2. SOCIALIZATION
MATERIAL
• General Public (Community,
Schoolchildren, etc.)
• Customers/water users in service area
• Prospective customers in area where the
wastewater management systems will be
installed/developed
TARGET GROUPS
• Function of Wastewater Management System Stability of
Wastewater Management System
• The purpose of the construction of waste water
management system
• Outline of development projects such as expected service
area, system type, target group of connection system,
implementation schedule, and others.
• Financial management of waste water management
system (cost structure, and obligation to pay tariff)
• Advantages / disadvantages of the construction of waste
water management systems
• Water customer responsibilities (house inlet installation,
registration, operation and maintenance, and tariff
payments)
THE OBJECTIVES OF
THE SOCIALIZATION Increase public
awareness in general
3. PROCESS • Determine the kelurahan
• List your goals
• Create a participant's invitation letter
• The location of the meeting
• Define material and resource
• Implementation
• Evaluation
LOCATION
• 41 Sub-district in Zone 1 where the pipeline
passes through the area
• The 41 sub-districts are: 18 sub-districts in
Central Jakarta (Cideng, North Petojo, Kebon
Kelapa, Gambir, South Petojo, Duri Pulo,
Mangga Dua Selatan, Karang Anyar, Pasar
Baru, Kartini, Kebon Sirih, Gondangdia, Cikini,
Menteng , Pegangsaan, Kampung Bali, Kebon
Kacang, Kebon Melati) .19 West Jakarta
Subdistricts (Pinangsia, Glodok, Mangga
Besar, Tangki, Majesty, Krukut, Taman Sari,
Maphar, Pekojan, Roa Malaka, Kredang,
Tambora, Jembatan Lima, Duri Utara , Tanah
Seral, Angke, Iron Bridge, Kalianyar, South
Duri), and 4 Sub-districts of North Jakarta
(Penjaringan, Pejagalan, Pluit, Ancol).
•District of Gambir, Tanah Abang Menteng &
Sawah Besar- Central Jakarta.
•District of Tambora & Taman Sari - West
Jakarta.
•District of Penjaringan & Pademangan - North
Jakarta. (in tender documents)
4. NARA SUMBER
• OFFICE OF WATER RESOURCES
• PD PAL JAYA
• LOCAL OFFICERS
TENDER PROCESS OF DATE 02
MEI 2018 S TILL 25 MAY 2018
5. LIST OF QUESTIONS ARISING IN SOCIALIZATION
PROCESS ON WWTP COMMUNAL
• Q: Are there any or no payments from residents?
• Q: Will the house unload during construction?
• Q: Will DKI restore the condition if there is dismantling the walls and houses in the WWTP program?
• Q: How to remove dirt from the house on IPAL Domestic Communal? And finally to where
• Q: What about system maintenance after building its IPAL?
• Q: Can wastewater treatment be used for watering into the garden?
• Q: Is the WWTP facility open or closed?
• Q: Who is the overall responsibility of the pipeline connection to the Dinas home? Private or done by
DSDA?
• Q: How to maintain IPAL / piping?
• Q: Will it overflow WWTP during the flood?
• Q: Do you have to build IPAL again? What year will it build?
• Q: Where will the pipe go?
• Q: How to maintain it? Will it be handed over to residents or budgeted forever by APBD?
• Q: When is the program implemented?
• Q: How to overcome the maze of kitchen pipe?
• Q: What about the installation fee?
• Q: Is there a monthly fee for use?
6. • Q: Do you separate or join waste water with water channel?
• Q: How is it repaired if there is demolition of houses in piping construction? by DKI subsidy or private?
• Q: Where is the location in planning to build a WWTP?
• Q: Is there an obligation on each if the WWTP runs?
• Q: Is there an obligation on each if the WWTP runs?
• Q: Is there any compensation about the construction of piping in the house? If there is no compensation,
people will have no awareness about the program.
• Q: Are there any permits related to household wastewater when building houses
• Q: Will the technical implementation of this matter interfere with existing home space?
• Q: Is there a fee charged to the individual, or will be borne by the local government.
• Q: What about the existing septic tank house, and does the septic tank still work after installing the piping
system?
• Q: Where will the IPAL location be built?
• Q: What is the location for the builder of WWTP?
• Q: When will the WWTP be built?
• Q: Wastewater produced from home industry, is it equated to disposal with household waste water?
• Q: Who will be responsible for the cost of plumbing from house to WWTP?
7. WHY DO NOT WANT TO CONNECT?
(Note Survey result in zone-0)
1.It's comfortable with a septic tank
2.Objection must dismantle the floor
3.Should cost to make the connection
4.Must pay waste water tariff
5.Still do not understand about waste water piping
system.
6.There is no problem with waste water yet.
7.The house that is occupied is the house of the
institution so it requires permission first.