SlideShare a Scribd company logo
JACK COLE
Experienced in the architectural
design of various live projects.
From small village hubs for
RIBA contest entries to multi-
million pound industrial projects.
AN INDUSTRY EXPERIENCED GRADUATE ARCHITECTURAL ENGINEER
Academically trained in the detailed
design of structural elements and
super structure stability. Awareness
of the needs of various parties from
experience in multidisciplinary firms.
Very high graduate competency in
BIM and modeling packages, with
a keen interest on expanding on
these skills. Industry experience
in large scale BIM co-ordination.
ARCHITECTURAL
DESIGN
ENGINEERING
KNOWLEDGE
BIM / MODELLING
TECHNICIAN
2
CONTENTS
01
02
03
Modeling complex geometry and detailing elements on a £355M recycling
and energy from waste facility. Suggesting design alterations when possible
and issuing drawings.
Working within a group of 4 young architects to design a community hub
in Sessay, N.Yorkshire. Assisting with the site plan, modeling sections and
rendering views for the presentation boards.
A collection of shorter projects I was involved in at TATA steel. Displaying a
variety of skills and proof of my technical versatility.
LeedsRERF-Recyclingandenergyfromwastefacility
TATA Steel Projects
SessayCommunityHub-RIBAcontest
TATA Steel Projects
AssortedShortProjects
TATA Steel Projects
3
04
05
06
Detailing, construction, and visualisation orientated projects I worked on with
Roost Architects.
A showcase of some of the small projects and tutorials I’ve undertaken in my
spare time to further develop my technical skills.
Fronting BIM co-ordination for the project. Devising model conversion
work-paths. Undertaking large amounts of building and site modeling.
Redesigning site layouts from a logistical standpoint.
RoostArchitectsProjects
A sample of some projects from Roost
AssortedTutorials/Experience
Personal development projects
TempleboroughBiomassFacility
TATA Steel Projects
4
LEEDS RECYCLING / ENERGY FROM WASTE
The Leeds RERF is a recycling and energy
from waste centre. The £335M project aims
to recycle as much as 40% of black bin
waste that would otherwise go to landfill.
During a summer internship in summer
2013 I had the opportunity to work
alongside another intern developing a
structural frame to house the projects
iconic green wall (right). The second week
I spent modelling and developing sheets
in Revit for the green-wall structure.
I firmly believe getting to know the team
during this placement helped immensely
with my interview the following year.
Being able to see the structure erected
during my various site visits during
the internship year was surely one of
the many highlights of the placement.
(The photo to the right shows the green-
wall planting boxes being prepared.)
TATA Steel Projects
ArchitecturalAssistant/Technician
5
Upon its completion it will be the tallest
glued laminated timber arch in the UK,
standing at 42 meters. It will also hold the
record for the largest green-wall utilizing
a single irrigation system in the world.
(The arch can be seen pictured on the left)
Finishes renders were among what I
presented to Billionaire Gary Klesch during
a tour he took of the TSP York offices.
A senior technician and I demonstrated
to him how we design our projects at TSP.
(Render presented shown below)
6
This was the first live project I have
worked on and therefore my activities
consisted mainly of making amendments
to construction drawings within Revit.
This was done by developing the 3-D
architecture team model and relating
the information to the other disciplines
models. Typical sections I would model are
shown below.
A usual work day consisted of me
receiving a sketch from the leading
architect and modelling his sketches.
Then preparing the drawings to be issued
that afternoon.
During this period I learnt a lot
about detailing / buildups and other
architectural qualities. As well as this I
experienced a handful of on site meetings
and how drawings are prepared for site.
7
Roof maintenance access walkway design meeting. Amendment suggestion I made to reduce visibility from the predominately viewed elevation (as well as reduced steelwork).
SESSAY COMMUNITY HUB - RIBA CONTEST
TATA Steel Projects
ArchitecturalAssistant/Technician
8
The project was a RIBA international
competition for the design of a
community centre and cricket pavilion
(amongst other quality sporting facilities)
in the small rural village of Sessay, North
Yorkshire. 86 firms from as far as Japan
made submissions for the initial contest.
The cost for the entire project had to come
to around £1.25M - £1.5M, making it the
most intimate, and socially focused project
I worked on during my time at TSP.
9
I was involved in developing relationship
diagrams with the team to reflect the
needs of the community into the layout.
As well as this there were phasing issues
to tackle as to keep the existing facilities
and cricket fields in use during the
construction phase.
My duties on this project included
making floor plans from the Revit model
(right), developing the carpark layouts
ready for the presentation boards.
In addition to this I assisted in some of the
renders on the following page.
10
The design proposal draws upon the
surrounding agricultural vernacular.
Whilst aspiring to be striking the
“barn-like” structure made it sit
within the rural setting of the village.
The reduction of heavy masonry outer
walls reduced the size and cost of the
foundations. Timber cladding panels can
be factory prefabricated complete with
breathing membrane insulation and
possess outstanding thermal and sound
insulation properties. The grey brick aimed
to give permanence within the setting.
I assisted in the rendering of the internal
and external visuals followed by post
processing in photoshop was utilised in
order to make compelling atmospheres
for the boards.
As well as this I collected precedents
to give stylistic options to both us as
designers and the client.
TATA Steel Projects
11
A collection of shorter projects I was involved in at TSP
Testing a variety of skills and proof of my technical versatility
TSP-ASSORTEDSHORTPROJECTS
Infrastructure Engineer
East Coast Mainline
When the work load became too much for
the track infrastructure department due to
people being on holiday I was drafted into
their team for a couple weeks to help them.
This coincided with work load dropping a
bit in the buildings and architecture team
meaning I could assist in this work.
