to and possessed by employees—passion! She
then says that the company translates this passion into positive customer
experiences, the overarching goal of the company. Based on the fact that
a “passion for the concept” is so important to the culture of Hot Topic,
which of the following statements is most likely an accurate statement?
Multiple Choice
Pay for performance would be a good way to motivate the employees of
Hot Topic.
Behavioral goals, as opposed to specific objective goals, would be
commonly used in the performance management system at Hot Topic.
Performance management is likely not a high priority for Hot Topic.
Financial performance measures are the most likely method of
evaluating employee performance.
Performance evaluations at Hot Topic likely are biased by leniency.
Which of the following best describes the motivation generated by the
Concert Reimbursement program?
Multiple Choice
Meaningfulness
Extrinsic
Intrinsic
Psychic
Inspirational
Which aspect of intrinsic motivation is illustrated by Betsy McLaughlin
in the video?
Multiple Choice
Choice
Inspiration
Achievement
Meaningfulness
Non-financial
Based on the description of Torrid, which of the following statements
would most likely be accurate concerning the employees working with
the customers in this store?
Multiple Choice
They are motivated primarily by financial extrinsic rewards.
The goals they set are primarily task oriented in nature.
They derive great motivation from nonfinancial extrinsic rewards.
Managers would only rarely need to use reinforcement or punishment
with them.
They are intrinsically motivated through meaningfulness of their jobs.
==============================================
MGT 312 Assignment Week 4 Apply Team Dynamics
Assignment
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 4 Apply: Team Dynamics Assignment
Review Ch. 8, 10, and 12 of Organizational Behavior in Connect®.
Scenario:
You have worked at your current employer for five years. Recently your
company merged with a much larger Boston Accounting Firm to
improve efficiencies, increase revenues, cut costs and adopt best practice
in the industry. After the merger, you find yourself on a team of four
other individuals that you have never met. Each individual is from a
different department: Auditing, Tax, Corporate Governance, Legal and
Insurance. The purpose of your team is to downsize your department in
terms of employees.
Create a 10-slide restructuring and downsizing plan presentation with
speaker notes that can be used in each department.
Answer the following questions in your plan:
Why is the change needed?
What will change?
Who will be affected?
How will they be affected?
How will potential conflict be managed?
How will trust be strengthened or repaired?
How will power be shared in the organization after the
restructuring/downsizing?
What tactics will be used to achieve a successful
restructuring/downsizing transition? What tactics will be avoided?
What are the benefits of the planned changes?
What is the timeframe of implementation?
How will changes be communicated to the employees?
Cite a minimum of one outside reference.
Format your assignment according to APA guidelines.
Submit your assignment.
Note: Grades are awarded based upon individual contributions to the
Learning Team assignment. Each Learning Team member receives a
grade based upon his/her contributions to the team assignment. Not all
students may receive the same grade for the team assignment.
==============================================
MGT 312 Assignment Week 5 Practice Knowledge Check
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 5 Practice: Week 5 Knowledge Check
Complete “Practice: Week 5 Knowledge Check” in Connect® by Day 5.
Note: You have unlimited attempts available to complete practice
assignments. The highest scored attempt will be recorded. These
assignments have earlier due dates, so plan accordingly. Grades must be
transferred manually to eCampus by your instructor. Don’t worry, this
might happen after your due date.
The career functions of the mentoring process that enhance career
development include
In the encounter phase of organizational socialization,
If there is a lack of information or inaccurate information about the
change, management should adopt an education and communication
approach to managing resistance to change.
Organizational culture is not statistically related to any measures of
organizational effectiveness.
Which of the following is not one of the career functions of mentoring?
In Kotter’s step of creating the guiding coalition, managers
The participation and involvement approach to overcoming resistance to
change should be used when
_________ is a stress reduction technique that is expensive because it
requires a trained psychologist or counselor.
A(n) _______ culture encourages being adaptable, creative, and fast to
respond to changes in the marketplace.
_______ are specific behaviors used to deal with a stressful situation.
What cultural types represent competing values?
A clan culture has an internal focus and values stability and control.
Artifacts include an organization’s acronyms, manner of dress, and
myths and stories told about the organization.
There are three types of change: upward, downward, and lateral.
Which type(s) of organizational culture has (have) been shown by
research to be most strongly related to subjective innovation?
Organizational climate is defined as the set of shared, taken-for-granted,
implicit assumptions that a group holds and that determines how it
perceives, thinks about, and reacts to its various
Mission statements represent the reason that an organization exists
The two dimensions of the competing values framework are
The two general functions of mentoring are internal and external.
According to research, organizational commitment is lower in market
cultures than in clan cultures.
Which of the following is not an underlying assumption of Lewin’s
model?
Meditation is an approach to stress reduction that involves redirecting
thoughts away from self, following a structured procedure
Secondary appraisals are perceptions of how you are able to deal or cope
with a given demand.
Which of the following mechanisms for changing organizational culture
addresses all three levels of culture?
External forces for change include demographic changes in the
organization’s workforce.
ABC Company states, “We put the smiles on kids’ faces.” This is its
The complete absence of stress is death.
The four phases of mentoring are initiation, cultivation, socialization,
and definition.
The socialization tactic that ranges from a newcomer being socialized
over time with the help of an experienced member, to the newcomer not
being provided with a role model, is
In the change and acquisition phase of organizational socialization, the
newcomer’s values, skills, and attitudes start to shift as the new recruit
discovers what the organization is truly like.
When implementing cultural change through the use of organizational
activities, processes, or outcomes, a leader is operating at the level of
espoused values.
One of the important functions of organizational culture is to facilitate
collective commitment.
Resistance to change is caused solely by irrational and stubborn
recipients of change.
Which of the following is not a characteristic of a change agent that
would cause resistance to change?
An example of social and political pressures for change is
A ________ outlines an organization’s long-term direction and the
actions necessary to achieve the planned results.
The first step of Kotter’s change model is to establish a sense of
urgency.
The levels of organizational culture are
In Lewin’s model, refreezing creates the motivation to change.
