WHAT IS A FREIGHT
CORRIDOR?
A dedicated freight corridor is a
specialized railway line or highway
designed and built specifically for the
transportation of freight or cargo. It is
separate from the existing passenger rail
or road network, allowing for efficient and
uninterrupted movement of goods.
Dedicated freight corridors are typically
constructed to overcome the limitations
and challenges of mixed-traffic routes,
where passenger and freight trains or
vehicles share the same tracks or roads.
Dedicated freight corridors offer numerous
advantages including
01
02
03
04
Faster transit times
Reduced transportation costs,
Improved safety,
Increased capacity for handling growing
freight volumes.
05
They can contribute to economic development by
promoting trade, attracting investments, and
facilitating the smooth movement of goods across
regions or countries.
CURRENT STATUS
Capacity
The current capacity of
Indian freight corridors is
1.25 billion tonnes per
annum (bpa). This is
expected to increase to
2.5 bpa by 2023-24.
Eastern Dedicated
Freight Corridor :
This corridor is 1,896 km
long and connects
Ludhiana in Punjab to
Kolkata in West Bengal.
It is currently operational
and has a capacity of 500
million tonnes per annum
(mtpa).
Western
Dedicated Freight
Corridor
This corridor is 1,504 km
long and connects Dadri
in Uttar Pradesh to
Jawaharlal Nehru Port
Trust (JNPT) in
Maharashtra. It is
currently under
construction and is
expected to be
operational by 2023-24.
The WDFC will have a
capacity of 750 mtpa.
Additional
corridor
In addition to the two
existing corridors, a third
corridor, the North-South
Corridor. This corridor
will be 1,500 km long and
will connect Delhi to
Chennai. The North-
South Corridor is
expected to be
operational by 2027-28.
TECHNOLOGY
01
02
03
04
Dedicated Freight Corridor (DFC)
Signaling System
Double Stacked Container Trains
High-Speed Track Construction
Technologies:
Advanced Freight Terminal Operations:
05 Communication and Information Systems
Capital
The estimated cost of the entire
DFC project was around 73,392 crs.
Indian rupees this cost includes
both the eastern dedicated freight
corridor (EDFC) and western
dedicated freight corridor (WDFC)
and covers various components
such as civil works, signaling,
electrification, land acquisition,
rolling stock, and other associated
infrastructure.
The cost for the project will be
funded by a combination of debt
from bilateral/multilateral agencies,
equity from ministry of railways and
public private partnership. The
capital structure of DFCCIL will
entail a debt equity ratio of 3:1.
EFFICIENCY OF FREIGHT CORRIDOR
CHALLENGES IN THE
RAILWAYS SECTOR
Land
Acquisition
Environmental
Clearances
Financial
Constraints
Operational
Challenges
ADDRESSING GAPS IN THE
RAILWAY FREIGHT CORRIDOR
SECTOR IN INDIA
Upgrading
Existing
Tracks
Building Dedicated
Freight Corridors
Investing in
Automation
Improving
Management
NATIONAL LOGISTICS POLICY (NLP) FOR
RAILWAY FREIGHT CORRIDORS IN INDIA
- The National Logistics Policy, launched in 2017
by the Ministry of Commerce and Industry, aims to
enhance the efficiency of the railway freight
corridor sector in India.
- Key goals of the NLP include increasing
capacity, reducing transit time, improving safety,
and enhancing connectivity for freight
transportation.
- The NLP outlines measures such as building
dedicated freight corridors, upgrading tracks,
investing in automation, improving management
practices, and providing training for railway staff.
PARALLELS BETWEEN INDIA AND USA
- Both India and the USA have extensive railway
networks to meet the growing demand for freight
transportation. India is the world's third-largest
country by population, while the USA is the third-
largest by land area.
- To address the increasing freight transportation
demands, both countries are investing in
dedicated freight corridors, separate tracks
exclusively for freight transport, to improve
efficiency and capacity.
- The construction and operation of dedicated
freight corridors are met with several challenges,
such as acquiring land, obtaining environmental
clearances, and securing sufficient funding for
the projects.
USA:
- The North American Rail Network (NAR) is a
proposed extensive freight corridor network that
aims to connect major cities in the USA and
Canada.
- The NAR is in the planning stages, and it is
projected to span 10,000 kilometers.
- The estimated cost for the NAR project is an
impressive $250 billion, reflecting the scale and
significance of the network.
- The expected completion date for the NAR is
2035, pending successful planning and
execution.
1. Western Dedicated Freight Corridor (WDFC)
- The WDFC is a major freight corridor spanning 1,504
kilometers, connecting Dadri in Uttar Pradesh to JNPT
(Jawaharlal Nehru Port Trust) in Maharashtra.
- The project's cost is estimated at ₹86,805 crore
(approximately US$11.8 billion).
- It is expected to be completed by 2023, significantly
boosting freight transportation capacity in the western
region of India.
2. Eastern Dedicated Freight Corridor (EDFC)
- The EDFC is another crucial freight corridor covering
1,856 kilometers, linking Ludhiana in Punjab to Dankuni
in West Bengal.
- The project's estimated cost is ₹108,000 crore
(around US$14.5 billion).
- The EDFC's expected completion date is in 2024,
enhancing freight connectivity in the eastern part of
India.
PREDICTED GROWTH OF INDIA AFTER
COMPLETION OF DEDICATED FREIGHT CORRIDORS
- The completion of dedicated freight corridors in
India is expected to have a significant impact on the
country's freight transportation sector.
- It is projected that the share of railways in overall
freight traffic will increase from 27% to 40% by 2030,
demonstrating the effectiveness of the corridors in
shifting freight traffic from other modes of
transportation.
- The World Bank has estimated that the dedicated
freight corridor project will generate approximately
₹1.5 trillion (US$19 billion) in economic benefits over
the next 30 years.
- During the construction phase, the project is
anticipated to create 2 million jobs, and during its
operation, it will generate an additional 1 million jobs.

