PUSH VS PULL STRATEGIES : COMPARISON
-Producer centric
-Longterm demand forecasts
-Make-to-stock
-High Inventory
-Inability to meet changing
demand
-Less Marketing cost
- Customer centric
- Improve cash flow
- Make-to-order
- Lower inventory
- Shorter lead-times
- Lead to unhappy customers
when badly implemented
- Difficult to implement
- High advertising costs
Eg. MRP Eg. Kanban, JIT
MRP Materials Requirement Planning –
DEFINITION BREAKDOWN
BREAKDOWN OF DEFINITION : MRP
INVENTORY
CONTROL
PRODUCTION
PLANNING &
SCHEDULING
SYSTEM
ENSURES
AVAILABILITY OF
MATERIALS
MAINTAINS
LOWEST POSSIBLE
STOCK LEVEL
PLAN &
SCHEDULE
Manufacturing,
Delivery
Purchasing
Sino Qua Non Consulting 5
3 OBJECTIVES OF MRP
LOGISTICS MANAGEMENT
INBOUND
procurement, handling, storage and
transportation
WAREHOUSING
warehousing, protective packing,
order fulfillment, stock control,
maintaining equilibrium between
demand and supply, stock
management
OUTBOUND
collection, maintenance, and
distribution or delivery to the final
consumer
Sino Qua Non Consulting 6
REVERSE LOGISTICS
LOGISTICS – AGENDA
Sino Qua Non Consulting 7
1. INTRODUCTION TO LOGISTICS
2. SUPPLY CHAIN MANAGEMENT
3. PRODUCTION MANAGEMENT – PUSH STRATEGY(MRP)
4. PRODUCTION MANAGEMENT – PULL STRATEGY (KANBAN)
5. INVENTORY MANAGEMENT BEST PRACTICES
6. INTRODUCTION TO INTERNATIONAL LOGISTICS
7. INCOTERMS
8. LETTER OF CREDIT - DOCUMENTARY CREDIT
9. CUSTOMS
VIDEO #2If video does not play, click here => https://youtu.be/R8dYLbJiTUE
Sino Qua Non Consulting
8
PULL SYSTEM : Lean , Just-in-Time, Kanban
Sino Qua Non Consulting 9
Lean Production:
Doing more with less by employing 'lean thinking.' Lean
manufacturing involves never ending efforts to eliminate or reduce
'muda' (Japanese for waste or any activity that consumes resources
without adding value) in design, manufacturing, distribution, and
customer service processes.
A western definition of Japan Toyota’s Kanban = JIT system
PULL SYSTEM : Lean , Just-in-Time, Kanban
Sino Qua Non Consulting 10
JIT is a form of Lean Production:
A just-in-time system of manufacturing (= producing
goods) is based on preventing waste by producing
only the amount of goods needed at a particular
time, and not paying to produce & store more goods
than are needed.
Sino Qua Non Consulting 11
Potential Benefits Potential Drawbacks
Lower stock holding means lower storage costs
and lower insurance costs
Little room for mistakes as minimum stock is
kept for re-working faulty products
Less working capital is tied up in the stock Production is highly reliant on suppliers and if
stock is not delivered on time, the whole
production schedule can be delayed
Less likelihood of stock perishing, becoming
obsolete or out of date
No spare finished product to meet unexpected
demand, possible loss of revenue.
Less time spent on checking and reworking
production as the emphasis is on geting the
work done right first time
A need for complex specialist stock system
Benefits vs Drawbacks of JIT
Definition Kanban
Sino Qua Non Consulting 12
Kanban 看板 (signboard or billboard in
Japanese) Toyota introduced and refined the
use of kanban in the 1950s.
Japanese manufacturing system in which the
supply of components is regulated through the
use of an instruction card sent along the
production line. Method to obtain JIT.
Sino Qua Non Consulting 13
Kanban Board : Eg. Planning an event
TO DO WORK-IN-PROGRESS
LIMITS = 4
DONE
INVITATIONS
FLIGHTS &
HOTELS
PRESS &
MARKETING
PERFORMERS
& LOGISTICS
work in progress (WIP) limits set
the maximum amount of work
that can exist in each status of a
workflow. Limiting the amount of
work in progress makes it easier
to identify inefficiency in a
team's workflow.
Sino Qua Non Consulting 14
Kanban Board : 3 Weeks later
TO DO WORK-IN-PROGRESS
LIMITS = 4
DONE
INVITATIONS
FLIGHTS &
HOTELS
PRESS &
MARKETING
PERFORMERS
& LOGISTICS
CONFIRM
ATTENDANCE
PRINTING/
DIFFUSION
Example #1 of Kanban Card
Sino Qua Non Consulting 15
Sino Qua Non Consulting 16
Example #2 of Kanban Card
Sino Qua Non Consulting 17
Example #3 of Kanban Card
Sino Qua Non Consulting 18
Examples of Kanban Boards : POST-IT
Sino Qua Non Consulting 19
Examples of Kanban Boards
Sino Qua Non Consulting 20
Examples of Kanban Boards
Sino Qua Non Consulting 21
KANBAN CAN ALSO BE ON SOFTWARE
DEMO VIDEO USING TRELLO
22
Example of JIT using a PIZZERIA
Pizza
Crust
WIPLIMITS
Workstation
chorizos Green peppers Mushrooms Cheese
STOREROOM
BOX
BOX
BOX
BOX
BOX
PIZZA JIT BONUS VIDEO
END #4
www.sinoquanon.com
Sino Qua Non Consulting 23

