SlideShare a Scribd company logo
1 of 33
Republic of the Philippines
BILIRAN PROVINCE STATE UNIVERSITY
Naval, Biliran
NEW TECHNOLOGY BUILDING ROOM 308
LIGHTING AUDIT
PREPARED BY:
CANOBAR JR JAY N., BSEE IV-A STUDENT
NIERRAS CHRIS JOY, BSEE IV-A STUDENT
ENGR. JUDE THADDEUS D . BANICO
INSTRUCTOR
INTRODUCTION
Every place needs lighting since it affects both the aesthetics and
functionality of the space. We will carefully examine the current
lighting systems throughout this audit with the aim of enhancing
illumination, energy efficiency, and the overall user experience. Our
lighting audit will offer crucial insights and ideas to assist us realize
our goals, whether you want to increase office productivity, foster an
inviting ambiance in a retail setting, or save money on energy.
Lighting audit objectives
1. Determine the condition, age, and performance of the current lighting infrastructure
by inspecting its fixtures and bulbs.
2. Determine the potential cost savings from reduced energy use, maintenance costs,
and replacement costs as a result of lighting changes.
3. Increase lighting aesthetics, reduce glare, and create a comfortable environment to
enhance tenants' or customers' overall experience.
4. Give a thorough cost-benefit analysis that details the required initial investment as
well as the (ROI) over time.
5. Have recommendations and conclusion.
SECTOR
- Public SCHOOL
DURATION OF WORK
- 1 Day (October 15, 2023)
DURATION OF LIGHTING AUDIT
- October 15, 2023
Materials used in the audit:
 Tape measure
 Lux-meter
 CALCULATOR
 PAPER & BALLPEN
 LAPTOP
Steps in gathering data:
Get the dimension of the room in meters.
Get the type of fixture used in the room.
Tabulate the gathered data.
Get the room indices, Installed Load Efficacy Ratio (ILER)
and other factors that affects the illumination of the room.
BRIEF COMPANY PROFILE:
Room 308 is located at New technology building in Biliran Province State
University HC72+9G7, P.I, P. Inocentes St, Naval, 6543 Biliran. where the
president is Dr. Victor C. Canezo Jr. The stablishment was built on October
2020.
DATA GATHERED:
LUMINAIRE SPECIFICATIONS:
NOTE: AVERAGE WATTAGE PER LAMP IS 18 WATTS & AVERAGE OUTPUT LUMEN PER LAMP IS 1500 LUMENS RESPECTIVELY.
SOURCE: ECOLUM PRICE LIST ( JANUARY 2018 PRICE LIST )
LOCATION LIGHTING
DEVICE
RATING
(WATTS)
LUMEN
OUTPUT
LIGHT OUTPUT
WIDE
VOLTAGE
DIMENSIONS LIFE HOURS
SUGGESTED
RETAIL PRICE
(S.R.P.)
(JANUARY
2018 PRICE
LIST)
(ECOLUM LED)
Room 308 is
located at N.T.B.
in Biliran
Province State
University
HC72+9G7, P.I, P.
Inocentes St,
Naval, 6543
Biliran.
ECOLUM LED
CFS01T8DL18
(LED T8 TUBE)
18W 1500 DAYLIGHT 100-240V 25.4 x 600 10,000 HOURS PHP 190
EXISTING LIGHTING LAYOUT ANDDIMENSIONS:
RECOMMENDEDDESIGNILLUMINANCE LEVELS
TASK
DAY TIME NIGHT TIME
APPLICATIONS
SOURCE: GUIDELINES FOR ENERGY CONSERVING DESIGN OF BUILDINGS.DOE,2008 (BASED ON ESNA LIGHTING HANDBOOK)
MINIMUM (LUX) MAXIMUM (LUX)
359 363
MINIMUM (LUX) MAXIMUM (LUX)
328 339
Lighting for working
interiors and activity
Interior
Classrooms General
TABLE 10.4 IES ILLUMINANCE CATEGORIES AND VALUES - FOR GENERIC INDOOR ACTIVITIES
ACTIVITY CATEGORY LUX FOOTCANDLES
Public spaces with dark surroundings A 20-30-50 2-3-5
Simple orientation for short temporary
visits
B 50-75-100 5-7.5-10
Working spaces where visual tasks are
only occasionally performed
C 100-150-200 5-7.5-10
Performance of visual tasks of high
contrast or large size
D 200-300-500 20-30-50
Performance of visual tasks of medium
contrast or small size
E 500-750-1000 50-75-100
Performance of visual tasks of low
contrast or very small size
