© 2017 Citrix | Confidential
Bala Vaidhinathan
CTO, eG Innovations
Amareswara Reddy
Technical Marketing Specialist, Citrix Ready
Are You Keeping Pace with
Citrix XenApp and XenDesktop
7.x Evolution?
JULY 19, 2018
Learn Best Practices to Deliver High-Performing
Applications & Desktops
“Citrix Ready is the #1
source to evaluate
verified partner
products for
customers making a
Citrix purchasing
decision”
Citrix Ready Marketplace
www.citrix.com/ready
Citrix Ready Program
www.citrix.com/partner-programs/citrix-ready.html
3 © 2017 Citrix | Confidential
Virtual
Apps
VDI
Desktops
Content
Collaboration
XenApp
Services
XenDesktop
Services
XenMobile
Services
ShareFile
Services
NetScaler
Services
Unified
Endpoint Mgmt
Health check,
auto-scaling
Smart
Tools
Digital
Workspaces
Workspace
Services
Security,
Performance
Citrix Cloud Management Plane : Unified Operations, Administration and Management
GW, ADC, WAF,
SD-WAN
Analytics
Services
Citrix Cloud Services
From Citrix Workspace to Discrete Services
SIMPLE FAST SECURE ADAPTABLE
Citrix
Cloud
services
4 © 2017 Citrix | Confidential
Value to Your Business – Bird’s Eye View
SIMPLE
• Implement fully
integrated Citrix
portfolio from
single management
plane
• Unified, reliable
access to any app
or data in any
environment
FAST SECURE ADAPTABLE
• Rapidly deploy Citrix
services in hours
• Utilize the latest
capabilities and
innovations
• Analytics-based
approached to
security
• Close security gaps
using always up-to-
date software
• Highest level of
flexibility by managing
apps across any cloud –
on premises, public,
private.
• Visibility into business
insights powered by
rich analytics
5 © 2017 Citrix | Confidential
Infrastructure Reduction with Citrix Cloud Implementation
Citrix Cloud DeploymentTraditional Deployment
Citrix Cloud
(operated by
Citrix)
Customer/
Partner
managed
6 © 2017 Citrix | Confidential
Unified Admin Experience
XenApp and XenDesktop Service XenMobile Service ShareFile Lifecycle Management
Service
Cloud Connector
Data Center
Citrix Cloud Platform
Customer /
Partner
architects
& operates
Citrix
architects
& operates
Private Cloud
Cloud Connector
Public Cloud
Cloud Connector
Apps and Desktops File Sync & SharingMobile App & Device Mgmt Design, Deploy, Manage
Manage Multiple XenApp/XenDesktop Resource Locations
© eG Innovations, Inc. | www.eginnovations.com
2018: The Year of Citrix Migration
18%
29%
23%
17%
13%
Within 3 months Within 6 months Within 1 year
Already migrated Not sure, no plan as of now
70%
XenApp 6.5 is reaching EOL on
June 30, 2018
• 70% of organizations will migrate
to XenApp and XenDesktop 7.x by
the end of the year
• 87% are expected to be on 7.x by
the end of the year.
2018 Citrix Migration Survey: www.eginnovations.com/Citrix-Migration-Trends
Agenda
Citrix XenApp and XenDesktop 7.x: A Radically New
Citrix Ecosystem
Is Your Monitoring Solution XA/XD 7.x Ready?
Best Practices for Monitoring XA/XD 7.x
Go Beyond Metric Collection: Machine Learning
and AI Ops
© eG Innovations, Inc. | www.eginnovations.com
About eG Innovations
Worldwide Locations
Global Headquarters: Singapore
US Headquarters: New Jersey
Founded in 2001
eG Innovations is a provider of enterprise-class application and IT infrastructure performance
management software that delivers end-to-end monitoring, diagnosis, reporting and analytics
across on-premises, cloud, and hybrid IT environments.
Faster diagnosis and resolution of performance problems
Enhanced service delivery and user satisfaction
Maximum business productivity and cost savings
Accelerated IT deployments and production rollouts
Improved user experience and customer satisfaction
Transform IT Service Delivery into Business Advantage
© eG Innovations, Inc. | www.eginnovations.com
Citrix XenApp and
XenDesktop 7.x:
A Radically New Citrix
Ecosystem
© eG Innovations, Inc. | www.eginnovations.com
Comparing XenApp 6.5 and XA/XD 7.x Architectures
StoreFront Delivery
Controller
NetScaler
License Server
Provisioning
Services
Active
Directory
Database
Hypervisor
Virtual Desktops
Desktop
VDA
Citrix End User XenApp Server
Server VDA
WEM Broker
Delivery
Group
• Major architecture overhaul from 6.5 (IMA) to 7.x (FMA)
• Unified architecture for XenApp and XenDesktop
• Many components from 6.5 replaced with new ones
Standalone XenApp 6.x architecture (IMA)
Consolidates remote access infrastructure to provide:
• SSO across to VDI, web and SaaS applications
• Remote access to all applications
• ICA proxy and secure delivery of VDI
An enterprise application store that provides
an interface for users to access virtual
desktops and applications remotely
A central management component of a XA/XD Site, which enables:
• Load management
• Communication with Storefront
• User and worker management
• Configuration and policy management
• Secure Ticket Authority for secured external connections
VDAs are available for both desktops and servers.