________ change is the most complex, costly, and uncertain of changes.
==============================================
MGT 312 Entire Course
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 1 Organizational Behavior in the Workplace
MGT 312 Week 2 Diversity and Personality at Work
MGT 312 Week 2 Big Five Personality Types
MGT 312 Week 3 Team Assignment Organizational Climate (Google)
MGT 312 Week 3 Using Strengths to Increase Motivation
MGT 312 Week 4 Team Assignment Five Bases of Power
MGT 312 Week 4 Individual Assignment Working in Groups and Team
s
MGT 312 Week 5 CAREER CONNECTION Socialization and Mentori
ng
MGT 312 Week 5 Organizational Development and Human Resources
==============================================
MGT 312 Final Guide 1
FOR MORE CLASSES VISIT
www.mgt312study.com
1
The interdisciplinary field dedicated to understanding and managing pe
ople at work is called:
Management dynamics
Management theory
Organizational dynamics
Organizational behavior
2
The distinction between flexible and fixed individual differences:
Is that managers have little or no impact on flexible differences
Is that managers should hire people based on their attitudes and emotio
ns
Is that managers have little or no impact on fixed differences
Has no practical value for managers
3
Regarding using personality testing as part of the hiring process, experts
have concluded that:
The typical personality test is not a valid predictor of job performance
Only the Big Five should be used as predictors of job performance
The effects of personality on job performance are so large it cannot be i
gnored by managers
There are many valid instruments available to managers to test for perso
nality types
4
In Ajzen’s theory of planned behavior, ___________ is (are) the key link
between _________.
Intentions; attidtudes and planned behavior
Norms; intentions and planned behavior
Intentions; norms and attitudes
Attitudes; intentions and planned behavior
5
According to the Ajzen model, the strongest predictor of an employee’s b
ehavior is (are):
The employee's intentions
The employee's attitudes
Social norms
The employee's values
6
The steps in the process of stereotype formation and maintenance in ord
er are:
Expectations, categorization, inferences, maintenance.
Categorization, inferences, expectations, maintenance.
Inferences, categorization, expectations, maintenance.
Categorization, expectations, inferences, maintenance.
7
Janelle, one of Abdul’s employees, has performed poorly on many aspec
ts of her job since she was hired four months ago. This is likely to be attr
ibuted to:
External causes
Fundamental bias
Internal causes
Self-serving bias
8
The potential to understand and regulate oneself is known as:
Naturalist intelligence
Intrapersonal intelligence
Kinesthetic intelligence
Interpersonal intelligence
9
Self-enhancement and self-transcendence are:
Personal attitudes
Endpoints of one of the dimensions of values
Workplace attitudes
Cognitions
10
Organizations with adhocracy cultures are described as:
Externally focused and valuing stability and control
Internally focused and valuing stability and control
Externally focused and valuing flexibility
Internally focused and valuing flexibility
11
Which of the following is the least fixed of a person’s individual differen
ces?
Cognitive abilities
Attitudes
Emotions
Intelligence
12
Camilla, a manager, notes that while Wilhelm’s written reports are very
thorough and accurate, his oral presentations are not effective. Camilla
is looking at:
Explicit factors
Implicit factors
Distinctiveness
Consistency
13
Stimulation is in the ____________ part of Schwartz’s model.
Conservation
Openness to change
Self-enhancement
Self-transcendence
14
The contingency approach suggests that:
A manager needs to learn a set of hard-and-fast rules.
There is one best way to manage.
OB theories apply to all situations.
The best answer depends on the situation.
15
Research shows that, in general:
Social capital increases group conflict.
Social capital decreases work group integration.
Social capital decreases organizational performance.
Social capital can improve operations.
16
The corporate staff in the accounting department at ABC Corporation w
ent on 12-
hour days during the holiday season, just like the regular retail employe
es do during that season. This is an example of a(n) _________ change.
Product
Radically innovative
Adaptive
Innovative
17
The extent to which an individual identifies with an organization and co
mmits to its goals is called:
Organizational satisfaction
Organizational commitment
Job involvement
Perceived organizational support
18
Joyce finds that the members of the project team to which she has been a
ssigned in her management class are all athletes on the college’s footbal
l and basketball teams. She immediately considers dropping the class be
cause she thinks her experience with that team will be negative. Joyce is
likely to be reacting to a:
Self-serving bias
===========================================
===
MGT 312 Final Guide 2
FOR MORE CLASSES VISIT
www.mgt312study.com
1 in the ________ of group development, group members try to get to kn
ow each other and establish common understanding.
2
Organizational ________ is the study of the many factors that have an i
mpact on how people and groups act, think, feel, and respond to work an
d organizations, and how organizations respond to their environments.
3
The highest level a group can possibly perform at is known as ________
.
4
In ________, managers establish the rules and reporting relationships t
hat allow people to achieve organizational goals.
5
When situational pressures are ________, personality is not a good pred
ictor of on-the-job performance.
6 A manager notices his task force's ideas are a little stale. He attributes
this to the fact that the group is homogeneous. He should ________.
7
The extent to which a leader actually does help a group or organization
to achieve its goals is best described as ________.
8
Which of the following statements best explains why work attitude has lit
tle relationship to job performance?
9
Transactional leaders motivate followers by ________.
10
The management of organizational politics most often falls to ________.
11
What statement best describes how situational factors may affect work m
ood?
12
The ________ of a worker's attitude reflects his thoughts about how to a
ct on the job.
13
A business owner accepts the importance of the ________ theory. Conse
quently he has structured his company to fit the factors that affect it the
most in an effort to eliminate as much uncertainty as possible.
14
Two managers have conflicting views of how to best handle a recent incr
ease in funds. They have many meetings and each manager must argue
his position. After several weeks, a decision is made that results in an ef
ficient and effective use of the new resources. This example best shows t
hat ________.
15
The ________ describes the different types of relationships that may dev
elop between a leader and a follower.
16
On her work team, Michelle develops detailed tasks lists and work flow c
harts to help her team members understand the steps involved in each pr
oject. She also maintains the project calendar and receives periodic upd
ates from each team member to ensure that projects are progressing on
schedule. Which role does Michelle most likely fill on her team?
17
Managers engage in ________ to increase their power and pursue goals
that favor their individual and group interests.
19
A wealthy heiress decides to take a job as a social worker. She is receivi
ng a lot of news coverage because of her decision, and while she doesn't
like the media attention, she is happy that the news reporters are seeing
her as the selfless person she wants to be. Her work behavior is best des
cribed as ________.
20
Organizational behavior is examined at three main levels: ________ .
21
A ________ is a systematic tendency to use, ignore, or interpret informa
tion about a target in a particular way that results in inaccurate percepti
ons.
22
When the business environment is ________, an organization is most lik
ely to decentralize authority and empower its employees to make operati
ng decisions.
23
Which element of work motivation answers the question "how hard does
a person work to perform a chosen behavior"?
24
The study of organizational behavior provides a set of ________ that ar
e useful for understanding the behavior that occurs within organizations
.
25
The ________ function of management allows managers to diagnose ho
w well they have performed.
26
Employees who have intrinsic work values will be motivated by _______
_.