F 1000-1500-2000 100-150-200
Performance of visual tasks of low
contrast or very small size over a
prolonged period
G 2000-3000-5000 200-300-500
Performance of very prolonged and
exacting visual tasks
H 5000-7500-10000 500-750-1000
Performance of very prolonged and
exacting visual tasks
I 10000-15000-20000 1000-1500-2000
SOURCE: BUREAU OF ENERGY EFFICIENCY
ROOM INDEX
COMMERCIAL LIGHTING
(OFFICES RETAILS & STORES
ETC) & VERY CLEAN
INDUSTRIAL APPLICATIONS.
STANDARD OR GOOD COLOR
RENDERING. Ra: 40-85
INDUSTRIAL LIGHTING
(MANUFACTURING AREAS,
WORKSHOP, WAREHOUSING
ETC.) STANDARD OR GOOD
COLOR RENDERING.
Ra: 40-85
INDUSTRIAL LIGHTING
INSTALLATIONS WHERE
STANDARD OR GOOD COLOR
RENDERING IS NOT
ESSENTIAL BUT COLOR
DISCRIMINATION IS
REQUIRED. Ra: 20-40
5 53(1.89) 49(2.04) 67(1.49)
4 52(1.92) 48(2.08) 66(1.52)
3 50(2.00) 46(2.17) 65(1.54)
2.5 48(2.08) 44(2.27) 64(1.56)
2 46(2.17) 42(2.38) 61(1.64)
1.5 43(2.33) 39(2.56) 58(1.72)
1.25 40(2.50) 36(2.78) 55(1.82)
1 36(2.78) 33(3.03) 52(1.92)
TARGET LUX/W/SQ.M(W/SQ.M/100LUX) VALUES FOR MAINTINED ILLUMINANCE ON HORIZONTAL PLANE FOR
ALL ROOM INDICES AND APPLICATIONS:
SOURCE : BUREAU OF ENERGY EFFICIENCY; RA COLOUR RENDERING INDEX
Reflectance factor table
Measured illumination, RCR & roomindex
ROOM
MEASURED ILLUMINATION
AVERAGE ILLUMINATION
(LUX)
ROOM INDEX
1. N.T.B. ROOM 308 347.25 lux 2.025
DAYTIME NIGHTTIME
361 lux 333.5 lux
RCR HCC HFC
2.47 0 1.23
NOTE: BASED ON OUR CALCULATION WITH STANDARD FORMULA.
INDICATORS OF PERFORMANCE
INSTALLED LOAD EFFICACY RATIO (ILER) ASSESSMENT
0.75 OR OVER SATISFACTORY TO GOOD
0.51 – 0.74 REVIEW SUGGESTED
0.5 or Less URGENT ACTION REQUIRED
SOURCE: BUREAU OF ENERGY EFFICIENCY
ROOM AREA
ROOM TOTAL
WATTAGE
WATT PER
SQ.M
AVERAGE
ILLUMINATION
(LUX)
ACTUAL LUX
PER WATT PER
SQ. M
TARGET LUX
PER WATT PER
SQ. M RA: 40-
80
ILER REMARKS
N.T.B. ROOM
308
65.6 SQ.M 216 3.3 W 347.25 105.23 99.82 1.05 SATISFACTORY
TO GOOD
COMPUTED ILER
NOTE: BASED ON OUR CALCULATION WITH STANDARD FORMULA.
SOURCE: BUREAU OF ENERGY EFFICIENCY.
ENERGYCONSUMPTIONS
ROOM WATTS
OPERATING HOURS
PER DAY
KWH PER DAY OF
OPERATION
KWH PER WEEK OF
OPERATION
KWH PER MONTH
OF OPERATION
WATT-HOUR PER
YEAR OF
OPERATION
N.T.B. ROOM
308
216 W 12 HOURS 2.592 KWH 10.368 KWH 41.472 KWH 414.72 KWH
ROOM WATTS
OPERATING HOURS
PER DAY
KWH PER DAY OF
OPERATION
(COST)
KWH PER WEEK OF
OPERATION
(COST)
KWH PER MONTH OF
OPERATION
(COST)
KWH PER YEAR OF
OPERATION
(COST)
N.T.B. ROOM
308
216 W 12 HOURS Php 36.12 KWH Php 144.46 KWH Php 577.85 KWH Php 5778.54 KWH
NOTE: BASED ON OUR CALCULATION WITH STANDARD FORMULA.
COST per kWh Basis: assume 15 PHP per kwh
ROOM TOTAL WATTAGE
COST PER DAY OF
OPERATION (PHP)
COST PER WEEK
OF OPERATION
(PHP)
COST PER MONTH
OF OPERATION
(PHP)
COST PER YEAR OF
OPERATION (PHP)
COST
THROUGHOUT ITS
LIFEHOUR (PHP)
N.T.B. ROOM 308 216 W Php 36.12 KWH Php 144.46 KWH Php 577.85 KWH Php 5778.54 KWH 30094.64
TOTAL 216 W Php 36.12 Php 144.46 KWH Php577.85 KWH Php 5778.54 KWH 30094.64
Total cost: PHP 30094.64 cost throughout life span of the lamps used.
CALCULATIONs FOR THE SPACING OF LUMINAIRE’S
LUMINAIRE DISTANCE IN LENGTH:
= LENGTH/NUMBERS OF LUMINAIRES IN LENGTH
= 8.2/3
= 2.74m
LUMINAIRE DISTANCE IN WIDTH:
= WIDTH/NUMBERS OF LUMINAIRES IN WIDTH
= 8/2
= 4m
WALL DISTANCE IN LENGTH: ( ROOM LENGTH: 8.2m)
= 2x =8.2 – 5.46
= 2x/2 = 2.73/2
x = 1.37m
WALL DISTANCE IN WIDTH: ( ROOM WIDTH: 8m)
= 2x =8 – 4
= 2x/2 = 4/2
x = 2m
CALCULATIONS
EXISTINGLUMINAIRE
= (18W x 12 LUMINAIRES) = 216 WATTS
= (216W x 12 HOURS) = 2592 W
= (2592 W x 1 DAY) = 2592 W/DAY
= 2592/1000 = 2.592 KWH
= (2.592 KWH x 13.9336 KWH)
