Joy Raj Bhowmik Reg No: 2018339064
A REPORT ON ONE DAY INDUSTRIAL VISIT TO THE
Lafarge Surma Cement Ltd | LafargeHolcim Bangladesh Ltd
The industrial visit is organized by:
Department of Mechanical Engineering
Shahjalal University of Science and Technology, Sylhet.
Joy Raj Bhowmik Reg No: 2018339064
Entrance of LafargeHolcim Surma Plant
Industry Profile:
Lafarge Surma Cement is located in Chhatak Sunamganj and the only fully integrated dry
process cement plant in Bangladesh. Lafarge Surma Cement Ltd. is a joint venture of
LafargeHolcim, a world leader in building materials and Cementos Molins, Spanish
multinational company with strong global presence in 90 countries. Lafarge Surma Cement
(LSC) is a group company of LafargeHolcim Group and Cementos Molins.
It has acquired 198 acres of land. The monthly production rate is about 1,17,590 metric tons of
clinker and 1,25,462.48 tons of cement. It has the longest troughed conveyor belt (17 km) in
the world. Safety is the top priority for the LH Group. In the event of health and safety concerns,
it strictly adheres to zero compromise. It has two unique products with different brand names,
one is Supercrete, a type of Portland limestone cement, and the other is Powercrete, a type of
Portland composite cement.
Joy Raj Bhowmik Reg No: 2018339064
Reporting at LafargeHolcim Surma Plant:
We arrived at the site around 10:00 am on September 22, 2022 with 25 people (22 3rd year
students and 3 teachers) at the site. And we were warmly welcomed by an engineer, Md.
Anamul Haque, Mechanical Maintenance, who was our instructor throughout the industry visit.
We had to present our vaccination record before entering the site of visit. After all health issues
had been dealt with, we were taken to the administration building by bus.
HR department briefing:
In the administration building, we were briefed on the background and capabilities of the
industry through a short presentation by HR Director Anamul Haque. In the briefing we
understand the industry insights and how an industry can work by aligning all sectors to it. The
HR Director also informed us about current and future projects in the industry. We were also
briefed on the instructions on health and safety protocols. By then we split into two groups and
the first group was taken to the lobby to wear safety gear. Then the first group was taken to the
main sights to visit with our instructor and one of our respected teachers.
Joy Raj Bhowmik Reg No: 2018339064
Visiting Sites
LBC (Long Belt Conveyor):
Inspecting The LBC
Conveys limestone to the plant which is an essential ingredient in cement production. 10 km
of the belt is in the Bangladesh region and 7 km is in the India region, totaling 17 km long. The
belt is of 800 ton/hr capacity. It has three drives of 630 KW each, 2 in Bangladesh and 1 in
India. Moves at a speed of 4 meters per second. It has a total of 15000 idler pulleys and only
40 belts on the factory premises. Then, we were taken to the storage shed.
LSS (Limestone Storage Shed):
A storage space for clay A storage space for Limestone
It is a storage space for limestone and clay. It has a bridge reclaimer and belt to transport the
raw materials of clay for the next operation.
Joy Raj Bhowmik Reg No: 2018339064
Hopper Building:
There different core clinker materials are mechanically separated. Then the mixture sent to the
VRM. Due to a maintenance issue, we were unable to visit the hopper building.
VRM (Vertical Roller Mill):
It is one of the most important machines. It grinds the proportionate raw material mixture to a
certain level of fineness. Here the clinker raw materials are crushed to its smallest chunks. A
hydraulic cylinder is used for this purpose, which presses the rollers onto the table and provides
the grinding pressure. Here accumulator is used to as a shock absorber.
Joy Raj Bhowmik Reg No: 2018339064
Preheater:
To turn the fine mixture of raw materials into clinker, the mixture was sent to the preheater
where it is heated up to 900°C. The preheater has number of tubes which helps to reach up the
required temperature. The preheater increases the efficiency of kiln. The conical parts are called
cyclone.
Kiln:
The kiln provides sufficient temperature and environment for necessary chemical reactions
required for clinker production. The kiln can reach temperatures of 1200°C and effectively heat
Joy Raj Bhowmik Reg No: 2018339064
the clinker. The clinker cooler is used under the kiln to cool the hot clinker with the help of
blown air. Then the cold clinker sent to the clinker silo.
Clinker Silo:
It is a storage space for clinker. It has an automatic system for storing clinker. The capacity of
the clinker silo is 1,00000 tons. Then the clinker sent to the cement mill.
Cement Mill:
Joy Raj Bhowmik Reg No: 2018339064
Grinds the mixture of clinker, gypsum, and limestone to produce the final product. Called ball
mill when ball is used for grinding mechanism. The cement mill has a capacity of 2 nos.  100
tons/hr each. Then the final sent to the cement silo.
Cement Silo:
It is a storage space for the produced cement. The cement silo has a capacity of 2nos.  11,000
tons each.
Packing Plant:
The packing plant has a capacity of 3nos. 100 tons/hr each (8 sprout Roto-packer). Due to a
maintenance issue, we were unable to visit the hopper building.
Loading:
The clinker loading system has a capacity of 400 tons/hour in open barge loading mode. And
the cement bag loading system has capacity of 2nos. 100tons/hr for both barge and truck
loader.
Other Factors:
The power required for the proper operation of the LafargeHolcim Surma Cement Plant is
produced and supplied by Wartsila. Wartsila produced 30 MW power. Also, some sort of power
Joy Raj Bhowmik Reg No: 2018339064
is generated from the Geocycle a sector of LafargeHolcim Surma Plant. There was a warehouse
to store different types of necessary components.
There was a mini fire station to prevent any kind of accidents. There is also enough safety
equipment to keep the workplace safe and healthy for employees.
Images:
Group Photograph with 25 people
(22 are the third-year students and 3 are our respected teachers)
Engineer, Md. Anamul Haque
briefs us on the industry visit
Joy Raj Bhowmik Reg No: 2018339064
Conclusion:
The entire visit to LafargeHolcim Surma Plant allows us to understand how raw materials are
produced so efficiently and how these raw materials can be used in cement production. We
have learned so many important things related to our academic studies. By visiting the industry,
we can understand how a multinational company can run its industry and deal with the other
consequences.
Being the only fully integrated dry process cement plant in Bangladesh, we could see how
much pressure and responsibility must be maintained to continue the production of both the
cement raw materials and the cements. The environment of that industry was so much friendly
and memorizing. We are very grateful to our distinguished teachers, our industry visit trainer
and the LafargeHolcim Surma Plant Authority.

