San Agustin National High School
“Let’s Go Digital”
2
The CI Team
Step 1
NILO P. SAMPUTON
School Head
FERNANDO B. ENAD
CI Team Leader
MARIE STEFANI C. HORA
Scribe
SUEDEN S. LANJE
Communication
PERLITA L. ENAD
Documentation
PEREGRITA J. DATAHAN
Process Observer
INTRODUCTION
School Profile
Name of School : San Agustin National High School
School ID : 302887
School Address : San Agustin, Sagbayan, Bohol
Municipality : Sagbayan
Province : Bohol
Number of Students : Male - 534
Female - 614
TOTAL - 1,148
Numbers of Teachers : 42
Location : Longitude: 9.9266333, Latitude: 124.0748608
School Head : MR. NILO P. SAMPUTON, SP1
3
Step 1
School Profile
4
San Agustin National HHS
Teachers
Step 1
5
Step 1
The Gate and the Entrance
6
Step 1
The Junior High School Buildings
7
The Senior High School Building
Step 1
School Performance Background
School Enrollment
8
369
404 416
435
476 476
804
880 892
0
100
200
300
400
500
600
700
800
900
1000
SY 2013-2014 SY 2014-2015 SY 2015-2016
Male Female Total
Step 1
9
Step 1
10
Step 1
1. Students crowd up the enrollment officer-in-charge to line up to
enroll during the enrollment period. The same officer needs to
randomly assign enrollees to sections/class.
2. On the first day of school, students had to roam around the
campus to lookup for their names posted on the classroom doors
to determine their section/room assignments.
3. Teachers had to manually write the names of their assigned
students to their School Form 1 and to write the same list to their
Class Record and other forms.
4. For the School Head to determine the current headcount, a
paper sheet needs to be passed on for the advisers to fill out.
Where Were We Before?
Project Background
The enrollment of San Agustin National High School has
continuously increased over time since its foundation in 1994. From
a single nipa hut as a classroom with around 40 students initially, it
went up to about 10 school buildings with around 800 students.
Despite the continuous increasing trend, the school has
long been utilizing the traditional method of records management.
Before, if a student enrolls, he submits his credentials and will be
received by an officer and process it. Thereafter, the student has to
wait for the first day of school to identify his/her class/section
assignment. During that time, a student has to hop from one room
to another to lookup for their name on the list posted on the
classroom doors. Moreover, the teacher has to manually write the
names of his/her students to the School Form 1 and does the same
for the other required school mandated forms, resulting to
repetition of work and thus resulting to data integrity issues.
11
Step 1
Project Background
With the above premise, the school was prompted to
initiate a project aimed at automating the records management of
San Agustin National High School from Enrollment to Record
Keeping. The project is entitled, “Let’s Get Digital” and its
implementation is through the use of a web-based application, the
SANHS MIS (San Agustin NHS – Management Information
System), which is a self-made and self-coded (programmed)
application utilizing the HTML+PHP and MySQL frameworks.
With the MIS, all records will become digitized, centralized
and automated
12
Step 1
Voice of the Customer
(Pupils Perception of a Clean School)
13
Step 2
9%
12%
11%
12%
8%8%
8%
11%
8%
13%
Properly Segregated
Garbage
Disease-free
Environment
Absence from Harmful
Insects
School Pollution-free
Well-disciplined Pupils
Clean Surroundings
Improved School
Ground
Zero Waste School
Enough Cleaning
Facilities
Proper Compost Pit
The CI Team conducted a survey on 72
pupils(Grades 3 to 6 Pupils)
using a questionnaire.
Teachers and Pupils Satisfaction
Rating on Waste Segregation
6%
18%
28%
48%
Very Satisfactory
Satisfactory
Fair
Poor
14
Voice of the Customer
(Conclusion)
• Unsegregated garbage has an effect on
the health and safety of the pupils and the
teachers.
• Classes hours are reduced because it is
consumed for cleaning the school ground.
• Burning of unsegregated garbage can
threatened ecological balance.
Step 2
15
Current State
SIPOC
Step 3
Sweeping and
Picking
of garbage
Collecting of
garbage
Burning of
garbage
Process Steps
16
SUPPLIERS
• Students
• Teachers
• Vendors
• Visitors
• Trees
INPUT
• Plastics
• Cellophanes
• Papers
• Leaves and
twigs
• Bottles
• Cans
• Fruit and
vegetable
peelings
PROCESS
• Waste
Management
OUTPUT
• Uncollected
garbage
• Scattered
wrappers
CUSTOMERS
• Environment
• Student
• Vendors
• Barrio Folks
• Teachers
• Visitors
Current State (Before Improvement)
Level 1: Waste Management Process Steps
17
Daily
Pupils
Collector
Pupils
assigned
to Burn
the
Garbage
Collecting of garbage by assigned
pupil cleaners.
Burning of garbage by assigned
pupil cleaners.Daily
Pupils
Sweepers
Sweeping of garbage by
assigned pupil cleaners.
Current State (Before Improvement)
Waste Management Process
Step 3
Sweeping and Picking of
garbage
Collecting of garbage Burning of garbage
 Sweeping of fallen twigs,
fallen or dried leaves,
plastics and papers, either
on the school ground or
inside the classroom.
 Picking of plastics,
cellophanes and other
forms of garbage.
 Swept garbage are
collected using trash cans
and sacks.
 Empty cans and unused
bottles are set aside on
places away from playing
areas to avoid accidents.