= PHP 36.12 KWH OF ELECTRICITY PER DAY
= (18W x 12 LUMINAIRES) = 216 WATTS
= (216W x 12 HOURS) = 2592 W
= (2592 W x 4 DAYS) = 10368 W/WEEK
= 10368/1000 = 10.368 KWH
= (10.368 KWH x 13.9336 KWH)
= PHP 144.46 KWH OF ELECTRICITY PER WEEK
= (18W x 12 LUMINAIRES) = 216 WATTS
= (216W x 12 HOURS) = 2592 W
= (2592 W x 16 DAY) = 41472 W/MONTH
= 41472/1000 = 41.472 KWH
= (41.472 KWH x 13.9336 KWH)
= PHP 577.85 KWH OF ELECTRICITY PER MONTH
= (18W x 12 LUMINAIRES) = 216 WATTS
= (216W x 12 HOURS) = 2592 W
= (2592 W x 16 DAY) = 41472 W/DAY
= 41472/1000 = 41.472 KWH
= (41.472 KWH x 10 MONTHS)
= 414.72 KWH
= (414.72 KWH x 13.9336)
= PHP 5778.54 KWH OF ELECTRICITY PER YEAR
CALCULATIONFOR COST THROUGHOUT ITS LIFEHOUR (PHP),
FOR THE EXISTINGTUBULAR LED LAMP
= (12 HOURS x 16 DAYS IN A MONTH)
= 192 HOURS IN A MONTH
= (192 HOURS x 10 MONTHS)
= 1920 HOURS ANNUAL
FOR MULTIPLIER
= 10000 HOURS/1920
= 5.208 YEARS
= (PHP 5778.54 KWH x 5.208 YEARS)
COST THROUGHOUT ITS LIFEHOUR (PHP) = 30094.64
RoomIndex (RI)
NEW TECHNOLOGY BUILDING ROOM 308: (8 WIDTH X 8.2 LENGTH) = 65.6SQ.M
LENGTH = 8.2 METERS
WIDTH = 8 METERS
CEILING HEIGHT = 2.6 METERS
HEIGHT OF LUMINAIRES ABOVE WORKING PLANE (MH)= 2.6 C.H. – 0.6 W.P. = 2 METERS
CALCULATE ROOM INDEX (RI) = ( L X W ) / (MH)( L + W )
= ( 8.2 X 8) / (2)( 8.2 + 8)
ROOM INDEX = 2.025
NEW TECHNOLOGY BUILDING ROOM 308 : (8 WIDTH X 8.2 LENGTH) = 65.6 SQM
ROOM LENGTH: 8.2 METERS
ROOM WIDTH: 8 METERS
ROOM HEIGHT: 3 METERS
WORKING PLANE: 0.6 METERS
MOUNTING HEIGHT: (ROOM HEIGHT – WORKING PLANE) = (2.6 M - 0.6 M)= 2 METERS
RCR = 5HRC (L + W)/LW
= 5 (2) (8.2 + 8)/(8.2) (8)
= 2.47
NOTE: 2.6 C.H. MINUS TO THE 0.6 WORKING PLANE,
THAT’S WHY THE HRC IS 2.
CCR = 5HCC (L + W)/LW
= 5 (0) (8.2 + 8)/(8.2)(8)
= 0
NOTE: LIGHT FIXTURE IS RECESSED, THAT’S WHY THE HCC IS 0.
Calculation for rcr, ccr fcr
FCR = 5FC (L + W)/LW
= 5 (0.6) (8.2 + 8)/(8.2) (8)
= 0.74
DOCUMENTATIONS
FINDINGS
 TUBULAR LED LAMP WITH LIGHT FIXTURE IS IN THE ROOM.
 THE TYPE, MOUNTING, AND SPACING OF THE LAMPS ARE ALL CONSISTENT, CALCULATED AND IT FOLLOWS
STANDARDS.
 THE REFLECTANCES OF THE WALL PAINT, CEILING, FLOOR, AND WINDOW SPACING FALL INTO THE
SATISFACTORY CATEGORY.
 THE ROOM'S ILLUMINATION LEVEL SUFFICIENTLY ILLUMINATES THE AREAS NEEDED FOR THE TASK ASSIGNED
FOR CLASSROOMS IN GENERAL.
 DIRTY WHITE, WHICH IS IN THE FAIR CATEGORY, IS THE COLOR OF THE WALL.
 BECAUSE OF ITS DIRTY WHITE COLOR AND SMOOTH TEXTURE, THE CEILING'S REFLECTANCE OF LIGHT IS
GOOD.
COMPARINGTHE SPECIFICATIONSOF T8 LEDFLUORESCENTTUBES
TECHNICAL
SPECIFICATIONS
FIREFLY BASIC SERIES ECOLUM LED FIREFLY PRO SERIES LINEAR FLOURESCENT
TUBE
LED TUBE LIGHT
WATTAGE 20 W 18 W 16 W 18 W 16 W
VOLTAGE AC 100 – 240V AC 100 – 240 V AC 220 – 240 V AC 220 – 240 V AC 85 – 265 V
LIFE HOURS 25,000 HOURS 10,000 HOURS 15,000 HOURS 20,000 HOURS 50,000 HOURS
LUMENS 1800 1,500 1650 1300 1600
KELVIN 6,500 K 6,500 K 6,500 K 6,500 K 6000 – 6500 K
COLOR DAYLIGHT DAYLIGHT DAYLIGHT DAYLIGHT DAYLIGHT
BEAM ANGLE 110 DEGREES 200 DEGREES 200 DEGREES 360 DEGREES 120 DEGREES
DIMMABLE NO NO NO YES NO
LAMP BASE G13 G13 G13 G13 G13
SRP PHP 475 PHP 190 PHP 180 PHP 323.28 PHP 203
T5 EBTST5DL20 CFSO1T8DL18 FL EFSO6T8DL16
TL – D SUPER 80 18W – 865
DAYLIGHT T8 ITL-16W-DL-011
TYPE
FIREFLY BASIC
SERIES
ECOLUM LED FIREFLY PRO SERIES LINEAR
FLOURESCENT
TUBE
LED TUBE LIGHT
LIFETIME 15,000 HOURS 10,000 HOURS 15000 HOURS 20,000 HOURS 50,000
WATTAGE 20 W 18 W 16 W 18 W 16 W
ELECTRIC CHARGE PHP 13.9336/KWH PHP 13.9336/KWH PHP 13.9336/KWH PHP 13.9336/KWH PHP 13.9336/KWH
OPERATING HOURS 12 HOURS/DAY 12 HOURS/DAY 12 HOURS/DAY 12 HOURS/DAY 12 HOURS/DAY
