SlideShare a Scribd company logo
ABC LTD Company
Internal Audit Guidelines for
ABC LTDGM-AS
ABC QMS
Prepared by: ABC QMS SEPG
ABC QMS Internal Audit Guidelines

HP Global Method for
Application Services
Error! Unknown document property name. Page 2 of 6
Guideline (1.5 /Error! Unknown document
property name.)
Error! Unknown document property name.
© Copyright 2016 Hewlett-Packard Development Company, L.P.
Valid agreement required.
internalauditpolicy-161103144034
Last changed: 03 November 2016 at 14:40
Document Revision History Document Revision History
Ver. No. Ver. Date PreparedBy ReviewedBy Approve
d By
Affected Section& Summaryof Change PIF
No.
ABC QMS Internal Audit Guidelines

HP Global Method for
Application Services
Error! Unknown document property name. Page 3 of 6
Guideline (1.5 /Error! Unknown document
property name.)
Error! Unknown document property name.
© Copyright 2016 Hewlett-Packard Development Company, L.P.
Valid agreement required.
internalauditpolicy-161103144034
Last changed: 03 November 2016 at 14:40
Table of Contents
1. Obtaining the Project List ................................................................................................................. 4
2. Projects Selection Criteria ................................................................................................................ 4
3. Waiver Criteria .................................................................................................................................. 4
4. Auditors/Observer Selection............................................................................................................. 4
5. Auditors/Observer Qualifying Criteria............................................................................................... 4
6. Writing NCs....................................................................................................................................... 5
7 Escalation Process ........................................................................................................................... 6
ABC QMS Internal Audit Guidelines

HP Global Method for
Application Services
Error! Unknown document property name. Page 4 of 6
Guideline (1.5 /Error! Unknown document
property name.)
Error! Unknown document property name.
© Copyright 2016 Hewlett-Packard Development Company, L.P.
Valid agreement required.
internalauditpolicy-161103144034
Last changed: 03 November 2016 at 14:40
1. Obtaining the ProjectList
 Obtain the project list from DU QM and the ‘DU Head Count’ from the DU Administrator
 DU council members to verify the project details for completeness
2. Projects Selection Criteria
The project selection criteria caters to projects with a combination of below characteristics but is not limited to
it. The list below is only an indicative list and the criteria could be different for each audit cycle.
 At least 50% coverage in each Delivery Unit/Business Unit(DU/BU)
 Good representation of all types of projects executed
 At least 35 - 40% People coverage in each Delivery Unit
 New projects, including projects under transition
 Projects not audited in previous cycle
 Critical projects – based on feedback received from BU/DU/Section Heads, DU Quality Managers,
Quality Reps, PMO
 Projects implementing pilot processes for at least three months
 Previous Audit performance
 Customer facing projects
3. Waiver Criteria
Refer to the Internal Audit Process
Note: Audit Council reserves the authority for Waiver
4. Auditors/ObserverSelection
 List of auditors is maintained by the audit council.
 AC to update the Auditors and Observers list for any new persons joining the Company and moved out
of the Company before every audit cycle.
 Project Leads and above should be included in the audit companies (They should figure either as a
trained 'Auditor' or 'Observer'. If not trained, their nominations need to be sent to the L&D and/or audit
council for internal audit training. The newly trained practitioners need to be an ‘observer’ in at least
one audit cycle)
 Ascertain if existing Auditors & Observers are still in the DU/BU or have moved between DUs/BUs
 Ascertain if any of the individuals on the list are onsite
 Identify if any new Managers have joined the DU/BU – obtain the name, employee number, grade and
Reporting Manager information from the DU/BU Admin/HR.
 Ping the new employee and obtain their Audit training & experience details.
 Delete info for individuals who have left the DU/BU or add the info for new joinee.
 If any Audit Company members have moved between DUs/BUs; is onsite or has left the Organization
then discuss with Audit Council to identify a new member
 Prepare Audit Companies – ideally an Audit company should have the Auditors from the same DU/BU
so that coordination becomes easy.
 Separate audit companies are formed with ‘CMMI’ model conversant auditors and ‘ITSM’ model
conversant auditors
 Inter practice audits are encouraged
 New Auditor/Observer is added based on previous audit experience. Refer to the Table below for the
Auditor Qualifying criteria.
ABC QMS Internal Audit Guidelines

