Jisc FE and skills development and resource programme – Auto Share and Learn
Project
CSG Briefing Paper 1
This is the first in a series of briefing papers that will document and share the planning and
progress of activities, actions and outcomes by Coleg Sir Gâr as a regional partner in the Jisc Auto
Share and Learn project. The purpose is to both aid and inform regional project management and
to provide information about achievements against targets for the main Project Board.
1. Formal approval of regional project planning proposal and budget
A meeting was held on Friday 11th
April at the Beacon Centre, Llanelli to formally consider the
proposed project plan and budget for the South West Wales contribution to the project
deliverables, managed by CSG.
Present at the meeting were:
Barry Liles, Principal and Chief Executive of Coleg Sir Gâr;
Dave Howells, Director of Business Development at Coleg Sir Gâr;
Tony Toole, Project Manager.
Following a presentation of the plan and budget (copied in the Appendices below) and an outline
discussion about the regional implementation arrangements and the anticipated contractual
arrangements, the proposal was approved by the Principal/CEO on behalf of the institution.
2. Immediate actions: WP1
The meeting then went on to discuss the set-up phase of the project. The outcomes of the
discussion were that:
 The CSG draft regional project plan and budget would be finalised following consideration
and endorsement by BMet as lead partner and by the Project Board;
 The regional project team membership would be agreed and appointments/secondments
made in line with the individual roles, work plans and budget allocations;
 A minimum of six supply chain companies would be invited to participate. The discussion
considered both the range of Tier 1, 2 & 3 companies in the region, their importance in the
supply chain, and their involvement in regional government economic policy and planning;
 Individual discussions would then be held with senior management in each of the supply
chain companies to agree:
1. Their commitment to the aims of the project, their contribution to optimising the
benefits it offers, and their membership of a regional steering group;
2. Arrangements for an initial survey of their current manufacturing and trading
environments with OEMs and other suppliers, together with their associated support
and training needs;
These initial negotiations with the supply chain companies will be organised by Tony Toole and will
be carried out jointly with Adam Twells, Head of Engineering at CSG. From this work:
 Initial proposals will be drawn up for a draft online support system specification;
 A regional project team meeting will be held with the supply company stakeholders
(working lunch) to discuss and agree plans for the online support system development.
 An evaluation of WP1 will be carried out and a report prepared for the full Project Board.
This will include plans and recommendations for WP2.
Jisc FE and skills development and resource programme – Auto Share and Learn
Project
3. Regional project management and communications
All of the documentation, resources and links produced for the South West Wales region will be
made available online at http://autoshareandlearn.pbworks.com. This will be regularly updated and
will be used as both a resource repository and a centre for project communications.
Tony Toole
April 2014
Jisc FE and skills development and resource programme – Auto Share and Learn Project
Appendix 1: Project Plan
The proposed Project Plan for the Coleg Sir Gâr regional contribution to the project is as follows:
Jisc FE and skills development and resource programme – Auto Share and Learn
Project
Appendix 2: Project Budget
The proposed Budget for the Coleg Sir Gâr contribution to the project is as follows:
Amount Other information
Staff costs (including on costs)
Project Director
(Senior Manager, 0.05FTE)
£3,0001
(matched funding)
Dave Howells, Director of
Business Development
Project Manager
(Senior Manager, 0.2FTE)
£12,0002
Tony Toole, Project
Manager
Training Materials Development
(Academic Staff, 0.1FTE)
£7,0003
tba
Implementation and Pilot Delivery
(Academic Staff, 0.1FTE)
£7,0004
tba
Evaluation and Embedding
(Academic Staff, 0.1 FTE)
£2,0005
tba
Non staff costs6
Travel and expenses £2,000 Primarily for company visits.
Project meetings will be
mainly online.
Dissemination £1,000 Workshops, dissemination
events and final conference
costs.
Additional costs (specify) £1,000 Consumables, printing,
telephone, etc.
Overheads (provide breakdown)
Institutional Staff overheads:
0.65FTE @ £13.53/hr (Funding
Council Calculation)
£13,000 Included in the institutional
contribution figure below
Total CSG budget £48,000
Total Jisc contribution £32,000
Total CSG contribution £16,000 Contribution from
institutional senior
management and staff
overheads.
Notes clarifying project costings (see line item references):
1. Responsibility and oversight of the regional project activities equivalent to one day per month of
senior management time for the full project duration.
2. Responsibility for the management of the regional project team and the successful delivery of
all project outcomes. Equivalent to one day per week of senior management time for the full
project duration.
3. Preparation of training materials, pedagogic planning and population of the online support
system. Equivalent to two days per week of academic staff time for 3 months.
Jisc FE and skills development and resource programme – Auto Share and Learn
Project
4. Tutor support of online training delivery, assessment and feedback. Equivalent to two days per
week of academic staff time for 3 months.
5. Evaluation of support system effectiveness, feedback and systems improvement, planning for
institutional embedding, future planning. Equivalent to one day per week of academic staff time
for 2 months.
6. The non-staffing costs amount to 8.3% of the CSG budget and will be largely taken up by
delivery, evaluation and project management expenses.
Specific staff costings will be provided once appointments are made to carry out the tasks involved.
However, it can be confirmed that all activities will be planned to be completed according to the
agreed timescale and within budget.

