Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a landscape, there are not only the space is matters but also integration between
natural site component with its landscape environs. Since the area to be developed is small in scale, the
design will take into account all positive qualities of the site – the ground forms, cover, exposures,
views, and all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and has been applied into
the field.
2
Tasks - Methodology
As a group (original group in Project 2 – not to create a new one), you are to choose one site of the
following. Each site has different contextual settings in which should be designated evenly among all
members in the group. Each member should get ONE site EACH.
Site Contextual Setting 1 Contextual Setting 2 Contextual Setting 3
Site 1:
ROOFTOP
A rooftop garden
located on a
commercial building.
A rooftop garden
located on a housing
area.
A rooftop garden
located on an office
building.
Shopping mall/ hotel Condominium/
apartment
Office tower
Site 2:
COURTYARD
A courtyard in a cultural
building area.
A courtyard in an
institutional building
area.
Mosque/ temple/
church
University/ college/
international schools
Site 3:
POCKET PARK
A pocket park located
at urban or town area.
A pocket park located at
office blocks.
A pocket park located
at shopping houses/
retail store.
At the end of a corner
road/ at road junction
Around/ middle/ end of
the office area
In front of/in between
shop houses/ at the
corner of/in between
retail store
Site 4:
NEIGHBOURHOOD
PARK
A park located at high
rise residential area.
A park located at landed
residential area.
Condominium/
apartment
Semi-D house/ terrace/
gated residence
Site 5:
INDOOR PARK
An indoor park located
in a commercial
building.
An indoor park located
in an office building.
An indoor park
located in a retail
shop.
In shopping mall In office building/
management office
In a car showroom/
show house unit
Individually, you are to propose a landscape design for the above given site. The site should be within
500,000mm2 to 600,000mm2 and the site context should be between 50m radius. You need to
create your own site context with reference to the above setting and to include boundary and access to
the site.
Imagine that you are going to present the project proposal to a client which requires you to prepare ALL
drawings for every development stages as following;
A. PROJECT DESCRIPTION
Should contain information of;
- A short paragraph of your design statement which explaining about the ideas, rationale of
the design and concept of the design. The narration should briefly describe, constructive
and informative.
- Location plan to show the location of your site. It can be directly downloaded from google
earth (not google map) with clear indication of the location.
- Site plan which needs to be developed by yourself. It must be somehow corresponding with
the site contextual setting as assigned to each site earlier.
3
B. CONCEPTUAL DIAGRAM
Should have;
- Bubble diagram is an ideation process that used as a means to show spaces and activities
that you want to propose.
- Conceptual diagram is a process to detail up bubble diagram which correlates with the
site. All ideas in bubble diagram need to transfer to conceptual diagram (which overlay with
base plan). You are to compose all elements and to consider about form composition,
shape and pattern of the design. You may provide sketches/ illustrations (sections/
elevations) to better represent your ideas.
C. MASTER PLAN
Before you proceed to this stage, you need to attain approval of the plan from your respective
tutors. In this stage, you need to produce master plan set of drawings which include;
- Master plan
- Elevation & Section
- Perspective
- Hardscape Palette
- Softscape Palette
**Note:
A self-independent study is required for presentation layout, architectural lettering and colouring. Do
save images from internet or scan from books for ideas collection and inspirations.
Submission Requirement
Each student is required to submit ALL of the following:
1. You need to submit the proposal in A3 booklet, landscape format. You are free to use any
type of paper for the drawings (preferably 120gsm and above), however it needs a hard cover
for front and back. You can use mounting board as the cover. It is compulsory to
comb/spring binding it.
2. You need to provide ALL of the following;
- Project Description
- Location Plan (not to scale)
- Site Plan (to determine the appropriate scale)
- Bubble Diagram (not to scale)
- Conceptual Plan (to determine the appropriate scale)
- Master Plan (scale 1:100)
- 1 Whole Stretch of Elevation (scale 1:100) & 1 Section (scale 1:50)
- 1 Perspective (not to scale)
- Hardscape & Softscape Palette
3. The proposal should have title block at bottom part of the layout which contains the information
of following**;
- The project title (you have to create name for this project)
- Site complete address
- Your company name, logo & address (to write “Prepared by..”)
- Your name & student ID
- FNBE (write in full), Semester 1, August 2015
**You need to comply with hierarchy of font size in writing the title block. To consult with tutors.
4. You are to show your progression drawing in every tutorial session to your respective tutors.
Tutorial sheet will be prepared. The progression drawing must be on butter paper, signed
4
by tutor with date, to be compiled together in the final submission. It is compulsory to
ensure that you are going through the process before completing the final work. Without that, it
could be proclaimed as plagiarism.
5. All drawings need to be completed manually (hand drawn & hand written) by using a proper
architectural (landscape) graphic communication. However, images for softscape and
hardscape can be digitally printed.
6. Drawings must be coloured. You may choose any medium of colouring techniques that you
are master in. You are given a freedom to choose whether to colour it all or a portion of the
drawing (make sure the portion coloured explains something) and have to be proper and
presentable.
7. You need to submit your work on 27th NOVEMBER 2015, FRIDAY at DISCUSSION ROOM
C5 (academic suites, block C, level 5). Time of submission will be informed. Late submission
after the allocated time will be held outside of the venue.
8. You are encouraged to take photo or scan your work for e-portfolio purposes.
*Gentle reminder;
Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no
assessment will be done.
If you are sick on the submission day, you have to provide MC with an official letter signed by
parents/guardian explaining about your health condition. A formal email should be written to the module
coordinator a day before/or before submission time. Otherwise, lecturers have right not to receive your
work.
5
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. DEMONSTRATED UNDERSTANDING IN MEETING THE REQUIREMENTS
(to complete all drawings with correct, precise and clear information required) 10%
2. CLARITY OF CONTENTAND QUALITY OF WORK
(ability to translate information to presentation drawings, accuracy of information, standard
quality of work, and appropriateness of the content) 15%
3. CREATIVITY AND ORIGINALITY OF WORKMANSHIP
(creativity in presenting the layout & drawings, compositions, colouring & writing style, and
good graphic communication techniques) 10%
4. PROGRESSION DRAWINGS 5%
TOTAL: 40%
Suggested References
Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons.
J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons.
Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada.
http://land8.com/photo/portfolio-page-3-worsley/prev?context=user

