The document summarizes a presentation given by James Campbell, CEO of Rockwell Diamonds, about diamond resource development and regulatory compliance. It discusses key topics like public reporting standards, mineral reporting codes, regulatory requirements for different stock exchanges, an overview of diamond mining approaches for kimberlite and alluvial deposits, challenges facing junior miners, and processes for assessing diamond resources and economic potential of deposits. The presentation provided perspectives on these issues from James Campbell's experience in the diamond mining industry.
2020 03-02 North Arrow Corporate Presentation Handout PDACnarminerals
Overview of North Arrow's most active diamond projects with a focus on our most advanced project, the Naujaat Diamond Project, located near tide water 9 km from the Hamlet of Naujaat , Nunavut.
Corporate update as of April 30, 2019. The focus is on the Naujaat Diamond Project in Nunavut currently at the bulk sampling stage to determine diamond value. The Hamlet of Naujaat is currently involved in the financing and permitting of a community access road that will bring many benefits to the community, one of which will be a road within 1.5 km of North Arrow's Q1-4 diamond deposit. Other projects touched on are the Mel, LDG, Loki and Pikoo Diamond Project.
Resinco® Capital Partners is a global investment company which specializes in providing early stage financing to private and public exploration and mining companies in the hard rock minerals, precious metals, rare-earth minerals, oil, gas, water and renewable energy markets.
Update on the positive activity in diamond pipeline from rough to polished as well as a corporate update on North Arrow and the Naujaat Diamond Project located close to tidewater in Nunavut. Processing of a 2000 tonne sample is underway with diamond recovery results are expected from February to the end of April 2022. The Pikoo Project, SK makes its way back in to the presentation as the Company solidifies plans to conduct a drill program there in the summer of 2022.
Update on the positive activity in diamond pipeline from rough to polished as well as a corporate update on North Arrow and the Naujaat Diamond Project located close to tidewater in Nunavut. Processing of a 2000 tonne sample is underway with diamond recovery results are expected from February to the end of April 2022. The Pikoo Project, SK makes its way back in to the presentation as the Company solidifies plans to conduct a drill program there in the summer of 2022.
2020 03-02 North Arrow Corporate Presentation Handout PDACnarminerals
Overview of North Arrow's most active diamond projects with a focus on our most advanced project, the Naujaat Diamond Project, located near tide water 9 km from the Hamlet of Naujaat , Nunavut.
Corporate update as of April 30, 2019. The focus is on the Naujaat Diamond Project in Nunavut currently at the bulk sampling stage to determine diamond value. The Hamlet of Naujaat is currently involved in the financing and permitting of a community access road that will bring many benefits to the community, one of which will be a road within 1.5 km of North Arrow's Q1-4 diamond deposit. Other projects touched on are the Mel, LDG, Loki and Pikoo Diamond Project.
Resinco® Capital Partners is a global investment company which specializes in providing early stage financing to private and public exploration and mining companies in the hard rock minerals, precious metals, rare-earth minerals, oil, gas, water and renewable energy markets.
Update on the positive activity in diamond pipeline from rough to polished as well as a corporate update on North Arrow and the Naujaat Diamond Project located close to tidewater in Nunavut. Processing of a 2000 tonne sample is underway with diamond recovery results are expected from February to the end of April 2022. The Pikoo Project, SK makes its way back in to the presentation as the Company solidifies plans to conduct a drill program there in the summer of 2022.
Update on the positive activity in diamond pipeline from rough to polished as well as a corporate update on North Arrow and the Naujaat Diamond Project located close to tidewater in Nunavut. Processing of a 2000 tonne sample is underway with diamond recovery results are expected from February to the end of April 2022. The Pikoo Project, SK makes its way back in to the presentation as the Company solidifies plans to conduct a drill program there in the summer of 2022.
Riley Gold (TSXV: RLYG) Corporate Presentation | February 2022AnnaSokolova11
Riley Gold is an exploration and development company focused in Nevada, USA. The Company’s primary focus is on its two cornerstone assets: the Tokop Gold Project located within the Walker Lane Trend and the Pipeline West/Clipper Project located in the Battle Mountain Eureka Trend. Riley Gold’s founders and leadership team have a proven track record of maximizing shareholder value during each phase of the mining life cycle: exploration, development, and production.
Gold 2013 Sydney - Middle Island Resources ASX:MDISymposium
Investor Presentation at the 2013 Gold Investment Symposium in Sydney, 16-17 October 2013. Presentation given by Middle Island Resources' Managing Director, Rick Yeates.
International Reporting Standards for Exploration Results, Mineral Resources ...roger_dixon
"International Reporting Standards for Exploration Results, Mineral Resources and Mineral Reserves with particular reference to coal" presented at the 1st Annual Coal Transportation Africa Summit, Gallagher Estate, Midrand, South Africa on 8 April 2014.
The role of Geoscientists in a Junior Exploration CompanyJames AH Campbell
The role of Geoscientists in a Junior Exploration Company.