HP Global Method for
Application Services
Error! Unknown document property name. Page 5 of 6
Guideline (1.5 /Error! Unknown document
property name.)
Error! Unknown document property name.
© Copyright 2016 Hewlett-Packard Development Company, L.P.
Valid agreement required.
internalauditpolicy-161103144034
Last changed: 03 November 2016 at 14:40
5. Auditors/ObserverQualifying Criteria
Lead Auditor: To qualify as lead auditor, the person should have been:
 Trained on ABC LTDGM AS
 Lead and managed projects
 Trained on CMMI/ITSM Framework(recommended)
 Practicing ABC LTDGM AS processes for at least 6 months
 Completed the internal audit training at ABC LTD
 Lead audits at ABC LTD
OR
 Participated in SEI-CMMI assessment as an assessor
OR
 Participated as an auditor in at least in 3 audit cycles at ABC LTD
OR
 Conducted at least 5 cycles of Internal Audit in his/her earlier work experience
OR
 Certified lead auditor
Auditor: To qualify as auditor, the person should have:
 Trained on ABC LTDGM AS
 Lead and managed projects
 Trained on CMMI/ITSM Framework
 Practicing ABC LTDGM AS processes for at least 6 months
 Completed the internal audit training at ABC LTD
 Been an observer on one Occasion + an Auditee on another occasion
OR
 Conducted at least 3 cycles of Internal Audit in his/her earlier work experience
Observer: To qualify as an Observer:
 All Project Leads and above at ABC LTD are qualified as Observers
AND
 Trained on ABC LTDGM AS
 Trained on CMMI/ITSM Framework
 Practicing ABC LTDGM AS processes for at least 6 months
 Should have completed internal audit training at ABC LTD
OR
 Had exposure to Internal Audit concepts in his/her earlier work experience.
6. Writing NCs
6.1.1 Ensure care while writing NCs especially with the following attributes: Clarity, Relevance to the project,
Usability, Verifiability, Ability for analysis
6.1.2 The deviation should be clearly stated so that appropriate corrective action can be identified easily.
6.1.3 It is also important to write non-conformance in a manner that is directly usable by the project by
identifying the corrective actions.
6.1.4 Use the following format to write non-conformance:
ABC QMS Internal Audit Guidelines

HP Global Method for
Application Services
Error! Unknown document property name. Page 6 of 6
Guideline (1.5 /Error! Unknown document
property name.)
Error! Unknown document property name.
© Copyright 2016 Hewlett-Packard Development Company, L.P.
Valid agreement required.
internalauditpolicy-161103144034
Last changed: 03 November 2016 at 14:40
 <Requirement> state in clear terms what was expected with the reference to process/ guideline that is
not adhered to
 However <state the deviation from the requirement> Write the deviation in a brief, unambiguous,
helpful and depersonalized manner. It should contain the specific issue.
 <Impact of the deviation> State the impact of non conformance on the project deliverable, along with
reference to Quality Management System.
 <Evidence> specific Document, Issue, Date, ID, Version and Roles/Areas which are observed as a
deviation. Use discretion in mentioning the evidence such that it is impersonal.
6.1.5 Use the following guidelines for classifying the NC as ‘major’ or ‘minor :
 Major Non conformance : Flaw in the process which could affect product/service quality
 Minor Non conformance: Slight deviation in the process which may not affect product/service quality
Refer to the Internal Audit training collateral for more details.
6.1.6 In NC writing avoid making blanket or open-ended statements. Mention the deviation in precise terms
with the extent or measure of deviation.
7 Escalation Process
The escalation process followed during the audit process:
No
No
Yes
Yes
No
Level1
From: Auditor
To: Audit Company lead
Issue/Conflict
resolved?
Level2
From: Audit Company Lead
To: Peer Audit Company Lead
Issue/Conflict
resolved?
Closed**
Level3
From: Peer Audit Company Lead
To: Audit Council / Audit Council Head
** 1.Issue
dropped
2. CA/PA
initiated
3.Close
Audit
Note: Timely resolution of escalations ensures
timely action and closure of audit process.