• Establish connection between the machine and the user device
• Verify that a Citrix license is available for the user session
• Apply policies that have been configured for the session
• Communicate session information to the Broker Service in the
Delivery Controller
© eG Innovations, Inc. | www.eginnovations.com
What’s New in Citrix XenApp/XenDesktop 7.x
 Citrix Workspace Environment
Management (WEM)
 Adaptive Transport Protocol
 Framehawk
 Session Pre-launch and Lingering
 GPU Capabilities
 Linux VDAs
 Citrix Cloud Delivery
Citrix products are evolving with every releasee
© eG Innovations, Inc. | www.eginnovations.com
Introducing Workspace Environment Management (WEM)
• WEM is Citrix’s Performance Management and User Environment Management tool for
all XA/XD Enterprise and Platinum Customers
• Reduces logon duration by up to 20-40%
– User logon is enabled first
– After that, other processing steps are
executed
• Intelligent resource and profile
management delivers the best user
experience and application response
time
• Analyzes user and application behavior
and intelligently adjusts RAM, CPU, and
I/O in the user workspace environment
WEM agents are installed on server and desktop VDAs
© eG Innovations, Inc. | www.eginnovations.com
Citrix HDX Adaptive Transport
• HDX adaptive transport is a new data transport mechanism for XA/XD 7.13 and above
• Faster, more scalable, and more
interactive on long-haul WAN and
internet connections
• Improves application interactivity and
data throughput
WAN Environments (from 50 to 250 msec RTT, and 0-1% packet loss)
Client drive
Mapping
Up to 10x
improvements
Printing Up to 2x
improvements
Thinwire
Interactivity
Up to 2.5x
improvements
Generic USB Up to 35%
improvements
• ICA virtual channels automatically respond to changing
network conditions
ICA channels intelligently switch the
underlying protocol between EDT and
TCP to deliver the best performance
HDX with Enlightened Data Transport (EDT)
© eG Innovations, Inc. | www.eginnovations.com
Framehawk
• A new ICA virtual channel, extends Citrix HDX technologies
– In static areas of the screen where the human eye can easily detect lost pixels,
Framehawk tries to extrapolate pixels so things look okay
– On a lossy network connection, Framehawk hides loss with interpolation, and the
user still perceives good image quality
– Framehawk intelligently distinguishes between different
types of packet loss
• If there is random loss, send more data to compensate
• If there is congestion loss, don't send more data as the channel is
already clogged
– Uses a data transport layer built on top of UDP
© eG Innovations, Inc. | www.eginnovations.com
Intelligent Session Management
• Session pre-launch and lingering
– Keeps the user session open after the
user closes the app
– Provides a quick app reconnect or
enable the user to open a new app
without repeating the logon process
© eG Innovations, Inc. | www.eginnovations.com
GPU and Linux Support
• Support for GPU acceleration with HDX 3D Pro
– Graphics-intensive applications use GPU instead of CPU
– Applicable for XenApp and XenDesktop
– Supported on Citrix, VMware and Microsoft hypervisors
– GPU passthrough and GPU sharing options
• Support for Linux VDAs
– Linux virtual desktops and application
virtualization based on an RHEL, CentOS, SUSE, or
Ubuntu distribution
© eG Innovations, Inc. | www.eginnovations.com
Service Delivery Through
• Management servers: Reside in
Control Plane hosted by Citrix
• XenApp servers and XenDesktop
VMs: Hosted on-premise
constitute the Resource Plane
• Citrix Cloud Connector: channel
for communication between
control and resource planes
Control Plane
Resource Plane
© eG Innovations, Inc. | www.eginnovations.com
Is Your Monitoring Solution
Citrix XenApp and
XenDesktop 7.x Ready?
© eG Innovations, Inc. | www.eginnovations.com
Analogy: Evolution of Mobile Networks and Mobile Devices
With technology evolution, applications,
use cases and supported devices also evolve
The same applies to performance monitoring
4G3G2GG
XenApp 6.x
XenApp & XenDesktop 7.x
You must consider a monitoring
technology that is purpose-built to
support the new technology and
protocols in XenApp/XenDesktop 7.x
© eG Innovations, Inc. | www.eginnovations.com
Proactive Monitoring: The Need of the Hour
• New components, many interactions between them
• Difficult to monitor all aspects of service operation
• Relying on user complaints is time consuming and reactive
• Test whether the entire Citrix delivery infrastructure is
functioning as expected. Run simulations and test specific
user logon and application access scenarios
Synthetic simulation of user logon, application and desktop
availability and session access is needed for proactive alerting!
of Citrix admins are looking
for proactive alerts
2016 Citrix Performance Survey by
DABCC and eG Innovations
© eG Innovations, Inc. | www.eginnovations.com
Real User Logon Monitoring Must be Done in a Distributed
Manner
• In XenApp 6.x, logon processing only
used to happen at the XenApp server
• Now, in XA/XD 7.x, logon processing
happens in two places
─ Delivery Controller: to measure
interactive session time, brokering,
profile loading, etc.
─ XenApp server / XenDesktop VM: to
measure session establishment
Monitoring visibility is needed
at both stages!
© eG Innovations, Inc. | www.eginnovations.com
Logon Monitoring Must Be WEM-Aware
• If WEM is used, logon time will be
much faster
• But WEM’s processing of user profile
loading, logon script execution, drive
mapping could be slow
• Even after logging in quickly, the Citrix
user will not be able to access the
application/desktop profile
• A monitoring system that is not WEM-
aware will not detect this situation
Diagram Source:
www.virtualfeller.com
Need monitoring visibility of WEM processing!
© eG Innovations, Inc. | www.eginnovations.com
Citrix Monitoring Must Cover New Components,
Protocols and Deployments
• FMA architecture of XA/XD 7.x is very different from XA 6.5 IMA
architecture
– New components : Delivery Controller, StoreFront, VDAs, WEM, etc.
– New protocol/virtual channels: EDT, Framehawk
– New delivery model: Citrix Cloud control plane, resource plan, Cloud Connector,
public cloud, etc.
When technology evolves, monitoring must evolve too!
© eG Innovations, Inc. | www.eginnovations.com
Monitoring Must Be FMA-Aware
• VDAs are key components of the
FMA architecture
• VDA failures can result in
apps/desktops not being available
• There could be several reasons why
a VDA may not be functioning
© eG Innovations, Inc. | www.eginnovations.com
Monitoring Must Be GPU-Aware
• Monitoring of traditional system resources when GPUs are in
use is not sufficient:
– Which VMs are using GPU?
– Which application/processes are consuming excessive GPU?
– Is any VM over-provisioned or under-provisioned with GPU?
– When will the hypervisor run out of GPU resources?
Monitor GPU availability and utilization!!
© eG Innovations, Inc. | www.eginnovations.com
Monitoring Best Practices
for Citrix XenApp and
XenDesktop 7.x
Infrastructures
© eG Innovations, Inc. | www.eginnovations.com
1. Monitor logon & user experience through synthetic simulation
2. Get deep visibility into real user logon processing
3. Track processing by Citrix WEM
4. In-depth monitoring of the Citrix Delivery Controller
5. Monitor the health of desktop and server VDA
6. Identify network problem in the client side affecting session
performance
7. Monitor EDT and Framehawk performance
8. Monitor application launch time, usage and browser activity
9. Monitor vGPU utilization and availability
10. Gain performance visibility into Citrix Cloud delivery
Monitoring Best Practices for XenApp/XenDesktop 7.x
© eG Innovations, Inc. | www.eginnovations.com
Monitor User Experience
Through Synthetic Simulation
Best Practice #1
© eG Innovations, Inc. | www.eginnovations.com
Built-in Logon Simulator for Proactive Logon Monitoring (contd.)
