SlideShare a Scribd company logo
Now thanks to my 3 years working with Revit professionally, I can help companies have drawings flexible in further changes, improve in terms of coherency
and accuracy, without wasting time drawing so many details, with my expertise in making functional families and parametric skills of drawings.
since Revit and BIM-oriented software programs were not prevalent, I was unemployed for a few months. Over this period, I used to majorly discover
challenges during the technical development of buildings’ projects, followed by working on solutions by making families and preparing items for the
development of projects.
roadening my horizons, enhancing my knowledge in the best way, learning so many new things. These are some of my reasons for being
adventurous in Italy, Germany, and the United States.
It was 2012 when I started working with Revit and did my academic projects with this software. After my graduation in December 2014,
B
Sina Hashemi
www.Linkedin.com/in/sinah-arch
CONTENTS
03
04
01 02
01
Arsenale Pontofico
03
Firouz-Abadi Hospital
02
Venice island –
Ear Structure
04
Master Final Thesis
Coding the Concept in Dynamo
Sketch
THE END
Detailed Drawing
Execution
Laser Cutting the
Stone pieces, using
the dynamo code of
Laser Cut
Origami Counter
Real Project
Arsenale Pomtofico – Academic Project
Sapienza University of Rome
Rome, Italy - 2018
Architectural Requalification
The course aimed to provide theoretical and methodological tools needed to set up and develop appropriate renovation interventions aimed at the Arsenale Pontofico building belongs to the 20th century.
In this group project, I was in charge of the design proposal for the interior space. Since the interior is spacious for two levels, I proposed an outstanding spaceframe structure made of glass and steel that
goes through the interior space with two levels connected with escalators, combined with plywood floors, aside from existing walls and columns with original materials. The ground floor is considered for
Sunday marketing stalls, followed by a coffee bar on the first floor and a studying lounge on the second floor. This design makes unique visions to each other part of the interior space.
Project’s Objective – Architectural Requalification
Ground floor is considered for Sunday
marketing stalls, followed by coffee bar in first
floor and studying lounge in second floor. This
design makes unique visions to each other part
of the interior space.
Interior Renders
Second Floor
First Floor
The spaceframe structure made of glass and
steel that goes through the interior space with
two levels connected with escalators, combined
with plywood floors, aside from existing walls
and columns with original materials. The
ground floor is considered for Sunday
marketing stalls, followed by a coffee bar on
the first floor and a studying lounge on the
second floor. This design makes unique visions
to each other part of the interior space.
STUDING LOUNGES – SOCIAL SPACES – MAGAZINES ROOM
MARKETS – FOODS n BEVERAGES - COFFEE
3D Section – Spaces Diagram
Liman Consulting Engineers
Tehran, Iran - 2016
Façade Design and Technical Development
Firouz-Abadi Hospital– Professional Project
Liman company’s major field of work is designing and executing healthcare projects. Once my supervisor faced my interest
in façade designing, offered me to design and technical development of the Firouz-Abadi Hospital project. I had some
restrictions for this job, no extra console and not any slanted element in the façade skin. At the same time, an innovative
design that should be different from other projects constructed by the company was demanding. Therefore, I utilized
reveals on walls, playing with materials to make a unique way design pattern, and in a subsequent step, developed that
approach to other sides and parts.
As well as façade works, I was in charge of working on technical developments plans and sections by helping my
colleagues. Working with other specialists of the project, mechanical engineers and structural engineers for instance, was a
wonderful experience to get in deep touch with all challenges of executing an enormous project.
Dry Stone Infrastructure
Parametric Height – Parametric Location of Beam connection
Roof Connection Details
Parametric Width
3D Panel
Parametric Height
Parametric Width
Dry Stone Connection
Parametric Dimension
Prepared 2D details for technical development are
mainly in dwg format.
Importing them in Revit and making them adaptive
with the project are usually tricky. By importing
them in Revit family environment, stacked with
proper reference lines, and nested family, I managed
to create time saving families that led to flexible and
accurate drawing.
Technical Development
Wall Section
As part of the project, a take-off of Wall
Schedule based on Thickness, length and
area was demanded. To making walls
with 10cm and 12cm together, 20cm
22cm and 24 cm together, and etc. I
used formula as shown blow.
Technical Development
Professional Wall Schedule
Design Options
