SlideShare a Scribd company logo
1 of 25
1
Presentation Title:
“History, location and features of Islam
Barrage.
(Prepared BY: Asad Kareem)
2
Irrigation Engineering Presentation
Group NO 002
Group Members:
 Ghulam Abbas, UET-13
 Zain Iqbal, UET-15
 Waseem Ejaz, UET-17
 Asad Kareem, UET-19
 Shabir Hussain, UET-21
Supervised By:
 Engr. Saleman Ali Zaidi
DEPARTMENT OF CIVIL ENGINEERING
SWEDISH COLLEGE OF ENGINEERING AND TECHNOLOGY
WAH CANTT, PAKISTAN
3
Presentation Overview
Barrage
History of Islam Barrage
Location of Islam Barrage
Nili Bar area and its location
Silent features and design discharge of Islam barrage
No of bays of Islam barrage
Canal system on Islam Barrage
Problems of Islam Barrage
Necessity of Rehabilitation
Project of Rehabilitation
4
What is barrage?
A dam placed in a watercourse to increase the depth of
water or to divert it into a channel for navigation or
irrigation
5
Barrage Diagram:
6
History of Islam Barrage :
 Islam Barrage is constructed on Sutlej river in Punjab
Provence of Pakistan.
 It was constructed across River Sutlej during 1922-
1927 as a component of Sutlej Valley Project.
 Sutlej valley project was one of the greatest gift by
Nawab Sir Sadiq Muhammad Khan Abbassi to the
State of Bahawalpur. In 1921 Secretary of the State
suggested the Sutlej valley project.
7
History:
 According to this project new canals should emit by
making dams on three rivers and these canals should
supply water to a huge area of the State. These dams
are called Head Sulemanki, Head Islam and Head
Punjnad.
 This project was started in 1922to 1933.
 The appropriate cost of this project was 33 crores and
31 lacs at the end of 1933 out of which 14 crores were
provided by the State of Bahawalpur. Two crores were
paid from the treasure of the State and the left amount
was paid by taking loan from the government.
8
Location of Islam Barrage:
 It is located on River Sutlej about 15 kilometres
(9.3 mi) north of Tehsil Hasilpur and about 7.5
kilometres (4.7 mi) south of Luddan on the Vehari-
Hasilpur road in DistricBahawalpur, Punjab Pakistan.
 It was completed as Sutlej Valley Project for irrigation
of Nili Bar area.
 Coordinates for dams are as following
29°49′35″N
72°32′57″E
9
Location on Pakistan Map
10
Location of Nili Bar Area:
 "Bar" is the name given to areas in Punjab which were
thick forests before the arrival of the modern canal
irrigation system.
 Its soil is very fertile, as this plain is formed by the
mud that has been collected by rivers flowing from
the Himalayas.
 Nili Bar is a geographical region in Punjab, Pakistan.
 It is between the rivers Ravi and Satluj.
11
Nili Bar area
Sahiwal,Okara,Pakpatan
12
Silent Features of Islam Barrage:
13
Design Discharge comparison with
Other Barrages:
14
0
200000
400000
600000
800000
1000000
1200000
1400000
1600000
Islam Barrage Tonsa Barrage Chashma Sukkur
Barrage
Trimmu Sidhnai
Barrages Design Discharge comparison
Barrages Design Discharge comparison
No of Bays
 Originally the main weir had 16 bays each 60 feet wide
flanked by right and left undersluices each consisting
of 4 bays also 60 feet wide each.
 However, after the damage caused by 1929 flood, when
six of its central bays (No. 11 to 16) collapsed, the
configuration of the barrage was substantially changed
in 1929-30 by replacing 6 collapsed bays of 60 feet
width with 11 bays of reduced width of 29 feet each.
Now number of bays is 29 where 18 are 60 feet wide
and 11 bays are 29 feet wide.
15
Islam Barrage
16
Canal System in Islam Barrage:
 The main purpose of Islam barrage are Irrigation and
Flood control.
 For irrigation, it has two off taking larger canals which
irrigate 689,000 acres of land in Southern Punjab and
700, 000 acres in the former Bahawalpur state.
 Mailsi Canal (4833 cusecs) arises from its right Bank
and Bahawal Canal (5400 cusecs) from the left. A third
smaller canal is called Qaim Canal (558 cusecs) also
arising from the left bank.
17
Problems of Islam Barrage:
 The major problem was insufficient flood passage
capacity of barrage in relation to flood intensities
developed over a 100-year return period.
 The poor structural state of the headwork has been
documented to be poor in June 1998, due to
inattention, lack of interest, and the operations of the
headwork has suffered. Every September when the
flood level rise and India releases a large amount of
water, it creates havoc in areas downstream from the
head works.
18
Problems of Islam Barrage:
According to a 2011 report, River Sutlej at this point is
the most polluted river in South Asia. The combined
unregulated discharge of Urban and Industrial waste
during its course through India and later Pakistan is
the most likely source of this problem.
19
Polluted Satluj:
20
Necessity of Rehabilitation
 In the Barrage the barrage, the main weir and the gates
operating mechanism are presently in a falling down
condition.
 The aging process and lack of maintenance are significant
damage to the regulating gates and hoisting equipment.
 Any further damage to this barrage can lead it to non
operative causing and will lead to to non-production of
agricultural crops, loss of revenue and increasing the
restoration cost, adversely affecting the national economy
in additional to human, social and environmental disaster.
21
Project on Rehabilitation:
The project envisages preparing detailed design of
rehabilitation and up gradation works at Islam Barrage
after review of the recommendations contained in the
Feasibility Report.
 Rehabilitation of Main Barrage and subsidiary weir.
 Rehabilitation and up gradation of Gates and Hoisting
System.
 Raising and Strengthening of flood protection bunds, and
provision of wetting channels.
22
Project on Rehabilitation:
 Provision of instrumentation and control system for
uplift pressure monitoring.
 Design of Gate Automation arrangements for local &
central control, if feasible, with suitable option of
alternate power supply.
 Provision of Emergency Spillway to cater for flood
flows in excess of design discharge capacity of the
barrage to avoid untoward breaches.
23
Picture Gallery:
24
25

