SlideShare a Scribd company logo
1 of 4
CURRICULUM-VITAE
M.KUMAR
S/O M.Nagaraju
D.No: 90/42
CMR Palli, Kadapa – 516004
Andhra Pradesh E-mail: kumar_yours2006@yahoo.com
kumar.masapalli@gmail.com
Mobile: 9901550787, 9966152535
Career Objective:
To do a challenging job which offers scope for consistent learning in Design
and enables me to take greater responsibilities and also tackle critical situation.
Educational Qualifications:
• B. E (Electrical & Electronics Engineering) from K.S.R.M. College of Engg, Kadapa,
with an aggregate of 63% in May 2008.
• Intermediate (Mathematics, Physics and Chemistry) from Nagarajuna Junior College
Kadapa, with an aggregate of 83.7% in March 2004.
• Secondary School Certificate from Municipal High School, Kadapa with an aggregate of
79% in March 2002.
Present Status:
Application Design Engineer, ALSTOM Transport India Ltd, Bangalore
(From March 2014 to till date)
Current Project: “CBTC Application Design for U400 Projects”.
Work Experience:
Around 7+ years’ experience in Signalling field and worked for Riyadh Metro CBTC
project with ALSTOM and 11 stations of S.C.Railway with Ansaldo Microlock II Electronic
Interlocking and 8 stations with Invensys Rail’s WESTRACE Electronic Interlocking system.
Job Experience:
From March 2014 to till now as Application Design Engineer at ALSTOM Transport
India Ltd, Bangalore
From March 2014 to June 2015: Riyadh project (driverless – UTO)
• Preparation of basic design,
• Preparation of data for scheme plan, yard layout from civil input
• Preparation of data table for the project. Placing signals, sddbs, and other
U400 concepts.
• Preparation of Real time issues document.
• Preparation Addressing plan.
• Preparation of Naming rules document
• Preparation of System Configuration rules
1
• Analysis of Customer comments and requirements and implementing in
project
• Updating data as per Civil input changes.
From July 2015 to Till now:
• Supporting for Taichung Green Line (TGL) project and Kochi Project
• Analysis for Design justification for TGL project
• Updating of data table for TGL
• Updating Kochi project Data table as per Customer comments
• Working out with different projects for driverless UTO system.
• Supporting the team with quick analysis and impacts
From April 2012 to Feb 2014 as a System Design Engineer in Invensys Rail Systems
India Pvt Ltd.
I have worked for Electronic Interlocking Projects with WESTRACE
 Preparation of Vital & Non-vital bit chart as per given SIP.
 Preparation of Non-Vital logic by using GCSS Software.
 FAT test of interlocking stations by using software simulator (GSIM) and Westcad
for operating as per TOC given by Railways.
 SAT test at site with operating panel & pc for commissioning of the system with
Customer.
 Proficient Knowledge on Vital signaling logic preparation.
 Proficient knowledge about the AUTOMATIC SIGNALLING system.
 Preparation of Westcad (VDU) by using PCGE software tool as per the given panel
diagram.
 Verification of Vital Logic Circuits and Non-Vital circuits with GSIM tool.
 Factory acceptance testing for WESTRACE MK-I application logic With GSIM
15 station Internal FAT and 10 stations CFAT (Customer Factory Acceptance
Test) and 8 stations Site Acceptance test done
 WESTRACE Startup testing and commissioning activities for NFR/WR/SECoR/CR.
 Verification of Interface circuits.
 Prepared non vital Logic for DEKARGAON Station in NFR
 Successfully commissioned 8 stations with WESTRACE.
Stations commissioned with WESTRACE System
 MAKUM JN in N.F.Railway (2 WESTRACE 63 routes)
 BARBENDA in S.E.Railway (1 WESTRACE 59 routes)
 CHAMPAJARAN in S.E.Railway (1 WESTRACE 26 routes)
 LATHIKATA in S.E.Railway (1 WESTRACE 28 routes)
 ANKLESHWAR in W.R (3 WESTRACE 102 routes)
 Bhusaval Thermal Power station in C.R (1 WESTRACE 53 routes)
 ROWTHABAGAN in N.F.R (1 WESTRACE 38 routes)
 MAJBAT in N.F.R (1 WESTRACE 40 routes)
From Aug 2010 to March 2012 As a Signalling Engineer in United Rail Road
Consultants Pvt Ltd, Secunderabad in NRE-GTL RE project
2
In this project my responsibilities are
 R.E modification designs of Guntakal South and North Cabins
 Verification of application logic by FAT & SAT.
 Interface Circuits verification.
 Cable core plans preparation and Verification.
 Functional Test of All Signaling Gears
 Verification of SSDAC of CEL Make.
 Preparation & Verification of Track Bonding plan
 Total functional test of Microlock II of Ansaldo.
 Preparation of Vital and Non vital bit chart
 Control Panel testing
 Coordinating with RVNL & Railway officials
 Successfully Commissioned 5 station in S.C.Railway Guntakal division
 Guntakal
 Timmanacharla
 Jakkalacheruvu
 Mangapatanam
 Nakkanadoddi
 Patakotacheruvu
From Nov 2008 to July 2010 as a Signalling Engineer Aarvee Associates Pvt Ltd,
Hyderabad) in Patch doubling works between GY-PMT Project
In This project my responsibilities are
 Verification of application logic by FAT & SAT.
 Interface Circuits verification.
 Cable core plans preparation and Verification.
 Functional Test of All Signalling Gears
 Verification of MSDAC & SSDAC of Thales Make.
 Total functional test of Microlock II of Ansaldo.
 Preparation of Vital and Non vital bitchart
 Control Panel testing
 Coordinating with RVNL & Railway officials
 Successfully Commissioned 7 station in S.C.Railway Guntakal division
 Rajampeta
 Hastavarmu
 Nandaluru
 Mantapampalli
 Ontimitta
 Bhakarapeta
Technical Skills:
Working Knowledge on MS Office and all WESTRACE Tools.
3
Strengths:
1) Good communication and programming skills
2) Ability to move within a Team and share my ideas and Visions
3) Believe in attitude, Hardworking with commitment, can learn things quickly
Personal details:
Date of Birth : 13-03-1987
Father’s Name : Nagaraju
Gender : Male
Nationality : Indian
Passport no : K4160725
Languages Known : English, Hindi, and Telugu
Permanent Address : D.no–90/42,C.M.R.Palli,
Yeramukapally (P.O),
Kadapa (district) - 516004,
Andhra Pradesh.
Declaration:
I hereby declare that the above written particulars are true to the best of my knowledge and
belief.
Place:
Date: (MASAPALLI KUMAR)
4