More Related Content

Similar to LHBL_JoyRajBhowmik_SUSTMEE.pdf

PROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORY
PROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORYPROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORY
PROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORY
Shanmugaraj M
 
Barak Valley Cements Ltd.,Assam- A study on its production and operations
Barak Valley Cements Ltd.,Assam- A study on its production and operationsBarak Valley Cements Ltd.,Assam- A study on its production and operations
Barak Valley Cements Ltd.,Assam- A study on its production and operations
Debasish Das
 

Similar to LHBL_JoyRajBhowmik_SUSTMEE.pdf (20)

ultratech cement 2017
ultratech cement 2017 ultratech cement 2017
ultratech cement 2017
 
PROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORY
PROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORYPROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORY
PROPOSAL FOR REHABILITATION WORKS OF ALANGULAM CEMENT FACTORY
 
synopsis of ambuja cement final project report
synopsis of  ambuja cement final project reportsynopsis of  ambuja cement final project report
synopsis of ambuja cement final project report
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Final SIP Project
Final SIP ProjectFinal SIP Project
Final SIP Project
 
Barak Valley Cements Ltd.,Assam- A study on its production and operations
Barak Valley Cements Ltd.,Assam- A study on its production and operationsBarak Valley Cements Ltd.,Assam- A study on its production and operations
Barak Valley Cements Ltd.,Assam- A study on its production and operations
 
Report on Cement manufacturing process
Report on Cement manufacturing process Report on Cement manufacturing process
Report on Cement manufacturing process
 
Project report_raw meal
Project report_raw mealProject report_raw meal
Project report_raw meal
 
JK LAKSHMI CEMENT (SIROHI)
JK LAKSHMI CEMENT (SIROHI)JK LAKSHMI CEMENT (SIROHI)
JK LAKSHMI CEMENT (SIROHI)
 
R.S.M.M. Shivam kushwah Presentation
R.S.M.M. Shivam kushwah PresentationR.S.M.M. Shivam kushwah Presentation
R.S.M.M. Shivam kushwah Presentation
 
cement industry program development
cement industry program developmentcement industry program development
cement industry program development
 
Cement Processing Report
Cement Processing ReportCement Processing Report
Cement Processing Report
 
Working capital jp
Working capital jpWorking capital jp
Working capital jp
 
shivamkushwahpresentation.pptx
shivamkushwahpresentation.pptxshivamkushwahpresentation.pptx
shivamkushwahpresentation.pptx
 
Royel cement
Royel cementRoyel cement
Royel cement
 
H04744450
H04744450H04744450
H04744450
 
Vertical Grinding Mill Powder making machine
Vertical Grinding Mill Powder making machine Vertical Grinding Mill Powder making machine
Vertical Grinding Mill Powder making machine
 
Cement manufacturing process by shubham malviya
Cement manufacturing process by shubham malviyaCement manufacturing process by shubham malviya
Cement manufacturing process by shubham malviya
 
Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.
 
