Introduction:
• The Project Site is located 20 KM northwest of Hyderabad, and 150
KM northeast of Karachi in Jamshoro Sindh.
• Consists of TWO Parts:
One part Installed ( 850 MW, 4units)
Second part Under- Construction ( 1320 MW, 2 units)
Installed Capacity:
Installed Capacity:
• The Machinery Installed inside the thermal power plant is
provided by The Harbin Power Engineering (HPE) Company
Limited.
• They installed Power Generating Equipment, Equipment for Power
Transmission and Substation, Electric Machine, Steam/Gas Turbine,
Industrial Boiler, Electro-technical Porcelain , Insulative Material etc..
Under- Construction Capacity:
• ADB(Asian development bank) is helping Pakistan to install a 2x660MW
supercritical coal fired unit with emission control devices at the Jamshoro
Thermal Power Station in Sindh province.
• The two supercritical coal fired units proposed to be established under the Project
— Unit 5 and Unit 6 — shall be erected south of the existing Unit 4, on an
arrangement similar to that of the existing units, i.e. the components will be
placed from west to east including electrical transformers, turbine hall, boilers,
and stack from Harbin Power Engineering (HPE).
Project Schedule & Cost:
Project Schedule & Cost:
• $900 million loan by Asian Development
Bank(ADB)
• $220 million loan by Islamic Development Bank
(IDB)
• $380m will be contributed by the government to
meet the overall estimated project cost of $1.5
billion.
2 x 66O MW coal Fired Power Project at Jamshoro Power Company Limited
Inaugurated by Mr. WERNER E.LIEPACH Country Director Asian
Development Bank on 28th February, 2015
Project Tariff Plan:
Working of Power-Plant:
• The function of the coal fired thermal power plant is to
convert the energy available in the coal to Electricity.
• Step 1:Heating of Coal, Coal is burnt in the boiler
furnace to produce heat.
𝐶 + 𝑂2 → 𝐶𝑂2 + 𝐻𝑒𝑎𝑡
Working of Power-Plant:
• Step 2: Thermodynamic Process, heat produced
from combustion convert water into steam in
boiler.
• Step 3: Produced Steam rotates the turbine which in
turn rotates the generator rotor and electricity is
produced.
Stages of Rankine Cycle:
Source of Fuel:
• Installed Capacity:
4 Gas Turbines ( 250 + 3 * 200 = 850 MW)
Unit 1: 250MW Fuel: Furnace/ RFO
Unit 2,3,4: 200MW (each) RFO + Gas (both)
Source of Fuel:
• Under- Construction Capacity: 2 Steam turbines ( 2 * 660 = 1320 MW)
Coal Source: 80% imported subbituminous; 20% domestic lignite
• Lignite will be provided by Thar Coalfields and Pakistan will import
subbituminous coal from INDONESIA (15-20 million tons/year) .
• PROPOSED PLANT EFFICIENCY :Gross 43.4 % for Sub-Bituminous Coal,
Gross 42.8 % for Blended Coal.
Transportation of Coal:
• The subbituminous coal will be imported and unloaded at Port Qasim.
• Supply Primarily by use of railroads and by trucks also.
• The railroad trains will have five or six locomotives and fifty cars of 50 tones
capacity each.
• Six to seven daily trains of 2,500 tones each will be delivered to the site for
unloading, and the unloading system will deliver coal to the storage yard.
Current State of the Project:
• The government, even after taking loans from the international
leading agencies, has completely failed to start the construction
of Jamshoro coal power project despite the lapse of almost three
years.
• The project was originally conceived by the Pakistan People's
Party (PPP) government but sitting Prime Minister Mian Nawaz
Sharif had signed the agreement during his recent tenure.
Current State of the Project:
• As the construction work could not begin as yet, is the clear that the
government would miss its completion deadline of Dec 2018.
• The ADB board approved the loan, which became effective in
November 2014 and the country is since paying 0.15% interest on
total amount as commitment charges. The government acquired the
loan for 25 years.
SUMMARY:
• Jamshoro PP is already producing 850MW (one 250MW and three
200MW).
• By the completion of this 1320MW coal power plants , jamshoro
power plant will be able to produce 2170MW at the end of 2019.
• In February 2014, ADB approved $900m, but due to slow funding
process and slow construction at site, this project is facing delay. But
government is trying to complete this project before 2018 elections.
Thank You…