Track logon availability
and performance 24x7
and identify slowness
Identify the cause of
logon slowness
© eG Innovations, Inc. | www.eginnovations.com
Get Deep Visibility into
Real User Logon Processing
Best Practice #2
© eG Innovations, Inc. | www.eginnovations.com
Monitoring Real User Logon
Best Practice #2
• View logon metrics from XenApp
server and Delivery Controller side
by side
• Diagnose which step is causing
slowness: brokering, interactive
session processing, user profile
loading, logon script execution, etc.
• Easily identify if logon processing
slowness is in the client side or
server side
• Track down the Group Policy
Client-Side Extension that is taking
high processing time
© eG Innovations, Inc. | www.eginnovations.com
Track Processing by Citrix Workspace
Environment Management (WEM)
Best Practice #3
© eG Innovations, Inc. | www.eginnovations.com
How eG Enterprise Monitors Citrix WEM
• Agent on XenApp
server/XenDesktop VM
to track WEM processing
times on the clients
• Agent on WEM broker to
track the broker’s
functioning
eG Enterprise
Web Console
XenApp and
XenDesktop VDA
WEM Broker
eG Agent
on VDA
eG Agent on
WEM Broker
Monitors WEM database connectivity,
license server connectivity, WEM
server event logs, processes, etc.
Monitor logon processing by WEM
(including initial and WEM agent
processing), CPU clamping, etc.
Best Practice #3
© eG Innovations, Inc. | www.eginnovations.com
Monitoring Logon Processing by Citrix WEM
Citrix Director only shows
interactive session time. This
does not include WEM agent
processing time
eG Enterprise monitors
initial processing and WEM
agent processing
Monitor WEM’s external
task processing messages
and identify which task
took more time to execute
Best Practice #3
© eG Innovations, Inc. | www.eginnovations.com
1. Monitor logon & user experience through synthetic simulation
2. Get deep visibility into real user logon processing
3. Track processing by Citrix WEM
4. In-depth monitoring of the Citrix Delivery Controller
5. Monitor the health of desktop and server VDA
6. Identify network problem in the client side affecting session
performance
7. Monitor EDT and Framehawk performance
8. Monitor application launch time, usage and browser activity
9. Monitor vGPU utilization and availability
10. Gain performance visibility into Citrix Cloud delivery
Monitoring Best Practices for XenApp/XenDesktop 7.x
(contd.)
© eG Innovations, Inc. | www.eginnovations.com
In-Depth Monitoring of
The Citrix Delivery Controller
Best Practice #4
© eG Innovations, Inc. | www.eginnovations.com
Monitoring the Citrix Delivery Controller
• The Delivery Controller is responsible for managing user access, and brokering and
optimizing connections
• Provides Machine Creation Services that create desktop and server images
Desktop Sessions
• User logon performance
• New user connections
• User connection failures
• Client connection failures
• Machine failures
• Configuration errors
• Unavailable licenses
• Unavailable capacity
Breakdown of Sessions
• Active sessions
• Connected sessions
• Disconnected sessions
• Preparing sessions
• Reconnecting sessions
• Non-brokered sessions
• Pending sessions
• Unknown sessions
Breakdown of Desktops
• Powered on/off
• With maintenance mode enabled
• Assigned/Unassigned
• With pending image update
• Preparing/resuming
• Start failures
• Stuck on boot desktops
• Unregistered desktops
Controller Services
• Broker service
• AD identity service
• Configuration service
• Host service
• Machine creation service
• Licensing service
• Monitoring service
• Logging service
Key Citrix Delivery Controller Metrics
Best Practice #4
Get purpose-built dashboard to monitor Delivery Controller performance, Delivery Groups,
Machine Catalogs, Brokering Machines, and the various Controller Services
© eG Innovations, Inc. | www.eginnovations.com
Monitor the Health of
Desktop and Server VDA
Best Practice #5
© eG Innovations, Inc. | www.eginnovations.com
Monitor Status of Citrix Server and Desktop VDA
Track the status of various VDA
services in one place, and
identify if the VDA is slow
Best Practice #5
© eG Innovations, Inc. | www.eginnovations.com
1. Monitor logon & user experience through synthetic simulation
2. Get deep visibility into real user logon processing
3. Track processing by Citrix WEM
4. In-depth monitoring of the Citrix Delivery Controller
5. Monitor the health of desktop and server VDA
6. Identify network problem in the client side affecting session
performance
7. Monitor EDT and Framehawk performance
8. Monitor application launch time, usage and browser activity
9. Monitor vGPU utilization and availability
10. Gain performance visibility into Citrix Cloud delivery
Monitoring Best Practices for XA/XD 7.x (contd.)
© eG Innovations, Inc. | www.eginnovations.com
Identify Network Problem in the Client Side
Affecting Session Performance
Best Practice #6
© eG Innovations, Inc. | www.eginnovations.com
Track Screen Refresh & Client Network Latency Side by Side
Compare screen refresh latency and
client network latency side by side
Best Practice #6
© eG Innovations, Inc. | www.eginnovations.com
Monitor EDT and Framehawk
Performance
Best Practice #7
© eG Innovations, Inc. | www.eginnovations.com
Monitoring Support for Citrix HDX Adaptive Transport
Monitor bandwidth,
roundtrip time, packet
retransmission, dropped
packets, congestions, etc.
Best Practice #7
Measure the performance of
XenApp and XenDesktop sessions
connected over EDT protocol
Diagnose deeper to view session-
wise EDT performance metrics
© eG Innovations, Inc. | www.eginnovations.com
Deep Visibility into Framehawk Virtual Channel
Measure and report on
Framehawk latency
Best Practice #7
© eG Innovations, Inc. | www.eginnovations.com
Monitor Browser Activity
Best Practice #8
© eG Innovations, Inc. | www.eginnovations.com
Browser URL Monitoring Inside a Citrix XenApp Session
Identify which URL accessed by the end user
through published IE/Edge browser is causing
excess resource utilization. Is the user
accessing video content, games, etc. which is
consuming high CPU/memory?
Best Practice #8
• Browser-based applications growing in popularity (e.g., salesforce)
• When there is resource shortage, Citrix admins need visibility into
URLs accessed in the XenApp session to identify any resource-
intensive websites/URLs are being accessed
© eG Innovations, Inc. | www.eginnovations.com
Track Session Resource Usage by Browser
Slice session resource usage metrics
by browser, and understand how
much CPU/memory is consumed by
a specific browser type
Best Practice #8
© eG Innovations, Inc. | www.eginnovations.com
1. Monitor logon & user experience through synthetic simulation
2. Get deep visibility into real user logon processing
3. Track processing by Citrix WEM
4. In-depth monitoring of the Citrix Delivery Controller
5. Monitor the health of desktop and server VDA
6. Identify network problem in the client side affecting session
performance
7. Monitor EDT and Framehawk performance
8. Monitor application launch time, usage and browser activity
9. Monitor GPU utilization and availability
10. Gain performance visibility into Citrix Cloud delivery
Monitoring Best Practices for XA/XD 7.x (contd.)