More Related Content

Similar to Landscape project proposal

Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
stactixzz97
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
yongzsoh
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
chuenmin
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Quo Ming
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
Lin Hui
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Louise Foong
 
FNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEFFNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEF
barbaraxchang
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape project
SongKit96
 
CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
ashleyyeap
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Amelisa Collins
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Dameerster
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Alexis Wei
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Leon Lim
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
Gynie
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892
KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Zheng Chee Cham
 
2B
2B2B
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Amelisa Collins
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Lee Fong Yen
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Jian Leo
 

Similar to Landscape project proposal (20)

Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
FNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEFFNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEF
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape project
 
CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
2B
2B2B
2B
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 

More from 瑞田 吳

Ici architect magazine
Ici architect magazineIci architect magazine
Ici architect magazine
瑞田 吳
 
Foundations in natural and built environment
Foundations in natural and built environmentFoundations in natural and built environment
Foundations in natural and built environment
瑞田 吳
 
Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015
瑞田 吳
 
Iciassignment 1b
Iciassignment 1bIciassignment 1b
Iciassignment 1b
瑞田 吳
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
瑞田 吳
 
Drawing project 2 july 2015
Drawing project 2 july 2015Drawing project 2 july 2015
Drawing project 2 july 2015
瑞田 吳
 
Drawing module outline july 2015
Drawing module outline july 2015Drawing module outline july 2015
Drawing module outline july 2015
瑞田 吳
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
瑞田 吳
 
Module outline jan2015
Module outline jan2015Module outline jan2015
Module outline jan2015
瑞田 吳
 
Project 1
Project 1Project 1
Project 1
瑞田 吳
 
Project 2
Project 2Project 2
Project 2
瑞田 吳
 
Assignment 02 masks
Assignment 02 masksAssignment 02 masks
Assignment 02 masks
瑞田 吳
 
Cts assignment 03
Cts assignment 03Cts assignment 03
Cts assignment 03
瑞田 吳
 
Final project brief
Final project briefFinal project brief
Final project brief
瑞田 吳
 
Cts module outline handout 11082015_v01
Cts module outline handout 11082015_v01Cts module outline handout 11082015_v01
Cts module outline handout 11082015_v01
瑞田 吳
 
