CLIENTS
Page 1
MARK JOHNSONO P E R A T I O N S &
P R O J E C T M A N A G E M E N T
EXPERIENCE
CERTIFICATIONS
PROFILE
CONTACT
PROJECT MANAGER IMR
Consultant, Operations Management &
Project management
Experienced consultant with transferable skills
in operations and project management for the oil
and gas industry including:
•	 Acid Stimulation
•	 Autonomous Subsea Systems Monitoring &
Control
•	 Bid Proposals
•	 Capping Stack Feed Study
•	 Fastball Flow-line Hydrate Remediation
•	 Final Acceptance Testing (FAT)
•	 Heave Compensation LARS (Launch and Recovery
System) for subsea drilling system(s)
•	 Hydrate Remediation
•	 International Rapid Response Capping Stack
•	 Mentoring
•	 On-site Intervention
•	 Operations 3D Spatial Control & Diagnostic
System
•	 Plug and Abandonment
•	 Project Management
•	 Riserless Intervention Study (SILS, EXPRO, SWIFT)
•	 Subsea Chemical Injection
•	 Subsea Drilling Units
•	 Subsea Installation (trees, jumpers, risers)
•	 Subsea Intervention and Completion
•	
Pipeline integrity and Flow Assurance
•	 CSO Deep Blue Flexible Riser Installation
•	 Design and Build Pipeline Lifting Frames
•	 Flow-line Remediation
•	 Gas Lift Line
•	 Gas Pipeline Feed Study
•	 Pipeline End Testing
•	 Pipeline Hydrate Remediation
•	 Pipeline Inspections (internal, external)
•	 Prototype Autonomous Inspection Vehicle (PAIV)
•	 Riser Inspections
•	 Riserless Well Light Intervention (RWLI)
•	 Subsea Pig Launchers
•	 Unplug Hydrated Flowline
BP (Aspen, EPTG,
Marlin, Pompano, Special
Operation & Maintenance
Support, Troika)
DTC, Inc.
Chevron (ETC Research,
Dual Gradient, Angola
Block 17, Agbami, Erskine,
Riserless Intervention)
FTO Services
Benthic, Inc.
ExxonMobile (URC, XOM
Production)
Digicon (Veritas)
International
Newfield Exploration
Twenty-seven (27) years of
extensive offshore engineering
and project lead experience in
development and implementation
of subsea system design,
production optimization, and
applied problem solving, with
emphasis on safety and mentoring
of employees.
Locations: Gulf of Mexico, Brazil, W.
Africa, North Sea, Norway, Malaysia
Volunteer: National Science
Foundation, National Academy of
Science
O
+1 832 483 6749
m
markvsystems@gmail.com
Intervention Maintenance & Repair
(IMR)
Production Optimization
twic offshore safegulf helicopter survival
school
pigging &
inspection*
* In progress
Remotely Operated Vehicle (ROV)
Subsea
Tracerco Survey
Feed Study Project Manager
Design Team Lead
FOLLOW ME
LinkedIn
Perry Slingsby
Oceaneering
International
Pfitzco, Inc.
Wild Well Control, Inc.
Page 2
PROJECTS & INVENTIONS
EDUCATION
AFFILIATIONS
PROFILE
Blow-out Preventer (Deep Water GoM)
Research Partnership to Secure Energy for
America (RPSEA) design award recipient on a new
Blow-out Preventor (BOP) for deep water Gulf of
Mexico (GoM).
Role: Consultant
Georgia Institute of Technology
Focus area: Thermodynamics
Katrina Downed Platform
Used Micro ROV technology, and Didson/Mesotech
sonar map wreckage. Developed first 3D imaging
of subsea downed objects.
Role: Project Lead
Rice University
Professional development coursework in business
administration.
URC & Feed Study (Arctic)
Create and design Remote Autonomous Control
and Light Repair system for Arctic projects.
Role: Consultant - Project Lead
Florida Institute of Technology
Inventor/Co-designer of the “Surf Rover” ROV, a
bottom-crawling, multi-task ROV for surf zone use
for the Army Corps of Engineers.
Hydrate Remediation Vacuum Tool
Design and deploy tool on BP Troika and
Pompano, successfully unblock pipelines at Pluto.
Role: Engineer/Designer/Inventor
DTC Inc.
BS in
Mechanical Engineering
British Petroleum (BP)
Rice Program for
Managers
ExxonMobile, URC
MS in
Ocean Engineering
Oceaneering
Progenitor in subsea equipment
technology, subsea systems
concepts, remotely operated
vehicles (ROV), ROV tooling, and
subsea operation methodologies.
Hydrate remediation, flowline
remediation, and 15K psi acid
stimulation inventor.