More Related Content

Similar to Internal audit policy

IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptxIIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
ssuser991a01
 
Business Analyst Training
Business  Analyst  TrainingBusiness  Analyst  Training
Business Analyst Training
Craig Brown
 
06304021
0630402106304021
06304021
Nafiur Rahman
 
FREE CBAP v3 Simulation Question test-set 01
FREE CBAP v3 Simulation Question test-set 01FREE CBAP v3 Simulation Question test-set 01
FREE CBAP v3 Simulation Question test-set 01
LN Mishra CBAP
 
Business continuity presentation
Business continuity presentationBusiness continuity presentation
Business continuity presentation
SteveKutzer
 
1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
Malcolm Sanders
 
Prepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docxPrepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docx
ChantellPantoja184
 
auditing Fram . from the start to Reporting .pdf
auditing Fram . from the start to Reporting .pdfauditing Fram . from the start to Reporting .pdf
auditing Fram . from the start to Reporting .pdf
nguyenanvuong2007
 
Midterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docx
Midterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docxMidterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docx
Midterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docx
jacmariek5
 
Five Ways To Overcome Project Management Challenge
Five Ways To Overcome Project Management Challenge Five Ways To Overcome Project Management Challenge
Five Ways To Overcome Project Management Challenge
Rock Interview
 
How to Navigate the Audit Process
How to Navigate the Audit ProcessHow to Navigate the Audit Process
How to Navigate the Audit Process
Travis P. Jack CPA, QKA
 
Audit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdfAudit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdf
Simar Neasy
 
Guidelines to Review Work products
Guidelines to Review Work productsGuidelines to Review Work products
Guidelines to Review Work products
Ashok Kumar
 
Midterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docx
Midterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docxMidterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docx
Midterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docx
jacmariek5
 
The project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project successThe project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project success
Mark Troncone MBA, PMP, CBAP, ITILv3, CSM
 
Audit report writing 5
Audit report writing 5Audit report writing 5
Audit report writing 5
DJones68
 
Istqb fl chap_3_edited
Istqb fl chap_3_editedIstqb fl chap_3_edited
Istqb fl chap_3_edited
Akash gupta
 
Agile in a highly regulated organization: part 2 2014
Agile in a highly regulated organization: part 2 2014Agile in a highly regulated organization: part 2 2014
Agile in a highly regulated organization: part 2 2014
Tami Flowers
 
Internal Process Audit
Internal Process AuditInternal Process Audit
Internal Process Audit
intellisenseit
 
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Institut Lean France
 

Similar to Internal audit policy (20)

IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptxIIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
 
Business Analyst Training
Business  Analyst  TrainingBusiness  Analyst  Training
Business Analyst Training
 
06304021
0630402106304021
06304021
 
FREE CBAP v3 Simulation Question test-set 01
FREE CBAP v3 Simulation Question test-set 01FREE CBAP v3 Simulation Question test-set 01
FREE CBAP v3 Simulation Question test-set 01
 
Business continuity presentation
Business continuity presentationBusiness continuity presentation
Business continuity presentation
 
1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
 
Prepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docxPrepare a 350- to 700-word paper in which you explain the ro.docx
Prepare a 350- to 700-word paper in which you explain the ro.docx
 
auditing Fram . from the start to Reporting .pdf
auditing Fram . from the start to Reporting .pdfauditing Fram . from the start to Reporting .pdf
auditing Fram . from the start to Reporting .pdf
 
Midterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docx
Midterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docxMidterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docx
Midterm Exam Fall 2015 ACCT 612 – Auditing Instructions • After you .docx
 
Five Ways To Overcome Project Management Challenge
Five Ways To Overcome Project Management Challenge Five Ways To Overcome Project Management Challenge
Five Ways To Overcome Project Management Challenge
 
How to Navigate the Audit Process
How to Navigate the Audit ProcessHow to Navigate the Audit Process
How to Navigate the Audit Process
 
Audit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdfAudit Reports Communicating Assurance Engagement Results.pdf
Audit Reports Communicating Assurance Engagement Results.pdf
 
Guidelines to Review Work products
Guidelines to Review Work productsGuidelines to Review Work products
Guidelines to Review Work products
 
Midterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docx
Midterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docxMidterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docx
Midterm Exam Fall 2015ACCT 612 – AuditingInstructions·.docx
 
The project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project successThe project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project success
 
Audit report writing 5
Audit report writing 5Audit report writing 5
Audit report writing 5
 
