Case 3
Maryland bridge
•Regd.no.- 845
•Name of patient: Sanju Manna
•Age:14years
•Sex: Male
•Place: Department of Pedodontics,GNIDSR
Patient came to the
outpatient department
of Pedodontics with
the complain of
trauma to upper front
teeth
•The patient was physically healthy and had no
history of relevant medical complications
•Patient gives history of trauma to upper anterior
teeth 15 days before while he was playing and had a
fall resulting in trauma to anterior teeth.
Intra-oral examination
•On clinical examination , it was found that upper right
central incisors was completely avulsed ,the empty
socket was confirmed clinically and radiographically.
•The patient was esthetically concern and wanted
replacement for the missing tooth.
TREATMENT PLANNING
•Upper and lower impression were recorded.
•Oral prophylaxis was done with ultrasonic
scaling.
•Maryland bridge was planned for replacement
of right maxillary central incisor.
UPPER & LOWER CAST
TRY IN PROCEDURE
Shade guide
SHADE SELECTION
PLACEMENT OF THE BRIDE

Maryland Bridge