SlideShare a Scribd company logo
1 of 3
Download to read offline
James R. Stinson
10410 Whitmore Lake Rd. Brighton, MI
(248) 756-5081, Jstinson110@gmail.com
Skills:
Excellent communication skills, proficient in Microsoft Office and Microsoft Project. I am a natural
leader with 15 years of experience in the construction industry, reading plans and specifications,
job cost estimating, material procurement, logging and processing change orders, schedule and
budget tracking and management.
Education:
 The ASHI School, Online – August 2016
Introduction to home inspection 60 hour course
 Career Academy, Online – July 2015 - ONGOING
Introduction to Project Management – 21 PDU Credits
PMP Exam Prep – 21 PDU Credits
 ITT Technical Institute, Troy MI – September 2010 – June 2012
Bachelors of Applied Sciences in Construction Management
GPA: 3.25
 ITT Technical Institute, Canton, MI – September 2008 – December 2010
Associate of Applied Sciences in Computer Drafting and Design
GPA: 3.18
Professional Certificates:
 ASHI Certified Home Inspector
 Project Management Institute (PMI.org) – In Progress
Project Management Professional (PMP)
Professional Experience:
Handy Home Inspections – 7-/1/16 – Present
www.handyhomeinspectionofmichigan.com
Owner / Inspector
 ASHI Certified Home Inspector
 General Inspection and Written report of residential properties to include:
o Roofing Systems
o Exterior Wall Assemblies
o Structural Components
o Electrical System
o HVAC Systems
o Insulation
o Interior Finishes
 Report Writing with Horizon Report Writing Software
LeafFilter North Inc. – 8/1/15 – 8/1/16
www.leaffilter.com
Regional Project Manager (Toledo, Fort Wayne)
 Recruit and train all new subcontractors
 Count, track and report warehouse inventory weekly
 Schedule all contracts with homeowner
 Pre and post job inspections when needed
 Manage service department
 Conduct weekly production meetings
 Process all payments for jobs completed weekly
 Increased production efficiencies by 25% in 1 year
 Increased average cash turn from 5 days to 3 days.
MainStreet Design Build – 1/15/2015 – 7/17/15
www.mainstreetdesignbuild.com
Production Manager
 Coordinate material procurement and delivery through Purchase Order program
 Create and maintain all job schedules
 Maintain and monitor daily job logs
 Write scope of work for sub contracts
 Manage all Change orders for all projects
 Qualify subcontractors bids
 Negotiate subcontract amount to stay within job cost
 Reward subcontracts
 Cost reporting / budget tracking and management using Sage Master Builder and Excel
 Lead weekly production meetings with project managers
 Hiring and firing of production staff
 Conduct yearly staff performance reviews
 Institute and manage “Spot Bonus” program
 Assign department staff to projects
 Manage entire production staff
 Conduct pre-construction walkthrough with sales manager, project manager, and client.
 Conduct project closeout walkthrough with sales manager, project manager and client.
Village Green Construction – 10/15/2012 – 12/15/14
Project Engineer
 Procurement of materials for multiple projects
 Establishing material supplier agreements
 Delivery scheduling and inventory tracking
 Preparing draw packages for multiple projects
 Project cost tracking and reporting using timberline and Microsoft Excel
 Material take offs and job cost estimating
 Finding qualified subcontractors
 Taking plans and specs out for bid
 Qualifying subcontractors proposals
 Writing sub-contractors scope of work
 Construction schedule tracking & management using Microsoft Project & Microsoft Excel
 Value Engineering
 Conduct weekly job meetings and meeting minute distribution.
PROJECT HIGHLIGHTS
 Renaissance City Apartments - 555 Brush St. Detroit MI
o 3.5 Million Dollar, 14 Month Contract
o 388 Unit, 33 Story High Rise Remodel
o 250K Sky Club On 33rd Floor
o 150K Backup Generator replacement
o 250K Entrance Canopy
o Awarded Best Remodeled Building In Detroit in 2014
 The Streeter Apartments – 345 East Ohio St. Chicago IL
o 8.2 Million Dollar, 24 Month Contract
o Remodel of 486 Unit 56 Story High Rise in Downtown Chicago
 Cold Cost City Apartments – 860 North Dewitt Place Chicago IL
o 1.7 Million Dollar, 13 Month Contract
o 147 Unit 23 Story High Rise Remodel in Downtown Chicago
Fox Theater Maintenance Co., East Lansing, MI – 2/6/2002 – 12/18/2008
Crew Leader / Foremen
 Manage crews of 10 or more people
 Communicate with site superintendent and skilled trade foremen’s and staff to help
organize on site work flow.
 Communicate with theater management to confirm scheduled work and gain access to
building.
 Walk through building with theater management upon completion of project address any
concerns that may arise and get sign off.
 Fill out payroll paper work for crews members
 Over see the Installation of: Speaker Systems, Stadium Seating, & Concession
Stands/kitchen equipment
 Layout stadium seating in accordance to the blueprints
 Installing, finishing and repairing Solid surface and stainless steel countertops
 Installing kitchen equipment
 Maintaining stadium seating, and other building issues, lighting, painting, minor electrical
issues, minor plumbing issues
 Inventory of spare seat parts available in each building and ordering new parts as needed
 Building scaffolding in accordance to OSCA regulations.
 Installation of screen frames, screens, makings, making motors and rigging. with use of
scissor lifts and scaffolding