ETCS is a new form of signalling for trains.
My job was to locate existing signal boxes
and junctions that this new technology
could be housed in.
12
This was the project that was most
rooted in engineering principles and
problem solving logic. After marking up
8 large A0+ sheets I would then hand
over my work to be copied up neatly on
AutoCAD by another young professional.
Evidence that the team leaders trusted
my judgement and sense of responsibility
in giving work out to others.
Infrastructure Engineer
ETCS Signaling Infrastructure
East Coast Mainline
13
For a few weeks I worked rendering
some visualisation images for the
projects client. This was to help them
to realise if they could fit all the
equipment on the site comfortably.
Modelling plant equipment as Revit
families and conveyor belts to make sure
the size of the factory would be adequate.
As well as this I spent some time
arranging sheets to present our findings
to the client during our weekly meetings.
Blötberget Iron Ore - Sweden
Architectural Technician
Visualisation Research
14
This coupled with Oculus Rift goggles
with its stereoscopic vision (simulates true
depth) had the potential to make highly
immersive walkthroughs.
As it turned out I would put this work to
one side for the rest of my time at TATA.
Templeborough was about to get the ,
requiring my full attention.
Textures and objects like doors needed
a considerable amount of extra work
assigned to them to make them operate
or look like they would in Revit
(disrupting ordinary work flow).
Also this program costs a few thousand
pounds for a licence, and around the
same time another games engine called
“Unreal” came onto the market as a
free open source piece of kit. Trumping
Unity in terms of cost and accessibility.
The images on the left show the games
engine and the oculus rift developers kit.
Due to having a keen interest in
visualisations and how to make our ideas
more clearer to both client and contractor
I was handed the chance to do some
research. Through research at work and
attending a regional BIM seminar I looked
into new ways of visualising our projects.
I researched into some new methods of
rending with tools we already had, new
render engines on the market, and even
looked at some game engines. I took a
particular interest in the game engine
Unity whilst attending the seminar.
By taking a model through a couple of
Autodesk programs I could drop models
into a “walkable” space. Allowing a client
to freely walk about the building as they
so chose.
Standard walkthroughs with set
paths of models offered some level of
immersion, but clearly nothing could
quite compare to freely moving about
the space as you would be able to if you
were actually in the building.
15
In between the work load on Leeds
ramping down and the work load on
Templborough ramping up I helped out
with some detailing and modelling on the
Wilton Efw project.
Most of this time was spent altering stairs
in core locations and fire escapes. The
stair tool in Revit is somewhat of a dark
art, but I’ve figured out some of its quirks
for the future.
Wilton Efw - Modelling / Drafting
In addition to this I learnt some more
general technicians tools in Revit such as
door/windowschedulingandkeyfinishes.
(Finishes renders for the client Sita below)
ASSORTEDROOSTARCHITECTSPROJECTS
16
Roost architects dealt with a lot of clients
that were not very in tune with the
construction industry and therefore were
not as capable of visualising build designs
as people who deal with them all day.
This meant that architectural renders
and visualisations were of the up
most importance as for a client to
realise what the design entailed.
This game me the chance of producing
some renders in V-Ray for sketch up, as well
as overshadowing as the architect photo-
shopped the images to touch them up.
Architectural Assistant
150mm cut stone
cills reveals and head
150
140mm nominal
coarsed reclaimed
stone outer leaf 150mm cut stone
Wall cavity 200mm including 100mm
Kingspan TW50 insulation
10mm 7kN/mm2 (Medium
density) blockwork inner leaf
12.5mm plasterboard on
dot and dabs
Thermabate cavity closer
100mm of Rockwool between trusses and a
further 200mm of Rockwool above. To
achieve a min U-value of 0.13W/m^2K
140mm nominal
coarsed reclaimed
stone outer leaf
Wall cavity 200mm including 100mm
Kingspan TW50 insulation
10mm 7kN/mm2 (Medium density)
blockwork inner leaf
12.5mm plasterboard on
dot and dabs
Breather membrane
Slate tiles
Timber roof trusses to
manufacturers recommendations
Inset mesh
25 x 32mm SW timber battens
Maintain 50mm continuous air gap
U Value = 0.18 W/m2 K
Wall ties
50mm air gap for ventilation
100x50mm SW wall plate
strapped to inner leaf with
galvanised steel straps
120mm diameter 112 round
galvanised steel gutter
Fascia board
CL
4900
50
GF
0
GL
Stone cill
Foundation to SE requirements
Underfloor heating
Install perimeter
insulation with a min R-
value of 0.75m2K/W
Seal between the wall
and floor air barrier
with a flexible sealant
GF
0
150
Ensure that cavities are kept clean of mortar snots or other debris during construction.
The wall insulation installed below the wall DPC must be fit for purpose with regards to water absorption.
Underfloor heating
GL
Foundation to SE requirements
Install perimeter
insulation with a min R-
value of 0.75m2K/W
Seal between the wall
and floor air barrier
with a flexible sealant
140mm nominal
coarsed reclaimed
stone outer leaf
Wall cavity 200mm including 100mm
Kingspan TW50 insulation
10mm 7kN/mm2
(Medium density)
blockwork inner leaf
Cavity tray
Weepholes
150mm hardcore
50mm sand blinding
Visqueen 1200g DPM
75mm sand
cement screed
150mm kingspan
TF70
500g visqueen
seperating layer
140mm nominal
coarsed reclaimed
stone outer leaf
140mm nominal
coarsed reclaimed
stone outer leaf
150mm cut stone
Wall cavity 200mm including 100mm
Kingspan TW50 insulation
10mm 7kN/mm2 (Medium density)
blockwork inner leaf
12.5mm plasterboard on
dot and dabs
Wall ties
Inset mesh
Catnic lintel
Thermabate cavity closer
120mm half round
galvanised steel gutter
Painted timber SW fascia board
Truss
CL
4900
150mm cut stone
NOTES
1. DO NOT SCALE FROM THIS DRAWING - USE FIGURED DIMENSIONS ONLY
2. READ IN CONJUNCTION WITH ALL OTHER RELEVANT CONSULTANTS /
SPECIALISTS DRAWINGS. REPORT ANY DISCREPANCIES BEFORE
AFFECTED WORK COMMENCES
3. ALL SETTING OUT DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR
BEFORE WORK COMMENCES.
4. THIS DRAWING REMAINS COPYRIGHT OF ROOST ARCHITECTS COPY /