Istqb fl chap_3_edited
Istqb fl chap_3_editedIstqb fl chap_3_edited
Istqb fl chap_3_edited
 
Agile in a highly regulated organization: part 2 2014
Agile in a highly regulated organization: part 2 2014Agile in a highly regulated organization: part 2 2014
Agile in a highly regulated organization: part 2 2014
 
Internal Process Audit
Internal Process AuditInternal Process Audit
Internal Process Audit
 
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
 

Recently uploaded

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 

Recently uploaded (20)

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 

Internal audit policy

  • 1. ABC LTD Company Internal Audit Guidelines for ABC LTDGM-AS ABC QMS Prepared by: ABC QMS SEPG
  • 2. ABC QMS Internal Audit Guidelines  HP Global Method for Application Services Error! Unknown document property name. Page 2 of 6 Guideline (1.5 /Error! Unknown document property name.) Error! Unknown document property name. © Copyright 2016 Hewlett-Packard Development Company, L.P. Valid agreement required. internalauditpolicy-161103144034 Last changed: 03 November 2016 at 14:40 Document Revision History Document Revision History Ver. No. Ver. Date PreparedBy ReviewedBy Approve d By Affected Section& Summaryof Change PIF No.
  • 3. ABC QMS Internal Audit Guidelines  HP Global Method for Application Services Error! Unknown document property name. Page 3 of 6 Guideline (1.5 /Error! Unknown document property name.) Error! Unknown document property name. © Copyright 2016 Hewlett-Packard Development Company, L.P. Valid agreement required. internalauditpolicy-161103144034 Last changed: 03 November 2016 at 14:40 Table of Contents 1. Obtaining the Project List ................................................................................................................. 4 2. Projects Selection Criteria ................................................................................................................ 4 3. Waiver Criteria .................................................................................................................................. 4 4. Auditors/Observer Selection............................................................................................................. 4 5. Auditors/Observer Qualifying Criteria............................................................................................... 4 6. Writing NCs....................................................................................................................................... 5 7 Escalation Process ........................................................................................................................... 6
  • 4. ABC QMS Internal Audit Guidelines  HP Global Method for Application Services Error! Unknown document property name. Page 4 of 6 Guideline (1.5 /Error! Unknown document property name.) Error! Unknown document property name. © Copyright 2016 Hewlett-Packard Development Company, L.P. Valid agreement required. internalauditpolicy-161103144034 Last changed: 03 November 2016 at 14:40 1. Obtaining the ProjectList  Obtain the project list from DU QM and the ‘DU Head Count’ from the DU Administrator  DU council members to verify the project details for completeness 2. Projects Selection Criteria The project selection criteria caters to projects with a combination of below characteristics but is not limited to it. The list below is only an indicative list and the criteria could be different for each audit cycle.  At least 50% coverage in each Delivery Unit/Business Unit(DU/BU)  Good representation of all types of projects executed  At least 35 - 40% People coverage in each Delivery Unit  New projects, including projects under transition  Projects not audited in previous cycle  Critical projects – based on feedback received from BU/DU/Section Heads, DU Quality Managers, Quality Reps, PMO  Projects implementing pilot processes for at least three months  Previous Audit performance  Customer facing projects 3. Waiver Criteria Refer to the Internal Audit Process Note: Audit Council reserves the authority for Waiver 4. Auditors/ObserverSelection  List of auditors is maintained by the audit council.  AC to update the Auditors and Observers list for any new persons joining the Company and moved out of the Company before every audit cycle.  Project Leads and above should be included in the audit companies (They should figure either as a trained 'Auditor' or 'Observer'. If not trained, their nominations need to be sent to the L&D and/or audit council for internal audit training. The newly trained practitioners need to be an ‘observer’ in at least one audit cycle)  Ascertain if existing Auditors & Observers are still in the DU/BU or have moved between DUs/BUs  Ascertain if any of the individuals on the list are onsite  Identify if any new Managers have joined the DU/BU – obtain the name, employee number, grade and Reporting Manager information from the DU/BU Admin/HR.  