Presentation to the Geoskills Webinar 7 July – 11 August 2020, part of the Foundations for a Geological Career series.
Compiled and presented by James Campbell on 14 July 2020.
Riley Gold (TSXV: RLYG) Corporate Presentation | February 2022AnnaSokolova11
Riley Gold is an exploration and development company focused in Nevada, USA. The Company’s primary focus is on its two cornerstone assets: the Tokop Gold Project located within the Walker Lane Trend and the Pipeline West/Clipper Project located in the Battle Mountain Eureka Trend. Riley Gold’s founders and leadership team have a proven track record of maximizing shareholder value during each phase of the mining life cycle: exploration, development, and production.
Gold 2013 Sydney - Middle Island Resources ASX:MDISymposium
Investor Presentation at the 2013 Gold Investment Symposium in Sydney, 16-17 October 2013. Presentation given by Middle Island Resources' Managing Director, Rick Yeates.
International Reporting Standards for Exploration Results, Mineral Resources ...roger_dixon
"International Reporting Standards for Exploration Results, Mineral Resources and Mineral Reserves with particular reference to coal" presented at the 1st Annual Coal Transportation Africa Summit, Gallagher Estate, Midrand, South Africa on 8 April 2014.
The role of Geoscientists in a Junior Exploration CompanyJames AH Campbell
The role of Geoscientists in a Junior Exploration Company.
Presentation to the Geoskills Webinar 7 July – 11 August 2020, part of the Foundations for a Geological Career series.
Compiled and presented by James Campbell on 14 July 2020.
Referencial de educacao_para_o_desenvolvimentopsicologiaestoi
A Educação para o Desenvolvimento, de acordo com o documento ‘Educação para a Cidadania – linhas
orientadoras’, visa a consciencialização e a compreensão das causas dos problemas do desenvolvimento e das desigualdades
a nível local e mundial, num contexto de interdependência e globalização, com a finalidade de promover
o direito e o dever de todas as pessoas e de todos os povos a participarem e contribuírem para um desenvolvimento
integral e sustentável.
Neste processo, reconhece-se que a escola deve assumir um papel fundamental, em todos os níveis e ciclos
de educação e ensino, proporcionando a aquisição de conhecimentos, o desenvolvimento de capacidades e
a promoção de valores, atitudes e comportamentos que permitam às crianças e aos jovens a compreensão
crítica e a participação informada perante desafios locais e globais que se colocam à construção de um mundo
mais justo, inclusivo e solidário.
North Arrow Corporate Presentation (december 2021) finalnarminerals
Update on the positive year the rough and polished diamond markets have experienced, as well as detail on the Naujaat Diamond Project's 2021 2000 tonne bulk sample and processing. Pikoo overview also included.
North Arrow Minerals Corporate update for March 2019 with a focus on the Naujaat Diamond Project. The Hamlet of Naujaat is currently in the permitting and financing stages of constructing a community access trail that will come within 1.5 km of the Q1-4 kimberlite. The trail will reduce the cost for North Arrow to take a planned 10,000 tonne bulk sample while providing more economic opportunities for the local community.
North Arrow Minerals Corporate Overview - May24, 2017narminerals
An overview of North Arrow Minerals' projects with a focus on the 100% owned Naujaat Project and Mel Diamond Projects. Other active projects touched upon include the Lac de Gras and Loki Projects in the Lac de Gras region, the Pikoo Project in SK, and the Hope Bay Oro Gold Project, on strike from the Doris Mine in NU.
Diamond exploration, mining, financing and driving entrepreneurial behaviour.James AH Campbell
A presentation entitled:
"Diamond exploration, mining, financing and driving entrepreneurial behaviour".
to the Antwerp World Diamond Council and Gordon Institute of Business ('GIBS') global seminar entitled "From Mine to Finger. A deep dive into the world of diamonds". 7 February 2024 at GIBS.
Most of the participants are either entrepreneurs in the diamond downstream space or academics from both institutions.
Corporate Governance for South African Mining Companies (a practitioner's view)James AH Campbell
Corporate Governance for South African Mining Companies (a practitioner's view).
Compliance & Reporting in the Minerals Industry
15th September 2023
University of the Witwatersrand
(MINN7052A)
Attracting Funds to Develop the Diamond Potential of Southern AfricaJames AH Campbell
Attracting Funds to Develop the Diamond Potential of Southern Africa
JAHCampbell
24 Aug 2023
Presentation to the Kimberely International Diamond Conference.
Prospecting for Solutions: Challenges facing the South African Mining IndustryJames AH Campbell
Prospecting for Solutions: Challenges facing the South African Mining Industry
James Campbell
Presentation to Drexel University MBA group in Johannesburg on 11 May 2023.
Is there any overlap between Corporate Governance & Public Reporting?James AH Campbell
Is there any overlap between Corporate Governance & Public Reporting?
Presentation to the Geological Society of South Africa.
10th October 2022, Johannesburg.