ELECTRICITY CHARGE
PER DAY
PHP 3.34 KWH PHP 2.592 KWH PHP 2.304 KWH PHP 3 PHP 2.304 KWH
MONTHLY
ELECTRICITY CHARGE
PHP 3.34 X 16 DAYS
= 53.44 KWH
PHP 2.592 X 16 DAYS
= 41.472 KWH
PHP 2.304 X 16 DAYS
= 36.864 KWH
PHP 3 X 16 DAYS
= 48 KWH
PHP 2.304 X 16 DAYS
= 36.864 KWH
1 YEAR ELECTRICITY
CHARGE
PHP 3.34 X 160 DAYS
= 534.4 KWH
PHP 2.592 X 160 DAYS
= 414.72 KWH
PHP 2.304 X 160 DAYS
= 368.64 KWH
PHP 3 X 160 DAYS
= 480 KWH
HP 2.304 X 160 DAYS
= 368.64 KWH
YEARLY SAVINGS 267.2 207.36 184.32 240 184.32
PRICE 475 190 180 323.28 203
ROI 1.8 YEARS 1.1 YEARS 1.0 YEARS 1.3 YEARS 1.1 YEARS
Return of investment (ROI)
T5 EBTST5DL20 CFSO1T8DL18 FL EFSO6T8DL16 T8 ITL-16W-DL-011
TL – D SUPER 80 18W – 865
DAYLIGHT
SOURCE: BUREAU OF ENERGY EFFICIENCY
LAMP EFFICACY
LAMP TYPES LUMENS WATTS EFFICACY (lm/W)
T5 EBTST5DL20 1800 20 90 Im/W
CFSO1T8DL18 1500 18 83.33 Im/W
FL LFS06T8DL18 1650 16 103.13 Im/W
TL – D SUPER 80 18W – 865
DAYLIGHT
1300 18 72.22 Im/W
T8 ITL-16W-DL-011 1600 16 100 Im/W
SOURCE: BUREAU OF ENERGY EFFICIENCY
WE CONCLUDE THAT, IT'S CRITICAL TO TAKE INTO
ACCOUNT ASPECTS LIKE ENERGY EFFICIENCY,
BRIGHTNESS, LONGEVITY, AND ENVIRONMENTAL
IMPACT WHEN EVALUATING LIGHT BULBS. THE DECISION
BETWEEN THE LIGHT BULBS ULTIMATELY COMES DOWN
TO OUR OWN REQUIREMENTS AND OBJECTIVES. MAKING
AN EDUCATED CHOICE FOR OUR LIGHTING
REQUIREMENTS WILL BE MADE EASIER WITH CAREFUL
CONSIDERATION OF THESE ELEMENTS.
Conclusion
RECOMMENDATIONS
 MAINTAIN AND DO A MONTHLY CHECKUP, SPECIALLY FOR CLEANING.
 IF NOT IN USE, SWITCH OFF THE LIGHTS.
 BE AWARE THAT INCREASED LAMP EFFICACY RESULTS IN GREATER SAVINGS FOR
LIGHTS WITH SIMILAR OUTPUT.
 IF THE LIGHTING IN THAT PARTICULAR ROOM IS SUFFICIENT FOR YOUR NEEDS, DO
NOT USE THE LAMP OR TURN IT OFF.
 TO PRESERVE ILLUMINATION, REPLACE ALL LAMPS EVERY FIVE YEARS FOR THE
EXISTING TUBULAR LED LAMP WITH LIGHT FIXTURE IN THE ROOM.
 WE RECOMMEND FIREFLY PRO SERIES (FL EFSO6T8DL16) AND LED TUBE LIGHT
(T8 ITL-16W-DL-011) FOR THE REPLACEMENT OF THE EXISTING TUBULAR LED LAMP,
IN A YEAR'S IT BURNS OUT.
RECOMMENDEDLUMINAIRE’S
TECHNICAL SPECIFICATIONS
FIREFLY PRO SERIES LED TUBE LIGHT
FL EFSO6T8DL16 T8 ITL-16W-DL-011
WATTAGE 16 W 16 W
VOLTAGE AC 220 – 240 V AC 85 – 265 V
LIFE HOURS 15,000 HOURS 50,000 HOURS
LUMENS 1650 1600
KELVIN 6,500 K 6000 – 6500 K
COLOR DAYLIGHT DAYLIGHT
BEAM ANGLE 200 DEGREES 120 DEGREES
EFFICACY (lm/W) 103.13 Im/W 100 Im/W
DIMMABLE NO NO
LAMP BASE G13 G13
SRP PHP 180 PHP 203
SOURCE: BUREAU OF ENERGY EFFICIENCY
Rec. 1 CALCULATIONFOR COSTTHROUGHOUTITS LIFEHOUR (PHP), FOR FIREFLY PRO
SERIES(FL EFSO6T8DL16).
= (12 HOURS x 16 DAYS IN A MONTH)
= 192 HOURS IN A MONTH
= (192 HOURS x 10 MONTHS)
= 1920 HOURS ANNUAL
FOR MULTIPLIER
= 15,000 HOURS/1920
= 7.8 YEARS
= (PHP 5136.48 KWH x 7.8 YEARS)
COST THROUGHOUT ITS LIFEHOUR (PHP) = 40064.544
= (16W x 12 LUMINAIRES) = 192 WATTS
= (192W x 12 HOURS) = 2304 W
= (2304 W x 16 DAY) = 36864 W/DAY
= 36864/1000 = 36.864 KWH
= (36.864 KWH x 10 MONTHS)
= 368.64 KWH
= (368.64 KWH x 13.9336)
= PHP 5136.48 KWH OF ELECTRICITY PER YEAR
Rec 2. CALCULATIONFOR COSTTHROUGHOUTITS LIFEHOUR (PHP),
FOR LED TUBELIGHT(T8 ITL-16W-DL-011).
= (12 HOURS x 16 DAYS IN A MONTH)
= 192 HOURS IN A MONTH
= (192 HOURS x 10 MONTHS)
= 1920 HOURS ANNUAL
FOR MULTIPLIER
= 50,000 HOURS/1920
= 26 YEARS
= (PHP 5136.48 KWH x 26 YEARS)
COST THROUGHOUT ITS LIFEHOUR (PHP) = 133548.48
= (16W x 12 LUMINAIRES) = 192 WATTS
= (192W x 12 HOURS) = 2304 W
= (2304 W x 16 DAY) = 36864 W/DAY
= 36864/1000 = 36.864 KWH
= (36.864 KWH x 10 MONTHS)
= 368.64 KWH
= (368.64 KWH x 13.9336)
= PHP 5136.48 KWH OF ELECTRICITY PER YEAR