• Every moment you work values
• Every decision you make matters
• Every idea you get cares much
Designing plenty of options and fragile modifications on
design jobs, are essential parts of the designing process. Your
supervisor in a firm should be aware of how much work you
have done.
Thanks to Revit design options, you can record and have all of
the options you created, modify them to have maximum
options all through one project.
Besides, you can combine different options of one part of
your project with that of another part. For example, you
design different options for the entrance of a building and do
the same for that of the façade. Then you can merge those
different options with each other and get the best outcome.
In this part of project, I had challenge of drawing Audience
Vision Lines for screen that had not fixed location on
drawing time. This situation could led to repetitive redrawing
works and time wasting in future. Therefore, I made it flexible
for any time and any dimension.
Technical Development
Parametric Amphi-Theater Detailing
By constraining dash-lines with screen, the drawing never
been shattered by changing screen’s position and size.
Besides this detail is usable for any other project and adaptive
in any dimension and quantity for easing work of drawer.
Finally the option which the whole
console has different color and random
touches of that on the other parts of the
building was approved by my supervisor
and client. I had some restrictions for this
job ,no extra console or and not any
slanted element in façade skin for
instance. At the same time, an innovative
design which should be different from
other projects constructed by the
company was demanded. Therefore, I
utilized reveals on walls and playing with
materials and made a unique way design
pattern and in subsequent step,
developed that approach to other sides
and parts.
Final Design
Venice island – Ear Structure
Academic Project
Bochum University of Applied Science
Bochum, Germany - 2019
Architectural Design Studio
A very huge Island near Venice, Which is 21 Hectare in area. Project tasks was dealing with some existing buildings and developing new structures.
But designing a structure which is considered as an invitation for voyagers to this Island, was one of my major points of this project. This design is inspired from EAR that represents
“listening to the tranquil sound of river“. According to the diagram below, the choice of material and structure form is based on softness of ear’s anatomy. Earlobe part for instance
is made by grass (to make place for lay down and enjoying the view of sea) and glass in façade. Spaceframe structure with composite panels are used for the other parts of façade.
According to the diagram below, the choice of material and structure
form is based on softness of ear’s anatomy. Earlobe part for instance is
made by grass (to make place for lay down and enjoying the view of sea)
and glass in façade. Spaceframe structure with composite panels are
used for the other parts of façade.
Concept
Ramp
Pool
Ramp
Green space for laying down
Restaurant
Stalls
Ramp
Diagram
Vertical Access
All levels are connected with each other only with Ramps. There is no
Elevators or Stairs box at all.
As of my deep interest in BIM, for my master final thesis, I intended to do a practical conservation project utilizing BIM from fundamental steps to end of construction and preservation after construction,
providing architectural documents as well as analyses and schedules by using BIM oriented software programs and 3D scanning.
Intercontinental motors building, designed by O’Neil Ford in 1960 was chosen as case study of this project. It’s been decided for new intervention of this building with a new function. Recreational space
(multi-functional use) for the glass box and Cinema-Theatre for the Saloon. Dealing with phases of this building (Existing, fabrics that should be demolished or maintained and New intervention construction),
3D scan of it’s brick wall facade, LEED study and solar analysis for a sustainable design, taking off schedules and maintaining Mortars using 3D Scan and Revit tools were some parts of this project.
HBIM Process for the Rehabilitation of Urban Built Heritage
UTSA - Sapienza
San Antonio, TX, USA – 2022
Adaptive Reuse
Intercontinental Motors Building – Master’s Thesis
Interior Natural Light
Subtracting the building
Vertically to make Patio by
demolishing Slab of Level 2 and
Roof
In majority works of O'Neil Ford,
he usually use natural light for
interior spaces rather than
artificial ones. As in our new
Intervention design, we are
transforming services' spaces to
functional spaces like offices and
public lounges, we need to make
some patio by subtracting some
parts in floors and roof. Besides,
adding green spaces and trees
into these patios can enhance
tranquility of office spaces and
waiting areas, which
psychologically leads to increase
in efficiency of employees in
office spaces as well as better
experience for people in their
waiting time.