27
Teams differ from groups in that teams ________.
28
In assessing intentions, cooperativeness is the degree to which
29
In which work situation will personality most likely play a role in job per
formance?
30
________ is the pattern of relatively enduring ways that a person feels, t
hinks, and behaves.
===========================================
===
MGT 312 Week 1 Organizational Behavior in the Workplace
FOR MORE CLASSES VISIT
www.mgt312study.com
Organizational Behavior in the Workplace
Complete the matrix below with 3 to 5 job skills found in the workplace t
hat could lead to improved job performance.
Write a 350- to 700-
word summary of what you have learned about Organizational Behavior
from your current readings. Include the following in your summary:
· Explain the connection between organizational behavior and your se
lected job skills from the matrix.
· Discuss how these job skills can lead to improved job performance.
· Explain how Organizational Behavior can aid you in decision-
making and problem-solving.
· Predict the consequences of unethical behavior in the workplace.
===========================================
===
MGT 312 Week 2 Big Five Personality Types
FOR MORE CLASSES VISIT
www.mgt312study.com
Complete the “What Is My Big Five Personality Profile?” self-
assessment.
Write a 700- to 1,050-word paper in which you address the following:
· Do you agree with the results of your assessment?
· Based on the results of your assessment, what do you see as your stre
ngths and weaknesses?
· How might your personality type influence your job performance?
Format your paper consistent with APA guidelines.
Click the Assignment Files tab to submit your assignment.
===========================================
===
MGT 312 Week 2 Diversity and Personality at Work
FOR MORE CLASSES VISIT
www.mgt312study.com
You are assigned to work on a team in the workplace with a person who
has a different personality type than you. Connect with your team memb
ers who have a different personality than you.
Write a 350- to 700-word paper in which includes the following:
· A description of each team member’s personality type
· A description of the advantages of working with those with differing
personality types
· A discussion of the disadvantages of working with those with differin
g personality types
· Examples of ways organizations can manage a diverse group of empl
oyees.
Cite 1 to 3 business sources not including the text that support the team’
s ideas regarding personality.
Format the paper consistent with APA guidelines.
Click the Assignment Files tab to submit the assignment.
===========================================
===
MGT 312 Week 3 Team Assignment Organizational Climate
(Google)
FOR MORE CLASSES VISIT
www.mgt312study.com
Locate a list of the 100 best companies to work for by using a search eng
ine.
Research companies from that list to ensure sufficient information is ava
ilable to review the Organizational Behavior environment of that compa
ny. Look for the following key words: amplifying effect, pro-
social behaviors, positive deviance, conscious capitalism.
Select one of the companies as a team.
Write a 350- to 700-
word analysis of the team’s chosen organization and its climate regardi
ng organizational behavior. Include the following in your review:
· Does this organization encourage positive Organizational Behavior?
· If yes, how do they demonstrate this?
· If not, what type of Organizational Behavior do they seem to encoura
ge?
Peer Review: The teams will share their findings with at least one other t
eam in class. The teams will critically analyze the review to see if the oth
er team provided adequate evidence to support their claims regarding th
e organizational climate of the chosen organization.
Incorporate the feedback from the peer review in the conclusion of the p
aper.
Format the paper consistent with APA guidelines.
Click the Assignment Files tab to submit the assignment.
===========================================
===
MGT 312 Week 3 Using Strengths to Increase Motivation
FOR MORE CLASSES VISIT
www.mgt312study.com
Complete the “What is My Level of PsyCap” self-assessment.
Write a 1050- to 1400-word paper in which you include the following:
· Explain why you agree or disagree with your results.
· Develop strategies to advance your career using your strengths.
· How can you use goal-
setting to increase motivation and improve job performance?
· How might your engagement as an employee and job satisfaction infl
uence job performance?
· Discuss at least 5 of the following motivational theories and explain
how these can aid in job performance.
· Extrinsic motivation
· Intrinsic motivation
· McGregor’s Theory X and Theory Y
· Maslow’s Needs Hierarchy
· Acquired needs theory
· Self-determination theory
· Herzberg’s theory of motivation
· Equity theory
· Expectancy theory
Format your paper consistent with APA guidelines.
Click the Assignment Files tab to submit your assignment.
===========================================
===
MGT 312 Week 4 Individual Assignment Working in Groups
and Teams
FOR MORE CLASSES VISIT
www.mgt312study.com
Complete the “Evaluate Team Member Effectiveness” self-assessment.
Write a 700- to 1,050-word paper in which you address the following:
· Do you agree with your results?
· Based on your self-
assessment, what do you see as your strengths and weaknesses regard
ing working on a team?
· Have you ever engaged in social loafing while on a team? Why or w
hy not?
· How does working effectively on a team give you an advantage in the
workplace?
· How do groups normally develop?
· How does the effectiveness of the team members influence the group’
s development process?
Format your paper consistent with APA guidelines.
Click the Assignment Files tab to submit your assignment.
===========================================
===
MGT 312 Week 4 Team Assignment Five Bases of Power
FOR MORE CLASSES VISIT
www.mgt312study.com
Create a 5- to 8-
slide Microsoft® PowerPoint® presentation in which you examine the fi
ve bases of power. Include the following:
· A description of each
· An example of each as used in the workplace
· An evaluation of which are the most and least desirable
· Ways to increase positive power bases
Click the Assignment Files tab to submit the assignment.
===========================================
===
MGT 312 Week 5 Apply Best Buy Case Study
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 5 Apply: Best Buy Case Study
Review the Week 5 Knowledge Check to prepare for this assignment.
Complete the “Best Buy Case Study” in Connect®.
Note: You have only 1 attempt available to complete this assignment.
Grades must be transferred manually to eCampus by your instructor.
Don’t worry, this might happen after your due date.
This problem-solving application profiles electronics retailer Best Buy.
The entrance of Amazon and Walmart into the online resale marketplace
gashed Best Buy’s instore sales. When you couple that with inefficient
processes and procedures at the organization, and scandals with senior
leadership, the organization really was in dire straits. Organizations such
as Circuit City, CompUSA and RadioShack could not survive their
problems, could Best Buy? In came new CEO Hubert Joly and CFO
Sharon McCollam. They are now in the middle of the many challenges
Best Buy is facing and need to find solutions to these major problems.
Some of Best Buy’s internal issues could best be addressed by ______
Multiple Choice
changing customer preferences
internal competition
demographic changes
participation/suggestions by employees
mergers and acquisitions
If Best Buy chose to compete by introducing online sales direct to the
consumer, this would be an example of ______ change
Multiple Choice
innovating
adaptive
radically innovative
Product
Process
Which type of analytical framework could help Best Buy develop a
strategic plan?