More Related Content

What's hot

What's hot (20)

Canal system of Pakistan
Canal system of PakistanCanal system of Pakistan
Canal system of Pakistan
 
water resources of Pakistan & Indus Basin Irrigation system
water resources of Pakistan & Indus Basin Irrigation systemwater resources of Pakistan & Indus Basin Irrigation system
water resources of Pakistan & Indus Basin Irrigation system
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
 
Link canals, Baraages and Dams
Link canals, Baraages and DamsLink canals, Baraages and Dams
Link canals, Baraages and Dams
 
INDUS WATER TREATY.
INDUS WATER TREATY.INDUS WATER TREATY.
INDUS WATER TREATY.
 
Indus water treaty of 1960 and role of world bank
Indus water treaty of 1960 and role of world bankIndus water treaty of 1960 and role of world bank
Indus water treaty of 1960 and role of world bank
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system
 
Irrigation system of Pakistan
Irrigation system of PakistanIrrigation system of Pakistan
Irrigation system of Pakistan
 
River Indus
River Indus River Indus
River Indus
 
Water resources of pakistan A Lecture By Mr Allah Dad Khan Visiting Profes...
Water resources of pakistan  A Lecture  By Mr Allah Dad Khan  Visiting Profes...Water resources of pakistan  A Lecture  By Mr Allah Dad Khan  Visiting Profes...
Water resources of pakistan A Lecture By Mr Allah Dad Khan Visiting Profes...
 
Chenab River
Chenab RiverChenab River
Chenab River
 
indus basin and salient fatures of barrages and link canals in pakistan
indus basin and salient fatures of barrages and link canals in pakistanindus basin and salient fatures of barrages and link canals in pakistan
indus basin and salient fatures of barrages and link canals in pakistan
 
Present Condition of Meghna River
Present Condition of Meghna RiverPresent Condition of Meghna River
Present Condition of Meghna River
 
Water Risk and Crisis of Pakistan
Water Risk and Crisis of PakistanWater Risk and Crisis of Pakistan
Water Risk and Crisis of Pakistan
 
Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...
Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...
Indo-Bangladesh Trans-boundary Ganges Water Interactions: Water Sharing to Co...
 
irrigation systems
irrigation systems irrigation systems
irrigation systems
 
Canal System of Pakistan
Canal System of PakistanCanal System of Pakistan
Canal System of Pakistan
 
