Lost in Transition
Fooled by randomness of projects, black swans,
traditional risk factors and the not-so usual suspects
Geert Jan Beekman
geertjan@xseed.nu
Introduction
“The reason why firms succeed or fail is perhaps the central question in strategy. It has
preoccupied the strategy field since its inception ….” is a 1991 quote by strategy guru
Michael Porter*
Replace some 20 years later ‘firms’ by ‘projects’ and the sigh is ever so current
To uncover these ‘reasons’ and to resolve them, once and for all, still is the challenge
of every stakeholder in todays uncertain economic circumstances
In the face of such uncertainties, every stakeholder wants to unambiguously allocate
success (but more so failure) to concrete internal and external factors, quantify their
contributions and nudge them in a positive direction!
These slides summarize some of the most recent findings on projects, risk,
randomness and ‘how-to-save-time-and-money-managing-your-projects’
* M. E. Porter. Towards a dynamic theory of strategy. Strategic Management Journal, 1991, 12, p. 95.
Our finished engagements and current research projects have yielded interesting and
sometimes unexpected findings :
• Fooled by Randomness
• Fooled by Black Swans
• Fooled by the Traditional Risk Factors: ‘The Usual Suspects’
• Fooled by the ‘Unusual Suspects’
– Managing the Process …..
– The Human Wiring
Some of our Findings
Fooled by Randomness
• Any portfolio of projects breaks down into ‘white
swans’ , ‘black swans’ and ‘lame ducks’
– White swans show a project overrun between -10%
and +40% and are ‘normally’ distributed. This means
that they run over budget in a linear way: 20%
overrun halfway, most likely ends up in a 40% (20%
* 2) overrun
– Black swans show a project overrun larger than the
white swans, and are exponentially distributed. This
means that they run over budget in an ‘exponential’
way: 20% overrun halfway, most likely ends up in a
400% (202) overrun*
– Lame ducks show a project underrun smaller than
the white swan, and are also exponentially
distributed. Unfortunately, these projects are
prematurely terminated and thus appear to
underrun their budget
• This breakdown holds for large as well as small
projects, In IT, business, real estate or facilities
• The left-hand side graph is a log-log plot (Standard
Excel feature) of the cumulative distribution of the
project overrrun [(actual/budget)*100]
* Provided that the exponential of the distribution is a factor ‘2’.
If it is a ‘3’, then the overrun becomes (203), ‘1.2’ it becomes 201.2
Fooled by Black Swans
White Swans
• Risk factors balance
– Doing things right on risk factors
(e.g. GOOD support by senior
management) off-sets doing
things wrong (e.g. LITTLE
support) and DAMPENS overrun
Black Swans
• Balance goes off-the-scale
– Doing things right, with few
exceptions, no longer off-sets
doing things wrong and
AMPLIFIES overrun
Fooled by Traditional Risk Factors (1/3)
1. Support from senior management
2. Clear and realistic objectives
3. Strong/detailed plan kept up to date
4. Good communications and feedback
5. User/Client involvement
6. Qualified staff
7. Effective change management
8. Competent project management
9. Strong business case / sound basis for the project
10. Sufficient / well allocated resources
11. Good leadership
12. Proven / familiar technology
13. Realistic schedule
14. Risks are assessed, addressed and managed
15. Project sponsor / champion
16. Effective monitoring & control
17. Adequate budget
18. Organizational adaptation / culture / structure
19. Good performance by suppliers / contractors / consultants
20. Planned close down review / acceptance of possible failure
21. Training provision
22. Political stability
23. Correct choice / past experience of PM tools & methods
24. Environmental influences
25. Learning from past experience
26. Project size
27. Appreciation of differing viewpoints
• Scientific research into project risk factors covers a 40 year history en has yielded a valid and reliable list of
27 factors that consistently have roved their effect on budget overruns
• This list is handsomely summarized in a 2006 paper by Joyce Fortune and Diana White*:
* Fortune, J. & D. White. Framing of project critical success factors by a systems model. IJPM, 2006, 53 – 65.
• In 2012 investigators of McKinsey cluster 21 of these 27 factors into 4 groups and conduct a regression
analysis on 5400 IT projects collected from dozens of companies
• They find a total contribution to budget overrun of 45% for the clusters but no significant effect for any of
the individual factors**
** Bloch, M., S. Blumberg & J. Laartz. Delivering large-scale IT projects on time, on budget and on value. McKinsey Quarterly, October 2012. (on line)
Fooled by Traditional Risk Factors (2/3)
• Our Transition Compass™
Algorithm calculates the
contribution of the same
factors on actual
portfolios between 30
and 180 projects
• The total contribution of
the clusters differs for
black swans and white
swans and never
surpasses 39%
– White Swans 25%
– Black Swans 39%
• The algorithm also
determines the
contributions of the
individual factors and
their interactions
Fooled by Traditional Risk Factors (3/3)
• The total contribution of
the clusters of white
swans is contingent on
the project domain* and
shows a considerable
bandwidth
• Black swans cluster more
evenly around the mean
*IT, Business, Commercieel Vastgoed & Facilities
Managing the Process …..
• Our experiences from
practice have uncovered
a fifth cluster with 6
other factors
• The cluster ‘Managing
the Process’ refers to
‘fulfilling your role’ and
‘taking your
responsibilities’ and
contributes considerably
to success and failure
• The total contribution
increases:
– White Swans
• 25%  34%
– Black Swans
• 39%  60%
The Human Wiring: Bias & Heuristics
• Our experiences from
practice have uncovered a
sixth cluster with 5 other
factors
• This cluster refers the
simplifying heuristics that
people use to form
judgments and take
complex decisions
• These heuristics are prone
to systematic bias and
contribute, on average, 22%
to success and failure
• The total contribution
increases further
– White Swans
• 34%  56%
– Black Swans
• 60%  82%