More Related Content

Viewers also liked

Eb short final_report_pots_pan
Eb short final_report_pots_panEb short final_report_pots_pan
Eb short final_report_pots_panTony Toole
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain managementTony Toole
 
Jisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalJisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalTony Toole
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain managementTony Toole
 
Tony Toole CV 2014
Tony Toole CV 2014Tony Toole CV 2014
Tony Toole CV 2014Tony Toole
 
5 s techniques
5 s techniques5 s techniques
5 s techniquesTony Toole
 
5 s techniques
5 s techniques5 s techniques
5 s techniquesTony Toole
 
Health and safety
Health and safetyHealth and safety
Health and safetyTony Toole
 

Viewers also liked (10)

Week 8:
Week 8: Week 8:
Week 8:
 
Eb short final_report_pots_pan
Eb short final_report_pots_panEb short final_report_pots_pan
Eb short final_report_pots_pan
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain management
 
Jisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalJisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposal
 
Automotive supply chain management
Automotive supply chain managementAutomotive supply chain management
Automotive supply chain management
 
Tony Toole CV 2014
Tony Toole CV 2014Tony Toole CV 2014
Tony Toole CV 2014
 
5 s techniques
5 s techniques5 s techniques
5 s techniques
 
5 s techniques
5 s techniques5 s techniques
5 s techniques
 
Kaizen
KaizenKaizen
Kaizen
 
Health and safety
Health and safetyHealth and safety
Health and safety
 

Similar to Jisc fe and skills project (csg briefing paper 1)

Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12Tony Toole
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFOSTEr in MED
 
3Worksheet The Project CharterProject NameBurl.docx
3Worksheet The Project CharterProject NameBurl.docx3Worksheet The Project CharterProject NameBurl.docx
3Worksheet The Project CharterProject NameBurl.docxgilbertkpeters11344
 
Assignment 8.14.docx
Assignment 8.14.docxAssignment 8.14.docx
Assignment 8.14.docxssuser562afc1
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of ExpertsDr Lendy Spires
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment Mark Ritchie
 
TOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdfTOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdfPoisonBeAware
 
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdfPlan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdfmhutttch
 
Impact over outputs - A UNOPS approach to project management - Steve Crosskey
Impact over outputs - A UNOPS approach to project management - Steve CrosskeyImpact over outputs - A UNOPS approach to project management - Steve Crosskey
Impact over outputs - A UNOPS approach to project management - Steve CrosskeyAssociation for Project Management
 
Even better departmental updates - october 2019
Even better departmental updates - october 2019Even better departmental updates - october 2019
Even better departmental updates - october 2019EmmaRimmer2
 
Even better departmental updates - October 2019
Even better   departmental updates - October 2019Even better   departmental updates - October 2019
Even better departmental updates - October 2019EmmaRimmer2
 
Item 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdfItem 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdfOECD Environment
 