Prospecting for Solutions: Challenges facing the South African Mining IndustryJames AH Campbell
Prospecting for Solutions: Challenges facing the South African Mining Industry.
Society of Economic Geologists, SA Chapter.
6th October 2022, University of the Witwatersrand.
Corporate Governance for South African Mining Companies (a practitioner's view)James AH Campbell
Corporate Governance for South African Mining Companies (a practitioner's view).
Compliance & Reporting in the Minerals Industry
27th September 2022,
University of the Witwatersrand
The Future of Botswana's Diamond Resources
James AH Campbell
Botswana Resources Infrastructure and Energy Forum ('BRIEF')
Gaborone, Botswana
16-17 May 2022
Volcanoes Presentation with material chiefly drawn from the Geological Society of the UK.
Presented to Reddam House Waterfall learners on 14 March 2022
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Remote sensing and monitoring are changing the mining industry for the better. These are providing innovative solutions to long-standing challenges. Those related to exploration, extraction, and overall environmental management by mining technology companies Odisha. These technologies make use of satellite imaging, aerial photography and sensors to collect data that might be inaccessible or from hazardous locations. With the use of this technology, mining operations are becoming increasingly efficient. Let us gain more insight into the key aspects associated with remote sensing and monitoring when it comes to mining.
As a business owner in Delaware, staying on top of your tax obligations is paramount, especially with the annual deadline for Delaware Franchise Tax looming on March 1. One such obligation is the annual Delaware Franchise Tax, which serves as a crucial requirement for maintaining your company’s legal standing within the state. While the prospect of handling tax matters may seem daunting, rest assured that the process can be straightforward with the right guidance. In this comprehensive guide, we’ll walk you through the steps of filing your Delaware Franchise Tax and provide insights to help you navigate the process effectively.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...PaulBryant58
This article provides a comprehensive guide on how to
effectively manage the convert Accpac to QuickBooks , with a particular focus on utilizing online accounting services to streamline the process.
1. 117-18 May 2016 |
PERSPECTIVES ON DIAMOND
RESOURCE DEVELOPMENT AND
REGULATORY COMPLIANCE
JAMES AH CAMPBELL
CEO, ROCKWELL DIAMONDS INC“uncovering the facets of our potential”
SAMREC/SAMVAL COMPANION VOLUME CONFERENCE
17-18 MAY 2016
2. 217-18 May 2016 |
OUTLINE
• PUBLIC REPORTING
• MINERAL REPORTING STANDARDS AND CODES
• REGULATORY REQUIREMENTS
• DIAMOND MINING
• ASSESSING DIAMOND POTENTIAL
• JUNIOR MINERS
• CASE STUDIES
• KIMBERLITE MINING
• ALLUVIAL MINING
• IMPLICATIONS FOR INVESTORS
• IMPLICATIONS FOR PUBLIC REPORTING
• CONCLUDING REMARKS
James Campbell is President and CEO of
Rockwell Diamonds Inc. Previous roles
include Non Executive Director of Stellar
Diamonds plc, Vice President - New Business
for Lucara Diamond Corp, Managing Director
of African Diamonds plc, Executive Deputy
Chairman of West African Diamonds plc.
James worked at De Beers for over twenty
years; his roles included General Manager for
Advanced Exploration & Resource Delivery
and Nicky Oppenheimer's Personal Assistant.
James holds a degree in Mining & Exploration
Geology from the Royal School of Mines
(Imperial College, London University) and an
MBA with distinction from Durham University.
He is a Fellow of the Institute of Mining,
Metallurgy & Materials, South African Institute
of Mining & Metallurgy and Institute of
Directors of South Africa. He is also a
Chartered Engineer (UK), Chartered Scientist
(UK) and a Professional Natural Scientist
(RSA).
James also chairs two NPO’s and is
deeply committed to South Africa.
4. 417-18 May 2016 |
PUBLIC REPORTING
Public reporting refers to all disclosure, such as press
releases, website postings, presentations, technical reports
and technical disclosure accompanying financial reports
(statements of Mineral Resources and Reserves)
Public reporting must be
♦ Material. i.e. present all reasonably expected information
♦ Transparent, i.e. presented in a clear and unambiguous
manner
♦ Prepared by Competent Persons (CP)
Competent Persons must
♦ Be a Member or Fellow of a Recognised Professional
Organisation (RPO).
♦ Have a minimum of five years’ relevant experience in the
style of mineralisation or type of deposit under consideration
and in the activity which that person is undertaking.
♦ Be satisfied that they could face their peers and
demonstrate competence in the commodity, type of deposit
and situation under consideration.
Professional codes of practice
set minimum standards for public
reporting.
