    September XX, 2011 
     
    The Honorable Hillary Clinton 
    Secretary, U.S. Department of State 
    Keystone XL EIS Project 
    PO Box 96503‐98500 
    Washington, DC 20090‐6503 
     
    Re: Support for Keystone XL Pipeline – National Interest Determination 
     
    Dear Secretary Clinton: 
     
    We are writing to express our strong support for EIS findings on the Keystone XL pipeline and to urge 
    you to approve the project by granting the Presidential Permit needed for construction to begin. We 
    fully support this project because we believe it is in the best interest of our constituents and the entire 
    country.   
     
    Our communities are members of the Ports‐to‐Plains Alliance, a grassroots coalition of cities, counties, 
    businesses, economic development organizations and chambers of commerce from a ten‐state, 2,300 
    mile long transportation and economic development corridor that stretches from Texas to Alberta, 
    Canada. 
     
    Keystone XL will provide significant economic benefits for our region.  The pipeline is expected to create 
    approximately 20,000 manufacturing and construction jobs in the United States.  It could also generate 
    more than $5.2 billion in tax revenue to the Keystone XL corridor states.  At a time when state and local 
    governments across the country are struggling to balance their budgets, these employment and revenue 
    benefits are critical to our region. 
     
    The pipeline is also critical to our country’s efforts to reduce our dependence on Middle East and 
    Venezuelan oil, by increasing our access to supplies from Canada, our neighbor and loyal ally, as well as 
    domestic supplies from the Bakken Formation of Montana and North Dakota.  Relying upon regimes that 
    are in many cases unstable and unfriendly to the United States is simply bad energy and national 
    security policy.  We have seen the shocks to our economy from oil spikes caused by turmoil in these 
    regions.    It is much preferable to develop stable, secure domestic and Canadian sources.  By providing 
    refineries along the Texas Gulf Coast with more than 700,000 barrels of oil each day from domestic and 
    Canadian resources, this pipeline will dramatically reduce our reliance on oil from unreliable and often 
    unfriendly sources. 
     
     
Limon Office                                                                      Lubbock Office
P.O. Box 9                                                              5401 N MLK Blvd., Unit 395
Limon, CO 80828                                                                Lubbock, TX 79403
P: 303.586.1787                                                                  P: 806.775.2338
F: 719.775.9073                                                                Fax: 806.775.3981
                                    www.portstoplains.com
 
Support for Keystone XL Pipeline – National Interest Determination
September xx, 2011
Page 2

As leaders from the region that the Keystone XL pipeline will traverse, we applaud the Department of 
State’s thoroughness during this approval process and appreciate the multiple opportunities for public 
input on the project and its potential impact on the environment.  The State Department has fully 
analyzed the project’s environmental impact and that the Final EIS rightfully concludes that there are no 
substantial environmental concerns that should prevent construction of this valuable energy 
infrastructure project.  We also have confidence that TransCanada will be a good steward of the land 
and that Keystone XL will be constructed using industry best practices and will meet or exceed all 
existing pipeline regulatory standards.   
 
The Keystone XL pipeline is clearly in the nation’s interest and will be a valuable tool in strengthening 
our national security and energy security.  Therefore, we respectfully request that upon completion of 
this review period, the Department of States move expeditiously to approve the pipeline and grant 
TransCanada the Presidential Permit it needs to proceed. 
 
 
Sincerely, 




Limon Office                                                                     Lubbock Office
P.O. Box 9                                                             5401 N MLK Blvd., Unit 395
Limon, CO 80828                                                               Lubbock, TX 79403
P: 303.586.1787                                                                 P: 806.775.2338
F: 719.775.9073                                                               Fax: 806.775.3981
                               www.portstoplains.com

More Related Content

Similar to Keystone XL Pipeline Support Letter (Sample)

Keystone XL Letter Dec 2012 NEDEQ
Keystone XL Letter Dec 2012 NEDEQKeystone XL Letter Dec 2012 NEDEQ
Keystone XL Letter Dec 2012 NEDEQ
Ports-To-Plains Blog
 