•	 Shallow and deep water produc-
tion fields
•	 Develop and execute engineer-
ing methods and construction to
improve:
•	 fabrication
•	 installation
•	 commissioning
•	 maintenance
mts spe auvsi iso-9001*
* Re-certification in
progress
CONTACT
TECHNICAL DESIGN &
INNOVATION
O
+1 832 483 6749
m
markvsystems@gmail.com
Design & Build Technology
Technical Lead
Launch and Recovery System (LARS)
Subsea Drilling
New Tooling Development (Deep Water)
Remotely Operated Vehicle (ROV) Skid
Design Team Lead
Surf Rover
Design bottom-crawling, multi-tasking ROV
used by Army Corps of Engineers in surf zones.
Role: Inventor/Co-designer
Florida Institute of
Technology
FOLLOW ME
LinkedIn
MARK JOHNSONO P E R A T I O N S &
P R O J E C T M A N A G E M E N T
Page 3
+1 832 483 6749
markvsystems@gmail.com
Houston TX 77008
TRANSFERABLE SKILLS
Summary
Measurable Successes
Personality & Work style
Preferences
Presentations
Other Affiliations
MARK JOHNSONO P E R A T I O N S &
P R O J E C T M A N A G E M E N T
PROJECT LEAD (ON-SHORE)
Project Manager
Engineering Project Manager
Design Team Lead
Feed Studies
Plug & Intervention
15K Acid Stimulation
FOLLOW ME
LinkedIn
Autonomous Unmanned Vehicle (AUV)
Technology
Business Strategy
Public Speaking
New Tooling Development (Deep Water)
Mentoring
PROJECT LEAD (OFF-SHORE)
Hydrate Remediation Project Manager
Riserless Well Light Intervention (RWLI)
& Inspections
Person In Charge (PIC) ROV, WASP,
Diving
Feed Studies
Design Team Lead
Underwater Construction
Flexible Risers
Pipeline Inspection
Mentoring
Extensive experience in offshore
construction, subsea interventions, subsea
inspections, hydrate remediation, and
flowline remediation. Running offshore
projects and arriving at solutions others
don’t realize by utilizing technical
expertise and experience in offshore
operations. Working on feed studies
and performing research for clients,
empowering them to make intelligent
decisions to move projects forward.
Leading teams to arrive at technical
solutions, as well as mentoring engineers,
enabling all to become solid team
members. Developing and building solid
interpersonal, and trust relationships.
Managing crews from different cultures,
and different work roles.
While the project tooling manager at
Oceaneering, I was the inventor of
the hydrate remediation skid used to
attack blockage issues in the subsea
infrastructure. This technology offering is
now recognized as a standard practice by
the oil and gas industry.
Creating and leading new teams, executing
new and improved solutions to problems
that have yet to be solved.
•	 Keynote speaker “BP Deepwater Produc-
tion Field of the Future”, TAMU AUV Confer-
ence (2004)
•	 Society of Petroleum Engineers Co-Chair,
Subsea Intervention/ROV Technology Con-
ference (2005)
•	 Committee Author API 17 G (Groups 2 & 4)
•	 Association of Diving Contractors (ADC)

Mark Johnson Resume (March 2017)

  • 1.
    CLIENTS Page 1 MARK JOHNSONOP E R A T I O N S & P R O J E C T M A N A G E M E N T EXPERIENCE CERTIFICATIONS PROFILE CONTACT PROJECT MANAGER IMR Consultant, Operations Management & Project management Experienced consultant with transferable skills in operations and project management for the oil and gas industry including: • Acid Stimulation • Autonomous Subsea Systems Monitoring & Control • Bid Proposals • Capping Stack Feed Study • Fastball Flow-line Hydrate Remediation • Final Acceptance Testing (FAT) • Heave Compensation LARS (Launch and Recovery System) for subsea drilling system(s) • Hydrate Remediation • International Rapid Response Capping Stack • Mentoring • On-site Intervention • Operations 3D Spatial Control & Diagnostic System • Plug and Abandonment • Project Management • Riserless Intervention Study (SILS, EXPRO, SWIFT) • Subsea Chemical Injection • Subsea Drilling Units • Subsea Installation (trees, jumpers, risers) • Subsea Intervention and Completion • Pipeline integrity and Flow Assurance • CSO Deep Blue Flexible Riser Installation • Design and Build Pipeline Lifting Frames • Flow-line Remediation • Gas Lift Line • Gas Pipeline Feed Study • Pipeline End Testing • Pipeline Hydrate Remediation • Pipeline Inspections (internal, external) • Prototype Autonomous Inspection Vehicle (PAIV) • Riser Inspections • Riserless Well Light Intervention (RWLI) • Subsea Pig Launchers • Unplug Hydrated Flowline BP (Aspen, EPTG, Marlin, Pompano, Special Operation & Maintenance Support, Troika) DTC, Inc. Chevron (ETC Research, Dual Gradient, Angola Block 17, Agbami, Erskine, Riserless Intervention) FTO Services Benthic, Inc. ExxonMobile (URC, XOM Production) Digicon (Veritas) International Newfield Exploration Twenty-seven (27) years of extensive offshore engineering and project lead experience in development and implementation of subsea system design, production optimization, and applied problem solving, with emphasis on safety and mentoring of employees. Locations: Gulf of Mexico, Brazil, W. Africa, North Sea, Norway, Malaysia Volunteer: National Science Foundation, National Academy of Science O +1 832 483 6749 m markvsystems@gmail.com Intervention Maintenance & Repair (IMR) Production Optimization twic offshore safegulf helicopter survival school pigging & inspection* * In progress Remotely Operated Vehicle (ROV) Subsea Tracerco Survey Feed Study Project Manager Design Team Lead FOLLOW ME LinkedIn Perry Slingsby Oceaneering International Pfitzco, Inc. Wild Well Control, Inc.