More Related Content

Similar to Logistics management 4 production management kanban

just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
Akhil Bhatia
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature view
Anqur Rauth
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
sashi prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
sashi prabhu
 
Chapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docx
Chapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docxChapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docx
Chapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docx
robertad6
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
Tanuj Kujur
 
Module 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxModule 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptx
ArunJyothi19
 

Similar to Logistics management 4 production management kanban (20)

JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
jit
jitjit
jit
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature view
 
Powerpoint
PowerpointPowerpoint
Powerpoint
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Module-4 JIT.ppt
Module-4 JIT.pptModule-4 JIT.ppt
Module-4 JIT.ppt
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
Just in Time (JIT)
Just in Time (JIT)Just in Time (JIT)
Just in Time (JIT)
 
Chapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docx
Chapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docxChapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docx
Chapter 7Lean Thinking and Lean SystemsMcGraw-Hill Ed.docx
 
BASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURINGBASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURING
 
Just in time (JIT).
Just in time (JIT).Just in time (JIT).
Just in time (JIT).
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
APOM_Unit 12_JIT_final which is a inventory control technique
APOM_Unit 12_JIT_final which is a inventory control techniqueAPOM_Unit 12_JIT_final which is a inventory control technique
APOM_Unit 12_JIT_final which is a inventory control technique
 
Module 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxModule 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptx
 

Recently uploaded

Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 

Recently uploaded (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Logistics management 4 production management kanban