More Related Content

What's hot

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
haxxo24
 
Chhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company LimitedChhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company Limited
Deepak Kurrey
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
Amit Gupta
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
Vikas Gupta
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
Shani Kumar Singh
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
Saad Raja
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
Rama Charan
 
DG Cement Power Plants (Internship Report)
DG Cement Power Plants (Internship Report)DG Cement Power Plants (Internship Report)
DG Cement Power Plants (Internship Report)
Haseeb Ahsan
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
ravi kant
 
Chandrapura thermal power station
Chandrapura thermal power stationChandrapura thermal power station
Chandrapura thermal power station
dlinkdir
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
Jeegnesh Solanki
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
Aanand Kumar
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plant
Jinendra Ninama
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
Arnab Kumar Pal
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Shubham Thakur
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
Vimal Tripathi
 
Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.
Sawan Kumar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Vinod Srivastava
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
BHANUKISHAN1
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
Md. Rimon Mia
 

What's hot (20)

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Chhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company LimitedChhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company Limited
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
DG Cement Power Plants (Internship Report)
DG Cement Power Plants (Internship Report)DG Cement Power Plants (Internship Report)
DG Cement Power Plants (Internship Report)
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Chandrapura thermal power station
Chandrapura thermal power stationChandrapura thermal power station
Chandrapura thermal power station
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plant
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 

Similar to Jamshoro power plant New

Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants
Arnab Nandi
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Navin Pathak
 
steam turbine presentations
steam turbine presentationssteam turbine presentations
steam turbine presentations
arvind singh rathore
 
2017 irao export presentation eng
2017 irao export presentation eng2017 irao export presentation eng
2017 irao export presentation eng
Viacheslav Leonov
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
lavishsoni2
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
Ishant Gautam.
 
Inter RAO - Export company presentation
Inter RAO - Export company presentationInter RAO - Export company presentation
Inter RAO - Export company presentation
Viacheslav Leonov
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Goindwal sahib thermal power plant
Goindwal sahib thermal power plantGoindwal sahib thermal power plant
Goindwal sahib thermal power plant
NADIM AKHTAR
 
Surathgarh thermal powerplant
Surathgarh thermal powerplantSurathgarh thermal powerplant
Surathgarh thermal powerplant
AAKASH DEEP SINGH
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
MAHENDRA MEENA
 
Shoaib khan ntpc
Shoaib khan ntpcShoaib khan ntpc
Shoaib khan ntpc
MOHD SHOAIB
 
ARNAB12.pdf
ARNAB12.pdfARNAB12.pdf
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
hariom nagar
 
Vocational training in NTPC
Vocational training in NTPCVocational training in NTPC
Vocational training in NTPC
Mohindra
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
Ambuj Kumar Singh
 
Steam powerplant by polayya chintada
Steam powerplant by polayya chintadaSteam powerplant by polayya chintada
Steam powerplant by polayya chintada
POLAYYA CHINTADA
 
2015 10 27 irao export general presentation
2015 10 27 irao export general presentation2015 10 27 irao export general presentation
2015 10 27 irao export general presentation
quadraru
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
sagar20jain
 
Stps report
Stps reportStps report
Stps report
Ramesh Tholiya
 

Similar to Jamshoro power plant New (20)

Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
steam turbine presentations
steam turbine presentationssteam turbine presentations
steam turbine presentations
 
2017 irao export presentation eng
2017 irao export presentation eng2017 irao export presentation eng
2017 irao export presentation eng
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Inter RAO - Export company presentation
Inter RAO - Export company presentationInter RAO - Export company presentation
Inter RAO - Export company presentation
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
Goindwal sahib thermal power plant
Goindwal sahib thermal power plantGoindwal sahib thermal power plant
Goindwal sahib thermal power plant
 
Surathgarh thermal powerplant
Surathgarh thermal powerplantSurathgarh thermal powerplant
Surathgarh thermal powerplant
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 
Shoaib khan ntpc
Shoaib khan ntpcShoaib khan ntpc
Shoaib khan ntpc
 
ARNAB12.pdf
ARNAB12.pdfARNAB12.pdf
ARNAB12.pdf
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
 