Public reports must be prepared
by a Competent Person (CP)
Codes differ slightly on the
requirements for CP’s relevant
experience
Membership in the RPO should
be primarily on the basis of
academic qualifications and
experience
RPOs should have enforceable
disciplinary processes including
the powers to suspend or expel
a member
Source: CRIRSCO
5. 517-18 May 2016 |
MINERAL REPORTING STANDARDS & CODES
National reporting standards for selected countries
International initiative launched
in South Africa in 1994
Working group established to
develop a set of standard
definitions for reporting of
mineral resources and mineral
reserves
Today most national reporting
standards share a common set
of codes and guidelines
The Canadian mining sector’s
credibility improved greatly
after the NI 43-101 was
introduced in 2001
19971994 1999 2000
International
initiative to
standardise
definitions for
market-related
reporting
(CRIRSCO)
Agreement on
definitions for
Mineral
Resources and
Mineral
Reserves
(Denver Accord)
Alignment with
United Nations
Framework
Classification
Updated JORC
Code published
(first release 1989)
Other national
reporting
standards/codes
published, e.g.
SAMREC, CIM
Country Reporting Standard/Code
Australia JORC Code (2012)
Canada CIM Definition Standards for Mineral Resources and
Reserves – NI 43-101 (2014)
Europe/UK PERC Reporting Standard (2013)
Russia NAEN Code (2011)
South Africa SAMREC Code (2007)
SAMVAL Code (2008)
USA SME Guide (2014)
Source: CRIRSCO, PWC
6. 617-18 May 2016 |
REGULATORY REQUIREMENTS
Mining reporting requirements applicable in selected jurisdictions
Stock
Exchange
Mining-specific Reporting
Requirements (post-listing)
Mineral Reporting
Standard
ASX Annual and half-year financial report
Quarterly report by CP on production
and development activities (incl.
expenditure); exploration activities;
mineral results & ore results
JORC
JSE Annual and quarterly financial report
Description of exploration and mining
activities by CP; mineral resource and
reserve statement
SAMREC
TSX/TSXV Annual and quarterly financial report CIM (NI 43-101)
LSE/AIM Annual and half-year financial report
Interim management statement
Resource updates by CP (AIM)
JORC, SAMREC, CIM,
other selected codes
HKEx/GEM Annual and quarterly financial report
Half-yearly updates on mining
JORC, SAMREC, CIM
The world’s largest diversified
mining groups are listed on LSE
In 2013, TSX and TSX-V
combined were home to 57% of
the world’s publicly listed mining
companies
Cross border international
listings and dual/triple listings of
miners on AIM, TSX and ASX
continue to increase
HKEx is becoming a destination
of choice for mining companies.
However, companies with only
inferred resources are not
eligible for listing
Source: PWC, Mining Association of Canada
8. 817-18 May 2016 |
DIAMOND MINING – TWO SCENARIOS
KIMBERLITES
• High establishment costs
• Open pit and underground
operations (with progression
in some cases)
• Grade, diamond distribution
can be constrained with
sampling and modelling
• Higher resource confidence
can mitigate uncertainty
ALLUVIALS
• Lower start-up costs
• Low grade, high variability
• High uncertainty
• High volume, low cost approach
• Scarcity of larger (high-value)
diamonds
• Volumes are key to repeatability
Alluvial operations perceived
as being better suited to
smaller operators (juniors)
than kimberlites
Most juniors and mid-tiers own
kimberlite projects
Majors such as De Beers have
been running large-scale
alluvial operations
Diamonds from alluvial
operations are on average
larger (cts/stone) and more
valuable ($/ct)
Attracting equity and debt
funding is challenging in
current markets
9. 917-18 May 2016 |
LISTED DIAMOND MINING IN SOUTH AFRICA
Company Size Listing SA operations
(K = kimberlite;
A = alluvial)
Annual
Production
(cts)
Annual
Revenue
(US$)
Blue Rock
Diamonds
Junior AIM Kareevlei (K) Ramp-up N/A
De Beers Major N/A Venetia,
Voorspoed (K)
4.5M No SA
reports
Diamcor
Mining
Junior TSX-V,
OTC
Krone-Endora (A) +/- 20,000
(incidental)
+/- 3M
DiamondCorp Junior AIM Lace (K) +/- 7,000
(ramp-up)
N/A
Petra
Diamonds
Mid-
tier
LSE Cullinan, Finsch,
Kimberley,
Koffiefontein (K)
3M 360M
Rockwell
Diamonds
Junior TSX,
JSE
Middle Orange
River (A)
36,000 51M
Trans Hex Junior JSE Lower Orange
River,
Namaqualand (A)
62,000 83M
South Africa currently produces
8% of world diamonds by
volume
In 2014 SA produced 8.1 million
carats of diamonds (nearly half
as pre-GFC levels)
The bulk of SA diamond
production is from primary
sources (kimberlites)
Operators are chiefly junior /
mid-tier companies
No new discoveries, nor
significant projects in the
pipeline
Source: company websites, SA Chamber of Mines
Many private diamond mining companies too
10. 1017-18 May 2016 |
A PERSPECTIVE ON JUNIOR MINERS
Source: Investopedia; mineralsnorth.ca; undervaluedequity
Some common traits of juniors Some common traits of majors
• Discoverers and developers of
new economic deposits
• Typically small-cap companies
• Exploration spend is their
lifeblood
• No/little production cashflow to
fund exploration activities
• Funding derived from share
issues & management
• No dividends paid - shareholders
rewarded by share price increase
• Results attract high degree of
public scrutiny and assurance
• Subject to full extent of regulatory
and reporting obligations
• Technical management teams
with deep practical experience
• Innovative, agile and fast
• Owners of mining operations
• Typically more than one mine
• Publicly traded, well capitalised
companies
• Exploration activities internally
funded by production cashflow
• Exploration spend viewed as
discretionary
• Steady, predictable cashflow
• Large corporate structures
• Complex decision processes
• Internal assurance processes
• Able to adjust production to
changing market conditions
• Large technical and non-
technical management
departments.