Multiple Choice
competing values analysis
SWOT analysis
systems analysis
force field analysis
organizational development analysis
Best Buy might use all of the methods of change listed below. Which of
these includes inputs, strategic plans, target elements of change, and
outputs?
Multiple Choice
organizational structure plan
social factors method
organizational arrangement
three-stage model of planned change
systems model of change
When other tactics will not work or are too expensive, the best approach
to overcoming resistance to change is
Multiple Choice
facilitation and support
manipulation and co-optation
explicit and implicit coercion
participation and involvement
education and commitment
The majority of problems Best Buy is facing have been brought about by
______ forces.
external
The change brought about by online competition from Amazon and
Walmart are examples of _____
Fill in the blank
Best Buy’s new CEO and CFO will need to function as catalysts in
helping the organization to deal with old problems in new ways. They
would then be known as
Fill in the blank
Recommend a solution to the problem outlined above in no more than
175- words
Essay
==============================================
MGT 312 Week 5 CAREER CONNECTION Socialization and
Mentoring
FOR MORE CLASSES VISIT
www.mgt312study.com
CAREER CONNECTION: This assignment builds socialization skills a
nd establishes the importance of mentoring to aid in career advancemen
t.
The team has been invited to present at a conference before top executiv
es of Fortune 500 companies. The topic the team is presenting on is “Ho
w Can Socialization and Mentoring Be Used For Career Advancement?
”
Create a 10- to 15-
slide Microsoft® PowerPoint® presentation in which you address the fo
llowing as they relate to the topic:
· How can socialization and mentoring be used to advance a career?
· How can socialization and mentoring help minimize resistance to ch
ange using the contingency approach?
· How can socialization and mentoring help people embrace these cha
nges as a part of career advancement?
· Include Feldman’s three-
phase model of socialization and the six socialization tactics as part of
the discussion.
Cite a minimum of 3 peer-reviewed sources other than your textbook.
Format the references according to APA guidelines and include as a ref
erence slide at the end of the presentation.
Click the Assignment Files tab to submit your assignment.
===========================================
===
MGT 312 Week 5 Organizational Development and Human
Resources
FOR MORE CLASSES VISIT
www.mgt312study.com
Write a 175- to 350-
word short paper that explains how Human Resource functions relate to
organizational development.
Click the Assignment Files tab to submit the assignment.
===========================================
===
MGT 312 Week 5 Practice Knowledge Check
FOR MORE CLASSES VISIT
www.mgt312study.com
MGT 312 Week 5 Practice Knowledge Check
Complete “Practice: Week 5 Knowledge Check” in Connect® by Day 5.
Note: You have unlimited attempts available to complete practice
assignments. The highest scored attempt will be recorded. These
assignments have earlier due dates, so plan accordingly. Grades must be
transferred manually to eCampus by your instructor. Don’t worry, this
might happen after your due date.
==============================================

MGT 312 STUDY Redefined Education--mgt312study.com

  • 1.
    MGT 312 AssignmentPractice Week 4 Knowledge Check FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 4 Practice: Week 4 Knowledge Check Complete “Week 4 Knowledge Check” in Connect® by Day 5. Note: You have unlimited attempts available to complete practice assignments. The highest scored attempt will be recorded. These assignments have earlier due dates, so plan accordingly. Grades must be transferred manually to eCampus by your instructor. Don’t panic, this might happen after your due date. A group that gets together because of a common interest is an informal group. True or False The 3 Cs of effective teams include charters and strategies, composition, and conscientiousness.
  • 2.
    True or False Adistributive negotiation usually involves a single issue in which one person gains at the expense of another. True or False Trust of disclosure is _____ trust. Multiple Choice communication competency contractual
  • 3.
    organizational expertise A _____ isa set of expected behaviors for members of the group as a whole. Multiple Choice group norm task role group role group competency maintenance role ==============================================
  • 4.
    MGT 312 AssignmentWeek 1 Apply To Tell or Not to Tell? FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 1 Apply To Tell or Not to Tell? Review the Week 1 Knowledge Check to prepare for this assignment. Complete the “To Tell or Not to Tell Assignment” in Connect®. Note: You have only 1 attempt available to complete this assignment. Grades must be transferred manually to eCampus by your instructor. Don’t worry, this might happen after your due date. Materials Learn: Connect® Access
  • 5.
    ============================================== MGT 312 AssignmentWeek 1 Practice Knowledge Check FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 1 PracticeKnowledge Check Note: You have unlimited attempts available to complete practice assignments. The highest scored attempt will be recorded. These assignments have earlier due dates, so plan accordingly. Grades must be transferred manually to eCampus by your instructor. Don’t worry, this might happen after your due date. Materials Learn: Connect® Access
  • 6.
    ============================================== MGT 312 AssignmentWeek 2 Apply Self-Assessment Reflection FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 2 Apply Self-Assessment Reflection Review your results from the Week 1 and Week 2 Self-Assessments: Self-Assessment: Assessing My Perspective on Ethics Self-Assessment: What is My Big Five Personality Profile? Self-Assessment: Assessing an Organization’s Diversity Climate Consider how the information you’ve gathered can be used to solve a problem, work on a team, and function within a business environment. Determine how you can use your findings to get along with co-workers that may have different assessment results.
  • 7.
    Evaluate how youwould handle stressful situations, manage change, and stay motivated. Complete “Apply: Self-Assessment Reflection” in Connect®. Do not exceed 175 words. Note: You have only 1 attempt available to complete this assignment. Grades must be transferred manually to eCampus by your instructor. Don’t worry, this might happen after your due date. ============================================== MGT 312 Assignment Week 2 Practice Knowledge Check FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 2 Practice Knowledge Check Complete “Practice: Week 2 Knowledge Check” in Connect® by Day 5
  • 8.
    Note: You haveunlimited attempts available to complete practice assignments. The highest scored attempt will be recorded. These assignments have earlier due dates, so plan accordingly. Grades must be transferred manually to eCampus by your instructor. Don’t worry, this might happen after your due date. Materials Learn: Connect® Access The potential to learn and use spoken and written languages is known as linguistic intelligence. True or False The internal dimensions of diversity Multiple Choice include personality.
  • 9.
    include race andgender. are viewed as changeable. include external differences. are not apparent to others. Intelligence cannot be modified or altered. True or False Prejudice is one of the most common barriers to implementing successful diversity programs. True or False
  • 10.