  • 1. Faculté de Droits & Economie – #4 Production Management Shing Wyee Jolivel, Sino Qua Non Consulting Sino Qua Non Consulting 1
  • 2. RECAP ON LESSON #3 MRP Sino Qua Non Consulting 2
  • 3. www.sinoquanon.com Sino Qua Non Consulting 3 VIDEO #1 If video does not play, click here => https://www.youtube.com/watch?v=HVnHyTsGZaY
  • 4. Sino Qua Non Consulting 4 PUSH VS PULL STRATEGIES : COMPARISON -Producer centric -Longterm demand forecasts -Make-to-stock -High Inventory -Inability to meet changing demand -Less Marketing cost - Customer centric - Improve cash flow - Make-to-order - Lower inventory - Shorter lead-times - Lead to unhappy customers when badly implemented - Difficult to implement - High advertising costs Eg. MRP Eg. Kanban, JIT
  • 5. MRP Materials Requirement Planning – DEFINITION BREAKDOWN BREAKDOWN OF DEFINITION : MRP INVENTORY CONTROL PRODUCTION PLANNING & SCHEDULING SYSTEM ENSURES AVAILABILITY OF MATERIALS MAINTAINS LOWEST POSSIBLE STOCK LEVEL PLAN & SCHEDULE Manufacturing, Delivery Purchasing Sino Qua Non Consulting 5 3 OBJECTIVES OF MRP
  • 6. LOGISTICS MANAGEMENT INBOUND procurement, handling, storage and transportation WAREHOUSING warehousing, protective packing, order fulfillment, stock control, maintaining equilibrium between demand and supply, stock management OUTBOUND collection, maintenance, and distribution or delivery to the final consumer Sino Qua Non Consulting 6 REVERSE LOGISTICS
  • 7. LOGISTICS – AGENDA Sino Qua Non Consulting 7 1. INTRODUCTION TO LOGISTICS 2. SUPPLY CHAIN MANAGEMENT 3. PRODUCTION MANAGEMENT – PUSH STRATEGY(MRP) 4. PRODUCTION MANAGEMENT – PULL STRATEGY (KANBAN) 5. INVENTORY MANAGEMENT BEST PRACTICES 6. INTRODUCTION TO INTERNATIONAL LOGISTICS 7. INCOTERMS 8. LETTER OF CREDIT - DOCUMENTARY CREDIT 9. CUSTOMS
  • 8. VIDEO #2If video does not play, click here => https://youtu.be/R8dYLbJiTUE Sino Qua Non Consulting 8
  • 9. PULL SYSTEM : Lean , Just-in-Time, Kanban Sino Qua Non Consulting 9 Lean Production: Doing more with less by employing 'lean thinking.' Lean manufacturing involves never ending efforts to eliminate or reduce 'muda' (Japanese for waste or any activity that consumes resources without adding value) in design, manufacturing, distribution, and customer service processes. A western definition of Japan Toyota’s Kanban = JIT system
  • 10. PULL SYSTEM : Lean , Just-in-Time, Kanban Sino Qua Non Consulting 10 JIT is a form of Lean Production: A just-in-time system of manufacturing (= producing goods) is based on preventing waste by producing only the amount of goods needed at a particular time, and not paying to produce & store more goods than are needed.
  • 11. Sino Qua Non Consulting 11 Potential Benefits Potential Drawbacks Lower stock holding means lower storage costs and lower insurance costs Little room for mistakes as minimum stock is kept for re-working faulty products Less working capital is tied up in the stock Production is highly reliant on suppliers and if stock is not delivered on time, the whole production schedule can be delayed Less likelihood of stock perishing, becoming obsolete or out of date No spare finished product to meet unexpected demand, possible loss of revenue. Less time spent on checking and reworking production as the emphasis is on geting the work done right first time A need for complex specialist stock system Benefits vs Drawbacks of JIT
  • 12. Definition Kanban Sino Qua Non Consulting 12 Kanban 看板 (signboard or billboard in Japanese) Toyota introduced and refined the use of kanban in the 1950s. Japanese manufacturing system in which the supply of components is regulated through the use of an instruction card sent along the production line. Method to obtain JIT.
  • 13. Sino Qua Non Consulting 13 Kanban Board : Eg. Planning an event TO DO WORK-IN-PROGRESS LIMITS = 4 DONE INVITATIONS FLIGHTS & HOTELS PRESS & MARKETING PERFORMERS & LOGISTICS work in progress (WIP) limits set the maximum amount of work that can exist in each status of a workflow. Limiting the amount of work in progress makes it easier to identify inefficiency in a team's workflow.
  • 14. Sino Qua Non Consulting 14 Kanban Board : 3 Weeks later TO DO WORK-IN-PROGRESS LIMITS = 4 DONE INVITATIONS FLIGHTS & HOTELS PRESS & MARKETING PERFORMERS & LOGISTICS CONFIRM ATTENDANCE PRINTING/ DIFFUSION
  • 15. Example #1 of Kanban Card Sino Qua Non Consulting 15
  • 16. Sino Qua Non Consulting 16 Example #2 of Kanban Card
  • 17. Sino Qua Non Consulting 17 Example #3 of Kanban Card
  • 18. Sino Qua Non Consulting 18 Examples of Kanban Boards : POST-IT
  • 19. Sino Qua Non Consulting 19 Examples of Kanban Boards
  • 20. Sino Qua Non Consulting 20 Examples of Kanban Boards
  • 21. Sino Qua Non Consulting 21 KANBAN CAN ALSO BE ON SOFTWARE DEMO VIDEO USING TRELLO
  • 22. 22 Example of JIT using a PIZZERIA Pizza Crust WIPLIMITS Workstation chorizos Green peppers Mushrooms Cheese STOREROOM BOX BOX BOX BOX BOX