What defines a junior miner?
♦ No single definition
♦ Prospectors and developers
♦ “The exploration division of
the mining industry”
♦ No marked separation
between junior and mid-tier
11. 1117-18 May 2016 |
ASSESSING DIAMOND POTENTIAL FOR MINING
(GENERALISED PROCESS)
Confidence in the
deposit/resource improves as
new information is analysed and
assumptions are re-visited
As confidence increases, so do
costs and timeframes
Technology plays a critical role in
resource assessment process,
as do risk modelling simulations
Accurate and reliable resource
models are essential inputs to a
sound economic assessment
Expert operators are able to
shorten timeframes, without
compromising on quality of
resource assessment
Deep knowledge, expertise are
key differentiators
Mapping,
sampling,
geophysics
Core drilling or
trenching
(100’s kg)
Initial bulk
sampling
(10-100’s t)
Infill drilling,
bulk sampling
(1000’s t)
Inferred
Resource
Indicated
Resource
Diamond potential,
surface size
estimate
Preliminary grade
estimate, prelim.
geological model
Global grade,
preliminary value
estimate
Geological,
density, volume,
grade, value
models
Preliminary
Economic
Assessment
Pre-Feasibility
Study
Bankable
Feasibility Study
Deposit
Target /
Anomaly
ActivityOutcomes
Mineral
Resource
Economic
Studies
INCREASING COSTS & TIMEFRAMES
DECREASING UNCERTAINTY & RISK
Duration: months
Cost: R millions
Duration: years
Cost: R tens of millions
12. 1217-18 May 2016 |
ASSESSING DIAMOND VALUE
Unlike other mineral commodities, diamonds don’t have set prices
Equity funders require that a rough diamond pricing model be
decided upfront in a deal
Two models in diamond valuation: fixed price book or open tender
Open tenders have the following advantages:
♦ Market related price
♦ Competitive bidding
♦ Pricing transparency
♦ Clients get the goods they want
♦ Premium paid for valued goods
Disadvantages of open tenders include:
♦ Less predictable cash flows
♦ Higher risk of price volatility
♦ Speculative buying
Open tenders are on the increase
♦ Initiated by juniors seeking transparent pricing models
♦ Majors have been integrating tenders into their sales
Five Models underpin a diamond
resource: Geological, Density,
Volume, Grade, Value
Modelling of value is unique to
diamond resource estimation
Value estimates require a
substantial investment in order
for a representative sample to be
obtained
Understanding the size
distribution of diamonds in a
deposit is critical in designing an
effective treatment plant
The value of diamonds
recovered can be optimised
through the selection of a
suitable bottom cut-off size
(BCOS)
Source: GIA, Rockwell
14. 1417-18 May 2016 |
A KIMBERLITE CASE STUDY: AK6 (KAROWE MINE)
AK6 is a diamondiferous
kimberlite pipe located in the
Orapa kimberlite field in north-
eastern Botswana
Discovered by De Beers in 1969,
but deemed low priority
Evaluated in 2003-2007 by
De Beers – African Diamonds JV
Now called Karowe Mine and is
owned and mined by Lucara
Diamond Corp
Mining began in 2012
Anticipated LoM is 15 years
Source: Lucara, JAH Campbell
15. 1517-18 May 2016 |
AK6 - THE JOURNEY
Initial
evaluation by
De Beers
Preliminary
size, grade,
value
encouraging
Boteti JV:
African
Diamonds, De
Beers (49/51)
Evaluation
Phase 1
Inferred
Mineral
Resource
Positive
sampling
results
released
Decision to
fast-track
evaluation
Evaluation
Phase 2
Indicated
Mineral
Resource
Conceptual
Study (DB):
marginal
economics;
capital
USD380M
Pre-Feasibility
Study (AFD):
robust
economics
Feasibility
Study (DB):
marginal
economics
Mining
Licence (2008)
Value
Engineering
Study (AFD):
robust
economics;
capital
USD88M
Lucara
acquires DB’s
share in Boteti
Feasibility
Study (Lucara):
robust
economics;
capital
USD156M
Lucara
acquires AFD’s
share in Boteti
Construction &
Commissioning
Cost:
USD110M
Mining begins
in Q2 2012
2003-5 2010-122005-6 2006-7 AK6 initially downgraded due
to small size (3.3ha), low
grade (3cpht) and poor mineral
chemistry
Re-assessed by De Beers
(Debot) in 2003
Boteti JV (AFD-DB) formed in
2004, prior to initial evaluation
results being released
Facilitated by AFD, Debot sold
its share to Lucara in 2009, in
the wake of the GFC and due
to apparent marginal
economics
AFD exited in 2010 following
significant share premium
buyout from Lucara
2008-9