More Related Content

Similar to Lighting_Audit.docx(PRESENTATION)(CANOBAR)_1.pptx

Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10
Kim Mitchell
 
Ch 20111 energy conservation
Ch 20111 energy conservationCh 20111 energy conservation
Ch 20111 energy conservation
Chandra Prakash
 

Similar to Lighting_Audit.docx(PRESENTATION)(CANOBAR)_1.pptx (20)

Energy Innovation ILIT Powerpoint
Energy Innovation ILIT PowerpointEnergy Innovation ILIT Powerpoint
Energy Innovation ILIT Powerpoint
 
SCR Tuning
SCR TuningSCR Tuning
SCR Tuning
 
PLS 2014: From Specification to Lighting Reality
PLS 2014: From Specification to Lighting RealityPLS 2014: From Specification to Lighting Reality
PLS 2014: From Specification to Lighting Reality
 
Floating Power Plant
Floating Power PlantFloating Power Plant
Floating Power Plant
 
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
Estimation & Analysis of a 5KWP Solar Photovoltaic Power Plant at JIS College...
 
IRJET- Implementing Zero Energy Efficiency in Residential Building
IRJET-  	  Implementing Zero Energy Efficiency in Residential BuildingIRJET-  	  Implementing Zero Energy Efficiency in Residential Building
IRJET- Implementing Zero Energy Efficiency in Residential Building
 
Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10Ccr sustainable building technologies draft 7.3.10
Ccr sustainable building technologies draft 7.3.10
 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential Building
 
Renewable Energy Laboratory group project.pdf
Renewable Energy Laboratory group project.pdfRenewable Energy Laboratory group project.pdf
Renewable Energy Laboratory group project.pdf
 
Ch 20111 energy conservation
Ch 20111 energy conservationCh 20111 energy conservation
Ch 20111 energy conservation
 
PV AND OTHER RENEWABLE ENERGY
 PV AND OTHER RENEWABLE ENERGY PV AND OTHER RENEWABLE ENERGY
PV AND OTHER RENEWABLE ENERGY
 
Sustainable Design of a Commercial Building
Sustainable Design of a Commercial BuildingSustainable Design of a Commercial Building
Sustainable Design of a Commercial Building
 
Energy management and cost optimization using solar energy
Energy management and cost optimization using solar energy Energy management and cost optimization using solar energy
Energy management and cost optimization using solar energy
 
PVSketch Sample report
PVSketch Sample reportPVSketch Sample report
PVSketch Sample report
 
PVSketch Trial 2- Japan
PVSketch Trial 2- JapanPVSketch Trial 2- Japan
PVSketch Trial 2- Japan
 
PV Sketch Trial 2 - Beta sales
PV Sketch Trial 2 - Beta salesPV Sketch Trial 2 - Beta sales
PV Sketch Trial 2 - Beta sales
 
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
 
Design Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating SystemDesign Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating System
 
SOLAR-RASHMI SINDUSTRIES
SOLAR-RASHMI SINDUSTRIESSOLAR-RASHMI SINDUSTRIES
SOLAR-RASHMI SINDUSTRIES
 
Slide 1_Arpita
Slide 1_ArpitaSlide 1_Arpita
Slide 1_Arpita
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