Result
These created Patios through demolishing some parts of the slab and the roof, not only provide
interior natural light with high windows, but also make tranquil views for interior sitting people.
Glass Box Showroom
Front-Head of the building, the glass box showroom, acts as the vital signature of the building from it's
establishment. Therefor it is recommended to save all of the modern architecture fabrications used in this part of the
building as it is.
The composite panel wall, however, faces some modifications to comply with the new functionality of the building.
The walls in the top floor will be demolished. In the first floor, as this showroom should have no straight connection
with the office rooms behind in the new intervention of the project, all current connections with supporting rooms,
the aisle way and windows for example, should be removed. Only one part of the wall will be remained the same.
Multi-Use Cinema Hall
A 180 degree theatre show room dividable with a moving wall
acting as both screen projection and acoustic insulation. This
converts a theater hall into two cinema hall.
Interior Renders
Second Floor
First Floor
Photogrammetry, is a useful tool in BIM process which can help to get accurate 3D scan of the existing building
with real conditions and use it in our project. For this step, a brick wall was chosen to start, with 52 pictures of
above 0.60 quality rate that led to 56,453 points in Tie Points and 58,327,931 points in Dense Cloud mode.
The model merged with the project accurately through the software program Autodesk Navisworks.
EROSIONS’ DRAWING
Export img to dwg in illustrator
with Trace Tool
The generated drawing in AutoCAD Import in Revit and place in the proper
place and scale
Surveying
Agisoft 3D Scan
Surveying some erosion of the building in AutoCAD with hatches and lines was a part of the project. Traditionally, I had to draw manually
over a picture, but in this case I utilized multiple use of some software programs to have it done automatically. I adjusted the photograph
through the Photoshop, converted that black and white picture to DWG with help of illustrator, and the job was done. This process saved
much of time and energy to get a valuable data.
To preserve valuable fabrications of this
historical building, the execution, and
documentation of this project are
challenging. Major renovation activities
must be done inside the building.
Meanwhile, the exterior walls and roof
should not be in danger of demolition.
Specifically, The interior cinema/theater
construction demands giant vehicles, and
there is no way to bring such things
inside but the two voids which are
provided as high doors' demolition.
Besides, as the interior seats are precast
concretes, to pass them from the
provided voids, they should be divided
into smaller pieces.
How to manage the Challenges above?
To figure out the challenges and correctly perform this project, an accurate
schedule is demanded. MSP project is a suitable tool to plan this project.
This plan is building information, and according to the 4D BIM definition,
this information can be modeled through Autodesk Navisworks. We
designate each task of the plan a 4D-ID and at the same time, we
designate each element in the Revit file with the related 4D-ID.
To simulate the construction steps, we merge the MSP data with the Revit
file, to control the workflow of the project's logistics.
To Watch the Animation, hit
this link to my LinkedIn post.
Instead of manually drafting each stage
of a project, through BIM it is possible to
organize time stage of every fabrication
of the building and document the
project's life cycle based on. In
conservation projects, after modeling the
existing projects, we can designate
fabrications that should be preserved,
mark elements to be demolished, apply
temporary elements in real world
execution stage, and present New
Intervention fabrications.
4D BIM
Timing
To have our design qualified for LEED points, Spatial Daylight
Autonomy (sDA) and Annual Sunlight Exposure (ASE) should
follow specific regulations. The glass box and southern rooms
behind in this building have ASE of higher than 20%, meaning
these rooms receive too many hours of direct sunlight,
negatively impacting direct sunlight on occupant comfort.
With the insight Plugin in
Autodesk Revit, the ASE
and sDA calculations of
the rooms were done and
assisted me making the
best decision for the New
Intervention.
With the application of Louver on 3 Sides of the Glass
box, the ASE of this massive glazed room decreased
to 15%. Besides, by utilizing the horizontal sun shield,
the director room, which had the issue of ASE in the
existing situation, receives a suitable amount of direct
sunlight. However, this addition, in my opinion,
seems a big penetration in the characteristic of this
modern building, instead, enhancing the comfort of
the interior space in the long run. Such regulations
are demanding in this era and future.
5D BIM
SOLAR ANALYSIS AND LEED STUDY
My Devised Solution
Sina Hashemi - Portfolio