16. 1617-18 May 2016 |
AK6 EVALUATION PROGRAMME (2003-2007)
Extensive evaluation:
♦ +/-23,000m core drilling
♦ +/- 12,500m LDD
♦ +25,000t samples collected
(not all processed)
Total cost of evaluation
programme USD26.8M
High levels of diamond
damage observed
High abundance of high value
Type II diamonds
Phase Technique Objective Results
Initial
evaluation
LDD
5x12¼”
Macro potential, preliminary
grade
97t (in situ)
25cpht (+1mm)
138USD/ct
High-resolution
geophysics
Surface area, geological
model
9.5ha
EvaluationPhase1
Percussion drilling
44x6.5”
Delineation, geological model,
mineral chemistry, macro
4,575m
28t (in situ)
29.6cpht (+1mm)
Core drilling
17xinclined
12xvertical
Internal geology, LDD pilots,
micro
9,883m
South Lobe
increased
LDD
13x23” @70m
Grade and revenue – inferred
resource 500ct for valuation
2,747t (in situ)
689cts
25.1cpht (+1mm)
EvaluationPhase2
Core drilling
11xvertical
29xinclined
Delineation, internal geology,
LDD pilots
12,860m
Kimberlite at
884m
LDD
12x23” @50m
Grade and revenue –
indicated resource 3000ct for
valuation
3,298t (in situ)
483cts
17.8 cpht (+1mm)
Trenching (S Lobe)
Grade and revenue 7.393t (in situ)
Trenching (C Lobe)
Grade and revenue 12,074t (in situ)
Source: Lucara, JAH Campbell
17. 1717-18 May 2016 |
AK6 / KAROWE RESOURCE STATEMENTS
Karowe Mineral
Resource / Reserve
(2013)
Tonnes
(000,000’s)
Grade
(cpht)
M Carats
(+1.25mm)
Value
(USD/ct)
Probable Reserve
(to 324m)
33.1 15.5 5.1 394
Indicated Resource
(to 400m)
48.07 16 7.61 393
Inferred Resource
(400-750m)
21 14 3.04 412
Source: JAH Campbell, Lucara
2003-7 evaluation programme led
to first mineral resource estimate
for AK6 (2009)
Grades regarded as conservative;
improvement anticipated with
further work
Considerable upside expected in
diamond values (revised upwards
by +25% in 2010)
Latest Karowe resource statement
(2013) reflects a drop in grades
and increase in values
Higher BCOS (1.25mm) accounts
for grade decrease
Value increase chiefly due to
incorporation of production and
sales data into estimates
2013 value estimation qualified
as conservative
AK6 Mineral
Resource (2009)
Tonnes
(000,000’s)
Grade
(cpht)
M Carats
(+1 mm)
Value
(USD/ct)
Indicated Resource
(to 372m)
40 22 8.9 153
Inferred Resource
(372-758m)
31 19 6 139
18. 1817-18 May 2016 |
KAROWE PRODUCTION PERFORMANCE
A proven large stone producer
2015 large stone recoveries:
20 greater than 200cts
7 greater than 300cts
Three exceptional stones
recovered from South Lobe in
November 2015, including
world’s second largest
diamond: 1,111cts Type IIa
Lesedi La Rona
Year
Tonnes
mined
(000,000’s)
Tonnes
treated
(000,000’s)
Carats
recovered
Grade
(cpht)
Ave
$/ct
sold
Stones
>10.8ct
s
2015 3.18 2.24 365,690 16.3 593 727
2014 3.32 2.42 430,292 17.7 644 815
2013 3.94 2.35 440,751 18.8 411 732
Source: Lucara
Operating costs are USD33-35 per tonne treated
Lobes
19. 1917-18 May 2016 |
REFLECTIONS ON AK6
Quality and abundance of large
diamonds initially
underestimated
Type IIa diamonds typically
colourless and extremely
transparent (notable examples
are the Cullinan and Koh-i-Noor)
Valuation models: market tender
vs. price book
Joint Venture dynamics: different
perspectives; funding structure
Fit-for-purpose approach to plant
design
Risk modelling / simulations
Impact of global events:
timing is crucial
Diamond value
♦ Type IIa diamonds recovered during bulk sampling
♦ Abundance of Type II and larger diamonds inadequately
considered in initial valuations
♦ Diamond value underestimated in financial modelling
♦ Karowe consistently delivering large and exceptional stones
Joint Venture
♦ Agreement signed ahead of first bulk sampling results
♦ JV operated by a major
♦ Substantial variance in
› Risk appetite
› Plant design philosophy
› Capital estimates
› Project economics
Economic context
♦ Global Financial Crisis
♦ Change in De Beers’ strategy
♦ Investors’ reluctance to fund a project deemed marginal
20. 2017-18 May 2016 |
AN ALLUVIAL CASE STUDY: SAXENDRIFT MINE
Alluvial diamond operation on
the south bank of the Orange
River, 160 km from Kimberley
Mined by TransHex in 2000-6
Purchased by Rockwell
Diamonds (RDI) in 2008
LoM extended by acquisition of
Saxendrift Extension in 2012
First full SA implementation of
Bourevestnik bulk X-Ray
technology in operational
environment