Vocational training in NTPC
Vocational training in NTPCVocational training in NTPC
Vocational training in NTPC
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Steam powerplant by polayya chintada
Steam powerplant by polayya chintadaSteam powerplant by polayya chintada
Steam powerplant by polayya chintada
 
2015 10 27 irao export general presentation
2015 10 27 irao export general presentation2015 10 27 irao export general presentation
2015 10 27 irao export general presentation
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
Stps report
Stps reportStps report
Stps report
 

More from Malik Zaid

Design of Power Plant for House
Design of Power Plant for HouseDesign of Power Plant for House
Design of Power Plant for House
Malik Zaid
 
Load Monitoring and Design of Power Plant with its specifications
Load Monitoring and Design of Power Plant with its specificationsLoad Monitoring and Design of Power Plant with its specifications
Load Monitoring and Design of Power Plant with its specifications
Malik Zaid
 
Audio amplifier
Audio amplifierAudio amplifier
Audio amplifier
Malik Zaid
 
single-phase-lab-report
single-phase-lab-reportsingle-phase-lab-report
single-phase-lab-report
Malik Zaid
 
buck_report
buck_reportbuck_report
buck_report
Malik Zaid
 
three phase inverter
three phase inverterthree phase inverter
three phase inverter
Malik Zaid
 
report
reportreport
report
Malik Zaid
 
report
reportreport
report
Malik Zaid
 
Business Idea and its Working Plan
Business Idea and its Working PlanBusiness Idea and its Working Plan
Business Idea and its Working Plan
Malik Zaid
 
synopsis
synopsissynopsis
synopsis
Malik Zaid
 
report_5_forces
report_5_forcesreport_5_forces
report_5_forces
Malik Zaid
 
print
printprint
print
Malik Zaid
 
Mobile Controlled Car
Mobile Controlled CarMobile Controlled Car
Mobile Controlled Car
Malik Zaid
 
Document on Different Power Plants In Pakistan
Document on Different Power Plants In PakistanDocument on Different Power Plants In Pakistan
Document on Different Power Plants In Pakistan
Malik Zaid
 
Document on Deisel And Gas Engine
Document on Deisel And Gas EngineDocument on Deisel And Gas Engine
Document on Deisel And Gas Engine
Malik Zaid
 
Document on Speed Control Of D.C Motors
Document on  Speed Control Of D.C MotorsDocument on  Speed Control Of D.C Motors
Document on Speed Control Of D.C Motors
Malik Zaid
 

More from Malik Zaid (16)

Design of Power Plant for House
Design of Power Plant for HouseDesign of Power Plant for House
Design of Power Plant for House
 
Load Monitoring and Design of Power Plant with its specifications
Load Monitoring and Design of Power Plant with its specificationsLoad Monitoring and Design of Power Plant with its specifications
Load Monitoring and Design of Power Plant with its specifications
 
Audio amplifier
Audio amplifierAudio amplifier
Audio amplifier
 
single-phase-lab-report
single-phase-lab-reportsingle-phase-lab-report
single-phase-lab-report
 
buck_report
buck_reportbuck_report
buck_report
 
three phase inverter
three phase inverterthree phase inverter
three phase inverter
 
report
reportreport
report
 
report
reportreport
report
 
Business Idea and its Working Plan
Business Idea and its Working PlanBusiness Idea and its Working Plan
Business Idea and its Working Plan
 
synopsis
synopsissynopsis
synopsis
 
report_5_forces
report_5_forcesreport_5_forces
report_5_forces
 
print
printprint
print
 
Mobile Controlled Car
Mobile Controlled CarMobile Controlled Car
Mobile Controlled Car
 
Document on Different Power Plants In Pakistan
Document on Different Power Plants In PakistanDocument on Different Power Plants In Pakistan
Document on Different Power Plants In Pakistan
 
Document on Deisel And Gas Engine
Document on Deisel And Gas EngineDocument on Deisel And Gas Engine
Document on Deisel And Gas Engine
 
Document on Speed Control Of D.C Motors
Document on  Speed Control Of D.C MotorsDocument on  Speed Control Of D.C Motors
Document on Speed Control Of D.C Motors
 