RSMML summer training ppt
RSMML summer training pptRSMML summer training ppt
RSMML summer training ppt
 

Recently uploaded

一比一原版赫尔大学毕业证如何办理
一比一原版赫尔大学毕业证如何办理一比一原版赫尔大学毕业证如何办理
一比一原版赫尔大学毕业证如何办理
F
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Menggugurkan Kandungan 087776558899
 
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
gakamzu
 
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
ZurliaSoop
 
Transferable Skills - Roadmaps & Resources - Dirk Spencer
Transferable Skills - Roadmaps & Resources - Dirk SpencerTransferable Skills - Roadmaps & Resources - Dirk Spencer
Transferable Skills - Roadmaps & Resources - Dirk Spencer
Dirk Spencer Corporate Recruiter LION
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
muwyto
 
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
muwyto
 
obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...
obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...
obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...
yulianti213969
 
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
gkyvm
 

Recently uploaded (20)

Ochsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdfOchsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdf
 
一比一原版赫尔大学毕业证如何办理
一比一原版赫尔大学毕业证如何办理一比一原版赫尔大学毕业证如何办理
一比一原版赫尔大学毕业证如何办理
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
 
UIowa Application Instructions - 2024 Update
UIowa Application Instructions - 2024 UpdateUIowa Application Instructions - 2024 Update
UIowa Application Instructions - 2024 Update
 
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
 
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
 
Transferable Skills - Roadmaps & Resources - Dirk Spencer
Transferable Skills - Roadmaps & Resources - Dirk SpencerTransferable Skills - Roadmaps & Resources - Dirk Spencer
Transferable Skills - Roadmaps & Resources - Dirk Spencer
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
 
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
 
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdfGanga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
 
obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...
obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...
obat aborsi pacitan wa 081336238223 jual obat aborsi cytotec asli di pacitan0...
 
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdfB.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
 
Malayali ℂollege ℂall Girls Rajkot Book Esha 7877925207 Top Class ℂall Girl S...
Malayali ℂollege ℂall Girls Rajkot Book Esha 7877925207 Top Class ℂall Girl S...Malayali ℂollege ℂall Girls Rajkot Book Esha 7877925207 Top Class ℂall Girl S...
Malayali ℂollege ℂall Girls Rajkot Book Esha 7877925207 Top Class ℂall Girl S...
 
We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!
 
Crafting an effective CV for AYUSH Doctors.pdf
Crafting an effective CV for AYUSH Doctors.pdfCrafting an effective CV for AYUSH Doctors.pdf
Crafting an effective CV for AYUSH Doctors.pdf
 
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
 
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdfUXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
UXPA Boston 2024 Maximize the Client Consultant Relationship.pdf
 
Career opportunities after 12th Science 2024 Biology group
Career opportunities after 12th Science 2024 Biology groupCareer opportunities after 12th Science 2024 Biology group
Career opportunities after 12th Science 2024 Biology group
 
Launch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideLaunch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's Guide
 