    A person who___________ is relatively unconstrained by situational forces and effects environmental change. Multiple Choice is emotionally intelligent has an internal locus of control has a proactive personality is an introvert is emotionally stable ==============================================
  • 11.
    MGT 312 AssignmentWeek 3 Apply Perceptions, Motivation, and Performance Management Practices FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 3 Apply: Perceptions, Motivation, and Performance Management Practices Review the Week 3 Knowledge Check to prepare for this assignment. Complete “Apply: Perceptions, Motivation, and Performance Management Practices” in Connect®. Note: You have only 1 attempt available to complete this assignment. Grades must be transferred manually to eCampus by your instructor. Don’t worry, this might happen after your due date. Arrow Furniture is a family-owned and operated manufacturer of high- end furniture located in North Carolina. The furniture industry has suffered from foreign competition over recent years. Nationwide, there have been massive layoffs and several large companies have closed.
  • 12.
    Arrow’s workers arefeeling these pressures and have begun displaying counterproductive behaviors. The HR manager recently told Mary Baker, the family member serving as CEO, that employees are threatening to unionize if they don’t get higher pay and more job security. Mary is upset by this comment because the family has supported employees with decent salaries and health benefits. Higher wages are the last thing the company needs if they are to remain competitive. The Baker family wants to turn things around. They know they will have to be more competitive price-wise. This might be achieved by finding cheaper suppliers, lowering employee labor costs, or increasing productivity. That said, the Baker’s strongly believe that it is important to “take care of their people,” many of whom are lifelong employees. A global car manufacturer is going to open a new facility in the community. It is likely the company will offer higher salaries and better benefits than offered by Arrow Furniture. The firm is known to offer such benefits in an attempt to reduce the need for a union. Jobs at this plant will be more technically advanced than those at Arrow and the company is offering job training to those who are interested. The Bakers are aware that the nature of work at Arrow results in moderate levels of hygiene factors and low motivators. Using the 3-Step Problem-Solving Approach and the Organizing Framework, what should the Bakers do to motivate their employees and get support for the company’s future plans?
  • 13.
    Review the followingconversation: Marcy: Dana, can I talk to you for a couple of minutes? We’ve been roommates for two years and I think I have a time management problem. I just don’t get enough done in a day. What do you think? Dana: Tell me more. How did you decide that you have a problem? Marcy: I never get everything done on my to-do list. The more I get done, the more I end up adding to the list. Dana: What would solving the problem look like to you? Marcy: Well, I’d get everything done on my list. Dana: Is that realistic? Marcy: It’s not, but what else am I going to do?
  • 14.
    Dana: What elsecan you do that will help? Can you work with an advisor? Use a scheduling program? This is an example of coaching. Describe the process of coaching and explain why is it important for managers to be effective coaches. ============================================== MGT 312 Assignment Week 3 Practice Knowledge Check FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 3 Practice: Week 3 Knowledge Check Complete “Practice: Week 3 Knowledge Check” in Connect® by Day 5. Note: You have unlimited attempts available to complete practice assignments. The highest scored attempt will be recorded. These assignments have earlier due dates, so plan accordingly. Grades must be
  • 15.
    transferred manually toeCampus by your instructor. Don’t worry, this might happen after your due date. Foundations of Motivation—Hot Topic This video case provides valuable insights into Hot Topic, a music and clothing retailer. The company has made Fortune’s 100 Best Companies to Work For list, and interviews with the CEO and other employees explain why. Hot Topic has a unique organizational culture with an accompanying and similarly unique performance management and motivation program. Opting for an open, no-walls corporate office, CEO Betsy McLaughlin hopes to foster communication, motivation, and increased performance by removing many of the barriers to cooperation and creativity found in many corporations today. This case will allow you to see how Hot Topic employees are motivated and some of the incentives the company uses in their performance management system. Click play to start the video and answer the questions that appear below. NOTE—You must answer every question. After all questions are answered, you can review and change your answers before submitting.
  • 16.
    Hot Topic CEOBetsy McLaughlin, describes a clear and consistent message communicated to and possessed by employees—passion! She then says that the company translates this passion into positive customer experiences, the overarching goal of the company. Based on the fact that a “passion for the concept” is so important to the culture of Hot Topic, which of the following statements is most likely an accurate statement? Multiple Choice Pay for performance would be a good way to motivate the employees of Hot Topic. Behavioral goals, as opposed to specific objective goals, would be commonly used in the performance management system at Hot Topic. Performance management is likely not a high priority for Hot Topic.
  • 17.
    Financial performance measuresare the most likely method of evaluating employee performance. Performance evaluations at Hot Topic likely are biased by leniency. Which of the following best describes the motivation generated by the Concert Reimbursement program? Multiple Choice Meaningfulness
  • 18.
  • 19.
    Which aspect ofintrinsic motivation is illustrated by Betsy McLaughlin in the video? Multiple Choice Choice Inspiration Achievement Meaningfulness Non-financial
  • 20.
    Based on thedescription of Torrid, which of the following statements would most likely be accurate concerning the employees working with the customers in this store? Multiple Choice They are motivated primarily by financial extrinsic rewards. The goals they set are primarily task oriented in nature. They derive great motivation from nonfinancial extrinsic rewards. Managers would only rarely need to use reinforcement or punishment with them. They are intrinsically motivated through meaningfulness of their jobs.
  • 21.
    ============================================== MGT 312 AssignmentWeek 4 Apply Team Dynamics Assignment FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 4 Apply: Team Dynamics Assignment Review Ch. 8, 10, and 12 of Organizational Behavior in Connect®. Scenario: You have worked at your current employer for five years. Recently your company merged with a much larger Boston Accounting Firm to improve efficiencies, increase revenues, cut costs and adopt best practice in the industry. After the merger, you find yourself on a team of four other individuals that you have never met. Each individual is from a different department: Auditing, Tax, Corporate Governance, Legal and Insurance. The purpose of your team is to downsize your department in terms of employees.
  • 22.
    Create a 10-sliderestructuring and downsizing plan presentation with speaker notes that can be used in each department. Answer the following questions in your plan: Why is the change needed? What will change? Who will be affected? How will they be affected? How will potential conflict be managed? How will trust be strengthened or repaired? How will power be shared in the organization after the restructuring/downsizing? What tactics will be used to achieve a successful restructuring/downsizing transition? What tactics will be avoided? What are the benefits of the planned changes? What is the timeframe of implementation? How will changes be communicated to the employees? Cite a minimum of one outside reference. Format your assignment according to APA guidelines.
  • 23.