Lighting_Audit.docx(PRESENTATION)(CANOBAR)_1.pptx

  • 1. Republic of the Philippines BILIRAN PROVINCE STATE UNIVERSITY Naval, Biliran NEW TECHNOLOGY BUILDING ROOM 308 LIGHTING AUDIT PREPARED BY: CANOBAR JR JAY N., BSEE IV-A STUDENT NIERRAS CHRIS JOY, BSEE IV-A STUDENT ENGR. JUDE THADDEUS D . BANICO INSTRUCTOR
  • 2. INTRODUCTION Every place needs lighting since it affects both the aesthetics and functionality of the space. We will carefully examine the current lighting systems throughout this audit with the aim of enhancing illumination, energy efficiency, and the overall user experience. Our lighting audit will offer crucial insights and ideas to assist us realize our goals, whether you want to increase office productivity, foster an inviting ambiance in a retail setting, or save money on energy.
  • 3. Lighting audit objectives 1. Determine the condition, age, and performance of the current lighting infrastructure by inspecting its fixtures and bulbs. 2. Determine the potential cost savings from reduced energy use, maintenance costs, and replacement costs as a result of lighting changes. 3. Increase lighting aesthetics, reduce glare, and create a comfortable environment to enhance tenants' or customers' overall experience. 4. Give a thorough cost-benefit analysis that details the required initial investment as well as the (ROI) over time. 5. Have recommendations and conclusion.
  • 4. SECTOR - Public SCHOOL DURATION OF WORK - 1 Day (October 15, 2023) DURATION OF LIGHTING AUDIT - October 15, 2023
  • 5. Materials used in the audit:  Tape measure  Lux-meter  CALCULATOR  PAPER & BALLPEN  LAPTOP Steps in gathering data: Get the dimension of the room in meters. Get the type of fixture used in the room. Tabulate the gathered data. Get the room indices, Installed Load Efficacy Ratio (ILER) and other factors that affects the illumination of the room.
  • 6. BRIEF COMPANY PROFILE: Room 308 is located at New technology building in Biliran Province State University HC72+9G7, P.I, P. Inocentes St, Naval, 6543 Biliran. where the president is Dr. Victor C. Canezo Jr. The stablishment was built on October 2020.
  • 8. LUMINAIRE SPECIFICATIONS: NOTE: AVERAGE WATTAGE PER LAMP IS 18 WATTS & AVERAGE OUTPUT LUMEN PER LAMP IS 1500 LUMENS RESPECTIVELY. SOURCE: ECOLUM PRICE LIST ( JANUARY 2018 PRICE LIST ) LOCATION LIGHTING DEVICE RATING (WATTS) LUMEN OUTPUT LIGHT OUTPUT WIDE VOLTAGE DIMENSIONS LIFE HOURS SUGGESTED RETAIL PRICE (S.R.P.) (JANUARY 2018 PRICE LIST) (ECOLUM LED) Room 308 is located at N.T.B. in Biliran Province State University HC72+9G7, P.I, P. Inocentes St, Naval, 6543 Biliran. ECOLUM LED CFS01T8DL18 (LED T8 TUBE) 18W 1500 DAYLIGHT 100-240V 25.4 x 600 10,000 HOURS PHP 190
  • 9. EXISTING LIGHTING LAYOUT ANDDIMENSIONS:
  • 10. RECOMMENDEDDESIGNILLUMINANCE LEVELS TASK DAY TIME NIGHT TIME APPLICATIONS SOURCE: GUIDELINES FOR ENERGY CONSERVING DESIGN OF BUILDINGS.DOE,2008 (BASED ON ESNA LIGHTING HANDBOOK) MINIMUM (LUX) MAXIMUM (LUX) 359 363 MINIMUM (LUX) MAXIMUM (LUX) 328 339 Lighting for working interiors and activity Interior Classrooms General
  • 11. TABLE 10.4 IES ILLUMINANCE CATEGORIES AND VALUES - FOR GENERIC INDOOR ACTIVITIES ACTIVITY CATEGORY LUX FOOTCANDLES Public spaces with dark surroundings A 20-30-50 2-3-5 Simple orientation for short temporary visits B 50-75-100 5-7.5-10 Working spaces where visual tasks are only occasionally performed C 100-150-200 5-7.5-10 Performance of visual tasks of high contrast or large size D 200-300-500 20-30-50 Performance of visual tasks of medium contrast or small size E 500-750-1000 50-75-100 Performance of visual tasks of low contrast or very small size F 1000-1500-2000 100-150-200 Performance of visual tasks of low contrast or very small size over a prolonged period G 2000-3000-5000 200-300-500 Performance of very prolonged and exacting visual tasks H 5000-7500-10000 500-750-1000 Performance of very prolonged and exacting visual tasks I 10000-15000-20000 1000-1500-2000 SOURCE: BUREAU OF ENERGY EFFICIENCY
  • 12. ROOM INDEX COMMERCIAL LIGHTING (OFFICES RETAILS & STORES ETC) & VERY CLEAN INDUSTRIAL APPLICATIONS. STANDARD OR GOOD COLOR RENDERING. Ra: 40-85 INDUSTRIAL LIGHTING (MANUFACTURING AREAS, WORKSHOP, WAREHOUSING ETC.) STANDARD OR GOOD COLOR RENDERING. Ra: 40-85 INDUSTRIAL LIGHTING INSTALLATIONS WHERE STANDARD OR GOOD COLOR RENDERING IS NOT ESSENTIAL BUT COLOR DISCRIMINATION IS REQUIRED. Ra: 20-40 5 53(1.89) 49(2.04) 67(1.49) 4 52(1.92) 48(2.08) 66(1.52) 3 50(2.00) 46(2.17) 65(1.54) 2.5 48(2.08) 44(2.27) 64(1.56) 2 46(2.17) 42(2.38) 61(1.64) 1.5 43(2.33) 39(2.56) 58(1.72) 1.25 40(2.50) 36(2.78) 55(1.82) 1 36(2.78) 33(3.03) 52(1.92) TARGET LUX/W/SQ.M(W/SQ.M/100LUX) VALUES FOR MAINTINED ILLUMINANCE ON HORIZONTAL PLANE FOR ALL ROOM INDICES AND APPLICATIONS: SOURCE : BUREAU OF ENERGY EFFICIENCY; RA COLOUR RENDERING INDEX Reflectance factor table