Saxendrift Mine has produced
numerous +100ct stones,
including the Alana (169cts)
and the Rockwell (287cts)
21. 2117-18 May 2016 |
SAXENDRIFT MINE
Three terrace complexes with
associated palaeochannel
depositional packages identified
on Saxendrift Mine:
Brakfontein Hill (“BHC”)
Saxendrift Hill (“SHC”)
Saxendrift River (“SRC”)
Saxendrift project properties
extend over 5,120.55ha,
comprising both Mining Rights
and Prospecting Rights
Saxendrift Mine also includes
Kwartelspan Complex (KPC),
contiguous to the east
Saxendrift River
Complex (SRC)
Saxendrift Hill Complex
(SHC)
Brakfontein Hill Complex
(BHC)
22. 2217-18 May 2016 |
SAXENDRIFT HISTORY
Early
artisanal
diggings in
mid 1920’s
98,000cts
recovered
Hard
calcrete
cover, poor
returns
Diggings end
by 1950
Mapping and
bulk
sampling by
Broadacres,
Moonstone
NCDM&E
operating
Saxendrift,
Brakfontein
Gem buys
NCDM&E
(1998)
TransHex,
Gem merge
(1999)
TransHex
acquires
permit (2000)
Saxendrift
Mine
commissioned
MOR
exploration
2001: 216ct
stone found
2003:
45,000$/ct for
blue diamond
Saxendrift
put on C&M
76,803cts
produced
RDI buys
Saxendrift
(2008)
New plant
installed
BHC bulk
sampling
(2008-9) and
trial mining
(2009-10)
BHC mining
(2011-2015)
SRC bulk
sampling
(2012-14)
SHC bulk
sampling
(2013-14)
KPC bulk
sampling
(2014)
RC drilling
for volume
estimations
(2015)
1920-50’s 2006-101980-90’s
Early digging activities dating
back to 1920’s-1950’s
Bulk sampling in 1980’s-90’s
Formal mining in late 1990’s
Blasting and earthmoving
equipment used to rip and
remove hard calcrete
Mined by TransHex since
2000, Rockwell since 2008
Concurrent bulk-sampling and
mining since late-2000’s
Drillhole material from volume
estimation not sampled for
diamonds (low grade)
2000-5 2011-16
Source: Rockwell, Explorations Unlimited
23. 2317-18 May 2016 |
SAXENDRIFT BULK SAMPLING / TRIAL MINING (2008-2014)
Due to the low grades and large
stone sizes in alluvial diamond
deposits, bulk samples are
collected and processed to
determine in-situ grades
Recovered diamonds are sold
on the open market to determine
realisable value
Mining in one area of an alluvial
diamond mine can occur
concurrently with trial-mining
and/or bulk-sampling operations
in other areas
The transition to trial mining and
onto production mining can be
seamless
Area Volume (m3) Carats
Grade
(ct/100m3)
Stones
Size
(ct/st)
Average
value
(USD/ct)
BHC
194,287
2,398,009
2,436.73
14,073.49
1.25
0.62
1,414 (2009)
1,956 (2010)
SRC
2,218,210 13,523.10 0.61 3,089 4.38 1,726 (2014)
SHC
1,007,781 4,209.27 0.42 761 5.53 1,904 (2014)
KPC
80,590 450.62 0.57 187 2.41 1,072 (2014)
Source: Rockwell, Explorations Unlimited
24. 2417-18 May 2016 |
SAXENDRIFT MINERAL RESOURCE
0
500
1000
1500
2000
2500
3000
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
2007 2009 2010 2012 2014 2015
USD/ct
Volume(m3)
MINERAL RESOURCE ESTIMATES
Inferred Indicated Value
2007 third party Mineral
Resource estimate re-modelled
in 2009 to Rockwell’s group
standards: drop in volumes,
increase in grades
Change in mining method in
2010 (entire sequence mined)
explains increase in volumes
and drop in grade
Bottom cut-off size increased
from 2mm to 5mm in 2011
(fewer carats recovered)
Upgrade of Inferred to Indicated
Resource in 2012 due to
proximity to mining face
Two-year moving average
of value from 2013
GFC
BCOS 5mm
Inf Res upgrade
0.68
0.41 1.01
0.72
0.66
0.56
0.47
0.47
0.45
0.53
0.42
0.5
RDI
model
Mining
method
Grade
25. 2517-18 May 2016 |
SAXENDRIFT PRODUCTION PERFORMANCE
Recovered grades in line with
modelled grades
Rigour applied to resource
modelling (and NI 43-101
reporting) leads to consistent
production performance
Mining feedback validates
resource assessment
Optimised EMV fleet is
paramount to operational
performance
Notable recoveries in 2014-15
included 6 stones over 100cts
Year
Volume treated
(m3)
Carats
recovered
Grade
(cts/100m3)
Ave $/ct
sold
2015 2,559,000 10,442 0.41 2,363
2014 2,296,000 12,701 0.55 2,338
2013 1,775,130 8,373 0.47 1,918
2012 1,469,215 6,944 0.47 2,444
2011 1,449,875 6,705 0.46 2,003
2010 1,216,503 8834 0.73 1968
2009 194,287 2,437 1.18 1,767
0
500
1000
1500
2000
2500
3000
3500
0
100000
200000
300000
400000
500000
600000
700000
800000
Q1-F14 Q2-F14 Q3-F14 Q4-F14 Q1-F15 Q2-F15 Q3-F15 Q4-F15
USD/ct
Volume(m3)