 Pupils, who are tasked as
garbage collectors, burn the
garbage.
Sometimes, pupils do
not clean their
assigned areas.
Sometimes, garbage
are uncollected
properly for pupils
are in a hurry due to
time constraint in
cleaning.
Environmental
and health
threatening
practice.
18
Some pupils are
unable to sweep all
the garbage. As a
result, some garbage
turns into an eyesore.
Current State
Layout of Cantores Elementary School Site
19
Vegetable
Garden
Room
1 & 2
Waiting
Shed
Room 3 Room 4 Room 5
Room
6
CR
Fruit Garden
School
Ground
Mini
Stage
Pathway
Current State
Process Performance
Breakdown of Unsegregated Garbage Collected Per Area
20
Classroo
ms
Waiting
Shed
Pathways Back of
Classroo
ms
Vegetable
and Fruit
Gardens
School
Ground
Total No.
of Trash
Cans
Monday 2 2 1 1 1 2 9
Tuesday 2 2 1 1 1 2 9
Wednesda
y
2 2 1 1 1 2 9
Thursday 2 2 1 1 1 2 9
Friday
2 2 1 1 1 2 9
Current State
Process Performance
0
1
2
3
4
5
6
7
8
9
10
Monday
Tuesday
Wednesday
Thursday
Friday
Step 3
21
Objective Statement
• Cantores Elementary School collected garbage at a range of
9 trash cans with an average of 2 kg per day, conducted on
Jan. 11-Feb. 19, 2016, which are 80% are unsegregated of
the temporary dumping area – with leaves, papers, twigs,
cellophanes, etc as the top most waste generated.
Step 4
22
Focused Problem Statement
• Cantores Elementary School’s objective is to collect all
possible garbage found inside and outside the classrooms,
including garbage found in the school ground and other areas
of the school, and be able to segregate these garbage
according to biodegradable and non-biodegradable garbage.
Root Cause Analysis
Step 5
Why-Why Diagram
Why has Cantores
Elementary School
collected garbage
at a range of 9
trash cans with an
average of 2 kg
per day, which are
80% are
unsegregated of
the temporary
dumping area with
leaves, papers,
twigs, cellophane,
etc. as top most
waste?
Garbage are
combined.
Teachers ignored
to check the
garbage in the
trashcans.
Twigs and falling
leaves are
combined with non-
biodegradable
garbage.
Lacking of
available
trashcans.
30 sq.m. area
outside the school
served as dumpsite.
Vacant times are
usually used for
checking pupils’
output.
Failure to
segregate
combined
garbage
Not following
school policy.
23
Front and back
garbage are
discarded in the
dumpsite.
Pupils threw food
wrappers
anywhere.
Maintain
cleanliness of
the school
ground.
Overlapping of
activities.
Root Cause Validation
Problem Statement:
Cantores Elementary School collected garbage at a range of 9 trash cans with an
average of 2 kg per day, conducted on Jan. 11-Feb. 19, 2016, which are 80% are
unsegregated of the temporary dumping area – with leaves, papers, twigs,
cellophanes, etc as the top most waste generated.
Probable Causes Validation
Controllability
of the School
Conclusion
(Valid or Not)
Class
Description of
Cause
Method Result
Within
Control
For solution
formulation
Man
Failure to
segregate
combined
garbage
Survey
observation
Valid
Within
control
For solution
formulation
Not following
school policies
Survey
observation
Valid
Within
control
For solution
formulation
Overlapping of
activities
Survey
observation
Valid
Within
control
For solution
formulations
i24
i25
Probable Causes Validation
Controllability
of the School
Conclusion
(Valid or Not)
Class
Description of
Cause
Method Result
Within
Control
For solution
formulation
Materials
Lacking of
available
trashcans
Observation Valid
Within
control
For solution
formulation
Environment
Maintain
cleanliness
inside the
school ground
Observation Valid
Within
control
For solution
formulations
Continuation . . .
Priority Valid Causes
Step 5
26
• Failure to segregate combined garbage.
• Disregard to follow school policies.
• Overlapping of school activities
• Lacking of available trashcans.
• Maintain the cleanliness inside the school
ground.
Recommended Improvements
Step 6
27
Priority Root Cause Recommended Improvement
Failure to segregate combined garbage. Provide labeled trashcans with
biodegradable and non-biodegradable in
every classroom and areas where pupils
usually stay.
Disregard to follow school policies. Re-orient pupils on proper garbage
disposal.
Overlapping of activities. Kindergarten to Grade II Teachers will
check the trashcans after morning class,
while Grades III to VI teachers will check
after afternoon classes.
Lacking of available trashcans. Provide more trashcans on every
classrooms.
Maintain the cleanliness inside school
ground.
Constructing of concrete compost pit.
Future State
SIPOC
Step 6
Improved Step 28
SUPPLIERS
• Students
• Teachers
• Vendors
• Visitors
• Trees
INPUT
• Plastics
• Cellophanes
• Papers
• Leaves and
twigs
• Bottles
• Cans
• Fruit and
vegetable
peelings
PROCESS
• Waste
Management
OUTPUT
• Uncollected
garbage
CUSTOMERS
• Environment
• Student
• Vendors
• Barrio Folks
• Teachers
• Visitors
Sweeping and
Picking
of garbage
Collecting of
garbage
Segregating
of garbage
Process Steps
Future State
Process Details
Step 6
29
Sweeping and Picking of
garbage
Collecting of garbage Segregating of garbage
 Sweeping of fallen twigs,
fallen or dried leaves,
plastics and papers, either
on the school ground or
inside the classroom.
 Picking of plastics,
cellophanes and other
forms of garbage.
 Swept garbage are
collected using labeled
trashcans.
 Supervision of teachers