More Related Content

What's hot (20)

Ashraf Ali
Ashraf AliAshraf Ali
Ashraf Ali
 
jith cv word3
jith cv word3jith cv word3
jith cv word3
 
CV_Shrikant
CV_ShrikantCV_Shrikant
CV_Shrikant
 
updated resume (1)
updated resume (1)updated resume (1)
updated resume (1)
 
ROHIT SINGH RESUME DT
ROHIT SINGH RESUME DTROHIT SINGH RESUME DT
ROHIT SINGH RESUME DT
 
Aleem Ashraf CV
Aleem Ashraf CV Aleem Ashraf CV
Aleem Ashraf CV
 
CV,
CV,CV,
CV,
 
C.V Muhammad Aamir Sardar
C.V Muhammad Aamir SardarC.V Muhammad Aamir Sardar
C.V Muhammad Aamir Sardar
 
Shubhangi Sharma_CV_2015
Shubhangi Sharma_CV_2015Shubhangi Sharma_CV_2015
Shubhangi Sharma_CV_2015
 
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaSr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
 
OM
OMOM
OM
 
Training Certificate
Training CertificateTraining Certificate
Training Certificate
 
ROHIT (1)
ROHIT (1)ROHIT (1)
ROHIT (1)
 
ELECTRICAL DESIGN ENGINEER LT & HT PANELS
ELECTRICAL DESIGN ENGINEER LT & HT PANELSELECTRICAL DESIGN ENGINEER LT & HT PANELS
ELECTRICAL DESIGN ENGINEER LT & HT PANELS
 
Adeel Ahmed-CV
Adeel Ahmed-CVAdeel Ahmed-CV
Adeel Ahmed-CV
 
rajesh resume latest
rajesh resume latestrajesh resume latest
rajesh resume latest
 
anand_IBS imp eng cv
anand_IBS imp eng cvanand_IBS imp eng cv
anand_IBS imp eng cv
 
Prashant_Khose_Resume
Prashant_Khose_ResumePrashant_Khose_Resume
Prashant_Khose_Resume
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
Cv pisalsart and attach file
 
M.A.Muqeem CV_Telecom
M.A.Muqeem CV_TelecomM.A.Muqeem CV_Telecom
M.A.Muqeem CV_Telecom
 

