This document is the Indian Standard code for general construction using steel structures (IS 800:2007). It provides guidelines and requirements for the design, fabrication, and erection of steel structures. Some key points:
- It outlines the materials, loads, structural analysis methods, limit state design approach, and design of members (tension, compression, bending) and connections.
- Factors like effective length, shear strength, stiffeners, plate girders, and combined forces are addressed.
- Fabrication, erection, inspection, fatigue, durability, fire resistance, and earthquake design are also covered.
- The standard aims to promote safe and economic steel construction in India based on the latest