More Related Content

What's hot

Powerpoint mis copy
Powerpoint mis   copyPowerpoint mis   copy
Powerpoint mis copy
jobert_028
 

What's hot (9)

Demonstrating ROI for Technology Investments 9.30.13
Demonstrating ROI for Technology Investments 9.30.13Demonstrating ROI for Technology Investments 9.30.13
Demonstrating ROI for Technology Investments 9.30.13
 
Decision Making Under Uncertainty
Decision Making Under UncertaintyDecision Making Under Uncertainty
Decision Making Under Uncertainty
 
5
55
5
 
Project Analysis And Valuation - Introduction To Project Analysis And Valuation
Project Analysis And Valuation - Introduction To Project Analysis And ValuationProject Analysis And Valuation - Introduction To Project Analysis And Valuation
Project Analysis And Valuation - Introduction To Project Analysis And Valuation
 
Determining the value of information literacy for employers
Determining the value of information literacy for employersDetermining the value of information literacy for employers
Determining the value of information literacy for employers
 
Chapter17 judgmentalbehavioural
Chapter17 judgmentalbehaviouralChapter17 judgmentalbehavioural
Chapter17 judgmentalbehavioural
 
Impact Management for Everyone
Impact Management for EveryoneImpact Management for Everyone
Impact Management for Everyone
 
Powerpoint mis copy
Powerpoint mis   copyPowerpoint mis   copy
Powerpoint mis copy
 
Bias assessment methods in project risk management
Bias assessment methods in project risk managementBias assessment methods in project risk management
Bias assessment methods in project risk management
 

Viewers also liked (6)

Tfs 2008 Overview
Tfs 2008 OverviewTfs 2008 Overview
Tfs 2008 Overview
 
Probability Distribution Fitting of Cost Overrun Profiles
Probability Distribution Fitting of Cost Overrun ProfilesProbability Distribution Fitting of Cost Overrun Profiles
Probability Distribution Fitting of Cost Overrun Profiles
 
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
 
Project cost management a simplified approach ppt - Oracle Primavera Collab...
Project cost management   a simplified approach ppt - Oracle Primavera Collab...Project cost management   a simplified approach ppt - Oracle Primavera Collab...
Project cost management a simplified approach ppt - Oracle Primavera Collab...
 