    Submit your assignment. Note:Grades are awarded based upon individual contributions to the Learning Team assignment. Each Learning Team member receives a grade based upon his/her contributions to the team assignment. Not all students may receive the same grade for the team assignment. ============================================== MGT 312 Assignment Week 5 Practice Knowledge Check FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 5 Practice: Week 5 Knowledge Check Complete “Practice: Week 5 Knowledge Check” in Connect® by Day 5. Note: You have unlimited attempts available to complete practice assignments. The highest scored attempt will be recorded. These assignments have earlier due dates, so plan accordingly. Grades must be
  • 24.
    transferred manually toeCampus by your instructor. Don’t worry, this might happen after your due date. The career functions of the mentoring process that enhance career development include In the encounter phase of organizational socialization, If there is a lack of information or inaccurate information about the change, management should adopt an education and communication approach to managing resistance to change. Organizational culture is not statistically related to any measures of organizational effectiveness.
  • 25.
    Which of thefollowing is not one of the career functions of mentoring? In Kotter’s step of creating the guiding coalition, managers The participation and involvement approach to overcoming resistance to change should be used when _________ is a stress reduction technique that is expensive because it requires a trained psychologist or counselor. A(n) _______ culture encourages being adaptable, creative, and fast to respond to changes in the marketplace.
  • 26.
    _______ are specificbehaviors used to deal with a stressful situation. What cultural types represent competing values? A clan culture has an internal focus and values stability and control. Artifacts include an organization’s acronyms, manner of dress, and myths and stories told about the organization.
  • 27.
    There are threetypes of change: upward, downward, and lateral. Which type(s) of organizational culture has (have) been shown by research to be most strongly related to subjective innovation? Organizational climate is defined as the set of shared, taken-for-granted, implicit assumptions that a group holds and that determines how it perceives, thinks about, and reacts to its various Mission statements represent the reason that an organization exists The two dimensions of the competing values framework are
  • 28.
    The two generalfunctions of mentoring are internal and external. According to research, organizational commitment is lower in market cultures than in clan cultures. Which of the following is not an underlying assumption of Lewin’s model? Meditation is an approach to stress reduction that involves redirecting thoughts away from self, following a structured procedure
  • 29.
    Secondary appraisals areperceptions of how you are able to deal or cope with a given demand. Which of the following mechanisms for changing organizational culture addresses all three levels of culture? External forces for change include demographic changes in the organization’s workforce. ABC Company states, “We put the smiles on kids’ faces.” This is its The complete absence of stress is death.
  • 30.
    The four phasesof mentoring are initiation, cultivation, socialization, and definition. The socialization tactic that ranges from a newcomer being socialized over time with the help of an experienced member, to the newcomer not being provided with a role model, is In the change and acquisition phase of organizational socialization, the newcomer’s values, skills, and attitudes start to shift as the new recruit discovers what the organization is truly like. When implementing cultural change through the use of organizational activities, processes, or outcomes, a leader is operating at the level of espoused values.
  • 31.
    One of theimportant functions of organizational culture is to facilitate collective commitment. Resistance to change is caused solely by irrational and stubborn recipients of change. Which of the following is not a characteristic of a change agent that would cause resistance to change? An example of social and political pressures for change is A ________ outlines an organization’s long-term direction and the actions necessary to achieve the planned results. The first step of Kotter’s change model is to establish a sense of urgency. The levels of organizational culture are
  • 32.
    In Lewin’s model,refreezing creates the motivation to change. ________ change is the most complex, costly, and uncertain of changes. ============================================== MGT 312 Entire Course FOR MORE CLASSES VISIT www.mgt312study.com MGT 312 Week 1 Organizational Behavior in the Workplace MGT 312 Week 2 Diversity and Personality at Work MGT 312 Week 2 Big Five Personality Types MGT 312 Week 3 Team Assignment Organizational Climate (Google) MGT 312 Week 3 Using Strengths to Increase Motivation MGT 312 Week 4 Team Assignment Five Bases of Power MGT 312 Week 4 Individual Assignment Working in Groups and Team s MGT 312 Week 5 CAREER CONNECTION Socialization and Mentori ng MGT 312 Week 5 Organizational Development and Human Resources
  • 33.
    ============================================== MGT 312 FinalGuide 1 FOR MORE CLASSES VISIT www.mgt312study.com 1 The interdisciplinary field dedicated to understanding and managing pe ople at work is called: Management dynamics Management theory Organizational dynamics Organizational behavior 2 The distinction between flexible and fixed individual differences: Is that managers have little or no impact on flexible differences Is that managers should hire people based on their attitudes and emotio ns Is that managers have little or no impact on fixed differences Has no practical value for managers 3 Regarding using personality testing as part of the hiring process, experts have concluded that: The typical personality test is not a valid predictor of job performance Only the Big Five should be used as predictors of job performance
  • 34.
    The effects ofpersonality on job performance are so large it cannot be i gnored by managers There are many valid instruments available to managers to test for perso nality types 4 In Ajzen’s theory of planned behavior, ___________ is (are) the key link between _________. Intentions; attidtudes and planned behavior Norms; intentions and planned behavior Intentions; norms and attitudes Attitudes; intentions and planned behavior 5 According to the Ajzen model, the strongest predictor of an employee’s b ehavior is (are): The employee's intentions The employee's attitudes Social norms The employee's values 6 The steps in the process of stereotype formation and maintenance in ord er are: Expectations, categorization, inferences, maintenance. Categorization, inferences, expectations, maintenance. Inferences, categorization, expectations, maintenance. Categorization, expectations, inferences, maintenance. 7 Janelle, one of Abdul’s employees, has performed poorly on many aspec ts of her job since she was hired four months ago. This is likely to be attr ibuted to: External causes
  • 35.
    Fundamental bias Internal causes Self-servingbias 8 The potential to understand and regulate oneself is known as: Naturalist intelligence Intrapersonal intelligence Kinesthetic intelligence Interpersonal intelligence 9 Self-enhancement and self-transcendence are: Personal attitudes Endpoints of one of the dimensions of values Workplace attitudes Cognitions 10 Organizations with adhocracy cultures are described as: Externally focused and valuing stability and control Internally focused and valuing stability and control Externally focused and valuing flexibility Internally focused and valuing flexibility 11 Which of the following is the least fixed of a person’s individual differen ces? Cognitive abilities Attitudes Emotions Intelligence 12
  • 36.