More Related Content

Similar to Indian Railways - Freight corridor details

Indian tranport sector 1
Indian tranport sector 1Indian tranport sector 1
Indian tranport sector 1
Amar Ashish Shrivastava
 
India's Infrastructure Development A Decade of Progress and Investment Opport...
India's Infrastructure Development A Decade of Progress and Investment Opport...India's Infrastructure Development A Decade of Progress and Investment Opport...
India's Infrastructure Development A Decade of Progress and Investment Opport...
Ranjan Das Talks
 
Group 3 (1).doc
Group 3 (1).docGroup 3 (1).doc
Group 3 (1).doc
pranayrokde2
 
Major issues in infrastructure
Major issues in infrastructureMajor issues in infrastructure
Major issues in infrastructure
vinyas87
 
Priorities infrastructure retreat- web
Priorities   infrastructure retreat- webPriorities   infrastructure retreat- web
Priorities infrastructure retreat- webDr Lendy Spires
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
Abhishek kumar Pandey
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
Bhavik khakhkhar
 
multimodal transport
multimodal transportmultimodal transport
multimodal transport
Rohit Digra
 
Dedicated Freight corridor
Dedicated Freight corridorDedicated Freight corridor
Dedicated Freight corridor
Rupali Sharma
 
MedaLogistics16 | Hussein Balaghi
MedaLogistics16 | Hussein BalaghiMedaLogistics16 | Hussein Balaghi
MedaLogistics16 | Hussein Balaghi
ASCAME
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiShobhit Acharya
 
Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015
Gyan Research And Analytics
 
Developing the Mobility Grid in India – Screening Emerging Opportunities in T...
Developing the Mobility Grid in India – Screening Emerging Opportunities in T...Developing the Mobility Grid in India – Screening Emerging Opportunities in T...
Developing the Mobility Grid in India – Screening Emerging Opportunities in T...
seoeninrac
 
CPEC OverView
CPEC OverViewCPEC OverView
CPEC OverView
Raheem Ullah
 
Indian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptxIndian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptx
joshuaa14
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
ANIKETBAMBOLE1
 
1.railway engnieering
1.railway engnieering1.railway engnieering
1.railway engnieering
Mani Vel
 
Inland waterways final
Inland waterways finalInland waterways final
Inland waterways final
Ajay Chathli
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysAbeer Ray
 

Similar to Indian Railways - Freight corridor details (20)

Indian tranport sector 1
Indian tranport sector 1Indian tranport sector 1
Indian tranport sector 1
 
India's Infrastructure Development A Decade of Progress and Investment Opport...
India's Infrastructure Development A Decade of Progress and Investment Opport...India's Infrastructure Development A Decade of Progress and Investment Opport...
India's Infrastructure Development A Decade of Progress and Investment Opport...
 
Group 3 (1).doc
Group 3 (1).docGroup 3 (1).doc
Group 3 (1).doc
 
Major issues in infrastructure
Major issues in infrastructureMajor issues in infrastructure
Major issues in infrastructure
 
Priorities infrastructure retreat- web
Priorities   infrastructure retreat- webPriorities   infrastructure retreat- web
Priorities infrastructure retreat- web
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
 
multimodal transport
multimodal transportmultimodal transport
multimodal transport
 
Dedicated Freight corridor
Dedicated Freight corridorDedicated Freight corridor
Dedicated Freight corridor
 
MedaLogistics16 | Hussein Balaghi
MedaLogistics16 | Hussein BalaghiMedaLogistics16 | Hussein Balaghi
MedaLogistics16 | Hussein Balaghi
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
wdfcil
wdfcilwdfcil
wdfcil
 
Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015
 
Developing the Mobility Grid in India – Screening Emerging Opportunities in T...
Developing the Mobility Grid in India – Screening Emerging Opportunities in T...Developing the Mobility Grid in India – Screening Emerging Opportunities in T...
Developing the Mobility Grid in India – Screening Emerging Opportunities in T...
 