DISTRIBUTE ONLY WITH CONSENT OF ROOST ARCHITECTS.
5. ALL DETAILS TO BE ACCREDITED CONSTRUCTION DETAILS COMPLIANT
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
JC SC
Building Regulations
As indicated
Details Sheet 2
2015 - 053
Greenlane Farm
John Fawthrop
A211
06/05/16
1 : 10
Window Elevation
1
1 : 10
Window Detail
4
1 : 10
Roof Eaves Detail
3
1 : 10
Door Threshold Detail
61 : 10
Wall / GF Slab Detail
5
1 : 10
Window Detail
2
Rev Description Date
17
Most of my time at Roost architects was
spent working up buildings regulations
drawings ready for site construction on
new building residential and extensions to
existing residential buildings.
My detailing skills were something Simon
(the owner of Roost) helped develop a lot
during my time there. Although I feel it is
one of my weaker skills at the moment I am
keen on further developing it into one of my
strengths.
I would frequently take phone calls from
clients and make them to manufacturers.
Sizing elements such as insulation, timber
joists and trusses. As well as confirming
technical build ups of elements such as
walls, roofs, slabs, intermediate floors etc.
Architectural Technician
ASSORTEDSELF TAUGHT WORK
Self Taught Projects
18
Here I have highlighted some of the
more complex parametric tutorials I
have undertaken after stopping the
MEng degree. It should be noted this
section could include rendering and
modelling tutorials / experience from
Zero Fifty. (But was left out to keep the
portfolio size down).
I was interested in the free
Revit plug-in called Dynamo
and decided to complete some
tutorials on the software. It’s
essentially grasshopper for Revit.
Parametric design excites me immensely
as I truly believe it is the way forward
in terms of complete holistic design
between the disciplines. On the right
is a system the dilates holes in the
cladding structure according to the
solar radiation expected.
19
Grasshopper / RhinoTutorials
However the two tools that I’m most
interested in were Rhinoceros and
Grasshopper. To myself (and from the
opinion of other professionals) they are the
industry standard for complex modeling.
Pictured on the right is a tutorial for
applying structural diagrids to NURB
curved surfaces.
NURB - Non-uniform rational basis
spline. (A clever modelling algorithm
reducing computational power required,
and opening the doors to more
interesting solutions.
20
The panels can be orientated to
minimise manufacturing waste. Panels
are tagged to assist fabrication/
manufacturing processes.
Parametric Space Frame - A parametric steel structure created using Grasshopper.Panelisation / Manufacturing
Structural Design Using Karamba
21
By applying a loading pattern to the
structure you can start to interrogate the
stability of the super structure.
Analysis can be provided to find how much compression, tension and torsion the members were subjected to.
TEMPLEBOROUGH BIOMASS FACILITY
TATA Steel Projects
Assistant/Technician/BIMCo-ord
22
During the second half of my placement
I worked mainly on the Templeborough
Biomass project. This is where my
responsibility on projects really started to
increase and I felt truly instrumental to
the buildings and architecture team at
TATA Steel Projects.
Project value £170M / LD’s £250K a week.
23
The project is a Biomass facility,
burning reclaimed wood to drive steam
turbines for electricity.
During this project I mainly took on the
roles of an Architectural Assistant and
project BIM coordinator.
This still included some duties I
undertook on Leeds such as issuing
sheets and live models, however on this
project I did little to no 2-D detailing.
Instead I was modelling in 3-D large
amounts of the site, components
and other ancillary context massing.
(Images showing various software formats)
I learnt Autodesk Navisworks to assist
in project co-ordination. (Pictured left).
This is clash detection software specifically
designed to highlight clashes (Overlaps
in the models). The problems were
highlighted within the register and
discussions could be made as how to
tackle the issue.
Aside from Revit BIM co-ordination I also
devised a workflow path to make our Revit
models useful to the process engineers
and their models useful to ours.
This included a lot of research, trouble
shooting and phone calls to certain parties.
24
In addition to this, my main piece of work on the project was to tackle site circulation.
We had been given a site that couldn’t operate with the required vehicle loading
during operation. This would take into account the loading and unloading of vehicles,
other operative vehicles, civilian traffic and right of access through roads for other
adjacent industry vehicles.
Most of my time on this project developing and evolving the site layout working
in liaison with other teams in the company such as Highways, M&E, Bridges, Civils,
Geotechnics and Drainage.
Site Circulation
One of the tools we used to rectify this issue, and I subsequently learnt during this
project, was Autodesk Vehicle tracking. By taking the site plans we were developing
from an architectural perspective I could “drive” around virtual vehicles on the site.
Whether they be the loading lorries, ordinary cars, waste disposal lorries or forklift
trucks. From this we could qualify the site layout as acceptable for that revision,
until the next issue arose where we would repeat this method of designing
out the problem then re-testing. A site plan with vehicle paths sketched on as
well as notes for further tracking can be seen below. The tracking allowed us to
further develop the overall site plan concept plan we would use to explain
our site strategy to all parties.
SiteVehicleTracking
25
One of the activities I undertook in liaison
with another team was ensuring occupant
and civilian safety on site (in regards to
the walkways). From this we could further
the precision of the tracking, highlight
preliminary walkways from an early stage
and aim to increase occupant safety.
Due to the project being altered more
than was initially expected when the
company received the concept design a
lot of logistical thinking was required to
solve potentially project halting issues.
I believe my course prepared me well
for such logistical architectural design
which is why I was selected to tackle such
problems before any of the other aspiring
young architects.
Biomass Logistics Site Access Design
E-mail: jackacole@sky.com
Mobile: 07527336987
Address: 17 Mayville Place
Hyde Park
Leeds
West Yorkshire		
LS6 1NE
LinkedIn: Profile Link