More Related Content

Similar to Sina Hashemi - Portfolio

ITD/ICI PRESENTATION
ITD/ICI PRESENTATIONITD/ICI PRESENTATION
ITD/ICI PRESENTATION
hirensiva
 
ICI ITD (1).pdf
ICI ITD (1).pdfICI ITD (1).pdf
ICI ITD (1).pdfgabchin29
 
Ici itd
Ici itdIci itd
ICI ITD.pptx
ICI ITD.pptxICI ITD.pptx
ICI ITD.pptxgabchin29
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065
Khor Hao Xiang
 
Civil Engineering CDR Sample (ANZSCO Code: 233211)
Civil Engineering CDR Sample (ANZSCO Code: 233211)Civil Engineering CDR Sample (ANZSCO Code: 233211)
Civil Engineering CDR Sample (ANZSCO Code: 233211)
Olivia Jackson
 
Sonal Gupta , Interior Design
Sonal Gupta , Interior DesignSonal Gupta , Interior Design
Sonal Gupta , Interior Design
dezyneecole
 
internship ppt.pptx
internship ppt.pptxinternship ppt.pptx
internship ppt.pptx
AdityaSapkale1
 
1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docx1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docx
jeremylockett77
 
Dissertation on Parametrism
Dissertation on ParametrismDissertation on Parametrism
Dissertation on Parametrism
RishabhJain572815
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-SamplesMichael Lyon
 
Portifolio of Selected Works
Portifolio of Selected WorksPortifolio of Selected Works
Portifolio of Selected WorksRKinzelman
 
ecotectanalysis10_whitepaper_revit_userguide_technical.pdf
ecotectanalysis10_whitepaper_revit_userguide_technical.pdfecotectanalysis10_whitepaper_revit_userguide_technical.pdf
ecotectanalysis10_whitepaper_revit_userguide_technical.pdf
KhKhulan2
 
CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4patrick webster
 
Nova Architecture
Nova ArchitectureNova Architecture
Nova Architecture
RafaelAponte19
 
Dubai Skyline Welcomes the New Museum of the Future.docx
Dubai Skyline Welcomes the New Museum of the Future.docxDubai Skyline Welcomes the New Museum of the Future.docx
Dubai Skyline Welcomes the New Museum of the Future.docx
Dr. Ehsan Bayat
 

Similar to Sina Hashemi - Portfolio (20)

ITD/ICI PRESENTATION
ITD/ICI PRESENTATIONITD/ICI PRESENTATION
ITD/ICI PRESENTATION
 
ICI ITD (1).pdf
ICI ITD (1).pdfICI ITD (1).pdf
ICI ITD (1).pdf
 
ICI ITD.pdf
ICI ITD.pdfICI ITD.pdf
ICI ITD.pdf
 
ICI ITD.pdf
ICI ITD.pdfICI ITD.pdf
ICI ITD.pdf
 
Ici itd
Ici itdIci itd
Ici itd
 
Ici itd
Ici itdIci itd
Ici itd
 
ICI ITD.pptx
ICI ITD.pptxICI ITD.pptx
ICI ITD.pptx
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065
 
Civil Engineering CDR Sample (ANZSCO Code: 233211)
Civil Engineering CDR Sample (ANZSCO Code: 233211)Civil Engineering CDR Sample (ANZSCO Code: 233211)
Civil Engineering CDR Sample (ANZSCO Code: 233211)
 
Sonal Gupta , Interior Design
Sonal Gupta , Interior DesignSonal Gupta , Interior Design
Sonal Gupta , Interior Design
 
internship ppt.pptx
internship ppt.pptxinternship ppt.pptx
internship ppt.pptx
 
1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docx1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docx
 
Dissertation on Parametrism
Dissertation on ParametrismDissertation on Parametrism
Dissertation on Parametrism
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-Samples
 
Portifolio of Selected Works
Portifolio of Selected WorksPortifolio of Selected Works
Portifolio of Selected Works
 
ecotectanalysis10_whitepaper_revit_userguide_technical.pdf
ecotectanalysis10_whitepaper_revit_userguide_technical.pdfecotectanalysis10_whitepaper_revit_userguide_technical.pdf
ecotectanalysis10_whitepaper_revit_userguide_technical.pdf
 
CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4
 
Nova Architecture
Nova ArchitectureNova Architecture
Nova Architecture
 
sangeetal_INTERIOR
sangeetal_INTERIORsangeetal_INTERIOR
sangeetal_INTERIOR
 
Dubai Skyline Welcomes the New Museum of the Future.docx
Dubai Skyline Welcomes the New Museum of the Future.docxDubai Skyline Welcomes the New Museum of the Future.docx
Dubai Skyline Welcomes the New Museum of the Future.docx
 

Recently uploaded

一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
madhavlakhanpal29
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
SudhanshuMandlik
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
9a93xvy
 

Recently uploaded (20)

一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
 

Sina Hashemi - Portfolio

  • 1.
  • 2. Now thanks to my 3 years working with Revit professionally, I can help companies have drawings flexible in further changes, improve in terms of coherency and accuracy, without wasting time drawing so many details, with my expertise in making functional families and parametric skills of drawings. since Revit and BIM-oriented software programs were not prevalent, I was unemployed for a few months. Over this period, I used to majorly discover challenges during the technical development of buildings’ projects, followed by working on solutions by making families and preparing items for the development of projects. roadening my horizons, enhancing my knowledge in the best way, learning so many new things. These are some of my reasons for being adventurous in Italy, Germany, and the United States. It was 2012 when I started working with Revit and did my academic projects with this software. After my graduation in December 2014, B Sina Hashemi www.Linkedin.com/in/sinah-arch
  • 3. CONTENTS 03 04 01 02 01 Arsenale Pontofico 03 Firouz-Abadi Hospital 02 Venice island – Ear Structure 04 Master Final Thesis
  • 4. Coding the Concept in Dynamo Sketch THE END Detailed Drawing Execution Laser Cutting the Stone pieces, using the dynamo code of Laser Cut Origami Counter Real Project
  • 5. Arsenale Pomtofico – Academic Project Sapienza University of Rome Rome, Italy - 2018 Architectural Requalification
  • 6. The course aimed to provide theoretical and methodological tools needed to set up and develop appropriate renovation interventions aimed at the Arsenale Pontofico building belongs to the 20th century. In this group project, I was in charge of the design proposal for the interior space. Since the interior is spacious for two levels, I proposed an outstanding spaceframe structure made of glass and steel that goes through the interior space with two levels connected with escalators, combined with plywood floors, aside from existing walls and columns with original materials. The ground floor is considered for Sunday marketing stalls, followed by a coffee bar on the first floor and a studying lounge on the second floor. This design makes unique visions to each other part of the interior space. Project’s Objective – Architectural Requalification
  • 7. Ground floor is considered for Sunday marketing stalls, followed by coffee bar in first floor and studying lounge in second floor. This design makes unique visions to each other part of the interior space. Interior Renders Second Floor First Floor The spaceframe structure made of glass and steel that goes through the interior space with two levels connected with escalators, combined with plywood floors, aside from existing walls and columns with original materials. The ground floor is considered for Sunday marketing stalls, followed by a coffee bar on the first floor and a studying lounge on the second floor. This design makes unique visions to each other part of the interior space.
  • 8. STUDING LOUNGES – SOCIAL SPACES – MAGAZINES ROOM MARKETS – FOODS n BEVERAGES - COFFEE 3D Section – Spaces Diagram
  • 9. Liman Consulting Engineers Tehran, Iran - 2016 Façade Design and Technical Development Firouz-Abadi Hospital– Professional Project Liman company’s major field of work is designing and executing healthcare projects. Once my supervisor faced my interest in façade designing, offered me to design and technical development of the Firouz-Abadi Hospital project. I had some restrictions for this job, no extra console and not any slanted element in the façade skin. At the same time, an innovative design that should be different from other projects constructed by the company was demanding. Therefore, I utilized reveals on walls, playing with materials to make a unique way design pattern, and in a subsequent step, developed that approach to other sides and parts. As well as façade works, I was in charge of working on technical developments plans and sections by helping my colleagues. Working with other specialists of the project, mechanical engineers and structural engineers for instance, was a wonderful experience to get in deep touch with all challenges of executing an enormous project.
  • 10. Dry Stone Infrastructure Parametric Height – Parametric Location of Beam connection Roof Connection Details Parametric Width 3D Panel Parametric Height Parametric Width Dry Stone Connection Parametric Dimension Prepared 2D details for technical development are mainly in dwg format. Importing them in Revit and making them adaptive with the project are usually tricky. By importing them in Revit family environment, stacked with proper reference lines, and nested family, I managed to create time saving families that led to flexible and accurate drawing. Technical Development Wall Section