Enbe final project r ev b
Enbe final project r ev bEnbe final project r ev b
Enbe final project r ev b
瑞田 吳
 
Enbe project one july 2015
Enbe project one    july 2015Enbe project one    july 2015
Enbe project one july 2015
瑞田 吳
 
Tjn
TjnTjn
Module outline enbe dmz 06082015 july2015
Module outline enbe dmz 06082015  july2015Module outline enbe dmz 06082015  july2015
Module outline enbe dmz 06082015 july2015
瑞田 吳
 
Ici town planner
Ici   town plannerIci   town planner
Ici town planner
瑞田 吳
 

More from 瑞田 吳 (20)

Ici architect magazine
Ici architect magazineIci architect magazine
Ici architect magazine
 
Foundations in natural and built environment
Foundations in natural and built environmentFoundations in natural and built environment
Foundations in natural and built environment
 
Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015
 
Iciassignment 1b
Iciassignment 1bIciassignment 1b
Iciassignment 1b
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
 
Drawing project 2 july 2015
Drawing project 2 july 2015Drawing project 2 july 2015
Drawing project 2 july 2015
 
Drawing module outline july 2015
Drawing module outline july 2015Drawing module outline july 2015
Drawing module outline july 2015
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
 
Module outline jan2015
Module outline jan2015Module outline jan2015
Module outline jan2015
 
Project 1
Project 1Project 1
Project 1
 
Project 2
Project 2Project 2
Project 2
 
Assignment 02 masks
Assignment 02 masksAssignment 02 masks
Assignment 02 masks
 
Cts assignment 03
Cts assignment 03Cts assignment 03
Cts assignment 03
 
Final project brief
Final project briefFinal project brief
Final project brief
 
Cts module outline handout 11082015_v01
Cts module outline handout 11082015_v01Cts module outline handout 11082015_v01
Cts module outline handout 11082015_v01
 
Enbe final project r ev b
Enbe final project r ev bEnbe final project r ev b
Enbe final project r ev b
 
Enbe project one july 2015
Enbe project one    july 2015Enbe project one    july 2015
Enbe project one july 2015
 
Tjn
TjnTjn
Tjn
 
Module outline enbe dmz 06082015 july2015
Module outline enbe dmz 06082015  july2015Module outline enbe dmz 06082015  july2015
Module outline enbe dmz 06082015 july2015
 
Ici town planner
Ici   town plannerIci   town planner
Ici town planner
 

Recently uploaded

A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 

Recently uploaded (20)