Saxendrift production 2014-15
Volume processed Value
Source: Rockwelll AR’s
0.39
Grade
0.54 0.76 0.50 0.64 0.34 0.39 0.32
27. 2717-18 May 2016 |
JUNIOR FUNDING
Equity financing is the juniors’
dominant source of funding,
while the majority of mining
debt financings are undertaken
by large market cap companies
In 2013, 62% of global mining
equity financing was raised on
TSX and TSX-V
ASX, TSX and AIM are funding
junior exploration and
development companies
Juniors are responsible for the
majority of further issues,
reflecting their need for cash to
fund exploration and feasibility
studies
Source: PDAC, PWC
28. 2817-18 May 2016 |
IMPLICATIONS FOR INVESTORS
Mining investors view favourably:
♦ Companies with experienced management teams, exploring
in prospective areas and with reasonable project timelines
♦ The use of new technology, as it demonstrates an ability to
work faster and cost-effectively
♦ Clarity on a company’s position with respect to key drivers
of future value (the investors’ reward lies in the increase in
share price)
♦ Companies who “graduate” from the venture to the main
board of a stock exchange, as this implies additional
corporate governance and due diligence effort
Mining investors view less favourably:
♦ New discoveries without a demonstrable way to mine the
mineral resource economically
♦ Junior miners with little or no track record, especially so
during cyclical mining downturns
Typically, juniors have to raise
equity to fund their
exploration/evaluation
activities all the way to
feasibility stage (whereas
majors are able to self-fund
this process)
Attracting and retaining
investors’ interest requires an
ongoing effort
Information of relevance to
investors is disclosed through
public reporting
Caution must be exercised not
to overstate the potential of a
project in an effort to keep
investors’ interest alive
Source: Canadian Mining Journal. PWC, Pinnacle Digest
29. 2917-18 May 2016 |
IMPLICATIONS FOR PUBLIC REPORTING
Public reporting is expected to:
♦ Provide high levels of assurance to accompany disclosure
of information of a financial or operational nature
♦ Provide clearly defined and highly reliable measures that
have the potential to influence markets
♦ Include non-GAAP performance measures - such as
production volumes, resources/reserves and cash costs –
which investors use in their analyses
♦ Report accurately on responsible operational activities in an
unambiguous, timely fashion
Accurate and transparent reports are critical in securing
subscriptions to further share issues, as IPOs generally raise
funds to cover only the first 2-3 years of exploration
Juniors are subject to a high
degree of public scrutiny and
assurance (majors tend to
conduct these internally)
Mineral resource estimates
and other non-GAAP
measures are increasingly
scrutinised by investors
Shortened project timeframes
are appealing, as long as
accuracy of information is not
compromised
Relevant and accurate
reporting helps to sustain
interest throughout the
lifecycle of a project
30. 3017-18 May 2016 |
CONCLUDING REMARKS
Mineral resource development is a complex and costly process
with a high degree of risk
Technology has a key role to play in the risk reduction process
Plant design philosophy can make or break a project
Experienced technical management is probably the most
important critical success factor
In order to comply with regulatory requirements, project results
must be reported within accepted frameworks
Stringent reporting parameters don’t always allow for the full
characterisation of future potential of a mining project
(commentary is just as important)
Accepted reporting standards are primarily designed to protect
investors from misrepresentation of resource value
There is a fine line between compliance and excessive caution,
which may result in conservative understatements of future
potential
Reporting and regulatory
requirements place a
significant burden of
compliance on juniors
However, relevance and
transparency of reporting is
increasingly important in
attracting junior funding
Rigour and diligence applied to
resource development pays off
in resource performance and
repeatability of results
Accelerated project timeframes
are appealing, but there is no
room for compromise on
resource assessment