Building it
PHASES OF A PROJECT
THREE PHASES OF A PROJECT
 Pre-construction
 Construction
 Post-construction
Within each phase, there are sub-phases
PRE-CONSTRUCTION PHASE
Pre-construction determines the ultimate
outcome of a project. At this stage, construction
contracting methodology must be determined.
 Concept
 Feasibility
 Design
PRE-CONSTRUCTION PHASE
Will the project be design/bid/build, or will a
construction manager be brought on board to
assist with the process?
 Concept
 Feasibility
 Design
PRE-CONSTRUCTION PHASE
The client’s responsibility is to:
 Address why the project is necessary
 Prepare a functional program
 Determine how will it be funded
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
At the conclusion of the pre-construction
phase, the following must be confirmed:
 Scope
 Cost
 Timing
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
“What is the purpose?”
Answer the “whys” of your project. The least
expensive stage of construction.
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
Functional program: list all your needs which will
fulfill the purpose.
Translate the functional program into a space plan.
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
At this point, the guidance of an architect or project
manager could be helpful, as it would expedite the
process by providing professional advice and
technical expertise.
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
A technical study is conducted to determine:
 Viability
 Cost
 Options
 Identification of constraints
 Schedule
PRE-CONSTRUCTION PHASE
This phase usually costs around 1% to 2%
of the project cost.
 Concept
 Feasibility
 Design
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
Purpose of the feasibility study:
 Determine what needs to be done to deliver the
project (a technical report)
 What will it cost?
 Is fulfilling the purpose viable under the constraints?
 What options are available to make it viable?
PRE-CONSTRUCTION PHASE
This phase usually costs around 8% to 10%
of the project cost.
 Concept
 Feasibility
 Design
DESIGN
Where the project begins to take shape. Now is the
time to make the right decisions.
Schematic Design
Design Development
Construction Documents
DESIGN
Schematic Design
Design Development
Construction Documents
 During this stage, a monitoring of the design
against the approved budget is essential.
 Milestone dates must be established and met.
 Logistics and schedule must be worked out.
A qualified project or construction manager has the
expertise to undertake these tasks.
DESIGN
Tendering Documents
(contract documents)
 Specifications, general conditions
 Drawings
 Instructions to bidders
 Addenda
DESIGN
Tendering:
Design/Bid/Build
 The work is tendered to general contractors
Construction Management
 The construction manager tenders the work, on
behalf of the client, to qualified trade contractors
CONSTRUCTION PHASE
During the Construction Phase, focus on
material procurement. Labour resources
are secondary.
Communication and planning are more
important than the technical aspects of
the physical construction.
Monitoring of progress is required to ensure:
 The budget is not being exceeded
 The schedule is on track
 The defined scope of work is not being compromised
POST-CONSTRUCTION PHASE
 Completion of deficiencies
 Completion of deferred work
 Issuance of close-out documents for
the owner’s use
 Commencement of the warranty
period
 Release of statutory holdback funds
Learnit buildit-manageit-141124083859-conversion-gate01

More Related Content

What's hot

ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016Ed Santavicca
 
Project Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessProject Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessAlin Veronika
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsJeremie Averous
 
Project management chapter 9
Project management chapter 9Project management chapter 9
Project management chapter 9VancityInstitute
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...IRJET Journal
 
JINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CVJINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CVJinu Louis
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?maria_singh
 
Neil Varma - Stages of Project Management
Neil Varma - Stages of Project ManagementNeil Varma - Stages of Project Management
Neil Varma - Stages of Project ManagementNeil Varma
 
Introduction to Project Management Assessment Notes
Introduction to Project Management Assessment NotesIntroduction to Project Management Assessment Notes
Introduction to Project Management Assessment NotesShaun Wilson
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...p6academy
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisSeta Ohanesian, PMP, LEED AP
 
Front End Design Benefits
Front End Design BenefitsFront End Design Benefits
Front End Design BenefitsSPECengineering
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerKHAJA Raheemuddin
 
Detailed project reports
Detailed project reportsDetailed project reports
Detailed project reportsAKANSHA GURELE
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Construction Estimator
Construction EstimatorConstruction Estimator
Construction EstimatorRana Alyas
 

What's hot (18)

ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016
 
Project Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessProject Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing Process
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex Projects
 
Project management chapter 9
Project management chapter 9Project management chapter 9
Project management chapter 9
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
 
JINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CVJINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CV
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Neil Varma - Stages of Project Management
Neil Varma - Stages of Project ManagementNeil Varma - Stages of Project Management
Neil Varma - Stages of Project Management
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
Introduction to Project Management Assessment Notes
Introduction to Project Management Assessment NotesIntroduction to Project Management Assessment Notes
Introduction to Project Management Assessment Notes
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative Analysis
 
Front End Design Benefits
Front End Design BenefitsFront End Design Benefits
Front End Design Benefits
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
Detailed project reports
Detailed project reportsDetailed project reports
Detailed project reports
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Construction Estimator
Construction EstimatorConstruction Estimator
Construction Estimator
 

Viewers also liked

contaminacion
contaminacioncontaminacion
contaminacionMabe Lita
 
Nick stetz resume & portfolio
Nick stetz resume & portfolioNick stetz resume & portfolio
Nick stetz resume & portfolioNick Stetz
 
Nick stetz resume & portfolio
Nick stetz resume & portfolioNick stetz resume & portfolio
Nick stetz resume & portfolioNick Stetz
 
Yenilikçi düşünme ve fikir üretme teknikleri
Yenilikçi düşünme ve fikir üretme teknikleriYenilikçi düşünme ve fikir üretme teknikleri
Yenilikçi düşünme ve fikir üretme teknikleriinnovativeslides
 
Seminar on Individual and Collective Bargaining
Seminar on Individual and Collective BargainingSeminar on Individual and Collective Bargaining
Seminar on Individual and Collective Bargainingangel90thomas
 
İleri hafıza teknikleri
İleri hafıza teknikleriİleri hafıza teknikleri
İleri hafıza teknikleriinnovativeslides
 
Lucrarea de licenta in 10 pasi
Lucrarea de licenta in 10 pasiLucrarea de licenta in 10 pasi
Lucrarea de licenta in 10 pasiAlexandra Nicolae
 
Teoria şi metodologia evaluării
Teoria şi metodologia evaluăriiTeoria şi metodologia evaluării
Teoria şi metodologia evaluăriiAlexandra Nicolae
 
Evaluarea procesului didactic
Evaluarea procesului didacticEvaluarea procesului didactic
Evaluarea procesului didacticAlexandra Nicolae
 
Constantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluariiConstantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluariiAlexandra Nicolae
 
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...Mumin HACIMUSALAR
 

Viewers also liked (16)

IEEEmadC
IEEEmadCIEEEmadC
IEEEmadC
 
contaminacion
contaminacioncontaminacion
contaminacion
 
Nick stetz resume & portfolio
Nick stetz resume & portfolioNick stetz resume & portfolio
Nick stetz resume & portfolio
 
Nick stetz resume & portfolio
Nick stetz resume & portfolioNick stetz resume & portfolio
Nick stetz resume & portfolio
 
Yenilikçi düşünme ve fikir üretme teknikleri
Yenilikçi düşünme ve fikir üretme teknikleriYenilikçi düşünme ve fikir üretme teknikleri
Yenilikçi düşünme ve fikir üretme teknikleri
 
Seminar on Individual and Collective Bargaining
Seminar on Individual and Collective BargainingSeminar on Individual and Collective Bargaining
Seminar on Individual and Collective Bargaining
 
Hellp ppt
Hellp pptHellp ppt
Hellp ppt
 
İnovasyon nedir?
İnovasyon nedir?İnovasyon nedir?
İnovasyon nedir?
 
My CV
My CVMy CV
My CV
 
İleri hafıza teknikleri
İleri hafıza teknikleriİleri hafıza teknikleri
İleri hafıza teknikleri
 
Lucrarea de licenta in 10 pasi
Lucrarea de licenta in 10 pasiLucrarea de licenta in 10 pasi
Lucrarea de licenta in 10 pasi
 
Teoria şi metodologia evaluării
Teoria şi metodologia evaluăriiTeoria şi metodologia evaluării
Teoria şi metodologia evaluării
 
Evaluarea procesului didactic
Evaluarea procesului didacticEvaluarea procesului didactic
Evaluarea procesului didactic
 
Constantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluariiConstantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluarii
 
Qureshi CV updated (1)
Qureshi CV updated (1)Qureshi CV updated (1)
Qureshi CV updated (1)
 
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
 

Similar to Learnit buildit-manageit-141124083859-conversion-gate01

Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesMcCarthy Holdings, Inc.
 
TOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptxTOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptxMadhusudhanPandey1
 
TOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdfTOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdfMadhusudhanPandey1
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptxPranshiGoyal2
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfChassyTesoro1
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectIOSR Journals
 
Lec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdfLec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdfGhulamQadirWaqar1
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxChandrasen Sharma
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pmbhashem007
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidyNASAPMC
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 

Similar to Learnit buildit-manageit-141124083859-conversion-gate01 (20)

Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
Construction process
Construction processConstruction process
Construction process
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
TOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptxTOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptx
 
TOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdfTOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdf
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptx
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Lec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdfLec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdf
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptx
 
Project development handbook rl website
Project development handbook rl websiteProject development handbook rl website
Project development handbook rl website
 
Project Development Handbook presentation
Project Development Handbook presentationProject Development Handbook presentation
Project Development Handbook presentation
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pm
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidy
 
bingsusu.pptx
bingsusu.pptxbingsusu.pptx
bingsusu.pptx
 
StreamLine Program
StreamLine ProgramStreamLine Program
StreamLine Program
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
Project management
Project managementProject management
Project management
 

Recently uploaded

《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...
《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...
《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...ur8mqw8e
 
VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...
VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...
VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...Call Girls in Nagpur High Profile
 
Vip Noida Escorts 9873940964 Greater Noida Escorts Service
Vip Noida Escorts 9873940964 Greater Noida Escorts ServiceVip Noida Escorts 9873940964 Greater Noida Escorts Service
Vip Noida Escorts 9873940964 Greater Noida Escorts Serviceankitnayak356677
 
Beautiful Sapna Call Girls CP 9711199012 ☎ Call /Whatsapps
Beautiful Sapna Call Girls CP 9711199012 ☎ Call /WhatsappsBeautiful Sapna Call Girls CP 9711199012 ☎ Call /Whatsapps
Beautiful Sapna Call Girls CP 9711199012 ☎ Call /Whatsappssapnasaifi408
 
VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...
VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...
VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...Call Girls in Nagpur High Profile
 
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查awo24iot
 
Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,
Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,
Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,Pooja Nehwal
 
Call Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile serviceCall Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile servicerehmti665
 
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一ga6c6bdl
 
哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样
哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样
哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样qaffana
 
High Profile Call Girls In Andheri 7738631006 Call girls in mumbai Mumbai ...
High Profile Call Girls In Andheri 7738631006 Call girls in mumbai  Mumbai ...High Profile Call Girls In Andheri 7738631006 Call girls in mumbai  Mumbai ...
High Profile Call Girls In Andheri 7738631006 Call girls in mumbai Mumbai ...Pooja Nehwal
 
如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一
如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一
如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一ga6c6bdl
 
定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一
定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一
定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一ga6c6bdl
 
Gaya Call Girls #9907093804 Contact Number Escorts Service Gaya
Gaya Call Girls #9907093804 Contact Number Escorts Service GayaGaya Call Girls #9907093804 Contact Number Escorts Service Gaya
Gaya Call Girls #9907093804 Contact Number Escorts Service Gayasrsj9000
 
Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...
Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...
Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...nagunakhan
 
Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...
Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...
Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...nagunakhan
 
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...Pooja Nehwal
 
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...
《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...
《伯明翰城市大学毕业证成绩单购买》学历证书学位证书区别《复刻原版1:1伯明翰城市大学毕业证书|修改BCU成绩单PDF版》Q微信741003700《BCU学...
 
VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...
VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...
VVIP Pune Call Girls Balaji Nagar (7001035870) Pune Escorts Nearby with Compl...
 
Vip Noida Escorts 9873940964 Greater Noida Escorts Service
Vip Noida Escorts 9873940964 Greater Noida Escorts ServiceVip Noida Escorts 9873940964 Greater Noida Escorts Service
Vip Noida Escorts 9873940964 Greater Noida Escorts Service
 
Beautiful Sapna Call Girls CP 9711199012 ☎ Call /Whatsapps
Beautiful Sapna Call Girls CP 9711199012 ☎ Call /WhatsappsBeautiful Sapna Call Girls CP 9711199012 ☎ Call /Whatsapps
Beautiful Sapna Call Girls CP 9711199012 ☎ Call /Whatsapps
 
VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...
VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...
VVIP Pune Call Girls Warje (7001035870) Pune Escorts Nearby with Complete Sat...
 
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
 
Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,
Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,
Call Girls In Andheri East Call 9892124323 Book Hot And Sexy Girls,
 
Low rate Call girls in Delhi Justdial | 9953330565
Low rate Call girls in Delhi Justdial | 9953330565Low rate Call girls in Delhi Justdial | 9953330565
Low rate Call girls in Delhi Justdial | 9953330565
 
Call Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile serviceCall Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile service
 
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单留信学历认证原版一比一
 
哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样
哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样
哪里办理美国宾夕法尼亚州立大学毕业证(本硕)psu成绩单原版一模一样
 
High Profile Call Girls In Andheri 7738631006 Call girls in mumbai Mumbai ...
High Profile Call Girls In Andheri 7738631006 Call girls in mumbai  Mumbai ...High Profile Call Girls In Andheri 7738631006 Call girls in mumbai  Mumbai ...
High Profile Call Girls In Andheri 7738631006 Call girls in mumbai Mumbai ...
 
