PREFIN. METAL FLASHING CAP TO
MATCH MS2 COLOUR
MODIFIED CAP SHEET
EXT. GRADE SHEATING BOARD
WOOD BLOCKING WITH R10
INSULATION INFILLEXTEND 2
MODIFIED CAP
SHEET TO SIDING
PREFIN. METAL
FLASHING W. DRIP
EDGE TO MATCH
MS2 COLOUR.
PREFIN. BLACK
METAL CLOSURE
PIECE AT MITERED
SIDING
5% SLOPE
MS2
R1b
EXTEND 2 MODIFIED CAP
SHEET TO SIDING
PREFIN. METAL FLASHING EDGE
TO MATCH MS2 COLOUR.
EXTEND CONT. SECOND CAP
SHEET 300mm FROM PARAPET
CANT STRIP
300
75
ANCHOR BOLT AT BASE AND SILL
FOR SHEAR LOAD RESISTANCE
SHEET NUMBER
TITLE
ISSUE CHART
GREGG BUILDING CONSULTANTS
PROJECT
Approved
Checked
Drawn
Job Number
Sheet Information
4/7/20154:22:23PMF:GB6.BLDG3013-DetailingModule11Module11ParapetDetail7.rvt
S-007
TYPICAL FLASHING
DETAIL @ PARAPET
GBC HEALTH
SCIENCES
BUILDING
TORONTO, ON
51 DOCKSIDE DRIVE
TORONTO, ON
GEORGE
BROWN
COLLEGE
S. MANN
J. GREGG
DETAIL 7
1 : 10
TYPICAL FLASHING DETAIL @ PARAPET
1 3D AXO VIEW - PARAPET DETAIL
2
MARK ISSUE DATE
1
2
3
5
6
7
9
8
10
4
LEGEND
1. R30 SEMI-RIGID INSULATION TYPE 4 (INS-4)
2. GAL STEEL SIDING MOUNTED VERTICALLY.
3. METAL FLASHING CAP.
4. WOOD BLOCK FRAMING FILLED WITH MIN. R20 BATT. INSUL.
5. RAINSCREEN MEMB. WRAPPED ABOVE SHATHING AND BLOCKING.
6. 200mm CONC. FLOOR SLAB.
7. COMPOSITE DECK AS PART OF ROOF TYPE R1b. REFER TO STRUCTURAL
8. 150mm COLD FORMED STEEL FRAMING 400 mm O.C.
9. W610X153 WIDE FLANGE STEEL BEAM. REFER TO STRUCTURAL
10. GALV. STEEL L CHANNEL MOUNTED TO INTERIOR EDGE OF W BEAM

More Related Content

What's hot

Senarai semak pelan bangunan baru serentak
Senarai semak pelan bangunan baru serentakSenarai semak pelan bangunan baru serentak
Senarai semak pelan bangunan baru serentak
Ray Tan Wing Hoe
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
SHAZEBALIKHAN1
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
Jeanne Hoo
 
Pre caste Concrete
Pre caste ConcretePre caste Concrete
Pre caste Concrete
University of Tikrit
 
TALAT Lecture 2104.01: Case Study on Glass Roof
TALAT Lecture 2104.01: Case Study on Glass RoofTALAT Lecture 2104.01: Case Study on Glass Roof
TALAT Lecture 2104.01: Case Study on Glass Roof
CORE-Materials
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
Arissa Loh
 
Earthquake resistant design
Earthquake resistant designEarthquake resistant design
Earthquake resistant design
Osama Farooquie
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)
Lek Yuen
 
Building ornament
Building ornamentBuilding ornament
Building ornament
Faddy Jamali
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
Rohaidah Aida
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
Est
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame door
Est
 
highland tower case study
highland tower case studyhighland tower case study
highland tower case study
amira688
 
08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure
Faculty of fine arts -Cairo. Egypt.
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
Lee Pei Gie
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
Angeline KH
 
General structural notes
General structural notesGeneral structural notes
General structural notes
Tony Gravagne, PE
 
Mezzanine floor system in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...
Mezzanine floor system   in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...Mezzanine floor system   in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...
Mezzanine floor system in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...
SEO Tech Solution
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
Shao Xun Sean Thun
 
