An inlet bench blasting operation was conducted at site DT-1 on January 11, 2010. Nitroglycerin explosives were used to blast 27 meters of rock. The blasting resulted in controlled fly rock within 20-25 meters and good fragmentation with a pull of nearly 4 feet. Some modifications were recommended, such as using the same delay sequence between connectors and for detached rock blocks.