Earned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMPEarned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMP
 
Baniszewski.john
Baniszewski.johnBaniszewski.john
Baniszewski.john
 

Similar to Lost in transition

Klastorin parte1 1
Klastorin parte1 1Klastorin parte1 1
Klastorin parte1 1
cpezoareyes
 
Chakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohithChakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohith
PMI2011
 
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
PMI_IREP_TP
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project management
Pavan Kumar
 

Similar to Lost in transition (20)

Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
 
Successful project
Successful projectSuccessful project
Successful project
 
Whose project is it anyway?
Whose project is it anyway?Whose project is it anyway?
Whose project is it anyway?
 
Klastorin parte1 1
Klastorin parte1 1Klastorin parte1 1
Klastorin parte1 1
 
Pm value
Pm valuePm value
Pm value
 
Scope creep - cylfe campain
Scope creep - cylfe campainScope creep - cylfe campain
Scope creep - cylfe campain
 
Ey prm-predicting-project-risks
Ey prm-predicting-project-risksEy prm-predicting-project-risks
Ey prm-predicting-project-risks
 
P070 a simple_view_of_complexity
P070 a simple_view_of_complexityP070 a simple_view_of_complexity
P070 a simple_view_of_complexity
 
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdfEBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
 
The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...
 
A Framework for Managing Project Risk
A Framework for Managing Project RiskA Framework for Managing Project Risk
A Framework for Managing Project Risk
 
Governing Projects Uni Syd INFO6007 2009
Governing Projects Uni Syd INFO6007 2009Governing Projects Uni Syd INFO6007 2009
Governing Projects Uni Syd INFO6007 2009
 
Project Governance Sydney Uni 2009
Project Governance   Sydney Uni 2009Project Governance   Sydney Uni 2009
Project Governance Sydney Uni 2009
 
PMexpo17 - The Stakeholder Perspective - Massimo Pirozzi
PMexpo17 - The Stakeholder Perspective - Massimo PirozziPMexpo17 - The Stakeholder Perspective - Massimo Pirozzi
PMexpo17 - The Stakeholder Perspective - Massimo Pirozzi
 
0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt
 
Chakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohithChakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohith
 
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project management
 
Is it time to rethink project managemnt theory
Is it time to rethink project managemnt theoryIs it time to rethink project managemnt theory
Is it time to rethink project managemnt theory
 
b2025surveysummary (1)
b2025surveysummary (1)b2025surveysummary (1)
b2025surveysummary (1)
 

Recently uploaded

anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 

Recently uploaded (20)

Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdfMaximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
IPTV Subscription in Ireland: Elevating Your Entertainment Experience
IPTV Subscription in Ireland: Elevating Your Entertainment ExperienceIPTV Subscription in Ireland: Elevating Your Entertainment Experience
IPTV Subscription in Ireland: Elevating Your Entertainment Experience
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 