Keystone XL Letter by Elected Officials and BOD
Keystone XL Letter by Elected Officials and BODKeystone XL Letter by Elected Officials and BOD
Keystone XL Letter by Elected Officials and BOD
Ports-To-Plains Blog
 
Ports-to-Plains Alliance Webinar on September 19, 2011
Ports-to-Plains Alliance Webinar on September 19, 2011Ports-to-Plains Alliance Webinar on September 19, 2011
Ports-to-Plains Alliance Webinar on September 19, 2011
Ports-To-Plains Blog
 
Waco Texas Development: Broadway Place Apartments
Waco Texas Development: Broadway Place ApartmentsWaco Texas Development: Broadway Place Apartments
Waco Texas Development: Broadway Place Apartments
CaitlandRodgers1
 
Serving Texas for 80 Years
Serving Texas for 80 YearsServing Texas for 80 Years
Serving Texas for 80 Years
Priscilla Chomko
 
March 9th Tulsa Oklahoma Real Estate Investments
March 9th Tulsa Oklahoma Real Estate InvestmentsMarch 9th Tulsa Oklahoma Real Estate Investments
March 9th Tulsa Oklahoma Real Estate Investments
Joe Pryor
 
Ontario Siphon Hug Project3
Ontario Siphon Hug Project3Ontario Siphon Hug Project3
Ontario Siphon Hug Project3
roaudet
 
The Everlasting Keystone XL Pipeline
The Everlasting Keystone XL PipelineThe Everlasting Keystone XL Pipeline
The Everlasting Keystone XL PipelineAbigail Christiansen
 
Ports-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of StatePorts-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of State
Ports-To-Plains Blog
 
The Port Of Toledo The Vital Center 2.2010
The Port Of Toledo The Vital Center 2.2010The Port Of Toledo The Vital Center 2.2010
The Port Of Toledo The Vital Center 2.2010guest1a7a07
 
The Port Of Toledo The Vital Center 2 2010
The Port Of Toledo The Vital Center 2 2010The Port Of Toledo The Vital Center 2 2010
The Port Of Toledo The Vital Center 2 2010guest1a7a07
 
Rishi kumar saratoga council october 2015 newsletter
Rishi kumar saratoga council october 2015 newsletterRishi kumar saratoga council october 2015 newsletter
Rishi kumar saratoga council october 2015 newsletter
Rishi Kumar
 
International Trade and the Golden Triangle
International Trade and the Golden TriangleInternational Trade and the Golden Triangle
International Trade and the Golden TrianglePortArthurSBS
 
03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipeline03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipelineartba
 
HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...
HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...
HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...
Follow me on Twitter @Stockshaman
 
Highbank Closes First Tranche of P.P. and Updates Pacific NW News
Highbank Closes First Tranche of P.P. and Updates Pacific NW NewsHighbank Closes First Tranche of P.P. and Updates Pacific NW News
Highbank Closes First Tranche of P.P. and Updates Pacific NW News
Follow me on Twitter @Stockshaman
 
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
artba
 
Lake Texoma Association Briefing- Texoma Region Public Meeting
Lake Texoma Association Briefing- Texoma Region Public MeetingLake Texoma Association Briefing- Texoma Region Public Meeting
Lake Texoma Association Briefing- Texoma Region Public MeetingLakeTexoma
 

Similar to Keystone XL Pipeline Support Letter (Sample) (20)

Keystone XL Letter Dec 2012 NEDEQ
Keystone XL Letter Dec 2012 NEDEQKeystone XL Letter Dec 2012 NEDEQ
Keystone XL Letter Dec 2012 NEDEQ
 
Keystone XL Letter by Elected Officials and BOD
Keystone XL Letter by Elected Officials and BODKeystone XL Letter by Elected Officials and BOD
Keystone XL Letter by Elected Officials and BOD
 