during collecting of
garbage.
 Pupils, who are tasked as
garbage collectors, throw
the garbage according to
color and label of compost
pit.
 One teacher per day is
assigned to monitor the
compost pit, to check
whether garbage are
thrown properly.
Absence of teacher’s
supervision.
Sometimes, pupils do
not clean their
assigned areas.
Some pupils are
unable to sweep all
the garbage. As a
result, some garbage
turns into an eyesore.
Future State
Improvement Highlights
• Provision of color-coded compost pit for proper
waste segregation.
• Simultaneous throwing of garbage with daily
teacher supervision to ensure proper waste
segregation.
• Daily checking of teacher per day to monitor
waste segregation in the compost pit.
30
Future State
Improvement Highlights
Decomposed materials
from the compost pit
will serve as organic
fertilizer for the fruit
and vegetable
garden.
Step 6
31
More
harvest
to reap.
Future State
Potential Problem Analysis
Potential
Problem
Probable Cause L
(1-5)
I
(1-5)
RF
(L x I)
Preventive Action
1. Issue 1
2. Issue 2
3. Issue 3
4. Issue 4
5. Issue 5
Step 7
L – Likelihood I – Impact RF – Risk Factor
Preventive action required for RF >10
32
Future State
Implementation Plan
Activity Output Responsibility Due
Date
Resources/
Budget
1. Activity 1
2. Activity 2
3. Activity 3
4. Activity 4
5. Activity 5
Step 7
33
GANTT CHART
34
Pilot
Implementation Status
Activity Output Responsibility Actual
Date
Remarks
1. Activity 1
2. Activity 2
3. Activity 3
4. Activity 4
5. Activity 5
Step 8
35
Pilot
Implementation Highlights
• (description of event)
Step 8
Illustration or picture
Sample form or report
New IM
36
Pilot
Implementation Highlights
• (description of event)
Step 8
Illustration or picture
Sample form or report
New IM
37
Pilot
Implementation Highlights
• (description of event)
Step 8
Illustration or picture
Sample form or report
New IM
38
Pilot
Process Performance
0
1
2
3
4
5
6
Category 1 Category 2 Category 3 Category 4
Series 1
Series 2
Series 3
Step 8
39
Pilot
Process Performance
BEFORE AFTER
40
Pilot
Learnings
Step 8
• (List key insights from pilot experience, including
any adjustments to the recommended
improvements)
41
Rollout
Strategy and Scope
• (describe the rollout strategy)
• (define the extension from the initial pilot scope,
e.g. to other sections, to other grade levels)
Step 9
42
Rollout
Stakeholder Analysis
Step 9
Enthusiastic support
Will work hard to make it happen
Help it work
Will lend appropriate support
Hesitant
Holds some reservations; won’t
volunteer
Indifferent
Won’t help; won’t hurt
Uncooperative
Will have to be prodded
Opposed
Will openly act on and state
opposition
Hostile
Will block at all costs
People or Groups
Teachers Students. PTA.Level of Commitment
i43
Rollout
Implementation Plan
Activity Output Responsibility Due
Date
Resources/
Budget
1. Activity 1
2. Activity 2
3. Activity 3
4. Activity 4
5. Activity 5
Step 9
44
Rollout
Implementation Status
Activity Output Responsibility Actual
Date
Remarks
1. Activity 1
2. Activity 2
3. Activity 3
4. Activity 4
5. Activity 5
Step 9
45
Rollout
Process Performance
0
1
2
3
4
5
6
Category 1 Category 2 Category 3 Category 4
Series 1
Series 2
Series 3
Step 9
46
Comparison of
Process Performance
PILOT ROLLOUT
47
Rollout
Implementation Highlights
• (description of event)
Step 9
Illustration or picture
Sample form or report
New IM
48
Rollout
Implementation Highlights
• (description of event)
Step 9
Illustration or picture
Sample form or report
New IM
49
Rollout
Implementation Highlights
• (description of event)
Step 9
Illustration or picture
Sample form or report
New IM
50
Rollout
Learnings
Step 9
• (List key insights from rollout experience,
including any adjustments to the recommended
improvements)
51
FUTURE STATE
BACKGROUND
CURRENT STATE
PROBLEM ANALYSIS
IMPLEMENTATION PLAN
LESSONS LEARNED
TEST RESULTS
PROJECT TITLE
Improvement on Examination Results Feedback Time
Team Members: DBH, EAF, BOG, VPR, RVP, DBS
The time between examination of students and the
return of examination results has an average of 7 days
with a max of 14 days. Students rely on the results of
the examination to know their academic performance
and to review for succeeding lessons.
Teacher
Student Submit
Exam
Collect
Exams
Group
exams
per grade
level
Check
Exams
Return to
Students
Receive
Examinatio
n Results
5 mins.
per exam
1 to 5
days30 secs. 30 secs.
Teacher
Student Submit
Exam
Collect
Exams
Check
Exams
Return to
Students
Receive
Examinatio
n Results
5 mins.
per exam
30 secs. 30 secs.
Recommendation:
1. Eliminate grouping of exam papers for each grade level.
2. Have a different set of exam for students who missed the exam.
Week
1
Week
2
Wee
k 3
Wee
k 4
Week
5 Who
%
Completion
Process Design Team 100%
Dissemination of New
Design DBH, RVP, BOG 100%
Simulation EAF, VPR, DBS 100%
Gathering of Feedback
from Teachers EAF, VPR, DBS 80%
Refinement of Process
Design Team 80%
Improve on Information Dissemination
Teachers should be trained to the new process to be followed on
providing feedback to students.
0
5
10
15
1 5 9 13 17 21 25 29
Feedback
Time
Step 10STAGE1:ASSESSSTAGE2:ANALYZE
STAGE2:ANALYZESTAGE3:ACT
Project Closure
Next Steps
• (action on next-level priority causes)
• (action on next-phase improvements)
• (links with other school processes or programs)
Step 10
53