Lost in transition

  • 1. /SEEDX Lost in Transition Fooled by randomness of projects, black swans, traditional risk factors and the not-so usual suspects Geert Jan Beekman geertjan@xseed.nu
  • 2. Introduction “The reason why firms succeed or fail is perhaps the central question in strategy. It has preoccupied the strategy field since its inception ….” is a 1991 quote by strategy guru Michael Porter* Replace some 20 years later ‘firms’ by ‘projects’ and the sigh is ever so current To uncover these ‘reasons’ and to resolve them, once and for all, still is the challenge of every stakeholder in todays uncertain economic circumstances In the face of such uncertainties, every stakeholder wants to unambiguously allocate success (but more so failure) to concrete internal and external factors, quantify their contributions and nudge them in a positive direction! These slides summarize some of the most recent findings on projects, risk, randomness and ‘how-to-save-time-and-money-managing-your-projects’ * M. E. Porter. Towards a dynamic theory of strategy. Strategic Management Journal, 1991, 12, p. 95.
  • 3. Our finished engagements and current research projects have yielded interesting and sometimes unexpected findings : • Fooled by Randomness • Fooled by Black Swans • Fooled by the Traditional Risk Factors: ‘The Usual Suspects’ • Fooled by the ‘Unusual Suspects’ – Managing the Process ….. – The Human Wiring Some of our Findings
  • 4. Fooled by Randomness • Any portfolio of projects breaks down into ‘white swans’ , ‘black swans’ and ‘lame ducks’ – White swans show a project overrun between -10% and +40% and are ‘normally’ distributed. This means that they run over budget in a linear way: 20% overrun halfway, most likely ends up in a 40% (20% * 2) overrun – Black swans show a project overrun larger than the white swans, and are exponentially distributed. This means that they run over budget in an ‘exponential’ way: 20% overrun halfway, most likely ends up in a 400% (202) overrun* – Lame ducks show a project underrun smaller than the white swan, and are also exponentially distributed. Unfortunately, these projects are prematurely terminated and thus appear to underrun their budget • This breakdown holds for large as well as small projects, In IT, business, real estate or facilities • The left-hand side graph is a log-log plot (Standard Excel feature) of the cumulative distribution of the project overrrun [(actual/budget)*100] * Provided that the exponential of the distribution is a factor ‘2’. If it is a ‘3’, then the overrun becomes (203), ‘1.2’ it becomes 201.2
  • 5. Fooled by Black Swans White Swans • Risk factors balance – Doing things right on risk factors (e.g. GOOD support by senior management) off-sets doing things wrong (e.g. LITTLE support) and DAMPENS overrun Black Swans • Balance goes off-the-scale – Doing things right, with few exceptions, no longer off-sets doing things wrong and AMPLIFIES overrun
  • 6. Fooled by Traditional Risk Factors (1/3) 1. Support from senior management 2. Clear and realistic objectives 3. Strong/detailed plan kept up to date 4. Good communications and feedback 5. User/Client involvement 6. Qualified staff 7. Effective change management 8. Competent project management 9. Strong business case / sound basis for the project 10. Sufficient / well allocated resources 11. Good leadership 12. Proven / familiar technology 13. Realistic schedule 14. Risks are assessed, addressed and managed 15. Project sponsor / champion 16. Effective monitoring & control 17. Adequate budget 18. Organizational adaptation / culture / structure 19. Good performance by suppliers / contractors / consultants 20. Planned close down review / acceptance of possible failure 21. Training provision 22. Political stability 23. Correct choice / past experience of PM tools & methods 24. Environmental influences 25. Learning from past experience 26. Project size 27. Appreciation of differing viewpoints • Scientific research into project risk factors covers a 40 year history en has yielded a valid and reliable list of 27 factors that consistently have roved their effect on budget overruns • This list is handsomely summarized in a 2006 paper by Joyce Fortune and Diana White*: * Fortune, J. & D. White. Framing of project critical success factors by a systems model. IJPM, 2006, 53 – 65. • In 2012 investigators of McKinsey cluster 21 of these 27 factors into 4 groups and conduct a regression analysis on 5400 IT projects collected from dozens of companies • They find a total contribution to budget overrun of 45% for the clusters but no significant effect for any of the individual factors** ** Bloch, M., S. Blumberg & J. Laartz. Delivering large-scale IT projects on time, on budget and on value. McKinsey Quarterly, October 2012. (on line)
  • 7. Fooled by Traditional Risk Factors (2/3) • Our Transition Compass™ Algorithm calculates the contribution of the same factors on actual portfolios between 30 and 180 projects • The total contribution of the clusters differs for black swans and white swans and never surpasses 39% – White Swans 25% – Black Swans 39% • The algorithm also determines the contributions of the individual factors and their interactions
  • 8. Fooled by Traditional Risk Factors (3/3) • The total contribution of the clusters of white swans is contingent on the project domain* and shows a considerable bandwidth • Black swans cluster more evenly around the mean *IT, Business, Commercieel Vastgoed & Facilities
  • 9. Managing the Process ….. • Our experiences from practice have uncovered a fifth cluster with 6 other factors • The cluster ‘Managing the Process’ refers to ‘fulfilling your role’ and ‘taking your responsibilities’ and contributes considerably to success and failure • The total contribution increases: – White Swans • 25%  34% – Black Swans • 39%  60%
  • 10. The Human Wiring: Bias & Heuristics • Our experiences from practice have uncovered a sixth cluster with 5 other factors • This cluster refers the simplifying heuristics that people use to form judgments and take complex decisions • These heuristics are prone to systematic bias and contribute, on average, 22% to success and failure • The total contribution increases further – White Swans • 34%  56% – Black Swans • 60%  82%