© eG Innovations, Inc. | www.eginnovations.com
Monitor vGPU Utilization
and Availability
Best Practice #9
© eG Innovations, Inc. | www.eginnovations.com
NVIDIA GPU Monitoring eG Enterprise integrates with NVIDIA APIs to deliver
GPU usage monitoring at the hypervisor level
Monitor vGPU utilization per desktop VM and
measure critical metrics, such as CPU, memory,
encoder/decoder utilization, etc. This is
supported for both ‘Shared’ and ‘Pass-through’
modes of NVIDIA GPU implementation.
Best Practice #9
Measure vGPU usage per
process running in a desktop
© eG Innovations, Inc. | www.eginnovations.com
Gain Performance Visibility into
Citrix Cloud Delivery
Best Practice #10
© eG Innovations, Inc. | www.eginnovations.com
Monitoring Citrix Cloud Environment
eG Enterprise
Web Console
• Agentless monitoring of the
Delivery Controller in the control
plane through Citrix APIs
• Agent-based monitoring XenApp
Server, Cloud Connector,
hypervisor, AD, etc. in the resource
plane
• Agentless monitoring of
XenDesktop VMs
Best Practice #10
© eG Innovations, Inc. | www.eginnovations.com
Citrix Cloud Topology and Dependency Mapping
Best Practice #10
© eG Innovations, Inc. | www.eginnovations.com
Monitoring the Citrix Cloud Delivery Controller
• eG Enterprise monitors the Cloud Delivery Controller in an agentless manner
• OS-level information (resources, processes, etc.) will not be available for the Cloud
Delivery Controller because it is in the Citrix-hosted and -managed control plane
Best Practice #10
© eG Innovations, Inc. | www.eginnovations.com
Monitoring the Citrix Cloud Connector
Monitor the availability,
response time, and content
validity metrics of the Cloud
Connector service
Monitor the health, availability
and performance of the
Windows server & OS where the
Cloud Connector is installed
Best Practice #10
© eG Innovations, Inc. | www.eginnovations.com
Key Citrix Cloud Performance Metrics at Your Fingertips
Best Practice #10
© eG Innovations, Inc. | www.eginnovations.com
1. Monitor user experience through synthetic simulation
2. Get deep visibility into real user logon processing
3. Track processing by Citrix WEM
4. In-depth monitoring of the Citrix delivery controller
5. Monitor the health of desktop and server VDA
6. Identify network problem in the client side affecting session
performance
7. Monitor EDT and Framehawk performance
8. Monitor browser activity
9. Monitor vGPU utilization
10. Gain performance visibility into Citrix Cloud delivery
Monitoring Best Practices for XenApp/XenDesktop 7.x
© eG Innovations, Inc. | www.eginnovations.com
Go Beyond Metric
Collection:
Machine Learning
and AIOps
© eG Innovations, Inc. | www.eginnovations.com
Too Many Metrics...
How to Make Sense of Data and Get Actionable Insight?
Analyzing all metrics manually and
trying to identify the root cause of
problems is challenging
Citrix admins need artificial intelligence and automated analytics to process
metrics, correlate them across different sources, track unusual patterns and
trends, and pinpoint the root cause of problems.
© eG Innovations, Inc. | www.eginnovations.com
Automatic Root Cause Diagnosis
Uncover the real cause of the problem.
Prove it is not Citrix!
© eG Innovations, Inc. | www.eginnovations.com
Self-Learning Auto-Baselines
© eG Innovations, Inc. | www.eginnovations.com
Auto-Baselining for Proactive Alerting
Automatically computed baseline
based on time of day, day of month
behavior enables proactive
detection of problems
© eG Innovations, Inc. | www.eginnovations.com
Intuitive Dashboards
© eG Innovations, Inc. | www.eginnovations.com
User Experience Dashboard
View user experience metrics of all
Citrix users on a single screen
Drill down to a particular user’s
real-time session metrics for
user experience analysis
© eG Innovations, Inc. | www.eginnovations.com
Built-in Reports for Customized
for XA/XD 7.x Analytics
© eG Innovations, Inc. | www.eginnovations.com
Citrix Reports
Get historical analytics for step-wise user
logon performance monitoring
Generate a report for top ‘n’ slow
application launches
© eG Innovations, Inc. | www.eginnovations.com
Summary
 Citrix XenApp and XenDesktop 7.x is a radically
new ecosystem
 Your monitoring practices have to be XA/XD 7.x
ready
 Collect the right metrics, analyze them, proactively
detect and fix issues by relying on AIOps and
machine learning
© eG Innovations, Inc. | www.eginnovations.com
Q&A
Work better. Live better.
74 © 2016 Citrix | Confidential
www.eginnovations.com
info@eginnovations.com
+1 (866) 526 6700
CitrixReady@Citrix.com
Thank you!
www.citrixready.citrix.com/

Keeping Pace with Citrix XenApp and XenDesktop 7.x Evolution

  • 1.
    © 2017 Citrix| Confidential Bala Vaidhinathan CTO, eG Innovations Amareswara Reddy Technical Marketing Specialist, Citrix Ready Are You Keeping Pace with Citrix XenApp and XenDesktop 7.x Evolution? JULY 19, 2018 Learn Best Practices to Deliver High-Performing Applications & Desktops
  • 2.
    “Citrix Ready isthe #1 source to evaluate verified partner products for customers making a Citrix purchasing decision” Citrix Ready Marketplace www.citrix.com/ready Citrix Ready Program www.citrix.com/partner-programs/citrix-ready.html
  • 3.
    3 © 2017Citrix | Confidential Virtual Apps VDI Desktops Content Collaboration XenApp Services XenDesktop Services XenMobile Services ShareFile Services NetScaler Services Unified Endpoint Mgmt Health check, auto-scaling Smart Tools Digital Workspaces Workspace Services Security, Performance Citrix Cloud Management Plane : Unified Operations, Administration and Management GW, ADC, WAF, SD-WAN Analytics Services Citrix Cloud Services From Citrix Workspace to Discrete Services SIMPLE FAST SECURE ADAPTABLE Citrix Cloud services
  • 4.