A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 

Landscape project proposal

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Noorul Iffa Mohd Nayan & Shazrene Nurjanna Samsudin Final Project Landscape Project Proposal 40% Individual (5% Progress Marks + 35% Final Marks) Submission: 27th November 2015, Friday (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a landscape, there are not only the space is matters but also integration between natural site component with its landscape environs. Since the area to be developed is small in scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and has been applied into the field.
  • 2. 2 Tasks - Methodology As a group (original group in Project 2 – not to create a new one), you are to choose one site of the following. Each site has different contextual settings in which should be designated evenly among all members in the group. Each member should get ONE site EACH. Site Contextual Setting 1 Contextual Setting 2 Contextual Setting 3 Site 1: ROOFTOP A rooftop garden located on a commercial building. A rooftop garden located on a housing area. A rooftop garden located on an office building. Shopping mall/ hotel Condominium/ apartment Office tower Site 2: COURTYARD A courtyard in a cultural building area. A courtyard in an institutional building area. Mosque/ temple/ church University/ college/ international schools Site 3: POCKET PARK A pocket park located at urban or town area. A pocket park located at office blocks. A pocket park located at shopping houses/ retail store. At the end of a corner road/ at road junction Around/ middle/ end of the office area In front of/in between shop houses/ at the corner of/in between retail store Site 4: NEIGHBOURHOOD PARK A park located at high rise residential area. A park located at landed residential area. Condominium/ apartment Semi-D house/ terrace/ gated residence Site 5: INDOOR PARK An indoor park located in a commercial building. An indoor park located in an office building. An indoor park located in a retail shop. In shopping mall In office building/ management office In a car showroom/ show house unit Individually, you are to propose a landscape design for the above given site. The site should be within 500,000mm2 to 600,000mm2 and the site context should be between 50m radius. You need to create your own site context with reference to the above setting and to include boundary and access to the site. Imagine that you are going to present the project proposal to a client which requires you to prepare ALL drawings for every development stages as following; A. PROJECT DESCRIPTION Should contain information of; - A short paragraph of your design statement which explaining about the ideas, rationale of the design and concept of the design. The narration should briefly describe, constructive and informative. - Location plan to show the location of your site. It can be directly downloaded from google earth (not google map) with clear indication of the location. - Site plan which needs to be developed by yourself. It must be somehow corresponding with the site contextual setting as assigned to each site earlier.
  • 3. 3 B. CONCEPTUAL DIAGRAM Should have; - Bubble diagram is an ideation process that used as a means to show spaces and activities that you want to propose. - Conceptual diagram is a process to detail up bubble diagram which correlates with the site. All ideas in bubble diagram need to transfer to conceptual diagram (which overlay with base plan). You are to compose all elements and to consider about form composition, shape and pattern of the design. You may provide sketches/ illustrations (sections/ elevations) to better represent your ideas. C. MASTER PLAN Before you proceed to this stage, you need to attain approval of the plan from your respective tutors. In this stage, you need to produce master plan set of drawings which include; - Master plan - Elevation & Section - Perspective - Hardscape Palette - Softscape Palette **Note: A self-independent study is required for presentation layout, architectural lettering and colouring. Do save images from internet or scan from books for ideas collection and inspirations. Submission Requirement Each student is required to submit ALL of the following: 1. You need to submit the proposal in A3 booklet, landscape format. You are free to use any type of paper for the drawings (preferably 120gsm and above), however it needs a hard cover for front and back. You can use mounting board as the cover. It is compulsory to comb/spring binding it. 2. You need to provide ALL of the following; - Project Description - Location Plan (not to scale) - Site Plan (to determine the appropriate scale) - Bubble Diagram (not to scale) - Conceptual Plan (to determine the appropriate scale) - Master Plan (scale 1:100) - 1 Whole Stretch of Elevation (scale 1:100) & 1 Section (scale 1:50) - 1 Perspective (not to scale) - Hardscape & Softscape Palette 3. The proposal should have title block at bottom part of the layout which contains the information of following**; - The project title (you have to create name for this project) - Site complete address - Your company name, logo & address (to write “Prepared by..”) - Your name & student ID - FNBE (write in full), Semester 1, August 2015 **You need to comply with hierarchy of font size in writing the title block. To consult with tutors. 4. You are to show your progression drawing in every tutorial session to your respective tutors. Tutorial sheet will be prepared. The progression drawing must be on butter paper, signed
  • 4. 4 by tutor with date, to be compiled together in the final submission. It is compulsory to ensure that you are going through the process before completing the final work. Without that, it could be proclaimed as plagiarism. 5. All drawings need to be completed manually (hand drawn & hand written) by using a proper architectural (landscape) graphic communication. However, images for softscape and hardscape can be digitally printed. 6. Drawings must be coloured. You may choose any medium of colouring techniques that you are master in. You are given a freedom to choose whether to colour it all or a portion of the drawing (make sure the portion coloured explains something) and have to be proper and presentable. 7. You need to submit your work on 27th NOVEMBER 2015, FRIDAY at DISCUSSION ROOM C5 (academic suites, block C, level 5). Time of submission will be informed. Late submission after the allocated time will be held outside of the venue. 8. You are encouraged to take photo or scan your work for e-portfolio purposes. *Gentle reminder; Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. If you are sick on the submission day, you have to provide MC with an official letter signed by parents/guardian explaining about your health condition. A formal email should be written to the module coordinator a day before/or before submission time. Otherwise, lecturers have right not to receive your work.
  • 5. 5 Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. DEMONSTRATED UNDERSTANDING IN MEETING THE REQUIREMENTS (to complete all drawings with correct, precise and clear information required) 10% 2. CLARITY OF CONTENTAND QUALITY OF WORK (ability to translate information to presentation drawings, accuracy of information, standard quality of work, and appropriateness of the content) 15% 3. CREATIVITY AND ORIGINALITY OF WORKMANSHIP (creativity in presenting the layout & drawings, compositions, colouring & writing style, and good graphic communication techniques) 10% 4. PROGRESSION DRAWINGS 5% TOTAL: 40% Suggested References Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons. J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons. Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada. http://land8.com/photo/portfolio-page-3-worsley/prev?context=user