Project in punjab
Project in punjabProject in punjab
Project in punjabHuma Ilyas
 
Quick view of a 7th Framework Program Project
Quick view of a 7th Framework Program ProjectQuick view of a 7th Framework Program Project
Quick view of a 7th Framework Program ProjectEnrique Serrano
 
Experiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaExperiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaYinhongsun
 

Similar to Jisc fe and skills project (csg briefing paper 1) (20)

Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication Plan
 
3Worksheet The Project CharterProject NameBurl.docx
3Worksheet The Project CharterProject NameBurl.docx3Worksheet The Project CharterProject NameBurl.docx
3Worksheet The Project CharterProject NameBurl.docx
 
Assignment 8.14.docx
Assignment 8.14.docxAssignment 8.14.docx
Assignment 8.14.docx
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of Experts
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment
 
Trinity_Case-Study
Trinity_Case-StudyTrinity_Case-Study
Trinity_Case-Study
 
TOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdfTOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdf
 
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdfPlan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
Plan Making Reforms Consultation - September 2023 Event Series - Publish.pdf
 
Impact over outputs - A UNOPS approach to project management - Steve Crosskey
Impact over outputs - A UNOPS approach to project management - Steve CrosskeyImpact over outputs - A UNOPS approach to project management - Steve Crosskey
Impact over outputs - A UNOPS approach to project management - Steve Crosskey
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
Even better departmental updates - october 2019
Even better departmental updates - october 2019Even better departmental updates - october 2019
Even better departmental updates - october 2019
 
Even better departmental updates - October 2019
Even better   departmental updates - October 2019Even better   departmental updates - October 2019
Even better departmental updates - October 2019
 
Item 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdfItem 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdf
 
Pkrmmp phase 2 ntb workshop draft 3 ty-session 0
Pkrmmp phase 2 ntb workshop draft 3 ty-session 0Pkrmmp phase 2 ntb workshop draft 3 ty-session 0
Pkrmmp phase 2 ntb workshop draft 3 ty-session 0
 
World bank project a case study of africa region
World bank project a case study of africa region World bank project a case study of africa region
World bank project a case study of africa region
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Quick view of a 7th Framework Program Project
Quick view of a 7th Framework Program ProjectQuick view of a 7th Framework Program Project
Quick view of a 7th Framework Program Project
 
Experiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaExperiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in India
 
Selma_CV1
Selma_CV1Selma_CV1
Selma_CV1
 

More from Tony Toole

Tel survey report
Tel survey reportTel survey report
Tel survey reportTony Toole
 
Tel survey, csg (final)
Tel survey, csg (final)Tel survey, csg (final)
Tel survey, csg (final)Tony Toole
 
Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)Tony Toole
 
Tel survey, swansea (final)
Tel survey, swansea (final)Tel survey, swansea (final)
Tel survey, swansea (final)Tony Toole
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice GuideTony Toole
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice GuideTony Toole
 
Alt c 2013 presentation
Alt c 2013 presentationAlt c 2013 presentation
Alt c 2013 presentationTony Toole
 
Tony toole cv 2013
Tony toole cv 2013Tony toole cv 2013
Tony toole cv 2013Tony Toole
 
Sip tel innovation report 3
Sip tel innovation report 3Sip tel innovation report 3
Sip tel innovation report 3Tony Toole
 
Sip tel innovation report 2
Sip tel innovation report 2Sip tel innovation report 2
Sip tel innovation report 2Tony Toole
 
Moocs and Open Education
Moocs and Open EducationMoocs and Open Education
Moocs and Open EducationTony Toole
 
Sip tel innovation report 1
Sip tel innovation report 1Sip tel innovation report 1
Sip tel innovation report 1Tony Toole
 
Jisc advance rsc wales sip application upload
Jisc advance   rsc wales sip application uploadJisc advance   rsc wales sip application upload
Jisc advance rsc wales sip application uploadTony Toole
 
Sip evaluation report 20513
Sip evaluation report 20513Sip evaluation report 20513
Sip evaluation report 20513Tony Toole
 
Pots pan final report
Pots pan final reportPots pan final report
Pots pan final reportTony Toole
 
Jisc rsc wales overview tony toole sip
Jisc rsc wales overview   tony toole sipJisc rsc wales overview   tony toole sip
Jisc rsc wales overview tony toole sipTony Toole
 