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
 

LHBL_JoyRajBhowmik_SUSTMEE.pdf

  • 1. Joy Raj Bhowmik Reg No: 2018339064 A REPORT ON ONE DAY INDUSTRIAL VISIT TO THE Lafarge Surma Cement Ltd | LafargeHolcim Bangladesh Ltd The industrial visit is organized by: Department of Mechanical Engineering Shahjalal University of Science and Technology, Sylhet.
  • 2. Joy Raj Bhowmik Reg No: 2018339064 Entrance of LafargeHolcim Surma Plant Industry Profile: Lafarge Surma Cement is located in Chhatak Sunamganj and the only fully integrated dry process cement plant in Bangladesh. Lafarge Surma Cement Ltd. is a joint venture of LafargeHolcim, a world leader in building materials and Cementos Molins, Spanish multinational company with strong global presence in 90 countries. Lafarge Surma Cement (LSC) is a group company of LafargeHolcim Group and Cementos Molins. It has acquired 198 acres of land. The monthly production rate is about 1,17,590 metric tons of clinker and 1,25,462.48 tons of cement. It has the longest troughed conveyor belt (17 km) in the world. Safety is the top priority for the LH Group. In the event of health and safety concerns, it strictly adheres to zero compromise. It has two unique products with different brand names, one is Supercrete, a type of Portland limestone cement, and the other is Powercrete, a type of Portland composite cement.
  • 3. Joy Raj Bhowmik Reg No: 2018339064 Reporting at LafargeHolcim Surma Plant: We arrived at the site around 10:00 am on September 22, 2022 with 25 people (22 3rd year students and 3 teachers) at the site. And we were warmly welcomed by an engineer, Md. Anamul Haque, Mechanical Maintenance, who was our instructor throughout the industry visit. We had to present our vaccination record before entering the site of visit. After all health issues had been dealt with, we were taken to the administration building by bus. HR department briefing: In the administration building, we were briefed on the background and capabilities of the industry through a short presentation by HR Director Anamul Haque. In the briefing we understand the industry insights and how an industry can work by aligning all sectors to it. The HR Director also informed us about current and future projects in the industry. We were also briefed on the instructions on health and safety protocols. By then we split into two groups and the first group was taken to the lobby to wear safety gear. Then the first group was taken to the main sights to visit with our instructor and one of our respected teachers.
  • 4. Joy Raj Bhowmik Reg No: 2018339064 Visiting Sites LBC (Long Belt Conveyor): Inspecting The LBC Conveys limestone to the plant which is an essential ingredient in cement production. 10 km of the belt is in the Bangladesh region and 7 km is in the India region, totaling 17 km long. The belt is of 800 ton/hr capacity. It has three drives of 630 KW each, 2 in Bangladesh and 1 in India. Moves at a speed of 4 meters per second. It has a total of 15000 idler pulleys and only 40 belts on the factory premises. Then, we were taken to the storage shed. LSS (Limestone Storage Shed): A storage space for clay A storage space for Limestone It is a storage space for limestone and clay. It has a bridge reclaimer and belt to transport the raw materials of clay for the next operation.
  • 5. Joy Raj Bhowmik Reg No: 2018339064 Hopper Building: There different core clinker materials are mechanically separated. Then the mixture sent to the VRM. Due to a maintenance issue, we were unable to visit the hopper building. VRM (Vertical Roller Mill): It is one of the most important machines. It grinds the proportionate raw material mixture to a certain level of fineness. Here the clinker raw materials are crushed to its smallest chunks. A hydraulic cylinder is used for this purpose, which presses the rollers onto the table and provides the grinding pressure. Here accumulator is used to as a shock absorber.
  • 6. Joy Raj Bhowmik Reg No: 2018339064 Preheater: To turn the fine mixture of raw materials into clinker, the mixture was sent to the preheater where it is heated up to 900°C. The preheater has number of tubes which helps to reach up the required temperature. The preheater increases the efficiency of kiln. The conical parts are called cyclone. Kiln: The kiln provides sufficient temperature and environment for necessary chemical reactions required for clinker production. The kiln can reach temperatures of 1200°C and effectively heat
  • 7. Joy Raj Bhowmik Reg No: 2018339064 the clinker. The clinker cooler is used under the kiln to cool the hot clinker with the help of blown air. Then the cold clinker sent to the clinker silo. Clinker Silo: It is a storage space for clinker. It has an automatic system for storing clinker. The capacity of the clinker silo is 1,00000 tons. Then the clinker sent to the cement mill. Cement Mill:
  • 8. Joy Raj Bhowmik Reg No: 2018339064 Grinds the mixture of clinker, gypsum, and limestone to produce the final product. Called ball mill when ball is used for grinding mechanism. The cement mill has a capacity of 2 nos.  100 tons/hr each. Then the final sent to the cement silo. Cement Silo: It is a storage space for the produced cement. The cement silo has a capacity of 2nos.  11,000 tons each. Packing Plant: The packing plant has a capacity of 3nos. 100 tons/hr each (8 sprout Roto-packer). Due to a maintenance issue, we were unable to visit the hopper building. Loading: The clinker loading system has a capacity of 400 tons/hour in open barge loading mode. And the cement bag loading system has capacity of 2nos. 100tons/hr for both barge and truck loader. Other Factors: The power required for the proper operation of the LafargeHolcim Surma Cement Plant is produced and supplied by Wartsila. Wartsila produced 30 MW power. Also, some sort of power
  • 9. Joy Raj Bhowmik Reg No: 2018339064 is generated from the Geocycle a sector of LafargeHolcim Surma Plant. There was a warehouse to store different types of necessary components. There was a mini fire station to prevent any kind of accidents. There is also enough safety equipment to keep the workplace safe and healthy for employees. Images: Group Photograph with 25 people (22 are the third-year students and 3 are our respected teachers) Engineer, Md. Anamul Haque briefs us on the industry visit
  • 10. Joy Raj Bhowmik Reg No: 2018339064 Conclusion: The entire visit to LafargeHolcim Surma Plant allows us to understand how raw materials are produced so efficiently and how these raw materials can be used in cement production. We have learned so many important things related to our academic studies. By visiting the industry, we can understand how a multinational company can run its industry and deal with the other consequences. Being the only fully integrated dry process cement plant in Bangladesh, we could see how much pressure and responsibility must be maintained to continue the production of both the cement raw materials and the cements. The environment of that industry was so much friendly and memorizing. We are very grateful to our distinguished teachers, our industry visit trainer and the LafargeHolcim Surma Plant Authority.