  • 13. Measured illumination, RCR & roomindex ROOM MEASURED ILLUMINATION AVERAGE ILLUMINATION (LUX) ROOM INDEX 1. N.T.B. ROOM 308 347.25 lux 2.025 DAYTIME NIGHTTIME 361 lux 333.5 lux RCR HCC HFC 2.47 0 1.23 NOTE: BASED ON OUR CALCULATION WITH STANDARD FORMULA.
  • 14. INDICATORS OF PERFORMANCE INSTALLED LOAD EFFICACY RATIO (ILER) ASSESSMENT 0.75 OR OVER SATISFACTORY TO GOOD 0.51 – 0.74 REVIEW SUGGESTED 0.5 or Less URGENT ACTION REQUIRED SOURCE: BUREAU OF ENERGY EFFICIENCY
  • 15. ROOM AREA ROOM TOTAL WATTAGE WATT PER SQ.M AVERAGE ILLUMINATION (LUX) ACTUAL LUX PER WATT PER SQ. M TARGET LUX PER WATT PER SQ. M RA: 40- 80 ILER REMARKS N.T.B. ROOM 308 65.6 SQ.M 216 3.3 W 347.25 105.23 99.82 1.05 SATISFACTORY TO GOOD COMPUTED ILER NOTE: BASED ON OUR CALCULATION WITH STANDARD FORMULA. SOURCE: BUREAU OF ENERGY EFFICIENCY.
  • 16. ENERGYCONSUMPTIONS ROOM WATTS OPERATING HOURS PER DAY KWH PER DAY OF OPERATION KWH PER WEEK OF OPERATION KWH PER MONTH OF OPERATION WATT-HOUR PER YEAR OF OPERATION N.T.B. ROOM 308 216 W 12 HOURS 2.592 KWH 10.368 KWH 41.472 KWH 414.72 KWH ROOM WATTS OPERATING HOURS PER DAY KWH PER DAY OF OPERATION (COST) KWH PER WEEK OF OPERATION (COST) KWH PER MONTH OF OPERATION (COST) KWH PER YEAR OF OPERATION (COST) N.T.B. ROOM 308 216 W 12 HOURS Php 36.12 KWH Php 144.46 KWH Php 577.85 KWH Php 5778.54 KWH NOTE: BASED ON OUR CALCULATION WITH STANDARD FORMULA.
  • 17. COST per kWh Basis: assume 15 PHP per kwh ROOM TOTAL WATTAGE COST PER DAY OF OPERATION (PHP) COST PER WEEK OF OPERATION (PHP) COST PER MONTH OF OPERATION (PHP) COST PER YEAR OF OPERATION (PHP) COST THROUGHOUT ITS LIFEHOUR (PHP) N.T.B. ROOM 308 216 W Php 36.12 KWH Php 144.46 KWH Php 577.85 KWH Php 5778.54 KWH 30094.64 TOTAL 216 W Php 36.12 Php 144.46 KWH Php577.85 KWH Php 5778.54 KWH 30094.64 Total cost: PHP 30094.64 cost throughout life span of the lamps used.
  • 18. CALCULATIONs FOR THE SPACING OF LUMINAIRE’S LUMINAIRE DISTANCE IN LENGTH: = LENGTH/NUMBERS OF LUMINAIRES IN LENGTH = 8.2/3 = 2.74m LUMINAIRE DISTANCE IN WIDTH: = WIDTH/NUMBERS OF LUMINAIRES IN WIDTH = 8/2 = 4m WALL DISTANCE IN LENGTH: ( ROOM LENGTH: 8.2m) = 2x =8.2 – 5.46 = 2x/2 = 2.73/2 x = 1.37m WALL DISTANCE IN WIDTH: ( ROOM WIDTH: 8m) = 2x =8 – 4 = 2x/2 = 4/2 x = 2m
  • 19. CALCULATIONS EXISTINGLUMINAIRE = (18W x 12 LUMINAIRES) = 216 WATTS = (216W x 12 HOURS) = 2592 W = (2592 W x 1 DAY) = 2592 W/DAY = 2592/1000 = 2.592 KWH = (2.592 KWH x 13.9336 KWH) = PHP 36.12 KWH OF ELECTRICITY PER DAY = (18W x 12 LUMINAIRES) = 216 WATTS = (216W x 12 HOURS) = 2592 W = (2592 W x 4 DAYS) = 10368 W/WEEK = 10368/1000 = 10.368 KWH = (10.368 KWH x 13.9336 KWH) = PHP 144.46 KWH OF ELECTRICITY PER WEEK = (18W x 12 LUMINAIRES) = 216 WATTS = (216W x 12 HOURS) = 2592 W = (2592 W x 16 DAY) = 41472 W/MONTH = 41472/1000 = 41.472 KWH = (41.472 KWH x 13.9336 KWH) = PHP 577.85 KWH OF ELECTRICITY PER MONTH = (18W x 12 LUMINAIRES) = 216 WATTS = (216W x 12 HOURS) = 2592 W = (2592 W x 16 DAY) = 41472 W/DAY = 41472/1000 = 41.472 KWH = (41.472 KWH x 10 MONTHS) = 414.72 KWH = (414.72 KWH x 13.9336) = PHP 5778.54 KWH OF ELECTRICITY PER YEAR
  • 20. CALCULATIONFOR COST THROUGHOUT ITS LIFEHOUR (PHP), FOR THE EXISTINGTUBULAR LED LAMP = (12 HOURS x 16 DAYS IN A MONTH) = 192 HOURS IN A MONTH = (192 HOURS x 10 MONTHS) = 1920 HOURS ANNUAL FOR MULTIPLIER = 10000 HOURS/1920 = 5.208 YEARS = (PHP 5778.54 KWH x 5.208 YEARS) COST THROUGHOUT ITS LIFEHOUR (PHP) = 30094.64
  • 21. RoomIndex (RI) NEW TECHNOLOGY BUILDING ROOM 308: (8 WIDTH X 8.2 LENGTH) = 65.6SQ.M LENGTH = 8.2 METERS WIDTH = 8 METERS CEILING HEIGHT = 2.6 METERS HEIGHT OF LUMINAIRES ABOVE WORKING PLANE (MH)= 2.6 C.H. – 0.6 W.P. = 2 METERS CALCULATE ROOM INDEX (RI) = ( L X W ) / (MH)( L + W ) = ( 8.2 X 8) / (2)( 8.2 + 8) ROOM INDEX = 2.025
  • 22. NEW TECHNOLOGY BUILDING ROOM 308 : (8 WIDTH X 8.2 LENGTH) = 65.6 SQM ROOM LENGTH: 8.2 METERS ROOM WIDTH: 8 METERS ROOM HEIGHT: 3 METERS WORKING PLANE: 0.6 METERS MOUNTING HEIGHT: (ROOM HEIGHT – WORKING PLANE) = (2.6 M - 0.6 M)= 2 METERS RCR = 5HRC (L + W)/LW = 5 (2) (8.2 + 8)/(8.2) (8) = 2.47 NOTE: 2.6 C.H. MINUS TO THE 0.6 WORKING PLANE, THAT’S WHY THE HRC IS 2. CCR = 5HCC (L + W)/LW = 5 (0) (8.2 + 8)/(8.2)(8) = 0 NOTE: LIGHT FIXTURE IS RECESSED, THAT’S WHY THE HCC IS 0. Calculation for rcr, ccr fcr FCR = 5FC (L + W)/LW = 5 (0.6) (8.2 + 8)/(8.2) (8) = 0.74
  • 24.
  • 25. FINDINGS  TUBULAR LED LAMP WITH LIGHT FIXTURE IS IN THE ROOM.  THE TYPE, MOUNTING, AND SPACING OF THE LAMPS ARE ALL CONSISTENT, CALCULATED AND IT FOLLOWS STANDARDS.  THE REFLECTANCES OF THE WALL PAINT, CEILING, FLOOR, AND WINDOW SPACING FALL INTO THE SATISFACTORY CATEGORY.  THE ROOM'S ILLUMINATION LEVEL SUFFICIENTLY ILLUMINATES THE AREAS NEEDED FOR THE TASK ASSIGNED FOR CLASSROOMS IN GENERAL.  DIRTY WHITE, WHICH IS IN THE FAIR CATEGORY, IS THE COLOR OF THE WALL.  BECAUSE OF ITS DIRTY WHITE COLOR AND SMOOTH TEXTURE, THE CEILING'S REFLECTANCE OF LIGHT IS GOOD.