    Camilla, a manager,notes that while Wilhelm’s written reports are very thorough and accurate, his oral presentations are not effective. Camilla is looking at: Explicit factors Implicit factors Distinctiveness Consistency 13 Stimulation is in the ____________ part of Schwartz’s model. Conservation Openness to change Self-enhancement Self-transcendence 14 The contingency approach suggests that: A manager needs to learn a set of hard-and-fast rules. There is one best way to manage. OB theories apply to all situations. The best answer depends on the situation. 15 Research shows that, in general: Social capital increases group conflict. Social capital decreases work group integration. Social capital decreases organizational performance. Social capital can improve operations. 16 The corporate staff in the accounting department at ABC Corporation w ent on 12- hour days during the holiday season, just like the regular retail employe es do during that season. This is an example of a(n) _________ change.
  • 37.
    Product Radically innovative Adaptive Innovative 17 The extentto which an individual identifies with an organization and co mmits to its goals is called: Organizational satisfaction Organizational commitment Job involvement Perceived organizational support 18 Joyce finds that the members of the project team to which she has been a ssigned in her management class are all athletes on the college’s footbal l and basketball teams. She immediately considers dropping the class be cause she thinks her experience with that team will be negative. Joyce is likely to be reacting to a: Self-serving bias =========================================== === MGT 312 Final Guide 2 FOR MORE CLASSES VISIT www.mgt312study.com
  • 38.
    1 in the________ of group development, group members try to get to kn ow each other and establish common understanding. 2 Organizational ________ is the study of the many factors that have an i mpact on how people and groups act, think, feel, and respond to work an d organizations, and how organizations respond to their environments. 3 The highest level a group can possibly perform at is known as ________ . 4 In ________, managers establish the rules and reporting relationships t hat allow people to achieve organizational goals. 5 When situational pressures are ________, personality is not a good pred ictor of on-the-job performance. 6 A manager notices his task force's ideas are a little stale. He attributes this to the fact that the group is homogeneous. He should ________. 7 The extent to which a leader actually does help a group or organization to achieve its goals is best described as ________. 8
  • 39.
    Which of thefollowing statements best explains why work attitude has lit tle relationship to job performance? 9 Transactional leaders motivate followers by ________. 10 The management of organizational politics most often falls to ________. 11 What statement best describes how situational factors may affect work m ood? 12 The ________ of a worker's attitude reflects his thoughts about how to a ct on the job. 13 A business owner accepts the importance of the ________ theory. Conse quently he has structured his company to fit the factors that affect it the most in an effort to eliminate as much uncertainty as possible. 14 Two managers have conflicting views of how to best handle a recent incr ease in funds. They have many meetings and each manager must argue his position. After several weeks, a decision is made that results in an ef ficient and effective use of the new resources. This example best shows t hat ________.
  • 40.
    15 The ________ describesthe different types of relationships that may dev elop between a leader and a follower. 16 On her work team, Michelle develops detailed tasks lists and work flow c harts to help her team members understand the steps involved in each pr oject. She also maintains the project calendar and receives periodic upd ates from each team member to ensure that projects are progressing on schedule. Which role does Michelle most likely fill on her team? 17 Managers engage in ________ to increase their power and pursue goals that favor their individual and group interests. 19 A wealthy heiress decides to take a job as a social worker. She is receivi ng a lot of news coverage because of her decision, and while she doesn't like the media attention, she is happy that the news reporters are seeing her as the selfless person she wants to be. Her work behavior is best des cribed as ________. 20 Organizational behavior is examined at three main levels: ________ . 21 A ________ is a systematic tendency to use, ignore, or interpret informa tion about a target in a particular way that results in inaccurate percepti ons.
  • 41.
    22 When the businessenvironment is ________, an organization is most lik ely to decentralize authority and empower its employees to make operati ng decisions. 23 Which element of work motivation answers the question "how hard does a person work to perform a chosen behavior"? 24 The study of organizational behavior provides a set of ________ that ar e useful for understanding the behavior that occurs within organizations . 25 The ________ function of management allows managers to diagnose ho w well they have performed. 26 Employees who have intrinsic work values will be motivated by _______ _. 27 Teams differ from groups in that teams ________. 28 In assessing intentions, cooperativeness is the degree to which 29
  • 42.
    In which worksituation will personality most likely play a role in job per formance? 30 ________ is the pattern of relatively enduring ways that a person feels, t hinks, and behaves. =========================================== === MGT 312 Week 1 Organizational Behavior in the Workplace FOR MORE CLASSES VISIT www.mgt312study.com Organizational Behavior in the Workplace Complete the matrix below with 3 to 5 job skills found in the workplace t hat could lead to improved job performance. Write a 350- to 700- word summary of what you have learned about Organizational Behavior from your current readings. Include the following in your summary: · Explain the connection between organizational behavior and your se lected job skills from the matrix. · Discuss how these job skills can lead to improved job performance. · Explain how Organizational Behavior can aid you in decision- making and problem-solving. · Predict the consequences of unethical behavior in the workplace.
  • 43.
    =========================================== === MGT 312 Week2 Big Five Personality Types FOR MORE CLASSES VISIT www.mgt312study.com Complete the “What Is My Big Five Personality Profile?” self- assessment. Write a 700- to 1,050-word paper in which you address the following: · Do you agree with the results of your assessment? · Based on the results of your assessment, what do you see as your stre ngths and weaknesses? · How might your personality type influence your job performance? Format your paper consistent with APA guidelines. Click the Assignment Files tab to submit your assignment. =========================================== === MGT 312 Week 2 Diversity and Personality at Work FOR MORE CLASSES VISIT www.mgt312study.com You are assigned to work on a team in the workplace with a person who
  • 44.
    has a differentpersonality type than you. Connect with your team memb ers who have a different personality than you. Write a 350- to 700-word paper in which includes the following: · A description of each team member’s personality type · A description of the advantages of working with those with differing personality types · A discussion of the disadvantages of working with those with differin g personality types · Examples of ways organizations can manage a diverse group of empl oyees. Cite 1 to 3 business sources not including the text that support the team’ s ideas regarding personality. Format the paper consistent with APA guidelines. Click the Assignment Files tab to submit the assignment. =========================================== === MGT 312 Week 3 Team Assignment Organizational Climate (Google) FOR MORE CLASSES VISIT www.mgt312study.com Locate a list of the 100 best companies to work for by using a search eng ine. Research companies from that list to ensure sufficient information is ava ilable to review the Organizational Behavior environment of that compa ny. Look for the following key words: amplifying effect, pro- social behaviors, positive deviance, conscious capitalism. Select one of the companies as a team.
  • 45.