More Related Content

Similar to Let's Get Digital - SANHS MIS

powerpoint presentation on our researches
powerpoint presentation on our researchespowerpoint presentation on our researches
powerpoint presentation on our researchesLovelyVeniaJoven2
 
Issue 5 Radians School News Letter!
Issue 5 Radians School News Letter! Issue 5 Radians School News Letter!
Issue 5 Radians School News Letter! Arturo Castrodad
 
Solid and liquid waste management practices in shs.pptx
Solid and liquid waste management practices in shs.pptxSolid and liquid waste management practices in shs.pptx
Solid and liquid waste management practices in shs.pptxDrHarishwamiDas
 
School green areas
School green areasSchool green areas
School green areasLittle Daisy
 
EVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptx
EVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptxEVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptx
EVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptxMaGinaGacho1
 
Introduction to school environment and multi-team role.pptx
Introduction to school environment and multi-team role.pptxIntroduction to school environment and multi-team role.pptx
Introduction to school environment and multi-team role.pptxdrmehreenjamshed
 
Farmington Elementary School Trash Audit
Farmington Elementary School Trash AuditFarmington Elementary School Trash Audit
Farmington Elementary School Trash AuditJim Skelly
 
Methodology practicum
Methodology practicumMethodology practicum
Methodology practicumSano Anil
 
WASH Friendly Schools
WASH Friendly SchoolsWASH Friendly Schools
WASH Friendly SchoolsAED
 
Italy frosinone
Italy frosinoneItaly frosinone
Italy frosinonejol85
 
Malta
MaltaMalta
Maltajol85
 
Jamal Doggett: School Climate + Positive Behavior = Academic Success!
Jamal Doggett: School Climate + Positive Behavior = Academic Success!Jamal Doggett: School Climate + Positive Behavior = Academic Success!
Jamal Doggett: School Climate + Positive Behavior = Academic Success!RaisingTheBar2015
 
New Rainbow Public School Orientation Session 2012-13
New Rainbow Public School Orientation Session 2012-13New Rainbow Public School Orientation Session 2012-13
New Rainbow Public School Orientation Session 2012-13nrpschool
 

Similar to Let's Get Digital - SANHS MIS (20)

powerpoint presentation on our researches
powerpoint presentation on our researchespowerpoint presentation on our researches
powerpoint presentation on our researches
 
Issue 5 Radians School News Letter!
Issue 5 Radians School News Letter! Issue 5 Radians School News Letter!
Issue 5 Radians School News Letter!
 
Solid and liquid waste management practices in shs.pptx
Solid and liquid waste management practices in shs.pptxSolid and liquid waste management practices in shs.pptx
Solid and liquid waste management practices in shs.pptx
 
Adoption of children to learning
Adoption of children to learningAdoption of children to learning
Adoption of children to learning
 
Fhf pbis 09v2
Fhf pbis 09v2Fhf pbis 09v2
Fhf pbis 09v2
 
School green areas
School green areasSchool green areas
School green areas
 
EVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptx
EVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptxEVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptx
EVA J. MONTILLA -NHS-Learning-Continuity-Plan.pptx
 
Introduction to school environment and multi-team role.pptx
Introduction to school environment and multi-team role.pptxIntroduction to school environment and multi-team role.pptx
Introduction to school environment and multi-team role.pptx
 
Farmington Elementary School Trash Audit
Farmington Elementary School Trash AuditFarmington Elementary School Trash Audit
Farmington Elementary School Trash Audit
 
Growing School and Youth Gardens ~ New York City, NY
Growing School and Youth Gardens ~ New York City, NYGrowing School and Youth Gardens ~ New York City, NY
Growing School and Youth Gardens ~ New York City, NY
 
Methodology practicum
Methodology practicumMethodology practicum
Methodology practicum
 
WASH Friendly Schools
WASH Friendly SchoolsWASH Friendly Schools
WASH Friendly Schools
 
Pedagogy
PedagogyPedagogy
Pedagogy
 
Italy frosinone
Italy frosinoneItaly frosinone
Italy frosinone
 
Cafeteria Composting in Schools: Strategies, Systems and Resources for Lane C...
Cafeteria Composting in Schools: Strategies, Systems and Resources for Lane C...Cafeteria Composting in Schools: Strategies, Systems and Resources for Lane C...
Cafeteria Composting in Schools: Strategies, Systems and Resources for Lane C...
 
Malta
MaltaMalta
Malta
 
Jamal Doggett: School Climate + Positive Behavior = Academic Success!
Jamal Doggett: School Climate + Positive Behavior = Academic Success!Jamal Doggett: School Climate + Positive Behavior = Academic Success!
Jamal Doggett: School Climate + Positive Behavior = Academic Success!
 
Pedagogy
PedagogyPedagogy
Pedagogy
 
Pedagogy
PedagogyPedagogy
Pedagogy
 
New Rainbow Public School Orientation Session 2012-13
New Rainbow Public School Orientation Session 2012-13New Rainbow Public School Orientation Session 2012-13
New Rainbow Public School Orientation Session 2012-13
 

Recently uploaded

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 

Recently uploaded (20)