More Related Content

What's hot (20)

Stephen N Martin Resume
Stephen N Martin ResumeStephen N Martin Resume
Stephen N Martin Resume
 
Anusha
AnushaAnusha
Anusha
 
RESUME 001rev
RESUME 001revRESUME 001rev
RESUME 001rev
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
Naresh Resume
Naresh Resume Naresh Resume
Naresh Resume
 
Resume Mohan
Resume MohanResume Mohan
Resume Mohan
 
Sr.civil engineer
Sr.civil engineerSr.civil engineer
Sr.civil engineer
 
Presentation_timeline
Presentation_timelinePresentation_timeline
Presentation_timeline
 
lokesh
lokeshlokesh
lokesh
 
Lin Chao
Lin ChaoLin Chao
Lin Chao
 
Craig A Derk Resume 11-11-15
Craig A Derk Resume 11-11-15Craig A Derk Resume 11-11-15
Craig A Derk Resume 11-11-15
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Diphda M Pumaren
Diphda M PumarenDiphda M Pumaren
Diphda M Pumaren
 
mikeresumerevised21715-1
mikeresumerevised21715-1mikeresumerevised21715-1
mikeresumerevised21715-1
 
Imran updated CV
Imran updated CVImran updated CV
Imran updated CV
 
PALANI CV
PALANI CVPALANI CV
PALANI CV
 
Tessie Resume
Tessie ResumeTessie Resume
Tessie Resume
 
Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)
 
Wolff - 2016 Resume
Wolff - 2016 ResumeWolff - 2016 Resume
Wolff - 2016 Resume
 
Resume
ResumeResume
Resume
 

Viewers also liked

LO 7 - Beats
LO 7 - BeatsLO 7 - Beats
LO 7 - Beatsevlee1
 
GTG 2015 General Fixture Presentation V2.0
GTG 2015 General Fixture Presentation V2.0GTG 2015 General Fixture Presentation V2.0
GTG 2015 General Fixture Presentation V2.0Muthu Babu
 
Continual improvement of the quality management system
Continual improvement of the quality management systemContinual improvement of the quality management system
Continual improvement of the quality management systemselinasimpson1501
 
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...SEOGOOGLE
 
GTG 2015 General Auto Presentation V2.0
GTG 2015 General Auto Presentation V2.0GTG 2015 General Auto Presentation V2.0
GTG 2015 General Auto Presentation V2.0Muthu Babu
 
Career Development in Student Athletes
Career Development in Student AthletesCareer Development in Student Athletes
Career Development in Student AthletesMaggie Carson
 
Additional Information 22 Jan 15
Additional Information 22 Jan  15Additional Information 22 Jan  15
Additional Information 22 Jan 15Kevin Barraclough
 
GeneralTest Copr 2016H1 English Version
GeneralTest Copr 2016H1 English VersionGeneralTest Copr 2016H1 English Version
GeneralTest Copr 2016H1 English VersionMuthu Babu
 
How quality management can be measured
How quality management can be measuredHow quality management can be measured
How quality management can be measuredselinasimpson1501
 

Viewers also liked (18)

Housing poverty~
Housing poverty~Housing poverty~
Housing poverty~
 
ATHEIST
ATHEISTATHEIST
ATHEIST
 
Lo #1
Lo #1Lo #1
Lo #1
 
Quality management issues
Quality management issuesQuality management issues
Quality management issues
 
LO 7 - Beats
LO 7 - BeatsLO 7 - Beats
LO 7 - Beats
 
GTG 2015 General Fixture Presentation V2.0
GTG 2015 General Fixture Presentation V2.0GTG 2015 General Fixture Presentation V2.0
GTG 2015 General Fixture Presentation V2.0
 
Continual improvement of the quality management system
Continual improvement of the quality management systemContinual improvement of the quality management system
Continual improvement of the quality management system
 
Quality management report
Quality management reportQuality management report
Quality management report
 
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất tại tp.hcm, cần t...
 