  • 26. COMPARINGTHE SPECIFICATIONSOF T8 LEDFLUORESCENTTUBES TECHNICAL SPECIFICATIONS FIREFLY BASIC SERIES ECOLUM LED FIREFLY PRO SERIES LINEAR FLOURESCENT TUBE LED TUBE LIGHT WATTAGE 20 W 18 W 16 W 18 W 16 W VOLTAGE AC 100 – 240V AC 100 – 240 V AC 220 – 240 V AC 220 – 240 V AC 85 – 265 V LIFE HOURS 25,000 HOURS 10,000 HOURS 15,000 HOURS 20,000 HOURS 50,000 HOURS LUMENS 1800 1,500 1650 1300 1600 KELVIN 6,500 K 6,500 K 6,500 K 6,500 K 6000 – 6500 K COLOR DAYLIGHT DAYLIGHT DAYLIGHT DAYLIGHT DAYLIGHT BEAM ANGLE 110 DEGREES 200 DEGREES 200 DEGREES 360 DEGREES 120 DEGREES DIMMABLE NO NO NO YES NO LAMP BASE G13 G13 G13 G13 G13 SRP PHP 475 PHP 190 PHP 180 PHP 323.28 PHP 203 T5 EBTST5DL20 CFSO1T8DL18 FL EFSO6T8DL16 TL – D SUPER 80 18W – 865 DAYLIGHT T8 ITL-16W-DL-011
  • 27. TYPE FIREFLY BASIC SERIES ECOLUM LED FIREFLY PRO SERIES LINEAR FLOURESCENT TUBE LED TUBE LIGHT LIFETIME 15,000 HOURS 10,000 HOURS 15000 HOURS 20,000 HOURS 50,000 WATTAGE 20 W 18 W 16 W 18 W 16 W ELECTRIC CHARGE PHP 13.9336/KWH PHP 13.9336/KWH PHP 13.9336/KWH PHP 13.9336/KWH PHP 13.9336/KWH OPERATING HOURS 12 HOURS/DAY 12 HOURS/DAY 12 HOURS/DAY 12 HOURS/DAY 12 HOURS/DAY ELECTRICITY CHARGE PER DAY PHP 3.34 KWH PHP 2.592 KWH PHP 2.304 KWH PHP 3 PHP 2.304 KWH MONTHLY ELECTRICITY CHARGE PHP 3.34 X 16 DAYS = 53.44 KWH PHP 2.592 X 16 DAYS = 41.472 KWH PHP 2.304 X 16 DAYS = 36.864 KWH PHP 3 X 16 DAYS = 48 KWH PHP 2.304 X 16 DAYS = 36.864 KWH 1 YEAR ELECTRICITY CHARGE PHP 3.34 X 160 DAYS = 534.4 KWH PHP 2.592 X 160 DAYS = 414.72 KWH PHP 2.304 X 160 DAYS = 368.64 KWH PHP 3 X 160 DAYS = 480 KWH HP 2.304 X 160 DAYS = 368.64 KWH YEARLY SAVINGS 267.2 207.36 184.32 240 184.32 PRICE 475 190 180 323.28 203 ROI 1.8 YEARS 1.1 YEARS 1.0 YEARS 1.3 YEARS 1.1 YEARS Return of investment (ROI) T5 EBTST5DL20 CFSO1T8DL18 FL EFSO6T8DL16 T8 ITL-16W-DL-011 TL – D SUPER 80 18W – 865 DAYLIGHT SOURCE: BUREAU OF ENERGY EFFICIENCY
  • 28. LAMP EFFICACY LAMP TYPES LUMENS WATTS EFFICACY (lm/W) T5 EBTST5DL20 1800 20 90 Im/W CFSO1T8DL18 1500 18 83.33 Im/W FL LFS06T8DL18 1650 16 103.13 Im/W TL – D SUPER 80 18W – 865 DAYLIGHT 1300 18 72.22 Im/W T8 ITL-16W-DL-011 1600 16 100 Im/W SOURCE: BUREAU OF ENERGY EFFICIENCY
  • 29. WE CONCLUDE THAT, IT'S CRITICAL TO TAKE INTO ACCOUNT ASPECTS LIKE ENERGY EFFICIENCY, BRIGHTNESS, LONGEVITY, AND ENVIRONMENTAL IMPACT WHEN EVALUATING LIGHT BULBS. THE DECISION BETWEEN THE LIGHT BULBS ULTIMATELY COMES DOWN TO OUR OWN REQUIREMENTS AND OBJECTIVES. MAKING AN EDUCATED CHOICE FOR OUR LIGHTING REQUIREMENTS WILL BE MADE EASIER WITH CAREFUL CONSIDERATION OF THESE ELEMENTS. Conclusion
  • 30. RECOMMENDATIONS  MAINTAIN AND DO A MONTHLY CHECKUP, SPECIALLY FOR CLEANING.  IF NOT IN USE, SWITCH OFF THE LIGHTS.  BE AWARE THAT INCREASED LAMP EFFICACY RESULTS IN GREATER SAVINGS FOR LIGHTS WITH SIMILAR OUTPUT.  IF THE LIGHTING IN THAT PARTICULAR ROOM IS SUFFICIENT FOR YOUR NEEDS, DO NOT USE THE LAMP OR TURN IT OFF.  TO PRESERVE ILLUMINATION, REPLACE ALL LAMPS EVERY FIVE YEARS FOR THE EXISTING TUBULAR LED LAMP WITH LIGHT FIXTURE IN THE ROOM.  WE RECOMMEND FIREFLY PRO SERIES (FL EFSO6T8DL16) AND LED TUBE LIGHT (T8 ITL-16W-DL-011) FOR THE REPLACEMENT OF THE EXISTING TUBULAR LED LAMP, IN A YEAR'S IT BURNS OUT.
  • 31. RECOMMENDEDLUMINAIRE’S TECHNICAL SPECIFICATIONS FIREFLY PRO SERIES LED TUBE LIGHT FL EFSO6T8DL16 T8 ITL-16W-DL-011 WATTAGE 16 W 16 W VOLTAGE AC 220 – 240 V AC 85 – 265 V LIFE HOURS 15,000 HOURS 50,000 HOURS LUMENS 1650 1600 KELVIN 6,500 K 6000 – 6500 K COLOR DAYLIGHT DAYLIGHT BEAM ANGLE 200 DEGREES 120 DEGREES EFFICACY (lm/W) 103.13 Im/W 100 Im/W DIMMABLE NO NO LAMP BASE G13 G13 SRP PHP 180 PHP 203 SOURCE: BUREAU OF ENERGY EFFICIENCY
  • 32. Rec. 1 CALCULATIONFOR COSTTHROUGHOUTITS LIFEHOUR (PHP), FOR FIREFLY PRO SERIES(FL EFSO6T8DL16). = (12 HOURS x 16 DAYS IN A MONTH) = 192 HOURS IN A MONTH = (192 HOURS x 10 MONTHS) = 1920 HOURS ANNUAL FOR MULTIPLIER = 15,000 HOURS/1920 = 7.8 YEARS = (PHP 5136.48 KWH x 7.8 YEARS) COST THROUGHOUT ITS LIFEHOUR (PHP) = 40064.544 = (16W x 12 LUMINAIRES) = 192 WATTS = (192W x 12 HOURS) = 2304 W = (2304 W x 16 DAY) = 36864 W/DAY = 36864/1000 = 36.864 KWH = (36.864 KWH x 10 MONTHS) = 368.64 KWH = (368.64 KWH x 13.9336) = PHP 5136.48 KWH OF ELECTRICITY PER YEAR
  • 33. Rec 2. CALCULATIONFOR COSTTHROUGHOUTITS LIFEHOUR (PHP), FOR LED TUBELIGHT(T8 ITL-16W-DL-011). = (12 HOURS x 16 DAYS IN A MONTH) = 192 HOURS IN A MONTH = (192 HOURS x 10 MONTHS) = 1920 HOURS ANNUAL FOR MULTIPLIER = 50,000 HOURS/1920 = 26 YEARS = (PHP 5136.48 KWH x 26 YEARS) COST THROUGHOUT ITS LIFEHOUR (PHP) = 133548.48 = (16W x 12 LUMINAIRES) = 192 WATTS = (192W x 12 HOURS) = 2304 W = (2304 W x 16 DAY) = 36864 W/DAY = 36864/1000 = 36.864 KWH = (36.864 KWH x 10 MONTHS) = 368.64 KWH = (368.64 KWH x 13.9336) = PHP 5136.48 KWH OF ELECTRICITY PER YEAR