  • 11. As part of the project, a take-off of Wall Schedule based on Thickness, length and area was demanded. To making walls with 10cm and 12cm together, 20cm 22cm and 24 cm together, and etc. I used formula as shown blow. Technical Development Professional Wall Schedule
  • 12. Design Options • Every moment you work values • Every decision you make matters • Every idea you get cares much Designing plenty of options and fragile modifications on design jobs, are essential parts of the designing process. Your supervisor in a firm should be aware of how much work you have done. Thanks to Revit design options, you can record and have all of the options you created, modify them to have maximum options all through one project. Besides, you can combine different options of one part of your project with that of another part. For example, you design different options for the entrance of a building and do the same for that of the façade. Then you can merge those different options with each other and get the best outcome. In this part of project, I had challenge of drawing Audience Vision Lines for screen that had not fixed location on drawing time. This situation could led to repetitive redrawing works and time wasting in future. Therefore, I made it flexible for any time and any dimension. Technical Development Parametric Amphi-Theater Detailing By constraining dash-lines with screen, the drawing never been shattered by changing screen’s position and size. Besides this detail is usable for any other project and adaptive in any dimension and quantity for easing work of drawer.
  • 13. Finally the option which the whole console has different color and random touches of that on the other parts of the building was approved by my supervisor and client. I had some restrictions for this job ,no extra console or and not any slanted element in façade skin for instance. At the same time, an innovative design which should be different from other projects constructed by the company was demanded. Therefore, I utilized reveals on walls and playing with materials and made a unique way design pattern and in subsequent step, developed that approach to other sides and parts. Final Design
  • 14. Venice island – Ear Structure Academic Project Bochum University of Applied Science Bochum, Germany - 2019 Architectural Design Studio A very huge Island near Venice, Which is 21 Hectare in area. Project tasks was dealing with some existing buildings and developing new structures. But designing a structure which is considered as an invitation for voyagers to this Island, was one of my major points of this project. This design is inspired from EAR that represents “listening to the tranquil sound of river“. According to the diagram below, the choice of material and structure form is based on softness of ear’s anatomy. Earlobe part for instance is made by grass (to make place for lay down and enjoying the view of sea) and glass in façade. Spaceframe structure with composite panels are used for the other parts of façade.
  • 15. According to the diagram below, the choice of material and structure form is based on softness of ear’s anatomy. Earlobe part for instance is made by grass (to make place for lay down and enjoying the view of sea) and glass in façade. Spaceframe structure with composite panels are used for the other parts of façade. Concept
  • 16. Ramp Pool Ramp Green space for laying down Restaurant Stalls Ramp Diagram
  • 17. Vertical Access All levels are connected with each other only with Ramps. There is no Elevators or Stairs box at all.
  • 18. As of my deep interest in BIM, for my master final thesis, I intended to do a practical conservation project utilizing BIM from fundamental steps to end of construction and preservation after construction, providing architectural documents as well as analyses and schedules by using BIM oriented software programs and 3D scanning. Intercontinental motors building, designed by O’Neil Ford in 1960 was chosen as case study of this project. It’s been decided for new intervention of this building with a new function. Recreational space (multi-functional use) for the glass box and Cinema-Theatre for the Saloon. Dealing with phases of this building (Existing, fabrics that should be demolished or maintained and New intervention construction), 3D scan of it’s brick wall facade, LEED study and solar analysis for a sustainable design, taking off schedules and maintaining Mortars using 3D Scan and Revit tools were some parts of this project. HBIM Process for the Rehabilitation of Urban Built Heritage UTSA - Sapienza San Antonio, TX, USA – 2022 Adaptive Reuse Intercontinental Motors Building – Master’s Thesis