    4 © 2017Citrix | Confidential Value to Your Business – Bird’s Eye View SIMPLE • Implement fully integrated Citrix portfolio from single management plane • Unified, reliable access to any app or data in any environment FAST SECURE ADAPTABLE • Rapidly deploy Citrix services in hours • Utilize the latest capabilities and innovations • Analytics-based approached to security • Close security gaps using always up-to- date software • Highest level of flexibility by managing apps across any cloud – on premises, public, private. • Visibility into business insights powered by rich analytics
  • 5.
    5 © 2017Citrix | Confidential Infrastructure Reduction with Citrix Cloud Implementation Citrix Cloud DeploymentTraditional Deployment Citrix Cloud (operated by Citrix) Customer/ Partner managed
  • 6.
    6 © 2017Citrix | Confidential Unified Admin Experience XenApp and XenDesktop Service XenMobile Service ShareFile Lifecycle Management Service Cloud Connector Data Center Citrix Cloud Platform Customer / Partner architects & operates Citrix architects & operates Private Cloud Cloud Connector Public Cloud Cloud Connector Apps and Desktops File Sync & SharingMobile App & Device Mgmt Design, Deploy, Manage Manage Multiple XenApp/XenDesktop Resource Locations
  • 7.
    © eG Innovations,Inc. | www.eginnovations.com 2018: The Year of Citrix Migration 18% 29% 23% 17% 13% Within 3 months Within 6 months Within 1 year Already migrated Not sure, no plan as of now 70% XenApp 6.5 is reaching EOL on June 30, 2018 • 70% of organizations will migrate to XenApp and XenDesktop 7.x by the end of the year • 87% are expected to be on 7.x by the end of the year. 2018 Citrix Migration Survey: www.eginnovations.com/Citrix-Migration-Trends
  • 8.
    Agenda Citrix XenApp andXenDesktop 7.x: A Radically New Citrix Ecosystem Is Your Monitoring Solution XA/XD 7.x Ready? Best Practices for Monitoring XA/XD 7.x Go Beyond Metric Collection: Machine Learning and AI Ops
  • 9.
    © eG Innovations,Inc. | www.eginnovations.com About eG Innovations Worldwide Locations Global Headquarters: Singapore US Headquarters: New Jersey Founded in 2001 eG Innovations is a provider of enterprise-class application and IT infrastructure performance management software that delivers end-to-end monitoring, diagnosis, reporting and analytics across on-premises, cloud, and hybrid IT environments. Faster diagnosis and resolution of performance problems Enhanced service delivery and user satisfaction Maximum business productivity and cost savings Accelerated IT deployments and production rollouts Improved user experience and customer satisfaction Transform IT Service Delivery into Business Advantage
  • 10.
    © eG Innovations,Inc. | www.eginnovations.com Citrix XenApp and XenDesktop 7.x: A Radically New Citrix Ecosystem
  • 11.
    © eG Innovations,Inc. | www.eginnovations.com Comparing XenApp 6.5 and XA/XD 7.x Architectures StoreFront Delivery Controller NetScaler License Server Provisioning Services Active Directory Database Hypervisor Virtual Desktops Desktop VDA Citrix End User XenApp Server Server VDA WEM Broker Delivery Group • Major architecture overhaul from 6.5 (IMA) to 7.x (FMA) • Unified architecture for XenApp and XenDesktop • Many components from 6.5 replaced with new ones Standalone XenApp 6.x architecture (IMA) Consolidates remote access infrastructure to provide: • SSO across to VDI, web and SaaS applications • Remote access to all applications • ICA proxy and secure delivery of VDI An enterprise application store that provides an interface for users to access virtual desktops and applications remotely A central management component of a XA/XD Site, which enables: • Load management • Communication with Storefront • User and worker management • Configuration and policy management • Secure Ticket Authority for secured external connections VDAs are available for both desktops and servers. • Establish connection between the machine and the user device • Verify that a Citrix license is available for the user session • Apply policies that have been configured for the session • Communicate session information to the Broker Service in the Delivery Controller
  • 12.
    © eG Innovations,Inc. | www.eginnovations.com What’s New in Citrix XenApp/XenDesktop 7.x  Citrix Workspace Environment Management (WEM)  Adaptive Transport Protocol  Framehawk  Session Pre-launch and Lingering  GPU Capabilities  Linux VDAs  Citrix Cloud Delivery Citrix products are evolving with every releasee
  • 13.
    © eG Innovations,Inc. | www.eginnovations.com Introducing Workspace Environment Management (WEM) • WEM is Citrix’s Performance Management and User Environment Management tool for all XA/XD Enterprise and Platinum Customers • Reduces logon duration by up to 20-40% – User logon is enabled first – After that, other processing steps are executed • Intelligent resource and profile management delivers the best user experience and application response time • Analyzes user and application behavior and intelligently adjusts RAM, CPU, and I/O in the user workspace environment WEM agents are installed on server and desktop VDAs
  • 14.
    © eG Innovations,Inc. | www.eginnovations.com Citrix HDX Adaptive Transport • HDX adaptive transport is a new data transport mechanism for XA/XD 7.13 and above • Faster, more scalable, and more interactive on long-haul WAN and internet connections • Improves application interactivity and data throughput WAN Environments (from 50 to 250 msec RTT, and 0-1% packet loss) Client drive Mapping Up to 10x improvements Printing Up to 2x improvements Thinwire Interactivity Up to 2.5x improvements Generic USB Up to 35% improvements • ICA virtual channels automatically respond to changing network conditions ICA channels intelligently switch the underlying protocol between EDT and TCP to deliver the best performance HDX with Enlightened Data Transport (EDT)
  • 15.
    © eG Innovations,Inc. | www.eginnovations.com Framehawk • A new ICA virtual channel, extends Citrix HDX technologies – In static areas of the screen where the human eye can easily detect lost pixels, Framehawk tries to extrapolate pixels so things look okay – On a lossy network connection, Framehawk hides loss with interpolation, and the user still perceives good image quality – Framehawk intelligently distinguishes between different types of packet loss • If there is random loss, send more data to compensate • If there is congestion loss, don't send more data as the channel is already clogged – Uses a data transport layer built on top of UDP
  • 16.
    © eG Innovations,Inc. | www.eginnovations.com Intelligent Session Management • Session pre-launch and lingering – Keeps the user session open after the user closes the app – Provides a quick app reconnect or enable the user to open a new app without repeating the logon process
  • 17.