GTG 2015 General Auto Presentation V2.0
GTG 2015 General Auto Presentation V2.0GTG 2015 General Auto Presentation V2.0
GTG 2015 General Auto Presentation V2.0
 
Career Development in Student Athletes
Career Development in Student AthletesCareer Development in Student Athletes
Career Development in Student Athletes
 
Tugas hendry
Tugas hendryTugas hendry
Tugas hendry
 
Douglas
DouglasDouglas
Douglas
 
Lo #1
Lo #1Lo #1
Lo #1
 
Additional Information 22 Jan 15
Additional Information 22 Jan  15Additional Information 22 Jan  15
Additional Information 22 Jan 15
 
GeneralTest Copr 2016H1 English Version
GeneralTest Copr 2016H1 English VersionGeneralTest Copr 2016H1 English Version
GeneralTest Copr 2016H1 English Version
 
Firence
FirenceFirence
Firence
 
How quality management can be measured
How quality management can be measuredHow quality management can be measured
How quality management can be measured
 

Similar to James_Stinson_Resume_82416

Similar to James_Stinson_Resume_82416 (20)

Stewart joran resume
Stewart joran resumeStewart joran resume
Stewart joran resume
 
Cherukuri
CherukuriCherukuri
Cherukuri
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
 
Bradley R Johnson Resume
Bradley R Johnson ResumeBradley R Johnson Resume
Bradley R Johnson Resume
 
RESUME 2016 Construction PM
RESUME 2016 Construction PMRESUME 2016 Construction PM
RESUME 2016 Construction PM
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Suraj Kumar-Resume Program Management
Suraj Kumar-Resume Program ManagementSuraj Kumar-Resume Program Management
Suraj Kumar-Resume Program Management
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
Vijay singh rajpoot2021
Vijay singh rajpoot2021 Vijay singh rajpoot2021
Vijay singh rajpoot2021
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Steven schoenknecht 2 6 13
Steven schoenknecht 2 6 13Steven schoenknecht 2 6 13
Steven schoenknecht 2 6 13
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
Krishnaprasad_chembakassery_BSA
Krishnaprasad_chembakassery_BSAKrishnaprasad_chembakassery_BSA
Krishnaprasad_chembakassery_BSA
 
Rek Employment History Appl Insert 041909
Rek Employment History Appl Insert 041909Rek Employment History Appl Insert 041909
Rek Employment History Appl Insert 041909
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)
 
Kevin Shaw Resume=012417
Kevin Shaw Resume=012417Kevin Shaw Resume=012417
Kevin Shaw Resume=012417
 
Julio Rodriguez Resume_Occupancy_linkedin
Julio Rodriguez Resume_Occupancy_linkedinJulio Rodriguez Resume_Occupancy_linkedin
Julio Rodriguez Resume_Occupancy_linkedin
 
CV_-_V._Chalapati__Doc._Controller
CV_-_V._Chalapati__Doc._ControllerCV_-_V._Chalapati__Doc._Controller
CV_-_V._Chalapati__Doc._Controller
 