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 

Let's Get Digital - SANHS MIS

  • 1. San Agustin National High School “Let’s Go Digital”
  • 2. 2 The CI Team Step 1 NILO P. SAMPUTON School Head FERNANDO B. ENAD CI Team Leader MARIE STEFANI C. HORA Scribe SUEDEN S. LANJE Communication PERLITA L. ENAD Documentation PEREGRITA J. DATAHAN Process Observer
  • 3. INTRODUCTION School Profile Name of School : San Agustin National High School School ID : 302887 School Address : San Agustin, Sagbayan, Bohol Municipality : Sagbayan Province : Bohol Number of Students : Male - 534 Female - 614 TOTAL - 1,148 Numbers of Teachers : 42 Location : Longitude: 9.9266333, Latitude: 124.0748608 School Head : MR. NILO P. SAMPUTON, SP1 3 Step 1
  • 4. School Profile 4 San Agustin National HHS Teachers Step 1
  • 5. 5 Step 1 The Gate and the Entrance
  • 6. 6 Step 1 The Junior High School Buildings
  • 7. 7 The Senior High School Building Step 1
  • 8. School Performance Background School Enrollment 8 369 404 416 435 476 476 804 880 892 0 100 200 300 400 500 600 700 800 900 1000 SY 2013-2014 SY 2014-2015 SY 2015-2016 Male Female Total Step 1
  • 10. 10 Step 1 1. Students crowd up the enrollment officer-in-charge to line up to enroll during the enrollment period. The same officer needs to randomly assign enrollees to sections/class. 2. On the first day of school, students had to roam around the campus to lookup for their names posted on the classroom doors to determine their section/room assignments. 3. Teachers had to manually write the names of their assigned students to their School Form 1 and to write the same list to their Class Record and other forms. 4. For the School Head to determine the current headcount, a paper sheet needs to be passed on for the advisers to fill out. Where Were We Before?
  • 11. Project Background The enrollment of San Agustin National High School has continuously increased over time since its foundation in 1994. From a single nipa hut as a classroom with around 40 students initially, it went up to about 10 school buildings with around 800 students. Despite the continuous increasing trend, the school has long been utilizing the traditional method of records management. Before, if a student enrolls, he submits his credentials and will be received by an officer and process it. Thereafter, the student has to wait for the first day of school to identify his/her class/section assignment. During that time, a student has to hop from one room to another to lookup for their name on the list posted on the classroom doors. Moreover, the teacher has to manually write the names of his/her students to the School Form 1 and does the same for the other required school mandated forms, resulting to repetition of work and thus resulting to data integrity issues. 11 Step 1
  • 12. Project Background With the above premise, the school was prompted to initiate a project aimed at automating the records management of San Agustin National High School from Enrollment to Record Keeping. The project is entitled, “Let’s Get Digital” and its implementation is through the use of a web-based application, the SANHS MIS (San Agustin NHS – Management Information System), which is a self-made and self-coded (programmed) application utilizing the HTML+PHP and MySQL frameworks. With the MIS, all records will become digitized, centralized and automated 12 Step 1
  • 13. Voice of the Customer (Pupils Perception of a Clean School) 13 Step 2 9% 12% 11% 12% 8%8% 8% 11% 8% 13% Properly Segregated Garbage Disease-free Environment Absence from Harmful Insects School Pollution-free Well-disciplined Pupils Clean Surroundings Improved School Ground Zero Waste School Enough Cleaning Facilities Proper Compost Pit The CI Team conducted a survey on 72 pupils(Grades 3 to 6 Pupils) using a questionnaire.
  • 14. Teachers and Pupils Satisfaction Rating on Waste Segregation 6% 18% 28% 48% Very Satisfactory Satisfactory Fair Poor 14
  • 15. Voice of the Customer (Conclusion) • Unsegregated garbage has an effect on the health and safety of the pupils and the teachers. • Classes hours are reduced because it is consumed for cleaning the school ground. • Burning of unsegregated garbage can threatened ecological balance. Step 2 15
  • 16. Current State SIPOC Step 3 Sweeping and Picking of garbage Collecting of garbage Burning of garbage Process Steps 16 SUPPLIERS • Students • Teachers • Vendors • Visitors • Trees INPUT • Plastics • Cellophanes • Papers • Leaves and twigs • Bottles • Cans • Fruit and vegetable peelings PROCESS • Waste Management OUTPUT • Uncollected garbage • Scattered wrappers CUSTOMERS • Environment • Student • Vendors • Barrio Folks • Teachers • Visitors
  • 17. Current State (Before Improvement) Level 1: Waste Management Process Steps 17 Daily Pupils Collector Pupils assigned to Burn the Garbage Collecting of garbage by assigned pupil cleaners. Burning of garbage by assigned pupil cleaners.Daily Pupils Sweepers Sweeping of garbage by assigned pupil cleaners.
  • 18. Current State (Before Improvement) Waste Management Process Step 3 Sweeping and Picking of garbage Collecting of garbage Burning of garbage  Sweeping of fallen twigs, fallen or dried leaves, plastics and papers, either on the school ground or inside the classroom.  Picking of plastics, cellophanes and other forms of garbage.  Swept garbage are collected using trash cans and sacks.  Empty cans and unused bottles are set aside on places away from playing areas to avoid accidents.  Pupils, who are tasked as garbage collectors, burn the garbage. Sometimes, pupils do not clean their assigned areas. Sometimes, garbage are uncollected properly for pupils are in a hurry due to time constraint in cleaning. Environmental and health threatening practice. 18 Some pupils are unable to sweep all the garbage. As a result, some garbage turns into an eyesore.
  • 19. Current State Layout of Cantores Elementary School Site 19 Vegetable Garden Room 1 & 2 Waiting Shed Room 3 Room 4 Room 5 Room 6 CR Fruit Garden School Ground Mini Stage Pathway
  • 20. Current State Process Performance Breakdown of Unsegregated Garbage Collected Per Area 20 Classroo ms Waiting Shed Pathways Back of Classroo ms Vegetable and Fruit Gardens School Ground Total No. of Trash Cans Monday 2 2 1 1 1 2 9 Tuesday 2 2 1 1 1 2 9 Wednesda y 2 2 1 1 1 2 9 Thursday 2 2 1 1 1 2 9 Friday 2 2 1 1 1 2 9
  • 22. Objective Statement • Cantores Elementary School collected garbage at a range of 9 trash cans with an average of 2 kg per day, conducted on Jan. 11-Feb. 19, 2016, which are 80% are unsegregated of the temporary dumping area – with leaves, papers, twigs, cellophanes, etc as the top most waste generated. Step 4 22 Focused Problem Statement • Cantores Elementary School’s objective is to collect all possible garbage found inside and outside the classrooms, including garbage found in the school ground and other areas of the school, and be able to segregate these garbage according to biodegradable and non-biodegradable garbage.
  • 23. Root Cause Analysis Step 5 Why-Why Diagram Why has Cantores Elementary School collected garbage at a range of 9 trash cans with an average of 2 kg per day, which are 80% are unsegregated of the temporary dumping area with leaves, papers, twigs, cellophane, etc. as top most waste? Garbage are combined. Teachers ignored to check the garbage in the trashcans. Twigs and falling leaves are combined with non- biodegradable garbage. Lacking of available trashcans. 30 sq.m. area outside the school served as dumpsite. Vacant times are usually used for checking pupils’ output. Failure to segregate combined garbage Not following school policy. 23 Front and back garbage are discarded in the dumpsite. Pupils threw food wrappers anywhere. Maintain cleanliness of the school ground. Overlapping of activities.
