14. Berthony Myrtil is cutting beams and Ezekyèl is nailing them to prepare for the cement slab.
15.
16. View of completed Library I project and Library II project in the making.
17. Construction head, Holand, starts tying the metal rods together along with (from right) Kenny Antoine, Mickaël Myrtil, Marckely Calixte, Wilder Dorcé and Rodnert Myrtil. Kenny is filling in holes.
18. Michel is filling in holes. Marckely is checking their work to make sure no cement will fall through.
19. These are the two doors leading out of the Library I construction.
20. These people signed up to make the cement slab and have arrived very early, before the boss.
21. The group will divide into several groups. One to mix the cement and sand, another to pass the buckets on the ground, another on the ladder and another on the top, and finally two designated people, one that receives the empty buckets on top and tosses them to the other one on the ground to place in line again.
26. The cement is moving quickly to the top of the building.
27. The last part of the cement slab is just being finished, most of the people have gone down to the ground, just a few are watching the last of the cement being poured and smoothed.