  • 19. Interior Natural Light Subtracting the building Vertically to make Patio by demolishing Slab of Level 2 and Roof In majority works of O'Neil Ford, he usually use natural light for interior spaces rather than artificial ones. As in our new Intervention design, we are transforming services' spaces to functional spaces like offices and public lounges, we need to make some patio by subtracting some parts in floors and roof. Besides, adding green spaces and trees into these patios can enhance tranquility of office spaces and waiting areas, which psychologically leads to increase in efficiency of employees in office spaces as well as better experience for people in their waiting time. Result These created Patios through demolishing some parts of the slab and the roof, not only provide interior natural light with high windows, but also make tranquil views for interior sitting people. Glass Box Showroom Front-Head of the building, the glass box showroom, acts as the vital signature of the building from it's establishment. Therefor it is recommended to save all of the modern architecture fabrications used in this part of the building as it is. The composite panel wall, however, faces some modifications to comply with the new functionality of the building. The walls in the top floor will be demolished. In the first floor, as this showroom should have no straight connection with the office rooms behind in the new intervention of the project, all current connections with supporting rooms, the aisle way and windows for example, should be removed. Only one part of the wall will be remained the same.
  • 20. Multi-Use Cinema Hall A 180 degree theatre show room dividable with a moving wall acting as both screen projection and acoustic insulation. This converts a theater hall into two cinema hall. Interior Renders Second Floor First Floor
  • 21. Photogrammetry, is a useful tool in BIM process which can help to get accurate 3D scan of the existing building with real conditions and use it in our project. For this step, a brick wall was chosen to start, with 52 pictures of above 0.60 quality rate that led to 56,453 points in Tie Points and 58,327,931 points in Dense Cloud mode. The model merged with the project accurately through the software program Autodesk Navisworks. EROSIONS’ DRAWING Export img to dwg in illustrator with Trace Tool The generated drawing in AutoCAD Import in Revit and place in the proper place and scale Surveying Agisoft 3D Scan Surveying some erosion of the building in AutoCAD with hatches and lines was a part of the project. Traditionally, I had to draw manually over a picture, but in this case I utilized multiple use of some software programs to have it done automatically. I adjusted the photograph through the Photoshop, converted that black and white picture to DWG with help of illustrator, and the job was done. This process saved much of time and energy to get a valuable data.
  • 22. To preserve valuable fabrications of this historical building, the execution, and documentation of this project are challenging. Major renovation activities must be done inside the building. Meanwhile, the exterior walls and roof should not be in danger of demolition. Specifically, The interior cinema/theater construction demands giant vehicles, and there is no way to bring such things inside but the two voids which are provided as high doors' demolition. Besides, as the interior seats are precast concretes, to pass them from the provided voids, they should be divided into smaller pieces. How to manage the Challenges above? To figure out the challenges and correctly perform this project, an accurate schedule is demanded. MSP project is a suitable tool to plan this project. This plan is building information, and according to the 4D BIM definition, this information can be modeled through Autodesk Navisworks. We designate each task of the plan a 4D-ID and at the same time, we designate each element in the Revit file with the related 4D-ID. To simulate the construction steps, we merge the MSP data with the Revit file, to control the workflow of the project's logistics. To Watch the Animation, hit this link to my LinkedIn post. Instead of manually drafting each stage of a project, through BIM it is possible to organize time stage of every fabrication of the building and document the project's life cycle based on. In conservation projects, after modeling the existing projects, we can designate fabrications that should be preserved, mark elements to be demolished, apply temporary elements in real world execution stage, and present New Intervention fabrications. 4D BIM Timing
  • 23. To have our design qualified for LEED points, Spatial Daylight Autonomy (sDA) and Annual Sunlight Exposure (ASE) should follow specific regulations. The glass box and southern rooms behind in this building have ASE of higher than 20%, meaning these rooms receive too many hours of direct sunlight, negatively impacting direct sunlight on occupant comfort. With the insight Plugin in Autodesk Revit, the ASE and sDA calculations of the rooms were done and assisted me making the best decision for the New Intervention. With the application of Louver on 3 Sides of the Glass box, the ASE of this massive glazed room decreased to 15%. Besides, by utilizing the horizontal sun shield, the director room, which had the issue of ASE in the existing situation, receives a suitable amount of direct sunlight. However, this addition, in my opinion, seems a big penetration in the characteristic of this modern building, instead, enhancing the comfort of the interior space in the long run. Such regulations are demanding in this era and future. 5D BIM SOLAR ANALYSIS AND LEED STUDY My Devised Solution