Smudie project discussion document
Smudie project discussion documentSmudie project discussion document
Smudie project discussion documentTony Toole
 
Smudie case study
Smudie case studySmudie case study
Smudie case studyTony Toole
 
Dewi case study swansea met
Dewi case study swansea metDewi case study swansea met
Dewi case study swansea metTony Toole
 
Information systems planning using a synthesis of modelling techniques
Information systems planning using a synthesis of modelling techniquesInformation systems planning using a synthesis of modelling techniques
Information systems planning using a synthesis of modelling techniquesTony Toole
 

More from Tony Toole (20)

Tel survey report
Tel survey reportTel survey report
Tel survey report
 
Tel survey, csg (final)
Tel survey, csg (final)Tel survey, csg (final)
Tel survey, csg (final)
 
Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)Tel survey, carmarthen lampeter (final)
Tel survey, carmarthen lampeter (final)
 
Tel survey, swansea (final)
Tel survey, swansea (final)Tel survey, swansea (final)
Tel survey, swansea (final)
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice Guide
 
E learning Good Practice Guide
E learning Good Practice GuideE learning Good Practice Guide
E learning Good Practice Guide
 
Alt c 2013 presentation
Alt c 2013 presentationAlt c 2013 presentation
Alt c 2013 presentation
 
Tony toole cv 2013
Tony toole cv 2013Tony toole cv 2013
Tony toole cv 2013
 
Sip tel innovation report 3
Sip tel innovation report 3Sip tel innovation report 3
Sip tel innovation report 3
 
Sip tel innovation report 2
Sip tel innovation report 2Sip tel innovation report 2
Sip tel innovation report 2
 
Moocs and Open Education
Moocs and Open EducationMoocs and Open Education
Moocs and Open Education
 
Sip tel innovation report 1
Sip tel innovation report 1Sip tel innovation report 1
Sip tel innovation report 1
 
Jisc advance rsc wales sip application upload
Jisc advance   rsc wales sip application uploadJisc advance   rsc wales sip application upload
Jisc advance rsc wales sip application upload
 
Sip evaluation report 20513
Sip evaluation report 20513Sip evaluation report 20513
Sip evaluation report 20513
 
Pots pan final report
Pots pan final reportPots pan final report
Pots pan final report
 
Jisc rsc wales overview tony toole sip
Jisc rsc wales overview   tony toole sipJisc rsc wales overview   tony toole sip
Jisc rsc wales overview tony toole sip
 
Smudie project discussion document
Smudie project discussion documentSmudie project discussion document
Smudie project discussion document
 
Smudie case study
Smudie case studySmudie case study
Smudie case study
 
Dewi case study swansea met
Dewi case study swansea metDewi case study swansea met
Dewi case study swansea met
 
Information systems planning using a synthesis of modelling techniques
Information systems planning using a synthesis of modelling techniquesInformation systems planning using a synthesis of modelling techniques
Information systems planning using a synthesis of modelling techniques
 

Recently uploaded

Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 

Recently uploaded (20)

Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 

Jisc fe and skills project (csg briefing paper 1)