More Related Content

Viewers also liked

FRANTZIA
FRANTZIAFRANTZIA
FRANTZIA
koldokoak
 
Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...
Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...
Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...
MediaMakers2016
 
LinkedInダイレクト・ソーシング(リクルーティング) 実践セミナー
LinkedInダイレクト・ソーシング(リクルーティング) 実践セミナーLinkedInダイレクト・ソーシング(リクルーティング) 実践セミナー
LinkedInダイレクト・ソーシング(リクルーティング) 実践セミナー
Andy, Xinbin Hu
 
Company profile pt ktz dinamik
Company profile pt ktz dinamikCompany profile pt ktz dinamik
Company profile pt ktz dinamik
ATT MOTOR
 
Presentasi SBL Juni 2016
Presentasi SBL Juni 2016Presentasi SBL Juni 2016
Presentasi SBL Juni 2016
kedaidollar
 
20151113 andrew l crabb resume
20151113 andrew l crabb resume20151113 andrew l crabb resume
20151113 andrew l crabb resume
Andrew Crabb
 
Nuevos ambientes de aprendizaje ensayo
Nuevos ambientes de aprendizaje   ensayoNuevos ambientes de aprendizaje   ensayo
Nuevos ambientes de aprendizaje ensayo
Angel Bernabé Palli Salas
 
Eng7 proverb; metaphor
Eng7 proverb; metaphorEng7 proverb; metaphor
Eng7 proverb; metaphor
Tine Lachica
 
How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...
How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...
How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...
Kevin Chavez
 
Eng7 academic writing vs creative writing
Eng7 academic writing vs creative writingEng7 academic writing vs creative writing
Eng7 academic writing vs creative writing
Tine Lachica
 
2. Presentation for LinkedIn
2. Presentation for LinkedIn2. Presentation for LinkedIn
2. Presentation for LinkedInAlireza Izadi
 

Viewers also liked (13)

CV-Gunawan Pujasandi
CV-Gunawan PujasandiCV-Gunawan Pujasandi
CV-Gunawan Pujasandi
 
FRANTZIA
FRANTZIAFRANTZIA
FRANTZIA
 
Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...
Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...
Евгений Вольнов, руководитель отдела рекламных технологий Independent Media. ...
 
LinkedInダイレクト・ソーシング(リクルーティング) 実践セミナー
LinkedInダイレクト・ソーシング(リクルーティング) 実践セミナーLinkedInダイレクト・ソーシング(リクルーティング) 実践セミナー
LinkedInダイレクト・ソーシング(リクルーティング) 実践セミナー
 
CV - July 15
CV - July 15CV - July 15
CV - July 15
 
Company profile pt ktz dinamik
Company profile pt ktz dinamikCompany profile pt ktz dinamik
Company profile pt ktz dinamik
 
Presentasi SBL Juni 2016
Presentasi SBL Juni 2016Presentasi SBL Juni 2016
Presentasi SBL Juni 2016
 
20151113 andrew l crabb resume
20151113 andrew l crabb resume20151113 andrew l crabb resume
20151113 andrew l crabb resume
 
Nuevos ambientes de aprendizaje ensayo
Nuevos ambientes de aprendizaje   ensayoNuevos ambientes de aprendizaje   ensayo
Nuevos ambientes de aprendizaje ensayo
 
Eng7 proverb; metaphor
Eng7 proverb; metaphorEng7 proverb; metaphor
Eng7 proverb; metaphor
 
How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...
How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...
How to Tweak or Test Your Facebook Ads to Find Out Which is More Effective to...
 
Eng7 academic writing vs creative writing
Eng7 academic writing vs creative writingEng7 academic writing vs creative writing
Eng7 academic writing vs creative writing
 
2. Presentation for LinkedIn
2. Presentation for LinkedIn2. Presentation for LinkedIn
2. Presentation for LinkedIn
 

Similar to Jack Cole Portfolio A4 Version June

Jack Cole TSP Industrial Placement Timeline Aug15
Jack Cole TSP Industrial Placement Timeline Aug15Jack Cole TSP Industrial Placement Timeline Aug15
Jack Cole TSP Industrial Placement Timeline Aug15Jack Cole
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-SamplesMichael Lyon
 
Amcb Selected Cv
Amcb Selected CvAmcb Selected Cv
Amcb Selected Cv
alan mcbeth
 
Sina Hashemi - Portfolio
Sina Hashemi - PortfolioSina Hashemi - Portfolio
Sina Hashemi - Portfolio
Sina Hashemi
 
Internship Report
Internship ReportInternship Report
Internship Report
Euxuan Ong
 