  • 2.
    Page 2 PROJECTS &INVENTIONS EDUCATION AFFILIATIONS PROFILE Blow-out Preventer (Deep Water GoM) Research Partnership to Secure Energy for America (RPSEA) design award recipient on a new Blow-out Preventor (BOP) for deep water Gulf of Mexico (GoM). Role: Consultant Georgia Institute of Technology Focus area: Thermodynamics Katrina Downed Platform Used Micro ROV technology, and Didson/Mesotech sonar map wreckage. Developed first 3D imaging of subsea downed objects. Role: Project Lead Rice University Professional development coursework in business administration. URC & Feed Study (Arctic) Create and design Remote Autonomous Control and Light Repair system for Arctic projects. Role: Consultant - Project Lead Florida Institute of Technology Inventor/Co-designer of the “Surf Rover” ROV, a bottom-crawling, multi-task ROV for surf zone use for the Army Corps of Engineers. Hydrate Remediation Vacuum Tool Design and deploy tool on BP Troika and Pompano, successfully unblock pipelines at Pluto. Role: Engineer/Designer/Inventor DTC Inc. BS in Mechanical Engineering British Petroleum (BP) Rice Program for Managers ExxonMobile, URC MS in Ocean Engineering Oceaneering Progenitor in subsea equipment technology, subsea systems concepts, remotely operated vehicles (ROV), ROV tooling, and subsea operation methodologies. Hydrate remediation, flowline remediation, and 15K psi acid stimulation inventor. • Shallow and deep water produc- tion fields • Develop and execute engineer- ing methods and construction to improve: • fabrication • installation • commissioning • maintenance mts spe auvsi iso-9001* * Re-certification in progress CONTACT TECHNICAL DESIGN & INNOVATION O +1 832 483 6749 m markvsystems@gmail.com Design & Build Technology Technical Lead Launch and Recovery System (LARS) Subsea Drilling New Tooling Development (Deep Water) Remotely Operated Vehicle (ROV) Skid Design Team Lead Surf Rover Design bottom-crawling, multi-tasking ROV used by Army Corps of Engineers in surf zones. Role: Inventor/Co-designer Florida Institute of Technology FOLLOW ME LinkedIn MARK JOHNSONO P E R A T I O N S & P R O J E C T M A N A G E M E N T
  • 3.
    Page 3 +1 832483 6749 markvsystems@gmail.com Houston TX 77008 TRANSFERABLE SKILLS Summary Measurable Successes Personality & Work style Preferences Presentations Other Affiliations MARK JOHNSONO P E R A T I O N S & P R O J E C T M A N A G E M E N T PROJECT LEAD (ON-SHORE) Project Manager Engineering Project Manager Design Team Lead Feed Studies Plug & Intervention 15K Acid Stimulation FOLLOW ME LinkedIn Autonomous Unmanned Vehicle (AUV) Technology Business Strategy Public Speaking New Tooling Development (Deep Water) Mentoring PROJECT LEAD (OFF-SHORE) Hydrate Remediation Project Manager Riserless Well Light Intervention (RWLI) & Inspections Person In Charge (PIC) ROV, WASP, Diving Feed Studies Design Team Lead Underwater Construction Flexible Risers Pipeline Inspection Mentoring Extensive experience in offshore construction, subsea interventions, subsea inspections, hydrate remediation, and flowline remediation. Running offshore projects and arriving at solutions others don’t realize by utilizing technical expertise and experience in offshore operations. Working on feed studies and performing research for clients, empowering them to make intelligent decisions to move projects forward. Leading teams to arrive at technical solutions, as well as mentoring engineers, enabling all to become solid team members. Developing and building solid interpersonal, and trust relationships. Managing crews from different cultures, and different work roles. While the project tooling manager at Oceaneering, I was the inventor of the hydrate remediation skid used to attack blockage issues in the subsea infrastructure. This technology offering is now recognized as a standard practice by the oil and gas industry. Creating and leading new teams, executing new and improved solutions to problems that have yet to be solved. • Keynote speaker “BP Deepwater Produc- tion Field of the Future”, TAMU AUV Confer- ence (2004) • Society of Petroleum Engineers Co-Chair, Subsea Intervention/ROV Technology Con- ference (2005) • Committee Author API 17 G (Groups 2 & 4) • Association of Diving Contractors (ADC)