Indus water treaty and its Aftermath - The complete Story
Indus water treaty and its Aftermath - The complete Story Indus water treaty and its Aftermath - The complete Story
Indus water treaty and its Aftermath - The complete Story
 
Indus Basin Irrigation System Of Pakistan
Indus Basin  Irrigation System Of PakistanIndus Basin  Irrigation System Of Pakistan
Indus Basin Irrigation System Of Pakistan
 
Types of Hydraulic Structures
Types of Hydraulic StructuresTypes of Hydraulic Structures
Types of Hydraulic Structures
 

Similar to Islam barrage

Pstn at mangalayatan 12 apr
Pstn at mangalayatan 12 aprPstn at mangalayatan 12 apr
Pstn at mangalayatan 12 apr
Ajay Chaturvedi
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
usman ijaz
 
Water Supply & Sanitation
Water Supply & SanitationWater Supply & Sanitation
Water Supply & Sanitation
rk_misra
 
Inter linking of river in india
Inter linking of river in indiaInter linking of river in india
Inter linking of river in india
Puspendu Samanta
 
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASURFLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
HAFIZABDULHASEEB
 

Similar to Islam barrage (20)

Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehman
 
Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01
 
Pstn at mangalayatan 12 apr
Pstn at mangalayatan 12 aprPstn at mangalayatan 12 apr
Pstn at mangalayatan 12 apr
 
PMBP SALIENTS
PMBP SALIENTSPMBP SALIENTS
PMBP SALIENTS
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
 
Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project
 
Ganges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation ProjectGanges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation Project
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control System
 
Water Supply & Sanitation
Water Supply & SanitationWater Supply & Sanitation
Water Supply & Sanitation
 
INTERLINKING OF RIVERS
INTERLINKING OF             RIVERSINTERLINKING OF             RIVERS
INTERLINKING OF RIVERS
 
Banqiao Dam Failure
Banqiao Dam FailureBanqiao Dam Failure
Banqiao Dam Failure
 
River Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic TransformationRiver Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic Transformation
 
Inter linking of river in india...
Inter linking of river in india...Inter linking of river in india...
Inter linking of river in india...
 
Inter linking of river in india
Inter linking of river in indiaInter linking of river in india
Inter linking of river in india
 
Three gorges dam project
Three gorges dam projectThree gorges dam project
Three gorges dam project
 
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASURFLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
 
FLOOD CONTINGENCY PLAN 2011
FLOOD CONTINGENCY PLAN 2011FLOOD CONTINGENCY PLAN 2011
FLOOD CONTINGENCY PLAN 2011
 
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASURFLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
FLOOD CONTINGENCY PLAN 2011 DISTRICT GOVT KASUR
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Recently uploaded (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Islam barrage

