• Measure & Review Team Productivity
• Standing Scaffolds (past their due
dates)
• Optimizing Scaffold Expenses
(optimum utilization of operational
scaffolds and their accurate
dismantling schedules)
• Material Inventory Management
• Many More
| Scaffolding Management Software
1
KPIs & THEIR BENEFITS IN SCAFFOLDING
OPERATIONS
MEASURE TEAM PRODUCTIVITY
• By collecting sizeable data,
decision makers can compare
performance of different
scaffolding teams. Scaffolding
teams can find weak link /
weak group within them as
well.
• These useful bits of
information help in defining
the strategies for planning,
competency improvement
and reviewing efforts.
| Scaffolding Management Software
2
Productivity
STANDING SCAFFOLDS (passed their due date)
| Scaffolding Management Software
3
• Software is able to provide data
related to all standing scaffolds. A
few ways in which this helps are;
 Better planning for forthcoming jobs
 Better utilization of scaffolds
 Radical savings of cost by dismantling
un-used scaffolds
Standing Scaffolds (passed their due date)
0 to 7 days
8 to 14 days
15 to 21 days
22 to 28 days
29 or more days
MONITORING SCAFFOLD EXPENSES
On few occasions, scaffolds
could be highly expensive
considering the objective.
With this metric, authorities
are able to keep an eye on
the utilization of the scaffold
and leverage it for optimum
value
| Scaffolding Management Software
4
Scaffold Tag # Project / Job Module Floor
No of
Day(s)
Rent in
USD
9 222 – NTPC
M1 13 CELLAR
DECK
First Floor-F1-M1-
222
189 $37,800.00
20 111-MASTER JOB M1 MJ111 13 Fone Mone MJ 138 $20,700.00
13
200 – GLOBAL
INFRA
M1 GI200 13 Fone Mone GI 145 $20,300.00
U2 222-NTPC
M1 13 CELLAR
DECK
First Floor-F1-M1-
222
190
$19,000.00
24
111 – MASTER
JOB
M1 MJ111 13 Fone Mone MJ 112
$16,800.00
23
200-GLOBAL
INFRA
M1 GI200 13
Fone Mone GI
140 $15,600.00
44
222-NTPC M1 13 CELLAR
DECK
First Floor-F1-M1-
222
160 $14,000.00
4
111 – MASTER
JOB
M1 MJ111 13 Fone Mone MJ 123 $13,500.00
MATERIAL INVENTORY MANAGEMENT
| Scaffolding Management Software
5
Check and review material in use v/s
staging area v/s In-store. With this metric,
store managers and authorities are able
to keep track of material accurately,
thereby, assisting them in optimum
utilization of material. This in turn results
in huge savings of time and resources.
| Scaffolding Management Software
5
Material Inventory
https://www.ask-ehs.com/software/scaffolding-management-software.html
http://www.ask-ehs.com
ASK-EHS Engineering & Consultants Pvt. Ltd.

KPIs Scaffolding

  • 1.
    • Measure &Review Team Productivity • Standing Scaffolds (past their due dates) • Optimizing Scaffold Expenses (optimum utilization of operational scaffolds and their accurate dismantling schedules) • Material Inventory Management • Many More | Scaffolding Management Software 1 KPIs & THEIR BENEFITS IN SCAFFOLDING OPERATIONS
  • 2.
    MEASURE TEAM PRODUCTIVITY •By collecting sizeable data, decision makers can compare performance of different scaffolding teams. Scaffolding teams can find weak link / weak group within them as well. • These useful bits of information help in defining the strategies for planning, competency improvement and reviewing efforts. | Scaffolding Management Software 2 Productivity
  • 3.
    STANDING SCAFFOLDS (passedtheir due date) | Scaffolding Management Software 3 • Software is able to provide data related to all standing scaffolds. A few ways in which this helps are;  Better planning for forthcoming jobs  Better utilization of scaffolds  Radical savings of cost by dismantling un-used scaffolds Standing Scaffolds (passed their due date) 0 to 7 days 8 to 14 days 15 to 21 days 22 to 28 days 29 or more days
  • 4.
    MONITORING SCAFFOLD EXPENSES Onfew occasions, scaffolds could be highly expensive considering the objective. With this metric, authorities are able to keep an eye on the utilization of the scaffold and leverage it for optimum value | Scaffolding Management Software 4 Scaffold Tag # Project / Job Module Floor No of Day(s) Rent in USD 9 222 – NTPC M1 13 CELLAR DECK First Floor-F1-M1- 222 189 $37,800.00 20 111-MASTER JOB M1 MJ111 13 Fone Mone MJ 138 $20,700.00 13 200 – GLOBAL INFRA M1 GI200 13 Fone Mone GI 145 $20,300.00 U2 222-NTPC M1 13 CELLAR DECK First Floor-F1-M1- 222 190 $19,000.00 24 111 – MASTER JOB M1 MJ111 13 Fone Mone MJ 112 $16,800.00 23 200-GLOBAL INFRA M1 GI200 13 Fone Mone GI 140 $15,600.00 44 222-NTPC M1 13 CELLAR DECK First Floor-F1-M1- 222 160 $14,000.00 4 111 – MASTER JOB M1 MJ111 13 Fone Mone MJ 123 $13,500.00
  • 5.
    MATERIAL INVENTORY MANAGEMENT |Scaffolding Management Software 5 Check and review material in use v/s staging area v/s In-store. With this metric, store managers and authorities are able to keep track of material accurately, thereby, assisting them in optimum utilization of material. This in turn results in huge savings of time and resources. | Scaffolding Management Software 5 Material Inventory