Ports-to-Plains Alliance Webinar on September 19, 2011
Ports-to-Plains Alliance Webinar on September 19, 2011Ports-to-Plains Alliance Webinar on September 19, 2011
Ports-to-Plains Alliance Webinar on September 19, 2011
 
Waco Texas Development: Broadway Place Apartments
Waco Texas Development: Broadway Place ApartmentsWaco Texas Development: Broadway Place Apartments
Waco Texas Development: Broadway Place Apartments
 
Serving Texas for 80 Years
Serving Texas for 80 YearsServing Texas for 80 Years
Serving Texas for 80 Years
 
March 9th Tulsa Oklahoma Real Estate Investments
March 9th Tulsa Oklahoma Real Estate InvestmentsMarch 9th Tulsa Oklahoma Real Estate Investments
March 9th Tulsa Oklahoma Real Estate Investments
 
Ontario Siphon Hug Project3
Ontario Siphon Hug Project3Ontario Siphon Hug Project3
Ontario Siphon Hug Project3
 
The Everlasting Keystone XL Pipeline
The Everlasting Keystone XL PipelineThe Everlasting Keystone XL Pipeline
The Everlasting Keystone XL Pipeline
 
Ports-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of StatePorts-to-Plains Letter Submitted to Department of State
Ports-to-Plains Letter Submitted to Department of State
 
The Port Of Toledo The Vital Center 2.2010
The Port Of Toledo The Vital Center 2.2010The Port Of Toledo The Vital Center 2.2010
The Port Of Toledo The Vital Center 2.2010
 
The Port Of Toledo The Vital Center 2 2010
The Port Of Toledo The Vital Center 2 2010The Port Of Toledo The Vital Center 2 2010
The Port Of Toledo The Vital Center 2 2010
 
Rishi kumar saratoga council october 2015 newsletter
Rishi kumar saratoga council october 2015 newsletterRishi kumar saratoga council october 2015 newsletter
Rishi kumar saratoga council october 2015 newsletter
 
International Trade and the Golden Triangle
International Trade and the Golden TriangleInternational Trade and the Golden Triangle
International Trade and the Golden Triangle
 
03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipeline03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipeline
 
RocBusiness page
RocBusiness pageRocBusiness page
RocBusiness page
 
Biz, 2.11
Biz, 2.11Biz, 2.11
Biz, 2.11
 
HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...
HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...
HIGHBANK (HBK-TSXV) (HBKRF-U.S.) NEWS FIRST NATIONS APPROVE OIL & GAS PIPELIN...
 
Highbank Closes First Tranche of P.P. and Updates Pacific NW News
Highbank Closes First Tranche of P.P. and Updates Pacific NW NewsHighbank Closes First Tranche of P.P. and Updates Pacific NW News
Highbank Closes First Tranche of P.P. and Updates Pacific NW News
 
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
 
Lake Texoma Association Briefing- Texoma Region Public Meeting
Lake Texoma Association Briefing- Texoma Region Public MeetingLake Texoma Association Briefing- Texoma Region Public Meeting
Lake Texoma Association Briefing- Texoma Region Public Meeting
 

More from Ports-To-Plains Blog

Canada and U.S. Trade Overview
Canada and U.S. Trade Overview Canada and U.S. Trade Overview
Canada and U.S. Trade Overview
Ports-To-Plains Blog
 
2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference Handouts2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference Handouts
Ports-To-Plains Blog
 
Energy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation InfrastructureEnergy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation Infrastructure
Ports-To-Plains Blog
 
Wind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. ManufacturingWind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. Manufacturing
Ports-To-Plains Blog
 
Compressed Air Wind Energy Storage
Compressed Air Wind Energy StorageCompressed Air Wind Energy Storage
Compressed Air Wind Energy Storage
Ports-To-Plains Blog
 
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Ports-To-Plains Blog
 
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-To-Plains Blog
 
2013 Energy Conference Save the Date
2013 Energy Conference Save the Date2013 Energy Conference Save the Date
2013 Energy Conference Save the Date
Ports-To-Plains Blog
 