Ian McIver Portfolio 2016-ghost
Ian McIver Portfolio 2016-ghostIan McIver Portfolio 2016-ghost
Ian McIver Portfolio 2016-ghostIan McIver
 
Cindy Brigitta_Work Application
Cindy Brigitta_Work ApplicationCindy Brigitta_Work Application
Cindy Brigitta_Work ApplicationCindy Brigitta
 
3D laser scanning: A tale of two architectural projects - One went wrong, one...
3D laser scanning: A tale of two architectural projects - One went wrong, one...3D laser scanning: A tale of two architectural projects - One went wrong, one...
3D laser scanning: A tale of two architectural projects - One went wrong, one...
Greg Dolphin
 
Curtins Summer Placement Review
Curtins Summer Placement ReviewCurtins Summer Placement Review
Curtins Summer Placement ReviewKelvin Gwaruka
 
Internship Report
Internship ReportInternship Report
Internship Report
dtan97
 
Report lim jernjack0317139
Report lim jernjack0317139Report lim jernjack0317139
Report lim jernjack0317139
jernjack
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
University of Wisconsin-Milwaukee
 
Scott Stubbs Design Portfolio - 041916
Scott Stubbs Design Portfolio - 041916Scott Stubbs Design Portfolio - 041916
Scott Stubbs Design Portfolio - 041916Scott Stubbs
 
From Vision to Version- Understanding Engineering Design Iterations.pdf
From Vision to Version- Understanding Engineering Design Iterations.pdfFrom Vision to Version- Understanding Engineering Design Iterations.pdf
From Vision to Version- Understanding Engineering Design Iterations.pdf
saniyamalyam
 
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013
Faidon (Phé-thon) Nikiforiadis
 
Dr faidon nikiforiadis examples of work from design portfolio november 2013
Dr faidon nikiforiadis    examples of work from design portfolio november 2013Dr faidon nikiforiadis    examples of work from design portfolio november 2013
Dr faidon nikiforiadis examples of work from design portfolio november 2013Faidon (Phé-thon) Nikiforiadis
 
CV & portfolio Vedika Mathur
CV & portfolio  Vedika MathurCV & portfolio  Vedika Mathur
CV & portfolio Vedika Mathur
Vedika Mathur
 
Ying's Portfolio 2016
Ying's Portfolio 2016Ying's Portfolio 2016
Ying's Portfolio 2016Calvin Cheung
 

Similar to Jack Cole Portfolio A4 Version June (20)

Jack Cole TSP Industrial Placement Timeline Aug15
Jack Cole TSP Industrial Placement Timeline Aug15Jack Cole TSP Industrial Placement Timeline Aug15
Jack Cole TSP Industrial Placement Timeline Aug15
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-Samples
 
Amcb Selected Cv
Amcb Selected CvAmcb Selected Cv
Amcb Selected Cv
 
Sina Hashemi - Portfolio
Sina Hashemi - PortfolioSina Hashemi - Portfolio
Sina Hashemi - Portfolio
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Ian McIver Portfolio 2016-ghost
Ian McIver Portfolio 2016-ghostIan McIver Portfolio 2016-ghost
Ian McIver Portfolio 2016-ghost
 
Cindy Brigitta_Work Application
Cindy Brigitta_Work ApplicationCindy Brigitta_Work Application
Cindy Brigitta_Work Application
 
Chapter 10-TOR
Chapter 10-TORChapter 10-TOR
Chapter 10-TOR
 
3D laser scanning: A tale of two architectural projects - One went wrong, one...
3D laser scanning: A tale of two architectural projects - One went wrong, one...3D laser scanning: A tale of two architectural projects - One went wrong, one...
3D laser scanning: A tale of two architectural projects - One went wrong, one...
 
Curtins Summer Placement Review
Curtins Summer Placement ReviewCurtins Summer Placement Review
Curtins Summer Placement Review
 
Tom Barnes CV
Tom Barnes CVTom Barnes CV
Tom Barnes CV
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Report lim jernjack0317139
Report lim jernjack0317139Report lim jernjack0317139
Report lim jernjack0317139
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
Scott Stubbs Design Portfolio - 041916
Scott Stubbs Design Portfolio - 041916Scott Stubbs Design Portfolio - 041916
Scott Stubbs Design Portfolio - 041916
 
From Vision to Version- Understanding Engineering Design Iterations.pdf
From Vision to Version- Understanding Engineering Design Iterations.pdfFrom Vision to Version- Understanding Engineering Design Iterations.pdf
From Vision to Version- Understanding Engineering Design Iterations.pdf
 
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013Dr Faidon Nikiforiadis    Examples of work from design portfolio november 2013
Dr Faidon Nikiforiadis Examples of work from design portfolio november 2013
 
Dr faidon nikiforiadis examples of work from design portfolio november 2013
Dr faidon nikiforiadis    examples of work from design portfolio november 2013Dr faidon nikiforiadis    examples of work from design portfolio november 2013
Dr faidon nikiforiadis examples of work from design portfolio november 2013
 
CV & portfolio Vedika Mathur
CV & portfolio  Vedika MathurCV & portfolio  Vedika Mathur
CV & portfolio Vedika Mathur
 
Ying's Portfolio 2016
Ying's Portfolio 2016Ying's Portfolio 2016
Ying's Portfolio 2016
 