    Write a 350-to 700- word analysis of the team’s chosen organization and its climate regardi ng organizational behavior. Include the following in your review: · Does this organization encourage positive Organizational Behavior? · If yes, how do they demonstrate this? · If not, what type of Organizational Behavior do they seem to encoura ge? Peer Review: The teams will share their findings with at least one other t eam in class. The teams will critically analyze the review to see if the oth er team provided adequate evidence to support their claims regarding th e organizational climate of the chosen organization. Incorporate the feedback from the peer review in the conclusion of the p aper. Format the paper consistent with APA guidelines. Click the Assignment Files tab to submit the assignment. =========================================== === MGT 312 Week 3 Using Strengths to Increase Motivation FOR MORE CLASSES VISIT www.mgt312study.com Complete the “What is My Level of PsyCap” self-assessment. Write a 1050- to 1400-word paper in which you include the following: · Explain why you agree or disagree with your results. · Develop strategies to advance your career using your strengths. · How can you use goal- setting to increase motivation and improve job performance? · How might your engagement as an employee and job satisfaction infl uence job performance?
  • 46.
    · Discuss atleast 5 of the following motivational theories and explain how these can aid in job performance. · Extrinsic motivation · Intrinsic motivation · McGregor’s Theory X and Theory Y · Maslow’s Needs Hierarchy · Acquired needs theory · Self-determination theory · Herzberg’s theory of motivation · Equity theory · Expectancy theory Format your paper consistent with APA guidelines. Click the Assignment Files tab to submit your assignment. =========================================== === MGT 312 Week 4 Individual Assignment Working in Groups and Teams FOR MORE CLASSES VISIT www.mgt312study.com Complete the “Evaluate Team Member Effectiveness” self-assessment. Write a 700- to 1,050-word paper in which you address the following: · Do you agree with your results? · Based on your self- assessment, what do you see as your strengths and weaknesses regard ing working on a team? · Have you ever engaged in social loafing while on a team? Why or w hy not?
  • 47.
    · How doesworking effectively on a team give you an advantage in the workplace? · How do groups normally develop? · How does the effectiveness of the team members influence the group’ s development process? Format your paper consistent with APA guidelines. Click the Assignment Files tab to submit your assignment. =========================================== === MGT 312 Week 4 Team Assignment Five Bases of Power FOR MORE CLASSES VISIT www.mgt312study.com Create a 5- to 8- slide Microsoft® PowerPoint® presentation in which you examine the fi ve bases of power. Include the following: · A description of each · An example of each as used in the workplace · An evaluation of which are the most and least desirable · Ways to increase positive power bases Click the Assignment Files tab to submit the assignment. =========================================== === MGT 312 Week 5 Apply Best Buy Case Study
  • 48.
    FOR MORE CLASSESVISIT www.mgt312study.com MGT 312 Week 5 Apply: Best Buy Case Study Review the Week 5 Knowledge Check to prepare for this assignment. Complete the “Best Buy Case Study” in Connect®. Note: You have only 1 attempt available to complete this assignment. Grades must be transferred manually to eCampus by your instructor. Don’t worry, this might happen after your due date. This problem-solving application profiles electronics retailer Best Buy. The entrance of Amazon and Walmart into the online resale marketplace gashed Best Buy’s instore sales. When you couple that with inefficient processes and procedures at the organization, and scandals with senior leadership, the organization really was in dire straits. Organizations such as Circuit City, CompUSA and RadioShack could not survive their problems, could Best Buy? In came new CEO Hubert Joly and CFO Sharon McCollam. They are now in the middle of the many challenges Best Buy is facing and need to find solutions to these major problems.
  • 49.
    Some of BestBuy’s internal issues could best be addressed by ______ Multiple Choice changing customer preferences internal competition demographic changes participation/suggestions by employees
  • 50.
    mergers and acquisitions IfBest Buy chose to compete by introducing online sales direct to the consumer, this would be an example of ______ change Multiple Choice innovating adaptive radically innovative Product
  • 51.
    Process Which type ofanalytical framework could help Best Buy develop a strategic plan? Multiple Choice competing values analysis SWOT analysis systems analysis force field analysis
  • 52.
    organizational development analysis BestBuy might use all of the methods of change listed below. Which of these includes inputs, strategic plans, target elements of change, and outputs? Multiple Choice organizational structure plan social factors method organizational arrangement three-stage model of planned change
  • 53.
    systems model ofchange When other tactics will not work or are too expensive, the best approach to overcoming resistance to change is Multiple Choice facilitation and support manipulation and co-optation explicit and implicit coercion participation and involvement
  • 54.
    education and commitment Themajority of problems Best Buy is facing have been brought about by ______ forces. external The change brought about by online competition from Amazon and Walmart are examples of _____ Fill in the blank Best Buy’s new CEO and CFO will need to function as catalysts in helping the organization to deal with old problems in new ways. They would then be known as Fill in the blank
  • 55.
    Recommend a solutionto the problem outlined above in no more than 175- words Essay ============================================== MGT 312 Week 5 CAREER CONNECTION Socialization and Mentoring FOR MORE CLASSES VISIT www.mgt312study.com CAREER CONNECTION: This assignment builds socialization skills a nd establishes the importance of mentoring to aid in career advancemen t. The team has been invited to present at a conference before top executiv es of Fortune 500 companies. The topic the team is presenting on is “Ho w Can Socialization and Mentoring Be Used For Career Advancement? ” Create a 10- to 15- slide Microsoft® PowerPoint® presentation in which you address the fo llowing as they relate to the topic: · How can socialization and mentoring be used to advance a career? · How can socialization and mentoring help minimize resistance to ch ange using the contingency approach? · How can socialization and mentoring help people embrace these cha nges as a part of career advancement?
  • 56.
    · Include Feldman’sthree- phase model of socialization and the six socialization tactics as part of the discussion. Cite a minimum of 3 peer-reviewed sources other than your textbook. Format the references according to APA guidelines and include as a ref erence slide at the end of the presentation. Click the Assignment Files tab to submit your assignment. =========================================== === MGT 312 Week 5 Organizational Development and Human Resources FOR MORE CLASSES VISIT www.mgt312study.com Write a 175- to 350- word short paper that explains how Human Resource functions relate to organizational development. Click the Assignment Files tab to submit the assignment. =========================================== === MGT 312 Week 5 Practice Knowledge Check FOR MORE CLASSES VISIT www.mgt312study.com
  • 57.
    MGT 312 Week5 Practice Knowledge Check Complete “Practice: Week 5 Knowledge Check” in Connect® by Day 5. Note: You have unlimited attempts available to complete practice assignments. The highest scored attempt will be recorded. These assignments have earlier due dates, so plan accordingly. Grades must be transferred manually to eCampus by your instructor. Don’t worry, this might happen after your due date. ==============================================