  • 24. Root Cause Validation Problem Statement: Cantores Elementary School collected garbage at a range of 9 trash cans with an average of 2 kg per day, conducted on Jan. 11-Feb. 19, 2016, which are 80% are unsegregated of the temporary dumping area – with leaves, papers, twigs, cellophanes, etc as the top most waste generated. Probable Causes Validation Controllability of the School Conclusion (Valid or Not) Class Description of Cause Method Result Within Control For solution formulation Man Failure to segregate combined garbage Survey observation Valid Within control For solution formulation Not following school policies Survey observation Valid Within control For solution formulation Overlapping of activities Survey observation Valid Within control For solution formulations i24
  • 25. i25 Probable Causes Validation Controllability of the School Conclusion (Valid or Not) Class Description of Cause Method Result Within Control For solution formulation Materials Lacking of available trashcans Observation Valid Within control For solution formulation Environment Maintain cleanliness inside the school ground Observation Valid Within control For solution formulations Continuation . . .
  • 26. Priority Valid Causes Step 5 26 • Failure to segregate combined garbage. • Disregard to follow school policies. • Overlapping of school activities • Lacking of available trashcans. • Maintain the cleanliness inside the school ground.
  • 27. Recommended Improvements Step 6 27 Priority Root Cause Recommended Improvement Failure to segregate combined garbage. Provide labeled trashcans with biodegradable and non-biodegradable in every classroom and areas where pupils usually stay. Disregard to follow school policies. Re-orient pupils on proper garbage disposal. Overlapping of activities. Kindergarten to Grade II Teachers will check the trashcans after morning class, while Grades III to VI teachers will check after afternoon classes. Lacking of available trashcans. Provide more trashcans on every classrooms. Maintain the cleanliness inside school ground. Constructing of concrete compost pit.
  • 28. Future State SIPOC Step 6 Improved Step 28 SUPPLIERS • Students • Teachers • Vendors • Visitors • Trees INPUT • Plastics • Cellophanes • Papers • Leaves and twigs • Bottles • Cans • Fruit and vegetable peelings PROCESS • Waste Management OUTPUT • Uncollected garbage CUSTOMERS • Environment • Student • Vendors • Barrio Folks • Teachers • Visitors Sweeping and Picking of garbage Collecting of garbage Segregating of garbage Process Steps
  • 29. Future State Process Details Step 6 29 Sweeping and Picking of garbage Collecting of garbage Segregating of garbage  Sweeping of fallen twigs, fallen or dried leaves, plastics and papers, either on the school ground or inside the classroom.  Picking of plastics, cellophanes and other forms of garbage.  Swept garbage are collected using labeled trashcans.  Supervision of teachers during collecting of garbage.  Pupils, who are tasked as garbage collectors, throw the garbage according to color and label of compost pit.  One teacher per day is assigned to monitor the compost pit, to check whether garbage are thrown properly. Absence of teacher’s supervision. Sometimes, pupils do not clean their assigned areas. Some pupils are unable to sweep all the garbage. As a result, some garbage turns into an eyesore.
  • 30. Future State Improvement Highlights • Provision of color-coded compost pit for proper waste segregation. • Simultaneous throwing of garbage with daily teacher supervision to ensure proper waste segregation. • Daily checking of teacher per day to monitor waste segregation in the compost pit. 30
  • 31. Future State Improvement Highlights Decomposed materials from the compost pit will serve as organic fertilizer for the fruit and vegetable garden. Step 6 31 More harvest to reap.
  • 32. Future State Potential Problem Analysis Potential Problem Probable Cause L (1-5) I (1-5) RF (L x I) Preventive Action 1. Issue 1 2. Issue 2 3. Issue 3 4. Issue 4 5. Issue 5 Step 7 L – Likelihood I – Impact RF – Risk Factor Preventive action required for RF >10 32
  • 33. Future State Implementation Plan Activity Output Responsibility Due Date Resources/ Budget 1. Activity 1 2. Activity 2 3. Activity 3 4. Activity 4 5. Activity 5 Step 7 33
  • 35. Pilot Implementation Status Activity Output Responsibility Actual Date Remarks 1. Activity 1 2. Activity 2 3. Activity 3 4. Activity 4 5. Activity 5 Step 8 35
  • 36. Pilot Implementation Highlights • (description of event) Step 8 Illustration or picture Sample form or report New IM 36
  • 37. Pilot Implementation Highlights • (description of event) Step 8 Illustration or picture Sample form or report New IM 37
  • 38. Pilot Implementation Highlights • (description of event) Step 8 Illustration or picture Sample form or report New IM 38
  • 39. Pilot Process Performance 0 1 2 3 4 5 6 Category 1 Category 2 Category 3 Category 4 Series 1 Series 2 Series 3 Step 8 39
  • 41. Pilot Learnings Step 8 • (List key insights from pilot experience, including any adjustments to the recommended improvements) 41
  • 42. Rollout Strategy and Scope • (describe the rollout strategy) • (define the extension from the initial pilot scope, e.g. to other sections, to other grade levels) Step 9 42
  • 43. Rollout Stakeholder Analysis Step 9 Enthusiastic support Will work hard to make it happen Help it work Will lend appropriate support Hesitant Holds some reservations; won’t volunteer Indifferent Won’t help; won’t hurt Uncooperative Will have to be prodded Opposed Will openly act on and state opposition Hostile Will block at all costs People or Groups Teachers Students. PTA.Level of Commitment i43
  • 44. Rollout Implementation Plan Activity Output Responsibility Due Date Resources/ Budget 1. Activity 1 2. Activity 2 3. Activity 3 4. Activity 4 5. Activity 5 Step 9 44
  • 45. Rollout Implementation Status Activity Output Responsibility Actual Date Remarks 1. Activity 1 2. Activity 2 3. Activity 3 4. Activity 4 5. Activity 5 Step 9 45
  • 46. Rollout Process Performance 0 1 2 3 4 5 6 Category 1 Category 2 Category 3 Category 4 Series 1 Series 2 Series 3 Step 9 46
  • 48. Rollout Implementation Highlights • (description of event) Step 9 Illustration or picture Sample form or report New IM 48
  • 49. Rollout Implementation Highlights • (description of event) Step 9 Illustration or picture Sample form or report New IM 49
  • 50. Rollout Implementation Highlights • (description of event) Step 9 Illustration or picture Sample form or report New IM 50
  • 51. Rollout Learnings Step 9 • (List key insights from rollout experience, including any adjustments to the recommended improvements) 51
  • 52. FUTURE STATE BACKGROUND CURRENT STATE PROBLEM ANALYSIS IMPLEMENTATION PLAN LESSONS LEARNED TEST RESULTS PROJECT TITLE Improvement on Examination Results Feedback Time Team Members: DBH, EAF, BOG, VPR, RVP, DBS The time between examination of students and the return of examination results has an average of 7 days with a max of 14 days. Students rely on the results of the examination to know their academic performance and to review for succeeding lessons. Teacher Student Submit Exam Collect Exams Group exams per grade level Check Exams Return to Students Receive Examinatio n Results 5 mins. per exam 1 to 5 days30 secs. 30 secs. Teacher Student Submit Exam Collect Exams Check Exams Return to Students Receive Examinatio n Results 5 mins. per exam 30 secs. 30 secs. Recommendation: 1. Eliminate grouping of exam papers for each grade level. 2. Have a different set of exam for students who missed the exam. Week 1 Week 2 Wee k 3 Wee k 4 Week 5 Who % Completion Process Design Team 100% Dissemination of New Design DBH, RVP, BOG 100% Simulation EAF, VPR, DBS 100% Gathering of Feedback from Teachers EAF, VPR, DBS 80% Refinement of Process Design Team 80% Improve on Information Dissemination Teachers should be trained to the new process to be followed on providing feedback to students. 0 5 10 15 1 5 9 13 17 21 25 29 Feedback Time Step 10STAGE1:ASSESSSTAGE2:ANALYZE STAGE2:ANALYZESTAGE3:ACT
  • 53. Project Closure Next Steps • (action on next-level priority causes) • (action on next-phase improvements) • (links with other school processes or programs) Step 10 53