    © eG Innovations,Inc. | www.eginnovations.com GPU and Linux Support • Support for GPU acceleration with HDX 3D Pro – Graphics-intensive applications use GPU instead of CPU – Applicable for XenApp and XenDesktop – Supported on Citrix, VMware and Microsoft hypervisors – GPU passthrough and GPU sharing options • Support for Linux VDAs – Linux virtual desktops and application virtualization based on an RHEL, CentOS, SUSE, or Ubuntu distribution
  • 18.
    © eG Innovations,Inc. | www.eginnovations.com Service Delivery Through • Management servers: Reside in Control Plane hosted by Citrix • XenApp servers and XenDesktop VMs: Hosted on-premise constitute the Resource Plane • Citrix Cloud Connector: channel for communication between control and resource planes Control Plane Resource Plane
  • 19.
    © eG Innovations,Inc. | www.eginnovations.com Is Your Monitoring Solution Citrix XenApp and XenDesktop 7.x Ready?
  • 20.
    © eG Innovations,Inc. | www.eginnovations.com Analogy: Evolution of Mobile Networks and Mobile Devices With technology evolution, applications, use cases and supported devices also evolve The same applies to performance monitoring 4G3G2GG XenApp 6.x XenApp & XenDesktop 7.x You must consider a monitoring technology that is purpose-built to support the new technology and protocols in XenApp/XenDesktop 7.x
  • 21.
    © eG Innovations,Inc. | www.eginnovations.com Proactive Monitoring: The Need of the Hour • New components, many interactions between them • Difficult to monitor all aspects of service operation • Relying on user complaints is time consuming and reactive • Test whether the entire Citrix delivery infrastructure is functioning as expected. Run simulations and test specific user logon and application access scenarios Synthetic simulation of user logon, application and desktop availability and session access is needed for proactive alerting! of Citrix admins are looking for proactive alerts 2016 Citrix Performance Survey by DABCC and eG Innovations
  • 22.
    © eG Innovations,Inc. | www.eginnovations.com Real User Logon Monitoring Must be Done in a Distributed Manner • In XenApp 6.x, logon processing only used to happen at the XenApp server • Now, in XA/XD 7.x, logon processing happens in two places ─ Delivery Controller: to measure interactive session time, brokering, profile loading, etc. ─ XenApp server / XenDesktop VM: to measure session establishment Monitoring visibility is needed at both stages!
  • 23.
    © eG Innovations,Inc. | www.eginnovations.com Logon Monitoring Must Be WEM-Aware • If WEM is used, logon time will be much faster • But WEM’s processing of user profile loading, logon script execution, drive mapping could be slow • Even after logging in quickly, the Citrix user will not be able to access the application/desktop profile • A monitoring system that is not WEM- aware will not detect this situation Diagram Source: www.virtualfeller.com Need monitoring visibility of WEM processing!
  • 24.
    © eG Innovations,Inc. | www.eginnovations.com Citrix Monitoring Must Cover New Components, Protocols and Deployments • FMA architecture of XA/XD 7.x is very different from XA 6.5 IMA architecture – New components : Delivery Controller, StoreFront, VDAs, WEM, etc. – New protocol/virtual channels: EDT, Framehawk – New delivery model: Citrix Cloud control plane, resource plan, Cloud Connector, public cloud, etc. When technology evolves, monitoring must evolve too!
  • 25.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring Must Be FMA-Aware • VDAs are key components of the FMA architecture • VDA failures can result in apps/desktops not being available • There could be several reasons why a VDA may not be functioning
  • 26.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring Must Be GPU-Aware • Monitoring of traditional system resources when GPUs are in use is not sufficient: – Which VMs are using GPU? – Which application/processes are consuming excessive GPU? – Is any VM over-provisioned or under-provisioned with GPU? – When will the hypervisor run out of GPU resources? Monitor GPU availability and utilization!!
  • 27.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring Best Practices for Citrix XenApp and XenDesktop 7.x Infrastructures
  • 28.
    © eG Innovations,Inc. | www.eginnovations.com 1. Monitor logon & user experience through synthetic simulation 2. Get deep visibility into real user logon processing 3. Track processing by Citrix WEM 4. In-depth monitoring of the Citrix Delivery Controller 5. Monitor the health of desktop and server VDA 6. Identify network problem in the client side affecting session performance 7. Monitor EDT and Framehawk performance 8. Monitor application launch time, usage and browser activity 9. Monitor vGPU utilization and availability 10. Gain performance visibility into Citrix Cloud delivery Monitoring Best Practices for XenApp/XenDesktop 7.x
  • 29.
    © eG Innovations,Inc. | www.eginnovations.com Monitor User Experience Through Synthetic Simulation Best Practice #1
  • 30.
    © eG Innovations,Inc. | www.eginnovations.com Built-in Logon Simulator for Proactive Logon Monitoring (contd.) Track logon availability and performance 24x7 and identify slowness Identify the cause of logon slowness
  • 31.
    © eG Innovations,Inc. | www.eginnovations.com Get Deep Visibility into Real User Logon Processing Best Practice #2
  • 32.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring Real User Logon Best Practice #2 • View logon metrics from XenApp server and Delivery Controller side by side • Diagnose which step is causing slowness: brokering, interactive session processing, user profile loading, logon script execution, etc. • Easily identify if logon processing slowness is in the client side or server side • Track down the Group Policy Client-Side Extension that is taking high processing time
  • 33.
    © eG Innovations,Inc. | www.eginnovations.com Track Processing by Citrix Workspace Environment Management (WEM) Best Practice #3
  • 34.
    © eG Innovations,Inc. | www.eginnovations.com How eG Enterprise Monitors Citrix WEM • Agent on XenApp server/XenDesktop VM to track WEM processing times on the clients • Agent on WEM broker to track the broker’s functioning eG Enterprise Web Console XenApp and XenDesktop VDA WEM Broker eG Agent on VDA eG Agent on WEM Broker Monitors WEM database connectivity, license server connectivity, WEM server event logs, processes, etc. Monitor logon processing by WEM (including initial and WEM agent processing), CPU clamping, etc. Best Practice #3
  • 35.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring Logon Processing by Citrix WEM Citrix Director only shows interactive session time. This does not include WEM agent processing time eG Enterprise monitors initial processing and WEM agent processing Monitor WEM’s external task processing messages and identify which task took more time to execute Best Practice #3
  • 36.