  • 1. Jisc FE and skills development and resource programme – Auto Share and Learn Project CSG Briefing Paper 1 This is the first in a series of briefing papers that will document and share the planning and progress of activities, actions and outcomes by Coleg Sir Gâr as a regional partner in the Jisc Auto Share and Learn project. The purpose is to both aid and inform regional project management and to provide information about achievements against targets for the main Project Board. 1. Formal approval of regional project planning proposal and budget A meeting was held on Friday 11th April at the Beacon Centre, Llanelli to formally consider the proposed project plan and budget for the South West Wales contribution to the project deliverables, managed by CSG. Present at the meeting were: Barry Liles, Principal and Chief Executive of Coleg Sir Gâr; Dave Howells, Director of Business Development at Coleg Sir Gâr; Tony Toole, Project Manager. Following a presentation of the plan and budget (copied in the Appendices below) and an outline discussion about the regional implementation arrangements and the anticipated contractual arrangements, the proposal was approved by the Principal/CEO on behalf of the institution. 2. Immediate actions: WP1 The meeting then went on to discuss the set-up phase of the project. The outcomes of the discussion were that:  The CSG draft regional project plan and budget would be finalised following consideration and endorsement by BMet as lead partner and by the Project Board;  The regional project team membership would be agreed and appointments/secondments made in line with the individual roles, work plans and budget allocations;  A minimum of six supply chain companies would be invited to participate. The discussion considered both the range of Tier 1, 2 & 3 companies in the region, their importance in the supply chain, and their involvement in regional government economic policy and planning;  Individual discussions would then be held with senior management in each of the supply chain companies to agree: 1. Their commitment to the aims of the project, their contribution to optimising the benefits it offers, and their membership of a regional steering group; 2. Arrangements for an initial survey of their current manufacturing and trading environments with OEMs and other suppliers, together with their associated support and training needs; These initial negotiations with the supply chain companies will be organised by Tony Toole and will be carried out jointly with Adam Twells, Head of Engineering at CSG. From this work:  Initial proposals will be drawn up for a draft online support system specification;  A regional project team meeting will be held with the supply company stakeholders (working lunch) to discuss and agree plans for the online support system development.  An evaluation of WP1 will be carried out and a report prepared for the full Project Board. This will include plans and recommendations for WP2.
  • 2. Jisc FE and skills development and resource programme – Auto Share and Learn Project 3. Regional project management and communications All of the documentation, resources and links produced for the South West Wales region will be made available online at http://autoshareandlearn.pbworks.com. This will be regularly updated and will be used as both a resource repository and a centre for project communications. Tony Toole April 2014
  • 3. Jisc FE and skills development and resource programme – Auto Share and Learn Project Appendix 1: Project Plan The proposed Project Plan for the Coleg Sir Gâr regional contribution to the project is as follows:
  • 4. Jisc FE and skills development and resource programme – Auto Share and Learn Project Appendix 2: Project Budget The proposed Budget for the Coleg Sir Gâr contribution to the project is as follows: Amount Other information Staff costs (including on costs) Project Director (Senior Manager, 0.05FTE) £3,0001 (matched funding) Dave Howells, Director of Business Development Project Manager (Senior Manager, 0.2FTE) £12,0002 Tony Toole, Project Manager Training Materials Development (Academic Staff, 0.1FTE) £7,0003 tba Implementation and Pilot Delivery (Academic Staff, 0.1FTE) £7,0004 tba Evaluation and Embedding (Academic Staff, 0.1 FTE) £2,0005 tba Non staff costs6 Travel and expenses £2,000 Primarily for company visits. Project meetings will be mainly online. Dissemination £1,000 Workshops, dissemination events and final conference costs. Additional costs (specify) £1,000 Consumables, printing, telephone, etc. Overheads (provide breakdown) Institutional Staff overheads: 0.65FTE @ £13.53/hr (Funding Council Calculation) £13,000 Included in the institutional contribution figure below Total CSG budget £48,000 Total Jisc contribution £32,000 Total CSG contribution £16,000 Contribution from institutional senior management and staff overheads. Notes clarifying project costings (see line item references): 1. Responsibility and oversight of the regional project activities equivalent to one day per month of senior management time for the full project duration. 2. Responsibility for the management of the regional project team and the successful delivery of all project outcomes. Equivalent to one day per week of senior management time for the full project duration. 3. Preparation of training materials, pedagogic planning and population of the online support system. Equivalent to two days per week of academic staff time for 3 months.
  • 5. Jisc FE and skills development and resource programme – Auto Share and Learn Project 4. Tutor support of online training delivery, assessment and feedback. Equivalent to two days per week of academic staff time for 3 months. 5. Evaluation of support system effectiveness, feedback and systems improvement, planning for institutional embedding, future planning. Equivalent to one day per week of academic staff time for 2 months. 6. The non-staffing costs amount to 8.3% of the CSG budget and will be largely taken up by delivery, evaluation and project management expenses. Specific staff costings will be provided once appointments are made to carry out the tasks involved. However, it can be confirmed that all activities will be planned to be completed according to the agreed timescale and within budget.