Editor's Notes

  1. Show results for the most critical performance area(s) based on Slide #3, using 2013 data. If available, data from prior years (3 years) may be used to show trends. Use the appropriate type of chart (pie, bar, line). The chart may provide the rationale for selecting a focus area such as a particular subject, grade level and section. This can be illustrated by encircling the relevant portion of the chart. Additional slides may be used to drill the performance down to the desired level
  2. Pictures of students lining up for enrollment. Pictures of students roaming around the campus looking for their names to determine section assignment. Pictures of old school registers. Pictures of class records with names differ from school register. Pictures of headcount sheet filled out by advisers.
  3. Performance results may be based on the school’s Basic Education Report Card (BERC), and may include measures such as NAT, Dropout Rate, Cohort Survival Rate, Completion Rate. Performance results may drill down to next level detail, such as mastery levels in specific subject areas, students at risk of dropping out (SARDO), at specific grade levels. Highlight performance measures where there are significant performance gaps (the focus of the project). Disaggregate data by gender if possible, where relevant. Performance results should be based on latest available data (calendar year 2013). Qualifying statements like “increasing….”, “decreasing….” (trending) may be included in this slide, and illustrated in the next slide (slide 4)
  4. Performance results may be based on the school’s Basic Education Report Card (BERC), and may include measures such as NAT, Dropout Rate, Cohort Survival Rate, Completion Rate. Performance results may drill down to next level detail, such as mastery levels in specific subject areas, students at risk of dropping out (SARDO), at specific grade levels. Highlight performance measures where there are significant performance gaps (the focus of the project). Disaggregate data by gender if possible, where relevant. Performance results should be based on latest available data (calendar year 2013). Qualifying statements like “increasing….”, “decreasing….” (trending) may be included in this slide, and illustrated in the next slide (slide 4)
  5. Derive VOC conclusions by relating VOC information to the school performance results described in slide 3 and detailed in slide 4. VOC may, among others, Confirm the existence of performance issue or concern Identify factors that contribute to the performance issue or concern Clarify the impact of the issue or concern to customers and other stakeholders, and highlight the relevance of the performance issue or concern Highlight opportunities for improvement
  6. A process is a set of interelated and interacting activities that transform inputs into outputs. “Suppliers” to the process may include customers and other stakeholders. “Inputs” may include materials, resources, and information “Outputs” may include measurable process results such as number of students taught, number of learning hours provided; as well as outcomes such as mastery levels achieved by students “Customers” may include students and other stakeholders. Show the SIPOC for the process being improved by the project (not the project’s improvement process, or activities being undertaken by the team to pursue the project) Identify the key process steps (major sets of activities),
  7. Process Details outline the key activities at each step of the process Process Name should be the same as in Slide 7 Process Steps (the row of boxes) should be the same as in Slide 7 List the key activities per step, in the order they occur. Where there’s an issue or concern, draw a cloud at the step, and write the issue or concern in the cloud. Issues or concerns may have been identified From the school background (slide 3 and 4) From the VOC (slide 6) Brainstormed by the Team while drawing up the process details It is possible that there is an issue or concern with a specific activity, in which case a cloud can also be drawn next to an activity.
  8. Show results for the most critical performance area(s), identified in the SIPOC (output column) Use the appropriate type of chart (pie, bar, line). The chart may provide the rationale for selecting a focus area such as a particular process step or activity, This can be illustrated by encircling the relevant portion of the chart. Additional slides may be used to drill the performance down to the desired level
  9. A problem is a deviation from a desired state or performance level at a particular point in time. The focused problem statement usually takes off from the general concern or issue described in the school background (slide 3 and 4), to a measurable gap in performance of the process being improved (the measurable outputs/outcomes in the SIPOC slide 7 and described in slide 9) Objectives should be specific, measurable, achievable, results-oriented, time-bound (SMART)
  10. The Fishbone diagram may also be used.. If one chart is used to illustrate the analysis, use either why-why or fishbone (pick one). A fishbone diagram already classifies causes (as Man, Machine, Method, Materials or Environment-related). Color may be used to show classification on a why-why diagram. Root causes are at the ends of the causal chains.
  11. Transfer the root causes to the Description column, classifying them accordingly (as Man, Machine, Method, Materials or Environment-related). Indicate the validation method used and the result of validation. Controllability refers to whether the root cause is actionable by the CI Team itself.l Questions to Help Validate Root Causes: 1. What is the proof that this cause exists? Is it concrete? Is it measurable? Are there more than two data elements that provide evidence? 2. What is the proof that this cause could lead to the stated effect? Am I merely asserting causation? (Ex. If a program is identified as the reason students are not achieving, is there evidence that it is not aligned to tested and taught curriculum? Have students spent the majority of the allotted instructional time using this program?) 3. What proof is there that this cause actually contributed to the problem? Given that it exists and could lead to this problem, how do I know it was not actually something else? 4. Is anything else needed, along with this cause, for the stated effect to occur? Is it self-sufficient? Is something else needed? (Ex. Are Special Education student schedules the only problem that prevents them from grade level curriculum exposure, or is there another key factor, perhaps the level of experience of teacher to scaffold instruction to meet the needs of all learners?) 5. Can anything else, besides this cause, lead to the stated effect? Are there alternative explanations that fit better? What other risks are there?