February 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains AllianceFebruary 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains Alliance
Ports-To-Plains Blog
 
Draft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL ProjectDraft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL Project
Ports-To-Plains Blog
 
Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012
Ports-To-Plains Blog
 
Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011
Ports-To-Plains Blog
 
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Ports-To-Plains Blog
 
Interim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory CommitteesInterim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory Committees
Ports-To-Plains Blog
 
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-To-Plains Blog
 
South Dakota Trade Relationships 2004-2011
South Dakota Trade Relationships 2004-2011South Dakota Trade Relationships 2004-2011
South Dakota Trade Relationships 2004-2011
Ports-To-Plains Blog
 
Return to Rural
Return to RuralReturn to Rural
Return to Rural
Ports-To-Plains Blog
 
Imaginative Enterprise - Stuart Boylan
Imaginative Enterprise - Stuart BoylanImaginative Enterprise - Stuart Boylan
Imaginative Enterprise - Stuart Boylan
Ports-To-Plains Blog
 
Imaginative Enterprise - Jeff Senger
Imaginative Enterprise - Jeff SengerImaginative Enterprise - Jeff Senger
Imaginative Enterprise - Jeff Senger
Ports-To-Plains Blog
 
Imaginative Enterprise - Mike Kotelko
Imaginative Enterprise - Mike KotelkoImaginative Enterprise - Mike Kotelko
Imaginative Enterprise - Mike Kotelko
Ports-To-Plains Blog
 

More from Ports-To-Plains Blog (20)

Canada and U.S. Trade Overview
Canada and U.S. Trade Overview Canada and U.S. Trade Overview
Canada and U.S. Trade Overview
 
2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference Handouts2013 Ports-to-Plains Alliance Energy Conference Handouts
2013 Ports-to-Plains Alliance Energy Conference Handouts
 
Energy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation InfrastructureEnergy Development Impact on Transportation Infrastructure
Energy Development Impact on Transportation Infrastructure
 
Wind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. ManufacturingWind Energy's Future and the Impact on U.S. Manufacturing
Wind Energy's Future and the Impact on U.S. Manufacturing
 
Compressed Air Wind Energy Storage
Compressed Air Wind Energy StorageCompressed Air Wind Energy Storage
Compressed Air Wind Energy Storage
 
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
Fuels Policy, Ethanol and RFS Reform Political and Policy Implications on Gas...
 
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
Ports-to-Plains: The Importance of a Statewide Transportation to Colorado's E...
 
2013 Energy Conference Save the Date
2013 Energy Conference Save the Date2013 Energy Conference Save the Date
2013 Energy Conference Save the Date
 
February 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains AllianceFebruary 2013 Update from the Ports-to-Plains Alliance
February 2013 Update from the Ports-to-Plains Alliance
 
Draft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL ProjectDraft Supplemental EIS for the Keystone XL Project
Draft Supplemental EIS for the Keystone XL Project
 
Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012Ports-to-Plains Alliance Webinar 113012
Ports-to-Plains Alliance Webinar 113012
 
Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011Nebraska Trade Relationships 2004 – 2011
Nebraska Trade Relationships 2004 – 2011
 
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
Comments on Interim Guidance on State Freight Plans and State Advisory Commit...
 
Interim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory CommitteesInterim Guidance on State Freight Plans and State Freight Advisory Committees
Interim Guidance on State Freight Plans and State Freight Advisory Committees
 
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
Ports-to-Plains Alliance Northern Working Group Strategic Plan October 2012
 
South Dakota Trade Relationships 2004-2011
South Dakota Trade Relationships 2004-2011South Dakota Trade Relationships 2004-2011
South Dakota Trade Relationships 2004-2011
 
Return to Rural
Return to RuralReturn to Rural
Return to Rural
 
Imaginative Enterprise - Stuart Boylan
Imaginative Enterprise - Stuart BoylanImaginative Enterprise - Stuart Boylan
Imaginative Enterprise - Stuart Boylan
 