  • 1. 1
  • 2. Presentation Title: “History, location and features of Islam Barrage. (Prepared BY: Asad Kareem) 2
  • 3. Irrigation Engineering Presentation Group NO 002 Group Members:  Ghulam Abbas, UET-13  Zain Iqbal, UET-15  Waseem Ejaz, UET-17  Asad Kareem, UET-19  Shabir Hussain, UET-21 Supervised By:  Engr. Saleman Ali Zaidi DEPARTMENT OF CIVIL ENGINEERING SWEDISH COLLEGE OF ENGINEERING AND TECHNOLOGY WAH CANTT, PAKISTAN 3
  • 4. Presentation Overview Barrage History of Islam Barrage Location of Islam Barrage Nili Bar area and its location Silent features and design discharge of Islam barrage No of bays of Islam barrage Canal system on Islam Barrage Problems of Islam Barrage Necessity of Rehabilitation Project of Rehabilitation 4
  • 5. What is barrage? A dam placed in a watercourse to increase the depth of water or to divert it into a channel for navigation or irrigation 5
  • 7. History of Islam Barrage :  Islam Barrage is constructed on Sutlej river in Punjab Provence of Pakistan.  It was constructed across River Sutlej during 1922- 1927 as a component of Sutlej Valley Project.  Sutlej valley project was one of the greatest gift by Nawab Sir Sadiq Muhammad Khan Abbassi to the State of Bahawalpur. In 1921 Secretary of the State suggested the Sutlej valley project. 7
  • 8. History:  According to this project new canals should emit by making dams on three rivers and these canals should supply water to a huge area of the State. These dams are called Head Sulemanki, Head Islam and Head Punjnad.  This project was started in 1922to 1933.  The appropriate cost of this project was 33 crores and 31 lacs at the end of 1933 out of which 14 crores were provided by the State of Bahawalpur. Two crores were paid from the treasure of the State and the left amount was paid by taking loan from the government. 8
  • 9. Location of Islam Barrage:  It is located on River Sutlej about 15 kilometres (9.3 mi) north of Tehsil Hasilpur and about 7.5 kilometres (4.7 mi) south of Luddan on the Vehari- Hasilpur road in DistricBahawalpur, Punjab Pakistan.  It was completed as Sutlej Valley Project for irrigation of Nili Bar area.  Coordinates for dams are as following 29°49′35″N 72°32′57″E 9
  • 11. Location of Nili Bar Area:  "Bar" is the name given to areas in Punjab which were thick forests before the arrival of the modern canal irrigation system.  Its soil is very fertile, as this plain is formed by the mud that has been collected by rivers flowing from the Himalayas.  Nili Bar is a geographical region in Punjab, Pakistan.  It is between the rivers Ravi and Satluj. 11
  • 13. Silent Features of Islam Barrage: 13
  • 14. Design Discharge comparison with Other Barrages: 14 0 200000 400000 600000 800000 1000000 1200000 1400000 1600000 Islam Barrage Tonsa Barrage Chashma Sukkur Barrage Trimmu Sidhnai Barrages Design Discharge comparison Barrages Design Discharge comparison
  • 15. No of Bays  Originally the main weir had 16 bays each 60 feet wide flanked by right and left undersluices each consisting of 4 bays also 60 feet wide each.  However, after the damage caused by 1929 flood, when six of its central bays (No. 11 to 16) collapsed, the configuration of the barrage was substantially changed in 1929-30 by replacing 6 collapsed bays of 60 feet width with 11 bays of reduced width of 29 feet each. Now number of bays is 29 where 18 are 60 feet wide and 11 bays are 29 feet wide. 15
  • 17. Canal System in Islam Barrage:  The main purpose of Islam barrage are Irrigation and Flood control.  For irrigation, it has two off taking larger canals which irrigate 689,000 acres of land in Southern Punjab and 700, 000 acres in the former Bahawalpur state.  Mailsi Canal (4833 cusecs) arises from its right Bank and Bahawal Canal (5400 cusecs) from the left. A third smaller canal is called Qaim Canal (558 cusecs) also arising from the left bank. 17
  • 18. Problems of Islam Barrage:  The major problem was insufficient flood passage capacity of barrage in relation to flood intensities developed over a 100-year return period.  The poor structural state of the headwork has been documented to be poor in June 1998, due to inattention, lack of interest, and the operations of the headwork has suffered. Every September when the flood level rise and India releases a large amount of water, it creates havoc in areas downstream from the head works. 18
  • 19. Problems of Islam Barrage: According to a 2011 report, River Sutlej at this point is the most polluted river in South Asia. The combined unregulated discharge of Urban and Industrial waste during its course through India and later Pakistan is the most likely source of this problem. 19
  • 21. Necessity of Rehabilitation  In the Barrage the barrage, the main weir and the gates operating mechanism are presently in a falling down condition.  The aging process and lack of maintenance are significant damage to the regulating gates and hoisting equipment.  Any further damage to this barrage can lead it to non operative causing and will lead to to non-production of agricultural crops, loss of revenue and increasing the restoration cost, adversely affecting the national economy in additional to human, social and environmental disaster. 21
  • 22. Project on Rehabilitation: The project envisages preparing detailed design of rehabilitation and up gradation works at Islam Barrage after review of the recommendations contained in the Feasibility Report.  Rehabilitation of Main Barrage and subsidiary weir.  Rehabilitation and up gradation of Gates and Hoisting System.  Raising and Strengthening of flood protection bunds, and provision of wetting channels. 22
  • 23. Project on Rehabilitation:  Provision of instrumentation and control system for uplift pressure monitoring.  Design of Gate Automation arrangements for local & central control, if feasible, with suitable option of alternate power supply.  Provision of Emergency Spillway to cater for flood flows in excess of design discharge capacity of the barrage to avoid untoward breaches. 23
  • 25. 25