James_Stinson_Resume_82416

  • 1. James R. Stinson 10410 Whitmore Lake Rd. Brighton, MI (248) 756-5081, Jstinson110@gmail.com Skills: Excellent communication skills, proficient in Microsoft Office and Microsoft Project. I am a natural leader with 15 years of experience in the construction industry, reading plans and specifications, job cost estimating, material procurement, logging and processing change orders, schedule and budget tracking and management. Education:  The ASHI School, Online – August 2016 Introduction to home inspection 60 hour course  Career Academy, Online – July 2015 - ONGOING Introduction to Project Management – 21 PDU Credits PMP Exam Prep – 21 PDU Credits  ITT Technical Institute, Troy MI – September 2010 – June 2012 Bachelors of Applied Sciences in Construction Management GPA: 3.25  ITT Technical Institute, Canton, MI – September 2008 – December 2010 Associate of Applied Sciences in Computer Drafting and Design GPA: 3.18 Professional Certificates:  ASHI Certified Home Inspector  Project Management Institute (PMI.org) – In Progress Project Management Professional (PMP) Professional Experience: Handy Home Inspections – 7-/1/16 – Present www.handyhomeinspectionofmichigan.com Owner / Inspector  ASHI Certified Home Inspector  General Inspection and Written report of residential properties to include: o Roofing Systems o Exterior Wall Assemblies o Structural Components o Electrical System o HVAC Systems o Insulation o Interior Finishes  Report Writing with Horizon Report Writing Software
  • 2. LeafFilter North Inc. – 8/1/15 – 8/1/16 www.leaffilter.com Regional Project Manager (Toledo, Fort Wayne)  Recruit and train all new subcontractors  Count, track and report warehouse inventory weekly  Schedule all contracts with homeowner  Pre and post job inspections when needed  Manage service department  Conduct weekly production meetings  Process all payments for jobs completed weekly  Increased production efficiencies by 25% in 1 year  Increased average cash turn from 5 days to 3 days. MainStreet Design Build – 1/15/2015 – 7/17/15 www.mainstreetdesignbuild.com Production Manager  Coordinate material procurement and delivery through Purchase Order program  Create and maintain all job schedules  Maintain and monitor daily job logs  Write scope of work for sub contracts  Manage all Change orders for all projects  Qualify subcontractors bids  Negotiate subcontract amount to stay within job cost  Reward subcontracts  Cost reporting / budget tracking and management using Sage Master Builder and Excel  Lead weekly production meetings with project managers  Hiring and firing of production staff  Conduct yearly staff performance reviews  Institute and manage “Spot Bonus” program  Assign department staff to projects  Manage entire production staff  Conduct pre-construction walkthrough with sales manager, project manager, and client.  Conduct project closeout walkthrough with sales manager, project manager and client.
  • 3. Village Green Construction – 10/15/2012 – 12/15/14 Project Engineer  Procurement of materials for multiple projects  Establishing material supplier agreements  Delivery scheduling and inventory tracking  Preparing draw packages for multiple projects  Project cost tracking and reporting using timberline and Microsoft Excel  Material take offs and job cost estimating  Finding qualified subcontractors  Taking plans and specs out for bid  Qualifying subcontractors proposals  Writing sub-contractors scope of work  Construction schedule tracking & management using Microsoft Project & Microsoft Excel  Value Engineering  Conduct weekly job meetings and meeting minute distribution. PROJECT HIGHLIGHTS  Renaissance City Apartments - 555 Brush St. Detroit MI o 3.5 Million Dollar, 14 Month Contract o 388 Unit, 33 Story High Rise Remodel o 250K Sky Club On 33rd Floor o 150K Backup Generator replacement o 250K Entrance Canopy o Awarded Best Remodeled Building In Detroit in 2014  The Streeter Apartments – 345 East Ohio St. Chicago IL o 8.2 Million Dollar, 24 Month Contract o Remodel of 486 Unit 56 Story High Rise in Downtown Chicago  Cold Cost City Apartments – 860 North Dewitt Place Chicago IL o 1.7 Million Dollar, 13 Month Contract o 147 Unit 23 Story High Rise Remodel in Downtown Chicago Fox Theater Maintenance Co., East Lansing, MI – 2/6/2002 – 12/18/2008 Crew Leader / Foremen  Manage crews of 10 or more people  Communicate with site superintendent and skilled trade foremen’s and staff to help organize on site work flow.  Communicate with theater management to confirm scheduled work and gain access to building.  Walk through building with theater management upon completion of project address any concerns that may arise and get sign off.  Fill out payroll paper work for crews members  Over see the Installation of: Speaker Systems, Stadium Seating, & Concession Stands/kitchen equipment  Layout stadium seating in accordance to the blueprints  Installing, finishing and repairing Solid surface and stainless steel countertops  Installing kitchen equipment  Maintaining stadium seating, and other building issues, lighting, painting, minor electrical issues, minor plumbing issues  Inventory of spare seat parts available in each building and ordering new parts as needed  Building scaffolding in accordance to OSCA regulations.  Installation of screen frames, screens, makings, making motors and rigging. with use of scissor lifts and scaffolding