Ping the new employee and obtain their Audit training & experience details.  Delete info for individuals who have left the DU/BU or add the info for new joinee.  If any Audit Company members have moved between DUs/BUs; is onsite or has left the Organization then discuss with Audit Council to identify a new member  Prepare Audit Companies – ideally an Audit company should have the Auditors from the same DU/BU so that coordination becomes easy.  Separate audit companies are formed with ‘CMMI’ model conversant auditors and ‘ITSM’ model conversant auditors  Inter practice audits are encouraged  New Auditor/Observer is added based on previous audit experience. Refer to the Table below for the Auditor Qualifying criteria.
  • 5. ABC QMS Internal Audit Guidelines  HP Global Method for Application Services Error! Unknown document property name. Page 5 of 6 Guideline (1.5 /Error! Unknown document property name.) Error! Unknown document property name. © Copyright 2016 Hewlett-Packard Development Company, L.P. Valid agreement required. internalauditpolicy-161103144034 Last changed: 03 November 2016 at 14:40 5. Auditors/ObserverQualifying Criteria Lead Auditor: To qualify as lead auditor, the person should have been:  Trained on ABC LTDGM AS  Lead and managed projects  Trained on CMMI/ITSM Framework(recommended)  Practicing ABC LTDGM AS processes for at least 6 months  Completed the internal audit training at ABC LTD  Lead audits at ABC LTD OR  Participated in SEI-CMMI assessment as an assessor OR  Participated as an auditor in at least in 3 audit cycles at ABC LTD OR  Conducted at least 5 cycles of Internal Audit in his/her earlier work experience OR  Certified lead auditor Auditor: To qualify as auditor, the person should have:  Trained on ABC LTDGM AS  Lead and managed projects  Trained on CMMI/ITSM Framework  Practicing ABC LTDGM AS processes for at least 6 months  Completed the internal audit training at ABC LTD  Been an observer on one Occasion + an Auditee on another occasion OR  Conducted at least 3 cycles of Internal Audit in his/her earlier work experience Observer: To qualify as an Observer:  All Project Leads and above at ABC LTD are qualified as Observers AND  Trained on ABC LTDGM AS  Trained on CMMI/ITSM Framework  Practicing ABC LTDGM AS processes for at least 6 months  Should have completed internal audit training at ABC LTD OR  Had exposure to Internal Audit concepts in his/her earlier work experience. 6. Writing NCs 6.1.1 Ensure care while writing NCs especially with the following attributes: Clarity, Relevance to the project, Usability, Verifiability, Ability for analysis 6.1.2 The deviation should be clearly stated so that appropriate corrective action can be identified easily. 6.1.3 It is also important to write non-conformance in a manner that is directly usable by the project by identifying the corrective actions. 6.1.4 Use the following format to write non-conformance:
  • 6. ABC QMS Internal Audit Guidelines  HP Global Method for Application Services Error! Unknown document property name. Page 6 of 6 Guideline (1.5 /Error! Unknown document property name.) Error! Unknown document property name. © Copyright 2016 Hewlett-Packard Development Company, L.P. Valid agreement required. internalauditpolicy-161103144034 Last changed: 03 November 2016 at 14:40  <Requirement> state in clear terms what was expected with the reference to process/ guideline that is not adhered to  However <state the deviation from the requirement> Write the deviation in a brief, unambiguous, helpful and depersonalized manner. It should contain the specific issue.  <Impact of the deviation> State the impact of non conformance on the project deliverable, along with reference to Quality Management System.  <Evidence> specific Document, Issue, Date, ID, Version and Roles/Areas which are observed as a deviation. Use discretion in mentioning the evidence such that it is impersonal. 6.1.5 Use the following guidelines for classifying the NC as ‘major’ or ‘minor :  Major Non conformance : Flaw in the process which could affect product/service quality  Minor Non conformance: Slight deviation in the process which may not affect product/service quality Refer to the Internal Audit training collateral for more details. 6.1.6 In NC writing avoid making blanket or open-ended statements. Mention the deviation in precise terms with the extent or measure of deviation. 7 Escalation Process The escalation process followed during the audit process: No No Yes Yes No Level1 From: Auditor To: Audit Company lead Issue/Conflict resolved? Level2 From: Audit Company Lead To: Peer Audit Company Lead Issue/Conflict resolved? Closed** Level3 From: Peer Audit Company Lead To: Audit Council / Audit Council Head ** 1.Issue dropped 2. CA/PA initiated 3.Close Audit Note: Timely resolution of escalations ensures timely action and closure of audit process.