Jack Cole Portfolio A4 Version June

  • 1. JACK COLE Experienced in the architectural design of various live projects. From small village hubs for RIBA contest entries to multi- million pound industrial projects. AN INDUSTRY EXPERIENCED GRADUATE ARCHITECTURAL ENGINEER Academically trained in the detailed design of structural elements and super structure stability. Awareness of the needs of various parties from experience in multidisciplinary firms. Very high graduate competency in BIM and modeling packages, with a keen interest on expanding on these skills. Industry experience in large scale BIM co-ordination. ARCHITECTURAL DESIGN ENGINEERING KNOWLEDGE BIM / MODELLING TECHNICIAN
  • 2. 2 CONTENTS 01 02 03 Modeling complex geometry and detailing elements on a £355M recycling and energy from waste facility. Suggesting design alterations when possible and issuing drawings. Working within a group of 4 young architects to design a community hub in Sessay, N.Yorkshire. Assisting with the site plan, modeling sections and rendering views for the presentation boards. A collection of shorter projects I was involved in at TATA steel. Displaying a variety of skills and proof of my technical versatility. LeedsRERF-Recyclingandenergyfromwastefacility TATA Steel Projects SessayCommunityHub-RIBAcontest TATA Steel Projects AssortedShortProjects TATA Steel Projects
  • 3. 3 04 05 06 Detailing, construction, and visualisation orientated projects I worked on with Roost Architects. A showcase of some of the small projects and tutorials I’ve undertaken in my spare time to further develop my technical skills. Fronting BIM co-ordination for the project. Devising model conversion work-paths. Undertaking large amounts of building and site modeling. Redesigning site layouts from a logistical standpoint. RoostArchitectsProjects A sample of some projects from Roost AssortedTutorials/Experience Personal development projects TempleboroughBiomassFacility TATA Steel Projects
  • 4. 4 LEEDS RECYCLING / ENERGY FROM WASTE The Leeds RERF is a recycling and energy from waste centre. The £335M project aims to recycle as much as 40% of black bin waste that would otherwise go to landfill. During a summer internship in summer 2013 I had the opportunity to work alongside another intern developing a structural frame to house the projects iconic green wall (right). The second week I spent modelling and developing sheets in Revit for the green-wall structure. I firmly believe getting to know the team during this placement helped immensely with my interview the following year. Being able to see the structure erected during my various site visits during the internship year was surely one of the many highlights of the placement. (The photo to the right shows the green- wall planting boxes being prepared.) TATA Steel Projects ArchitecturalAssistant/Technician
  • 5. 5 Upon its completion it will be the tallest glued laminated timber arch in the UK, standing at 42 meters. It will also hold the record for the largest green-wall utilizing a single irrigation system in the world. (The arch can be seen pictured on the left) Finishes renders were among what I presented to Billionaire Gary Klesch during a tour he took of the TSP York offices. A senior technician and I demonstrated to him how we design our projects at TSP. (Render presented shown below)
  • 6. 6 This was the first live project I have worked on and therefore my activities consisted mainly of making amendments to construction drawings within Revit. This was done by developing the 3-D architecture team model and relating the information to the other disciplines models. Typical sections I would model are shown below. A usual work day consisted of me receiving a sketch from the leading architect and modelling his sketches. Then preparing the drawings to be issued that afternoon. During this period I learnt a lot about detailing / buildups and other architectural qualities. As well as this I experienced a handful of on site meetings and how drawings are prepared for site.
  • 7. 7 Roof maintenance access walkway design meeting. Amendment suggestion I made to reduce visibility from the predominately viewed elevation (as well as reduced steelwork).
  • 8. SESSAY COMMUNITY HUB - RIBA CONTEST TATA Steel Projects ArchitecturalAssistant/Technician 8 The project was a RIBA international competition for the design of a community centre and cricket pavilion (amongst other quality sporting facilities) in the small rural village of Sessay, North Yorkshire. 86 firms from as far as Japan made submissions for the initial contest. The cost for the entire project had to come to around £1.25M - £1.5M, making it the most intimate, and socially focused project I worked on during my time at TSP.
  • 9. 9 I was involved in developing relationship diagrams with the team to reflect the needs of the community into the layout. As well as this there were phasing issues to tackle as to keep the existing facilities and cricket fields in use during the construction phase. My duties on this project included making floor plans from the Revit model (right), developing the carpark layouts ready for the presentation boards. In addition to this I assisted in some of the renders on the following page.
  • 10. 10 The design proposal draws upon the surrounding agricultural vernacular. Whilst aspiring to be striking the “barn-like” structure made it sit within the rural setting of the village. The reduction of heavy masonry outer walls reduced the size and cost of the foundations. Timber cladding panels can be factory prefabricated complete with breathing membrane insulation and possess outstanding thermal and sound insulation properties. The grey brick aimed to give permanence within the setting. I assisted in the rendering of the internal and external visuals followed by post processing in photoshop was utilised in order to make compelling atmospheres for the boards. As well as this I collected precedents to give stylistic options to both us as designers and the client.
  • 11. TATA Steel Projects 11 A collection of shorter projects I was involved in at TSP Testing a variety of skills and proof of my technical versatility TSP-ASSORTEDSHORTPROJECTS Infrastructure Engineer East Coast Mainline When the work load became too much for the track infrastructure department due to people being on holiday I was drafted into their team for a couple weeks to help them. This coincided with work load dropping a bit in the buildings and architecture team meaning I could assist in this work. ETCS is a new form of signalling for trains. My job was to locate existing signal boxes and junctions that this new technology could be housed in.