    © eG Innovations,Inc. | www.eginnovations.com 1. Monitor logon & user experience through synthetic simulation 2. Get deep visibility into real user logon processing 3. Track processing by Citrix WEM 4. In-depth monitoring of the Citrix Delivery Controller 5. Monitor the health of desktop and server VDA 6. Identify network problem in the client side affecting session performance 7. Monitor EDT and Framehawk performance 8. Monitor application launch time, usage and browser activity 9. Monitor vGPU utilization and availability 10. Gain performance visibility into Citrix Cloud delivery Monitoring Best Practices for XenApp/XenDesktop 7.x (contd.)
  • 37.
    © eG Innovations,Inc. | www.eginnovations.com In-Depth Monitoring of The Citrix Delivery Controller Best Practice #4
  • 38.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring the Citrix Delivery Controller • The Delivery Controller is responsible for managing user access, and brokering and optimizing connections • Provides Machine Creation Services that create desktop and server images Desktop Sessions • User logon performance • New user connections • User connection failures • Client connection failures • Machine failures • Configuration errors • Unavailable licenses • Unavailable capacity Breakdown of Sessions • Active sessions • Connected sessions • Disconnected sessions • Preparing sessions • Reconnecting sessions • Non-brokered sessions • Pending sessions • Unknown sessions Breakdown of Desktops • Powered on/off • With maintenance mode enabled • Assigned/Unassigned • With pending image update • Preparing/resuming • Start failures • Stuck on boot desktops • Unregistered desktops Controller Services • Broker service • AD identity service • Configuration service • Host service • Machine creation service • Licensing service • Monitoring service • Logging service Key Citrix Delivery Controller Metrics Best Practice #4 Get purpose-built dashboard to monitor Delivery Controller performance, Delivery Groups, Machine Catalogs, Brokering Machines, and the various Controller Services
  • 39.
    © eG Innovations,Inc. | www.eginnovations.com Monitor the Health of Desktop and Server VDA Best Practice #5
  • 40.
    © eG Innovations,Inc. | www.eginnovations.com Monitor Status of Citrix Server and Desktop VDA Track the status of various VDA services in one place, and identify if the VDA is slow Best Practice #5
  • 41.
    © eG Innovations,Inc. | www.eginnovations.com 1. Monitor logon & user experience through synthetic simulation 2. Get deep visibility into real user logon processing 3. Track processing by Citrix WEM 4. In-depth monitoring of the Citrix Delivery Controller 5. Monitor the health of desktop and server VDA 6. Identify network problem in the client side affecting session performance 7. Monitor EDT and Framehawk performance 8. Monitor application launch time, usage and browser activity 9. Monitor vGPU utilization and availability 10. Gain performance visibility into Citrix Cloud delivery Monitoring Best Practices for XA/XD 7.x (contd.)
  • 42.
    © eG Innovations,Inc. | www.eginnovations.com Identify Network Problem in the Client Side Affecting Session Performance Best Practice #6
  • 43.
    © eG Innovations,Inc. | www.eginnovations.com Track Screen Refresh & Client Network Latency Side by Side Compare screen refresh latency and client network latency side by side Best Practice #6
  • 44.
    © eG Innovations,Inc. | www.eginnovations.com Monitor EDT and Framehawk Performance Best Practice #7
  • 45.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring Support for Citrix HDX Adaptive Transport Monitor bandwidth, roundtrip time, packet retransmission, dropped packets, congestions, etc. Best Practice #7 Measure the performance of XenApp and XenDesktop sessions connected over EDT protocol Diagnose deeper to view session- wise EDT performance metrics
  • 46.
    © eG Innovations,Inc. | www.eginnovations.com Deep Visibility into Framehawk Virtual Channel Measure and report on Framehawk latency Best Practice #7
  • 47.
    © eG Innovations,Inc. | www.eginnovations.com Monitor Browser Activity Best Practice #8
  • 48.
    © eG Innovations,Inc. | www.eginnovations.com Browser URL Monitoring Inside a Citrix XenApp Session Identify which URL accessed by the end user through published IE/Edge browser is causing excess resource utilization. Is the user accessing video content, games, etc. which is consuming high CPU/memory? Best Practice #8 • Browser-based applications growing in popularity (e.g., salesforce) • When there is resource shortage, Citrix admins need visibility into URLs accessed in the XenApp session to identify any resource- intensive websites/URLs are being accessed
  • 49.
    © eG Innovations,Inc. | www.eginnovations.com Track Session Resource Usage by Browser Slice session resource usage metrics by browser, and understand how much CPU/memory is consumed by a specific browser type Best Practice #8
  • 50.
    © eG Innovations,Inc. | www.eginnovations.com 1. Monitor logon & user experience through synthetic simulation 2. Get deep visibility into real user logon processing 3. Track processing by Citrix WEM 4. In-depth monitoring of the Citrix Delivery Controller 5. Monitor the health of desktop and server VDA 6. Identify network problem in the client side affecting session performance 7. Monitor EDT and Framehawk performance 8. Monitor application launch time, usage and browser activity 9. Monitor GPU utilization and availability 10. Gain performance visibility into Citrix Cloud delivery Monitoring Best Practices for XA/XD 7.x (contd.)
  • 51.
    © eG Innovations,Inc. | www.eginnovations.com Monitor vGPU Utilization and Availability Best Practice #9
  • 52.
    © eG Innovations,Inc. | www.eginnovations.com NVIDIA GPU Monitoring eG Enterprise integrates with NVIDIA APIs to deliver GPU usage monitoring at the hypervisor level Monitor vGPU utilization per desktop VM and measure critical metrics, such as CPU, memory, encoder/decoder utilization, etc. This is supported for both ‘Shared’ and ‘Pass-through’ modes of NVIDIA GPU implementation. Best Practice #9 Measure vGPU usage per process running in a desktop
  • 53.
    © eG Innovations,Inc. | www.eginnovations.com Gain Performance Visibility into Citrix Cloud Delivery Best Practice #10
  • 54.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring Citrix Cloud Environment eG Enterprise Web Console • Agentless monitoring of the Delivery Controller in the control plane through Citrix APIs • Agent-based monitoring XenApp Server, Cloud Connector, hypervisor, AD, etc. in the resource plane • Agentless monitoring of XenDesktop VMs Best Practice #10
  • 55.
    © eG Innovations,Inc. | www.eginnovations.com Citrix Cloud Topology and Dependency Mapping Best Practice #10
  • 56.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring the Citrix Cloud Delivery Controller • eG Enterprise monitors the Cloud Delivery Controller in an agentless manner • OS-level information (resources, processes, etc.) will not be available for the Cloud Delivery Controller because it is in the Citrix-hosted and -managed control plane Best Practice #10
  • 57.