Imaginative Enterprise - Jeff Senger
Imaginative Enterprise - Jeff SengerImaginative Enterprise - Jeff Senger
Imaginative Enterprise - Jeff Senger
 
Imaginative Enterprise - Mike Kotelko
Imaginative Enterprise - Mike KotelkoImaginative Enterprise - Mike Kotelko
Imaginative Enterprise - Mike Kotelko
 

Recently uploaded

Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 

Recently uploaded (20)

Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 

Keystone XL Pipeline Support Letter (Sample)

  • 1.   September XX, 2011    The Honorable Hillary Clinton  Secretary, U.S. Department of State  Keystone XL EIS Project  PO Box 96503‐98500  Washington, DC 20090‐6503    Re: Support for Keystone XL Pipeline – National Interest Determination    Dear Secretary Clinton:    We are writing to express our strong support for EIS findings on the Keystone XL pipeline and to urge  you to approve the project by granting the Presidential Permit needed for construction to begin. We  fully support this project because we believe it is in the best interest of our constituents and the entire  country.      Our communities are members of the Ports‐to‐Plains Alliance, a grassroots coalition of cities, counties,  businesses, economic development organizations and chambers of commerce from a ten‐state, 2,300  mile long transportation and economic development corridor that stretches from Texas to Alberta,  Canada.    Keystone XL will provide significant economic benefits for our region.  The pipeline is expected to create  approximately 20,000 manufacturing and construction jobs in the United States.  It could also generate  more than $5.2 billion in tax revenue to the Keystone XL corridor states.  At a time when state and local  governments across the country are struggling to balance their budgets, these employment and revenue  benefits are critical to our region.    The pipeline is also critical to our country’s efforts to reduce our dependence on Middle East and  Venezuelan oil, by increasing our access to supplies from Canada, our neighbor and loyal ally, as well as  domestic supplies from the Bakken Formation of Montana and North Dakota.  Relying upon regimes that  are in many cases unstable and unfriendly to the United States is simply bad energy and national  security policy.  We have seen the shocks to our economy from oil spikes caused by turmoil in these  regions.    It is much preferable to develop stable, secure domestic and Canadian sources.  By providing  refineries along the Texas Gulf Coast with more than 700,000 barrels of oil each day from domestic and  Canadian resources, this pipeline will dramatically reduce our reliance on oil from unreliable and often  unfriendly sources.      Limon Office Lubbock Office P.O. Box 9 5401 N MLK Blvd., Unit 395 Limon, CO 80828 Lubbock, TX 79403 P: 303.586.1787 P: 806.775.2338 F: 719.775.9073 Fax: 806.775.3981 www.portstoplains.com  
  • 2. Support for Keystone XL Pipeline – National Interest Determination September xx, 2011 Page 2 As leaders from the region that the Keystone XL pipeline will traverse, we applaud the Department of  State’s thoroughness during this approval process and appreciate the multiple opportunities for public  input on the project and its potential impact on the environment.  The State Department has fully  analyzed the project’s environmental impact and that the Final EIS rightfully concludes that there are no  substantial environmental concerns that should prevent construction of this valuable energy  infrastructure project.  We also have confidence that TransCanada will be a good steward of the land  and that Keystone XL will be constructed using industry best practices and will meet or exceed all  existing pipeline regulatory standards.      The Keystone XL pipeline is clearly in the nation’s interest and will be a valuable tool in strengthening  our national security and energy security.  Therefore, we respectfully request that upon completion of  this review period, the Department of States move expeditiously to approve the pipeline and grant  TransCanada the Presidential Permit it needs to proceed.      Sincerely,  Limon Office Lubbock Office P.O. Box 9 5401 N MLK Blvd., Unit 395 Limon, CO 80828 Lubbock, TX 79403 P: 303.586.1787 P: 806.775.2338 F: 719.775.9073 Fax: 806.775.3981 www.portstoplains.com