Curtain walls
Curtain wallsCurtain walls
Curtain walls
Anna Bedwell
 

What's hot (20)

Senarai semak pelan bangunan baru serentak
Senarai semak pelan bangunan baru serentakSenarai semak pelan bangunan baru serentak
Senarai semak pelan bangunan baru serentak
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
 
Pre caste Concrete
Pre caste ConcretePre caste Concrete
Pre caste Concrete
 
TALAT Lecture 2104.01: Case Study on Glass Roof
TALAT Lecture 2104.01: Case Study on Glass RoofTALAT Lecture 2104.01: Case Study on Glass Roof
TALAT Lecture 2104.01: Case Study on Glass Roof
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Earthquake resistant design
Earthquake resistant designEarthquake resistant design
Earthquake resistant design
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)
 
Building ornament
Building ornamentBuilding ornament
Building ornament
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame door
 
highland tower case study
highland tower case studyhighland tower case study
highland tower case study
 
08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure08-Working details-ceiling-Knauf metal profiles_brochure
08-Working details-ceiling-Knauf metal profiles_brochure
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
General structural notes
General structural notesGeneral structural notes
General structural notes
 
Mezzanine floor system in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...
Mezzanine floor system   in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...Mezzanine floor system   in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...
Mezzanine floor system in Chennai|Vijayawada|Nellore|Mumbai|Pune|Delhi|Tric...
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Curtain walls
Curtain wallsCurtain walls
Curtain walls
 

J. Gregg 100875103 - Parapet Detail 7 TYPICAL FLASHING DETAIL @ PARAPET

  • 1. PREFIN. METAL FLASHING CAP TO MATCH MS2 COLOUR MODIFIED CAP SHEET EXT. GRADE SHEATING BOARD WOOD BLOCKING WITH R10 INSULATION INFILLEXTEND 2 MODIFIED CAP SHEET TO SIDING PREFIN. METAL FLASHING W. DRIP EDGE TO MATCH MS2 COLOUR. PREFIN. BLACK METAL CLOSURE PIECE AT MITERED SIDING 5% SLOPE MS2 R1b EXTEND 2 MODIFIED CAP SHEET TO SIDING PREFIN. METAL FLASHING EDGE TO MATCH MS2 COLOUR. EXTEND CONT. SECOND CAP SHEET 300mm FROM PARAPET CANT STRIP 300 75 ANCHOR BOLT AT BASE AND SILL FOR SHEAR LOAD RESISTANCE SHEET NUMBER TITLE ISSUE CHART GREGG BUILDING CONSULTANTS PROJECT Approved Checked Drawn Job Number Sheet Information 4/7/20154:22:23PMF:GB6.BLDG3013-DetailingModule11Module11ParapetDetail7.rvt S-007 TYPICAL FLASHING DETAIL @ PARAPET GBC HEALTH SCIENCES BUILDING TORONTO, ON 51 DOCKSIDE DRIVE TORONTO, ON GEORGE BROWN COLLEGE S. MANN J. GREGG DETAIL 7 1 : 10 TYPICAL FLASHING DETAIL @ PARAPET 1 3D AXO VIEW - PARAPET DETAIL 2 MARK ISSUE DATE 1 2 3 5 6 7 9 8 10 4 LEGEND 1. R30 SEMI-RIGID INSULATION TYPE 4 (INS-4) 2. GAL STEEL SIDING MOUNTED VERTICALLY. 3. METAL FLASHING CAP. 4. WOOD BLOCK FRAMING FILLED WITH MIN. R20 BATT. INSUL. 5. RAINSCREEN MEMB. WRAPPED ABOVE SHATHING AND BLOCKING. 6. 200mm CONC. FLOOR SLAB. 7. COMPOSITE DECK AS PART OF ROOF TYPE R1b. REFER TO STRUCTURAL 8. 150mm COLD FORMED STEEL FRAMING 400 mm O.C. 9. W610X153 WIDE FLANGE STEEL BEAM. REFER TO STRUCTURAL 10. GALV. STEEL L CHANNEL MOUNTED TO INTERIOR EDGE OF W BEAM