    © eG Innovations,Inc. | www.eginnovations.com Monitoring the Citrix Cloud Connector Monitor the availability, response time, and content validity metrics of the Cloud Connector service Monitor the health, availability and performance of the Windows server & OS where the Cloud Connector is installed Best Practice #10
  • 58.
    © eG Innovations,Inc. | www.eginnovations.com Key Citrix Cloud Performance Metrics at Your Fingertips Best Practice #10
  • 59.
    © eG Innovations,Inc. | www.eginnovations.com 1. Monitor user experience through synthetic simulation 2. Get deep visibility into real user logon processing 3. Track processing by Citrix WEM 4. In-depth monitoring of the Citrix delivery controller 5. Monitor the health of desktop and server VDA 6. Identify network problem in the client side affecting session performance 7. Monitor EDT and Framehawk performance 8. Monitor browser activity 9. Monitor vGPU utilization 10. Gain performance visibility into Citrix Cloud delivery Monitoring Best Practices for XenApp/XenDesktop 7.x
  • 60.
    © eG Innovations,Inc. | www.eginnovations.com Go Beyond Metric Collection: Machine Learning and AIOps
  • 61.
    © eG Innovations,Inc. | www.eginnovations.com Too Many Metrics... How to Make Sense of Data and Get Actionable Insight? Analyzing all metrics manually and trying to identify the root cause of problems is challenging Citrix admins need artificial intelligence and automated analytics to process metrics, correlate them across different sources, track unusual patterns and trends, and pinpoint the root cause of problems.
  • 62.
    © eG Innovations,Inc. | www.eginnovations.com Automatic Root Cause Diagnosis Uncover the real cause of the problem. Prove it is not Citrix!
  • 63.
    © eG Innovations,Inc. | www.eginnovations.com Self-Learning Auto-Baselines
  • 64.
    © eG Innovations,Inc. | www.eginnovations.com Auto-Baselining for Proactive Alerting Automatically computed baseline based on time of day, day of month behavior enables proactive detection of problems
  • 65.
    © eG Innovations,Inc. | www.eginnovations.com Intuitive Dashboards
  • 66.
    © eG Innovations,Inc. | www.eginnovations.com User Experience Dashboard View user experience metrics of all Citrix users on a single screen Drill down to a particular user’s real-time session metrics for user experience analysis
  • 67.
    © eG Innovations,Inc. | www.eginnovations.com Built-in Reports for Customized for XA/XD 7.x Analytics
  • 68.
    © eG Innovations,Inc. | www.eginnovations.com Citrix Reports Get historical analytics for step-wise user logon performance monitoring Generate a report for top ‘n’ slow application launches
  • 69.
    © eG Innovations,Inc. | www.eginnovations.com Summary  Citrix XenApp and XenDesktop 7.x is a radically new ecosystem  Your monitoring practices have to be XA/XD 7.x ready  Collect the right metrics, analyze them, proactively detect and fix issues by relying on AIOps and machine learning
  • 70.
    © eG Innovations,Inc. | www.eginnovations.com
  • 71.
  • 72.
    Work better. Livebetter. 74 © 2016 Citrix | Confidential www.eginnovations.com info@eginnovations.com +1 (866) 526 6700 CitrixReady@Citrix.com Thank you! www.citrixready.citrix.com/

Editor's Notes

  • #4 Like you, most companies are on a cloud journey and need a better way to provide their users with access to the apps, data, and services they need, and a better way for IT to provision, manage, and secure all of it. It is probably not surprising to you that 90% of companies use public cloud solutions, with an average of 4 public cloud apps. And it is projected that 52% of workloads will be in the cloud by 2020. Citrix has ’moved to the cloud’ as well, and our entire workspace services portfolio is available in the form of Citrix Cloud services. But our cloud transformation isn’t just about making our independent products available as cloud services. We are unifying our products into an integrated portfolio of services that more holistically address the needs of today’s hybrid, multi-cloud IT environment. What this means for you is a better way to provide any service to any user that is simple, fast, secure, and adaptable Citrix Administrators use a single management plane to deliver unified and reliable access to the apps, data and network their employees need. Let’s get a bit more specific…
  • #5 As a result – you now have an environment that is… Simple… Consider being able to implement a fully integrated Citrix portfolio from a single management plane Or provide unified, reliable access to ANY app or data in any environment Fast… You can now rapidly deploy Citrix services in hours instead of days, weeks, or months And you’ll automatically have access to the latest capabilities and innovations. Secure… With our analytics-based approach to security, you will have visibility into the behavior and usage of everything across your infrastructure so you can identify and mitigate threats And you can close security gaps quickly knowing that you are always up-to-date with the latest software and patches Adaptable… And as we’ve discussed earlier, this provides you with the highest level of flexibility by managing apps across any cloud – on premises, public cloud, or private cloud. And increased visibility into business insights across all of those workloads.
  • #6 As a result – you now have an environment that is… Simple… Consider being able to implement a fully integrated Citrix portfolio from a single management plane Or provide unified, reliable access to ANY app or data in any environment Fast… You can now rapidly deploy Citrix services in hours instead of days, weeks, or months And you’ll automatically have access to the latest capabilities and innovations. Secure… With our analytics-based approach to security, you will have visibility into the behavior and usage of everything across your infrastructure so you can identify and mitigate threats And you can close security gaps quickly knowing that you are always up-to-date with the latest software and patches Adaptable… And as we’ve discussed earlier, this provides you with the highest level of flexibility by managing apps across any cloud – on premises, public cloud, or private cloud. And increased visibility into business insights across all of those workloads.
  • #7 As a result – you now have an environment that is… Simple… Consider being able to implement a fully integrated Citrix portfolio from a single management plane Or provide unified, reliable access to ANY app or data in any environment Fast… You can now rapidly deploy Citrix services in hours instead of days, weeks, or months And you’ll automatically have access to the latest capabilities and innovations. Secure… With our analytics-based approach to security, you will have visibility into the behavior and usage of everything across your infrastructure so you can identify and mitigate threats And you can close security gaps quickly knowing that you are always up-to-date with the latest software and patches Adaptable… And as we’ve discussed earlier, this provides you with the highest level of flexibility by managing apps across any cloud – on premises, public cloud, or private cloud. And increased visibility into business insights across all of those workloads.
  • #13 https://support.citrix.com/article/CTX201127 https://www.citrix.com/blogs/2018/04/06/from-ima-to-fma-where-to-find-xenapp-6-5-features-in-xenapp-xendesktop-7/