Viewers also liked

Procurement Article
Procurement ArticleProcurement Article
Procurement ArticleJohn Baglivi
 
23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.
23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.
23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.The Business Council of Mongolia
 
30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim Dwyer
30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim Dwyer30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim Dwyer
30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim DwyerThe Business Council of Mongolia
 
Comment choisir mobile Développeurs Mobile App développement et
Comment choisir mobile Développeurs Mobile App développement etComment choisir mobile Développeurs Mobile App développement et
Comment choisir mobile Développeurs Mobile App développement etStabl Web
 
08.09.2011 Being the first institutional investor in Mongolia, James Passin
08.09.2011 Being the first institutional investor in Mongolia, James Passin08.09.2011 Being the first institutional investor in Mongolia, James Passin
08.09.2011 Being the first institutional investor in Mongolia, James PassinThe Business Council of Mongolia
 
23.04.2015, English language institute program update, Enkhtsetseg Ganbold
23.04.2015, English language institute program update, Enkhtsetseg Ganbold23.04.2015, English language institute program update, Enkhtsetseg Ganbold
23.04.2015, English language institute program update, Enkhtsetseg GanboldThe Business Council of Mongolia
 
Resume 2015a
Resume 2015aResume 2015a
Resume 2015aGray Ana
 
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe BurkeThe Business Council of Mongolia
 
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal BadamgerelThe Business Council of Mongolia
 
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...The Business Council of Mongolia
 
Ricoh Higher Ed Services Overview Brochure-Kallai
Ricoh Higher Ed Services Overview Brochure-KallaiRicoh Higher Ed Services Overview Brochure-Kallai
Ricoh Higher Ed Services Overview Brochure-KallaiRay Kallai
 
CACUSS2015presentation_FINAL
CACUSS2015presentation_FINALCACUSS2015presentation_FINAL
CACUSS2015presentation_FINALCatherine Salole
 

Viewers also liked (20)

Procurement Article
Procurement ArticleProcurement Article
Procurement Article
 
23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.
23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.
23.05.2013 Building Mongolian Talent Pipeline, Enkhbaatar D.
 
19.04.2013 About regulation on FDI, S. Javkhlanbaatar
19.04.2013 About regulation on FDI, S. Javkhlanbaatar19.04.2013 About regulation on FDI, S. Javkhlanbaatar
19.04.2013 About regulation on FDI, S. Javkhlanbaatar
 
10.02.2012 SCANIA in Mining, Monnis International
10.02.2012 SCANIA in Mining, Monnis International10.02.2012 SCANIA in Mining, Monnis International
10.02.2012 SCANIA in Mining, Monnis International
 
30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim Dwyer
30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim Dwyer30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim Dwyer
30.10.2013 Mongolian economy: Investment opportunities/challenges, Jim Dwyer
 
Comment choisir mobile Développeurs Mobile App développement et
Comment choisir mobile Développeurs Mobile App développement etComment choisir mobile Développeurs Mobile App développement et
Comment choisir mobile Développeurs Mobile App développement et
 
CACUSS2011
CACUSS2011CACUSS2011
CACUSS2011
 
08.09.2011 Being the first institutional investor in Mongolia, James Passin
08.09.2011 Being the first institutional investor in Mongolia, James Passin08.09.2011 Being the first institutional investor in Mongolia, James Passin
08.09.2011 Being the first institutional investor in Mongolia, James Passin
 
23.04.2015, English language institute program update, Enkhtsetseg Ganbold
23.04.2015, English language institute program update, Enkhtsetseg Ganbold23.04.2015, English language institute program update, Enkhtsetseg Ganbold
23.04.2015, English language institute program update, Enkhtsetseg Ganbold
 
13.03.2009, NEWSWIRE, Issue 60
13.03.2009, NEWSWIRE, Issue 6013.03.2009, NEWSWIRE, Issue 60
13.03.2009, NEWSWIRE, Issue 60
 
Resume 2015a
Resume 2015aResume 2015a
Resume 2015a
 
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
 
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
 
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
 
31.10.2014, NEWSWIRE, Issue 349
31.10.2014, NEWSWIRE, Issue 34931.10.2014, NEWSWIRE, Issue 349
31.10.2014, NEWSWIRE, Issue 349
 
29.05.2009, NEWSWIRE, Issue 71
29.05.2009, NEWSWIRE, Issue 7129.05.2009, NEWSWIRE, Issue 71
29.05.2009, NEWSWIRE, Issue 71
 