  12. Inclusion on the list considers the following: Contribution to the problem – The CI Team usually focuses on valid causes which are major contributors to the problem. Valid root causes may be prioritized via pareto analysis (additional slide) Controllability - The CI Team usually focuses on valid causes within its control. Interrelationships between causes – The CI Team usually includes causes which strongly affect or influence other causes. High;ight reasons for prioritization
  13. Transfer the priority valid causes from slide 13 to this slide. A combination of improvements may be required to address the identified causes. Where there are several independent improvement alternatives to a root cause, a decision matrix (additional slide) may be included to select the best alternative.
  14. Highlight steps which have been improved (use a different fill color) Insert any additional steps (use a different fill color from improved steps) Delete steps which have been eliminated (typically non value-adding steps) Modify the list of outputs to reflect the impact of the improvements.
  15. Transfer the process steps from slide 16 to this slide. Highlight steps and activities which have been improved (use a different fill color) Insert any additional activities or steps Delete any steps or activities which have been eliminated (typically non value-adding steps or activities)
  16. Highlight innovations (a radically different way of doing something) and/or performance breakthroughs (a significant jump in performance level). This template initially has 3 slides (slides 18 – 20). Use more (or less slides) to cover innovations and breakthroughs. IM - instructional material
  17. Identify potential problems with the improvements Constraints on resources needed for implementation Situations or conditions which can hinder the effective implementation of the improvement Negative impact on succeeding process steps or other processes
  18. Identify key activities needed to implement the improvements. Include preventive actions (from slide 21). This slide can show the major activities, although a detailed implementation plan should be ready.
  19. Show the actual pilot implementation status. Remarks may include Level of completion of activities or outputs Delays between scheduled and actual dates Changes in planned activities or outputs Implementation issues or concerns
  20. Highlight major activities or events. Forms, reports and instructional materials may be included to show actual use. A slide may cover multiple events and include several pictures. This template initially has 3 slides (slides 24 – 26). Use more (or less) slides to cover major activities or events.
  21. Highlight major activities or events. Forms, reports and instructional materials may be included to show actual use.
  22. Highlight major activities or events. Forms, reports and instructional materials may be included to show actual use.
  23. Show improved results for the most critical performance area(s). Chart may be similar in format to slide 9 (current state performance), but showing improved performance. Use additional slides to show results for any additional measures developed as part of the improvement solution. Cost/benefit analysis may also be shown
  24. Adjustments to the recommended improvement may include Further refinement in the process or system (e.g. adjustments in the forms or instructional materials used, additional monitoring). A revised SIPOC and process details may be included, if needed. Changes in how the improvement is implemented Additional supporting activities like training
  25. The rollout strategy may include Implementation timing – phases (time) Expansion in scope – phases (areas), selected sections, selected grade levels, selected student segments Preparations – communication, training and education, resource acquisition Engaging the support of other stakeholders Standardization – issuance of memo or school order to document new/changes in policies and guidelines, revised procedures, forms and reports.
  26. Sample stakeholders and commitment levels shown; replace with actual
  27. Identify key activities needed to rollout the improvements, following the rollout strategy (slide 29). Include actions to improve the level of stakeholder commitment (from slide 30). This slide can show the major activities, although a detailed implementation plan should be ready.
  28. Implementation plan (indicating due date and resources/budget) may be shown if rollout has not yet been started. Remarks may include Level of completion of activities or outputs Delays between scheduled and actual dates Changes in planned activities or outputs Implementation issues or concerns
  29. Show improved results for the most critical performance area(s). Chart may be similar in format to slide 27(pilot performance), but showing improved performance across expanded scope in rollout. Use additional slides to show results for any additional measures developed as part of the rollout. Cost/benefit analysis may also be shown
  30. Highlight major activities or events. Forms, reports and instructional materials may be included to show actual use. A slide may cover multiple events and include several pictures. This template initially has 3 slides (slides 34 – 36). Use more (or less) slides to cover major activities or events.
  31. Highlight major activities or events. Forms, reports and instructional materials may be included to show actual use. A slide may cover multiple events and include several pictures. This template initially has 3 slides (slides 34 – 36). Use more (or less) slides to cover major activities or events.
  32. Highlight major activities or events. Forms, reports and instructional materials may be included to show actual use. A slide may cover multiple events and include several pictures. This template initially has 3 slides (slides 34 – 36). Use more (or less) slides to cover major activities or events.
  33. Adjustments to the recommended improvement may include Further refinement in the process or system (e.g. adjustments in the forms or instructional materials used, additional monitoring). A revised SIPOC and process details may be included, if needed. Changes in how the improvement is implemented Additional supporting activities like training
  34. Show the completed CI Project Template (A3) The objective statement may be included in the Future State section.
  35. Some valid root causes may not have been prioritized in the initial pilot and rollout. General courses of action to address these causes should be included as next steps. Depending on the rollout strategy (Slide 29), some implementation of the improvements may have been split into phases. The next phase should be included as next steps. Links and/or impact to other school processes or programs may need to be evaluated. Improvements in performance monitoring and evaluation may need to be reflected in the school’s performance monitoring system as part of standardization.