如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一
如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一
如何办理(NUS毕业证书)新加坡国立大学毕业证成绩单留信学历认证原版一比一
 
定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一
定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一
定制宾州州立大学毕业证(PSU毕业证) 成绩单留信学历认证原版一比一
 
Gaya Call Girls #9907093804 Contact Number Escorts Service Gaya
Gaya Call Girls #9907093804 Contact Number Escorts Service GayaGaya Call Girls #9907093804 Contact Number Escorts Service Gaya
Gaya Call Girls #9907093804 Contact Number Escorts Service Gaya
 
Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...
Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...
Russian Call Girls In South Delhi Delhi 9711199012 💋✔💕😘 Independent Escorts D...
 
Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...
Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...
Slim Call Girls Service Badshah Nagar * 9548273370 Naughty Call Girls Service...
 
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
 
young call girls in Sainik Farm 🔝 9953056974 🔝 Delhi escort Service
young call girls in Sainik Farm 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Sainik Farm 🔝 9953056974 🔝 Delhi escort Service
young call girls in Sainik Farm 🔝 9953056974 🔝 Delhi escort Service
 
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
 

Learnit buildit-manageit-141124083859-conversion-gate01

  • 2. THREE PHASES OF A PROJECT  Pre-construction  Construction  Post-construction Within each phase, there are sub-phases
  • 3. PRE-CONSTRUCTION PHASE Pre-construction determines the ultimate outcome of a project. At this stage, construction contracting methodology must be determined.  Concept  Feasibility  Design
  • 4. PRE-CONSTRUCTION PHASE Will the project be design/bid/build, or will a construction manager be brought on board to assist with the process?  Concept  Feasibility  Design
  • 5. PRE-CONSTRUCTION PHASE The client’s responsibility is to:  Address why the project is necessary  Prepare a functional program  Determine how will it be funded
  • 6. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design At the conclusion of the pre-construction phase, the following must be confirmed:  Scope  Cost  Timing
  • 7. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design “What is the purpose?” Answer the “whys” of your project. The least expensive stage of construction.
  • 8. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design Functional program: list all your needs which will fulfill the purpose. Translate the functional program into a space plan.
  • 9. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design At this point, the guidance of an architect or project manager could be helpful, as it would expedite the process by providing professional advice and technical expertise.
  • 10. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design A technical study is conducted to determine:  Viability  Cost  Options  Identification of constraints  Schedule
  • 11. PRE-CONSTRUCTION PHASE This phase usually costs around 1% to 2% of the project cost.  Concept  Feasibility  Design
  • 12. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design Purpose of the feasibility study:  Determine what needs to be done to deliver the project (a technical report)  What will it cost?  Is fulfilling the purpose viable under the constraints?  What options are available to make it viable?
  • 13. PRE-CONSTRUCTION PHASE This phase usually costs around 8% to 10% of the project cost.  Concept  Feasibility  Design
  • 14. DESIGN Where the project begins to take shape. Now is the time to make the right decisions. Schematic Design Design Development Construction Documents
  • 15. DESIGN Schematic Design Design Development Construction Documents  During this stage, a monitoring of the design against the approved budget is essential.  Milestone dates must be established and met.  Logistics and schedule must be worked out. A qualified project or construction manager has the expertise to undertake these tasks.
  • 16. DESIGN Tendering Documents (contract documents)  Specifications, general conditions  Drawings  Instructions to bidders  Addenda
  • 17. DESIGN Tendering: Design/Bid/Build  The work is tendered to general contractors Construction Management  The construction manager tenders the work, on behalf of the client, to qualified trade contractors
  • 18. CONSTRUCTION PHASE During the Construction Phase, focus on material procurement. Labour resources are secondary. Communication and planning are more important than the technical aspects of the physical construction. Monitoring of progress is required to ensure:  The budget is not being exceeded  The schedule is on track  The defined scope of work is not being compromised
  • 19. POST-CONSTRUCTION PHASE  Completion of deficiencies  Completion of deferred work  Issuance of close-out documents for the owner’s use  Commencement of the warranty period  Release of statutory holdback funds