Ricoh Higher Ed Services Overview Brochure-Kallai
Ricoh Higher Ed Services Overview Brochure-KallaiRicoh Higher Ed Services Overview Brochure-Kallai
Ricoh Higher Ed Services Overview Brochure-Kallai
 
28.09.2015 competitiveness in central asia
28.09.2015 competitiveness in central asia28.09.2015 competitiveness in central asia
28.09.2015 competitiveness in central asia
 
25.07.2014, NEWSWIRE, Issue 334-335
25.07.2014, NEWSWIRE, Issue 334-33525.07.2014, NEWSWIRE, Issue 334-335
25.07.2014, NEWSWIRE, Issue 334-335
 
CACUSS2015presentation_FINAL
CACUSS2015presentation_FINALCACUSS2015presentation_FINAL
CACUSS2015presentation_FINAL
 

Similar to Build a Career in Railway Signalling (20)

Resume-Sagar-1
Resume-Sagar-1Resume-Sagar-1
Resume-Sagar-1
 
my_updated_CV_14_3_16
my_updated_CV_14_3_16my_updated_CV_14_3_16
my_updated_CV_14_3_16
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
Dhiru singh
Dhiru singhDhiru singh
Dhiru singh
 
Nikhil
NikhilNikhil
Nikhil
 
Jaiprakash Gupta - Resume
Jaiprakash Gupta - ResumeJaiprakash Gupta - Resume
Jaiprakash Gupta - Resume
 
Updated_CV
Updated_CVUpdated_CV
Updated_CV
 
Karthic 2015
Karthic 2015Karthic 2015
Karthic 2015
 
CV
CVCV
CV
 
RAJEEV_KUMAR_SHUKLA
RAJEEV_KUMAR_SHUKLARAJEEV_KUMAR_SHUKLA
RAJEEV_KUMAR_SHUKLA
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
Abhishek CV
Abhishek CVAbhishek CV
Abhishek CV
 
CV - PJ
CV - PJCV - PJ
CV - PJ
 
RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
 
CV_subandhu dutta
CV_subandhu duttaCV_subandhu dutta
CV_subandhu dutta
 
Vijay Sagar Resume
Vijay Sagar  ResumeVijay Sagar  Resume
Vijay Sagar Resume
 
Ishantshrivastava resume
Ishantshrivastava resumeIshantshrivastava resume
Ishantshrivastava resume
 
CV udayan
CV  udayan CV  udayan
CV udayan
 
Nagendra(2)
Nagendra(2)Nagendra(2)
Nagendra(2)
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 