  • 12. 12 This was the project that was most rooted in engineering principles and problem solving logic. After marking up 8 large A0+ sheets I would then hand over my work to be copied up neatly on AutoCAD by another young professional. Evidence that the team leaders trusted my judgement and sense of responsibility in giving work out to others. Infrastructure Engineer ETCS Signaling Infrastructure East Coast Mainline
  • 13. 13 For a few weeks I worked rendering some visualisation images for the projects client. This was to help them to realise if they could fit all the equipment on the site comfortably. Modelling plant equipment as Revit families and conveyor belts to make sure the size of the factory would be adequate. As well as this I spent some time arranging sheets to present our findings to the client during our weekly meetings. Blötberget Iron Ore - Sweden Architectural Technician
  • 14. Visualisation Research 14 This coupled with Oculus Rift goggles with its stereoscopic vision (simulates true depth) had the potential to make highly immersive walkthroughs. As it turned out I would put this work to one side for the rest of my time at TATA. Templeborough was about to get the , requiring my full attention. Textures and objects like doors needed a considerable amount of extra work assigned to them to make them operate or look like they would in Revit (disrupting ordinary work flow). Also this program costs a few thousand pounds for a licence, and around the same time another games engine called “Unreal” came onto the market as a free open source piece of kit. Trumping Unity in terms of cost and accessibility. The images on the left show the games engine and the oculus rift developers kit. Due to having a keen interest in visualisations and how to make our ideas more clearer to both client and contractor I was handed the chance to do some research. Through research at work and attending a regional BIM seminar I looked into new ways of visualising our projects. I researched into some new methods of rending with tools we already had, new render engines on the market, and even looked at some game engines. I took a particular interest in the game engine Unity whilst attending the seminar. By taking a model through a couple of Autodesk programs I could drop models into a “walkable” space. Allowing a client to freely walk about the building as they so chose. Standard walkthroughs with set paths of models offered some level of immersion, but clearly nothing could quite compare to freely moving about the space as you would be able to if you were actually in the building.
  • 15. 15 In between the work load on Leeds ramping down and the work load on Templborough ramping up I helped out with some detailing and modelling on the Wilton Efw project. Most of this time was spent altering stairs in core locations and fire escapes. The stair tool in Revit is somewhat of a dark art, but I’ve figured out some of its quirks for the future. Wilton Efw - Modelling / Drafting In addition to this I learnt some more general technicians tools in Revit such as door/windowschedulingandkeyfinishes. (Finishes renders for the client Sita below)
  • 16. ASSORTEDROOSTARCHITECTSPROJECTS 16 Roost architects dealt with a lot of clients that were not very in tune with the construction industry and therefore were not as capable of visualising build designs as people who deal with them all day. This meant that architectural renders and visualisations were of the up most importance as for a client to realise what the design entailed. This game me the chance of producing some renders in V-Ray for sketch up, as well as overshadowing as the architect photo- shopped the images to touch them up. Architectural Assistant
  • 17. 150mm cut stone cills reveals and head 150 140mm nominal coarsed reclaimed stone outer leaf 150mm cut stone Wall cavity 200mm including 100mm Kingspan TW50 insulation 10mm 7kN/mm2 (Medium density) blockwork inner leaf 12.5mm plasterboard on dot and dabs Thermabate cavity closer 100mm of Rockwool between trusses and a further 200mm of Rockwool above. To achieve a min U-value of 0.13W/m^2K 140mm nominal coarsed reclaimed stone outer leaf Wall cavity 200mm including 100mm Kingspan TW50 insulation 10mm 7kN/mm2 (Medium density) blockwork inner leaf 12.5mm plasterboard on dot and dabs Breather membrane Slate tiles Timber roof trusses to manufacturers recommendations Inset mesh 25 x 32mm SW timber battens Maintain 50mm continuous air gap U Value = 0.18 W/m2 K Wall ties 50mm air gap for ventilation 100x50mm SW wall plate strapped to inner leaf with galvanised steel straps 120mm diameter 112 round galvanised steel gutter Fascia board CL 4900 50 GF 0 GL Stone cill Foundation to SE requirements Underfloor heating Install perimeter insulation with a min R- value of 0.75m2K/W Seal between the wall and floor air barrier with a flexible sealant GF 0 150 Ensure that cavities are kept clean of mortar snots or other debris during construction. The wall insulation installed below the wall DPC must be fit for purpose with regards to water absorption. Underfloor heating GL Foundation to SE requirements Install perimeter insulation with a min R- value of 0.75m2K/W Seal between the wall and floor air barrier with a flexible sealant 140mm nominal coarsed reclaimed stone outer leaf Wall cavity 200mm including 100mm Kingspan TW50 insulation 10mm 7kN/mm2 (Medium density) blockwork inner leaf Cavity tray Weepholes 150mm hardcore 50mm sand blinding Visqueen 1200g DPM 75mm sand cement screed 150mm kingspan TF70 500g visqueen seperating layer 140mm nominal coarsed reclaimed stone outer leaf 140mm nominal coarsed reclaimed stone outer leaf 150mm cut stone Wall cavity 200mm including 100mm Kingspan TW50 insulation 10mm 7kN/mm2 (Medium density) blockwork inner leaf 12.5mm plasterboard on dot and dabs Wall ties Inset mesh Catnic lintel Thermabate cavity closer 120mm half round galvanised steel gutter Painted timber SW fascia board Truss CL 4900 150mm cut stone NOTES 1. DO NOT SCALE FROM THIS DRAWING - USE FIGURED DIMENSIONS ONLY 2. READ IN CONJUNCTION WITH ALL OTHER RELEVANT CONSULTANTS / SPECIALISTS DRAWINGS. REPORT ANY DISCREPANCIES BEFORE AFFECTED WORK COMMENCES 3. ALL SETTING OUT DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR BEFORE WORK COMMENCES. 4. THIS DRAWING REMAINS COPYRIGHT OF ROOST ARCHITECTS COPY / DISTRIBUTE ONLY WITH CONSENT OF ROOST ARCHITECTS. 