This document outlines the process and considerations for designing a pavement section for a 188.752 km stretch of National Highway from Kadapa to Kurnool in India. It discusses flexible vs rigid pavement design methods and costs analyses. Tests will be conducted to determine soil properties and compaction. Required materials include soil, water, compaction molds, tamping rods, and weighing machines. The work schedule includes project selection, material collection, and sample preparation over 3 weeks in March-April 2022. References discuss pavement design methods and case studies of highway projects.