Build a Career in Railway Signalling

  • 1. CURRICULUM-VITAE M.KUMAR S/O M.Nagaraju D.No: 90/42 CMR Palli, Kadapa – 516004 Andhra Pradesh E-mail: kumar_yours2006@yahoo.com kumar.masapalli@gmail.com Mobile: 9901550787, 9966152535 Career Objective: To do a challenging job which offers scope for consistent learning in Design and enables me to take greater responsibilities and also tackle critical situation. Educational Qualifications: • B. E (Electrical & Electronics Engineering) from K.S.R.M. College of Engg, Kadapa, with an aggregate of 63% in May 2008. • Intermediate (Mathematics, Physics and Chemistry) from Nagarajuna Junior College Kadapa, with an aggregate of 83.7% in March 2004. • Secondary School Certificate from Municipal High School, Kadapa with an aggregate of 79% in March 2002. Present Status: Application Design Engineer, ALSTOM Transport India Ltd, Bangalore (From March 2014 to till date) Current Project: “CBTC Application Design for U400 Projects”. Work Experience: Around 7+ years’ experience in Signalling field and worked for Riyadh Metro CBTC project with ALSTOM and 11 stations of S.C.Railway with Ansaldo Microlock II Electronic Interlocking and 8 stations with Invensys Rail’s WESTRACE Electronic Interlocking system. Job Experience: From March 2014 to till now as Application Design Engineer at ALSTOM Transport India Ltd, Bangalore From March 2014 to June 2015: Riyadh project (driverless – UTO) • Preparation of basic design, • Preparation of data for scheme plan, yard layout from civil input • Preparation of data table for the project. Placing signals, sddbs, and other U400 concepts. • Preparation of Real time issues document. • Preparation Addressing plan. • Preparation of Naming rules document • Preparation of System Configuration rules 1
  • 2. • Analysis of Customer comments and requirements and implementing in project • Updating data as per Civil input changes. From July 2015 to Till now: • Supporting for Taichung Green Line (TGL) project and Kochi Project • Analysis for Design justification for TGL project • Updating of data table for TGL • Updating Kochi project Data table as per Customer comments • Working out with different projects for driverless UTO system. • Supporting the team with quick analysis and impacts From April 2012 to Feb 2014 as a System Design Engineer in Invensys Rail Systems India Pvt Ltd. I have worked for Electronic Interlocking Projects with WESTRACE  Preparation of Vital & Non-vital bit chart as per given SIP.  Preparation of Non-Vital logic by using GCSS Software.  FAT test of interlocking stations by using software simulator (GSIM) and Westcad for operating as per TOC given by Railways.  SAT test at site with operating panel & pc for commissioning of the system with Customer.  Proficient Knowledge on Vital signaling logic preparation.  Proficient knowledge about the AUTOMATIC SIGNALLING system.  Preparation of Westcad (VDU) by using PCGE software tool as per the given panel diagram.  Verification of Vital Logic Circuits and Non-Vital circuits with GSIM tool.  Factory acceptance testing for WESTRACE MK-I application logic With GSIM 15 station Internal FAT and 10 stations CFAT (Customer Factory Acceptance Test) and 8 stations Site Acceptance test done  WESTRACE Startup testing and commissioning activities for NFR/WR/SECoR/CR.  Verification of Interface circuits.  Prepared non vital Logic for DEKARGAON Station in NFR  Successfully commissioned 8 stations with WESTRACE. Stations commissioned with WESTRACE System  MAKUM JN in N.F.Railway (2 WESTRACE 63 routes)  BARBENDA in S.E.Railway (1 WESTRACE 59 routes)  CHAMPAJARAN in S.E.Railway (1 WESTRACE 26 routes)  LATHIKATA in S.E.Railway (1 WESTRACE 28 routes)  ANKLESHWAR in W.R (3 WESTRACE 102 routes)  Bhusaval Thermal Power station in C.R (1 WESTRACE 53 routes)  ROWTHABAGAN in N.F.R (1 WESTRACE 38 routes)  MAJBAT in N.F.R (1 WESTRACE 40 routes) From Aug 2010 to March 2012 As a Signalling Engineer in United Rail Road Consultants Pvt Ltd, Secunderabad in NRE-GTL RE project 2
  • 3. In this project my responsibilities are  R.E modification designs of Guntakal South and North Cabins  Verification of application logic by FAT & SAT.  Interface Circuits verification.  Cable core plans preparation and Verification.  Functional Test of All Signaling Gears  Verification of SSDAC of CEL Make.  Preparation & Verification of Track Bonding plan  Total functional test of Microlock II of Ansaldo.  Preparation of Vital and Non vital bit chart  Control Panel testing  Coordinating with RVNL & Railway officials  Successfully Commissioned 5 station in S.C.Railway Guntakal division  Guntakal  Timmanacharla  Jakkalacheruvu  Mangapatanam  Nakkanadoddi  Patakotacheruvu From Nov 2008 to July 2010 as a Signalling Engineer Aarvee Associates Pvt Ltd, Hyderabad) in Patch doubling works between GY-PMT Project In This project my responsibilities are  Verification of application logic by FAT & SAT.  Interface Circuits verification.  Cable core plans preparation and Verification.  Functional Test of All Signalling Gears  Verification of MSDAC & SSDAC of Thales Make.  Total functional test of Microlock II of Ansaldo.  Preparation of Vital and Non vital bitchart  Control Panel testing  Coordinating with RVNL & Railway officials  Successfully Commissioned 7 station in S.C.Railway Guntakal division  Rajampeta  Hastavarmu  Nandaluru  Mantapampalli  Ontimitta  Bhakarapeta Technical Skills: Working Knowledge on MS Office and all WESTRACE Tools. 3
  • 4. Strengths: 1) Good communication and programming skills 2) Ability to move within a Team and share my ideas and Visions 3) Believe in attitude, Hardworking with commitment, can learn things quickly Personal details: Date of Birth : 13-03-1987 Father’s Name : Nagaraju Gender : Male Nationality : Indian Passport no : K4160725 Languages Known : English, Hindi, and Telugu Permanent Address : D.no–90/42,C.M.R.Palli, Yeramukapally (P.O), Kadapa (district) - 516004, Andhra Pradesh. Declaration: I hereby declare that the above written particulars are true to the best of my knowledge and belief. Place: Date: (MASAPALLI KUMAR) 4