5. ALL DETAILS TO BE ACCREDITED CONSTRUCTION DETAILS COMPLIANT SCALE (@ A1) CHECKED BY TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE STATUS PURPOSE OF ISSUE CODE SUITABILITY DESCRIPTION JC SC Building Regulations As indicated Details Sheet 2 2015 - 053 Greenlane Farm John Fawthrop A211 06/05/16 1 : 10 Window Elevation 1 1 : 10 Window Detail 4 1 : 10 Roof Eaves Detail 3 1 : 10 Door Threshold Detail 61 : 10 Wall / GF Slab Detail 5 1 : 10 Window Detail 2 Rev Description Date 17 Most of my time at Roost architects was spent working up buildings regulations drawings ready for site construction on new building residential and extensions to existing residential buildings. My detailing skills were something Simon (the owner of Roost) helped develop a lot during my time there. Although I feel it is one of my weaker skills at the moment I am keen on further developing it into one of my strengths. I would frequently take phone calls from clients and make them to manufacturers. Sizing elements such as insulation, timber joists and trusses. As well as confirming technical build ups of elements such as walls, roofs, slabs, intermediate floors etc. Architectural Technician
  • 18. ASSORTEDSELF TAUGHT WORK Self Taught Projects 18 Here I have highlighted some of the more complex parametric tutorials I have undertaken after stopping the MEng degree. It should be noted this section could include rendering and modelling tutorials / experience from Zero Fifty. (But was left out to keep the portfolio size down). I was interested in the free Revit plug-in called Dynamo and decided to complete some tutorials on the software. It’s essentially grasshopper for Revit. Parametric design excites me immensely as I truly believe it is the way forward in terms of complete holistic design between the disciplines. On the right is a system the dilates holes in the cladding structure according to the solar radiation expected.
  • 19. 19 Grasshopper / RhinoTutorials However the two tools that I’m most interested in were Rhinoceros and Grasshopper. To myself (and from the opinion of other professionals) they are the industry standard for complex modeling. Pictured on the right is a tutorial for applying structural diagrids to NURB curved surfaces. NURB - Non-uniform rational basis spline. (A clever modelling algorithm reducing computational power required, and opening the doors to more interesting solutions.
  • 20. 20 The panels can be orientated to minimise manufacturing waste. Panels are tagged to assist fabrication/ manufacturing processes. Parametric Space Frame - A parametric steel structure created using Grasshopper.Panelisation / Manufacturing
  • 21. Structural Design Using Karamba 21 By applying a loading pattern to the structure you can start to interrogate the stability of the super structure. Analysis can be provided to find how much compression, tension and torsion the members were subjected to.
  • 22. TEMPLEBOROUGH BIOMASS FACILITY TATA Steel Projects Assistant/Technician/BIMCo-ord 22 During the second half of my placement I worked mainly on the Templeborough Biomass project. This is where my responsibility on projects really started to increase and I felt truly instrumental to the buildings and architecture team at TATA Steel Projects. Project value £170M / LD’s £250K a week.
  • 23. 23 The project is a Biomass facility, burning reclaimed wood to drive steam turbines for electricity. During this project I mainly took on the roles of an Architectural Assistant and project BIM coordinator. This still included some duties I undertook on Leeds such as issuing sheets and live models, however on this project I did little to no 2-D detailing. Instead I was modelling in 3-D large amounts of the site, components and other ancillary context massing. (Images showing various software formats) I learnt Autodesk Navisworks to assist in project co-ordination. (Pictured left). This is clash detection software specifically designed to highlight clashes (Overlaps in the models). The problems were highlighted within the register and discussions could be made as how to tackle the issue. Aside from Revit BIM co-ordination I also devised a workflow path to make our Revit models useful to the process engineers and their models useful to ours. This included a lot of research, trouble shooting and phone calls to certain parties.
  • 24. 24 In addition to this, my main piece of work on the project was to tackle site circulation. We had been given a site that couldn’t operate with the required vehicle loading during operation. This would take into account the loading and unloading of vehicles, other operative vehicles, civilian traffic and right of access through roads for other adjacent industry vehicles. Most of my time on this project developing and evolving the site layout working in liaison with other teams in the company such as Highways, M&E, Bridges, Civils, Geotechnics and Drainage. Site Circulation One of the tools we used to rectify this issue, and I subsequently learnt during this project, was Autodesk Vehicle tracking. By taking the site plans we were developing from an architectural perspective I could “drive” around virtual vehicles on the site. Whether they be the loading lorries, ordinary cars, waste disposal lorries or forklift trucks. From this we could qualify the site layout as acceptable for that revision, until the next issue arose where we would repeat this method of designing out the problem then re-testing. A site plan with vehicle paths sketched on as well as notes for further tracking can be seen below. The tracking allowed us to further develop the overall site plan concept plan we would use to explain our site strategy to all parties. SiteVehicleTracking
  • 25. 25 One of the activities I undertook in liaison with another team was ensuring occupant and civilian safety on site (in regards to the walkways). From this we could further the precision of the tracking, highlight preliminary walkways from an early stage and aim to increase occupant safety. Due to the project being altered more than was initially expected when the company received the concept design a lot of logistical thinking was required to solve potentially project halting issues. I believe my course prepared me well for such logistical architectural design which is why I was selected to tackle such problems before any of the other aspiring young architects. Biomass Logistics Site Access Design
  • 26. E-mail: jackacole@sky.com Mobile: 07527336987 Address: 17 Mayville Place Hyde Park Leeds West Yorkshire LS6 1NE LinkedIn: Profile Link