Jamshoro power plant New

  • 2. CONTENTS: • INTRODUCTION • WORKING OF POWER-PLANT • SOURCE OF FUEL • PROJECT CURRENT STATUS • SUMMARY
  • 3. Introduction: • The Project Site is located 20 KM northwest of Hyderabad, and 150 KM northeast of Karachi in Jamshoro Sindh. • Consists of TWO Parts: One part Installed ( 850 MW, 4units) Second part Under- Construction ( 1320 MW, 2 units)
  • 5. Installed Capacity: • The Machinery Installed inside the thermal power plant is provided by The Harbin Power Engineering (HPE) Company Limited. • They installed Power Generating Equipment, Equipment for Power Transmission and Substation, Electric Machine, Steam/Gas Turbine, Industrial Boiler, Electro-technical Porcelain , Insulative Material etc..
  • 6. Under- Construction Capacity: • ADB(Asian development bank) is helping Pakistan to install a 2x660MW supercritical coal fired unit with emission control devices at the Jamshoro Thermal Power Station in Sindh province. • The two supercritical coal fired units proposed to be established under the Project — Unit 5 and Unit 6 — shall be erected south of the existing Unit 4, on an arrangement similar to that of the existing units, i.e. the components will be placed from west to east including electrical transformers, turbine hall, boilers, and stack from Harbin Power Engineering (HPE).
  • 8.
  • 9. Project Schedule & Cost: • $900 million loan by Asian Development Bank(ADB) • $220 million loan by Islamic Development Bank (IDB) • $380m will be contributed by the government to meet the overall estimated project cost of $1.5 billion.
  • 10. 2 x 66O MW coal Fired Power Project at Jamshoro Power Company Limited Inaugurated by Mr. WERNER E.LIEPACH Country Director Asian Development Bank on 28th February, 2015
  • 12. Working of Power-Plant: • The function of the coal fired thermal power plant is to convert the energy available in the coal to Electricity. • Step 1:Heating of Coal, Coal is burnt in the boiler furnace to produce heat. 𝐶 + 𝑂2 → 𝐶𝑂2 + 𝐻𝑒𝑎𝑡
  • 13. Working of Power-Plant: • Step 2: Thermodynamic Process, heat produced from combustion convert water into steam in boiler. • Step 3: Produced Steam rotates the turbine which in turn rotates the generator rotor and electricity is produced.
  • 14.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. Source of Fuel: • Installed Capacity: 4 Gas Turbines ( 250 + 3 * 200 = 850 MW) Unit 1: 250MW Fuel: Furnace/ RFO Unit 2,3,4: 200MW (each) RFO + Gas (both)
  • 25. Source of Fuel: • Under- Construction Capacity: 2 Steam turbines ( 2 * 660 = 1320 MW) Coal Source: 80% imported subbituminous; 20% domestic lignite • Lignite will be provided by Thar Coalfields and Pakistan will import subbituminous coal from INDONESIA (15-20 million tons/year) . • PROPOSED PLANT EFFICIENCY :Gross 43.4 % for Sub-Bituminous Coal, Gross 42.8 % for Blended Coal.
  • 26.
  • 27. Transportation of Coal: • The subbituminous coal will be imported and unloaded at Port Qasim. • Supply Primarily by use of railroads and by trucks also. • The railroad trains will have five or six locomotives and fifty cars of 50 tones capacity each. • Six to seven daily trains of 2,500 tones each will be delivered to the site for unloading, and the unloading system will deliver coal to the storage yard.
  • 28. Current State of the Project: • The government, even after taking loans from the international leading agencies, has completely failed to start the construction of Jamshoro coal power project despite the lapse of almost three years. • The project was originally conceived by the Pakistan People's Party (PPP) government but sitting Prime Minister Mian Nawaz Sharif had signed the agreement during his recent tenure.
  • 29. Current State of the Project: • As the construction work could not begin as yet, is the clear that the government would miss its completion deadline of Dec 2018. • The ADB board approved the loan, which became effective in November 2014 and the country is since paying 0.15% interest on total amount as commitment charges. The government acquired the loan for 25 years.
  • 30. SUMMARY: • Jamshoro PP is already producing 850MW (one 250MW and three 200MW). • By the completion of this 1320MW coal power plants , jamshoro power plant will be able to produce 2170MW at the end of 2019. • In February 2014, ADB approved $900m, but due to slow funding process and slow construction at site, this project is facing delay. But government is trying to complete this project before 2018 elections.