CPEC OverView
CPEC OverViewCPEC OverView
CPEC OverView
 
Indian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptxIndian Railways_Joshuaa_Lenus_IND_ECON.pptx
Indian Railways_Joshuaa_Lenus_IND_ECON.pptx
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
 
1.railway engnieering
1.railway engnieering1.railway engnieering
1.railway engnieering
 
Inland waterways final
Inland waterways finalInland waterways final
Inland waterways final
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
 

Recently uploaded

一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
ahmedendrise81
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 

Recently uploaded (20)

一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 

Indian Railways - Freight corridor details

  • 1. RAILWAYS (FREIGHT) GROUP NO 15 CHETAN PATIL- 23020344019 DUSHYANT TYAGI- 23020344023 VARSHA D- 23020344068
  • 2. WHAT IS A FREIGHT CORRIDOR? A dedicated freight corridor is a specialized railway line or highway designed and built specifically for the transportation of freight or cargo. It is separate from the existing passenger rail or road network, allowing for efficient and uninterrupted movement of goods. Dedicated freight corridors are typically constructed to overcome the limitations and challenges of mixed-traffic routes, where passenger and freight trains or vehicles share the same tracks or roads.
  • 3. Dedicated freight corridors offer numerous advantages including 01 02 03 04 Faster transit times Reduced transportation costs, Improved safety, Increased capacity for handling growing freight volumes. 05 They can contribute to economic development by promoting trade, attracting investments, and facilitating the smooth movement of goods across regions or countries.
  • 4. CURRENT STATUS Capacity The current capacity of Indian freight corridors is 1.25 billion tonnes per annum (bpa). This is expected to increase to 2.5 bpa by 2023-24. Eastern Dedicated Freight Corridor : This corridor is 1,896 km long and connects Ludhiana in Punjab to Kolkata in West Bengal. It is currently operational and has a capacity of 500 million tonnes per annum (mtpa). Western Dedicated Freight Corridor This corridor is 1,504 km long and connects Dadri in Uttar Pradesh to Jawaharlal Nehru Port Trust (JNPT) in Maharashtra. It is currently under construction and is expected to be operational by 2023-24. The WDFC will have a capacity of 750 mtpa. Additional corridor In addition to the two existing corridors, a third corridor, the North-South Corridor. This corridor will be 1,500 km long and will connect Delhi to Chennai. The North- South Corridor is expected to be operational by 2027-28.
  • 5. TECHNOLOGY 01 02 03 04 Dedicated Freight Corridor (DFC) Signaling System Double Stacked Container Trains High-Speed Track Construction Technologies: Advanced Freight Terminal Operations: 05 Communication and Information Systems
  • 6. Capital The estimated cost of the entire DFC project was around 73,392 crs. Indian rupees this cost includes both the eastern dedicated freight corridor (EDFC) and western dedicated freight corridor (WDFC) and covers various components such as civil works, signaling, electrification, land acquisition, rolling stock, and other associated infrastructure. The cost for the project will be funded by a combination of debt from bilateral/multilateral agencies, equity from ministry of railways and public private partnership. The capital structure of DFCCIL will entail a debt equity ratio of 3:1.
  • 8.
  • 9. CHALLENGES IN THE RAILWAYS SECTOR Land Acquisition Environmental Clearances Financial Constraints Operational Challenges
  • 10. ADDRESSING GAPS IN THE RAILWAY FREIGHT CORRIDOR SECTOR IN INDIA Upgrading Existing Tracks Building Dedicated Freight Corridors Investing in Automation Improving Management
  • 11. NATIONAL LOGISTICS POLICY (NLP) FOR RAILWAY FREIGHT CORRIDORS IN INDIA - The National Logistics Policy, launched in 2017 by the Ministry of Commerce and Industry, aims to enhance the efficiency of the railway freight corridor sector in India. - Key goals of the NLP include increasing capacity, reducing transit time, improving safety, and enhancing connectivity for freight transportation. - The NLP outlines measures such as building dedicated freight corridors, upgrading tracks, investing in automation, improving management practices, and providing training for railway staff.
  • 12. PARALLELS BETWEEN INDIA AND USA - Both India and the USA have extensive railway networks to meet the growing demand for freight transportation. India is the world's third-largest country by population, while the USA is the third- largest by land area. - To address the increasing freight transportation demands, both countries are investing in dedicated freight corridors, separate tracks exclusively for freight transport, to improve efficiency and capacity. - The construction and operation of dedicated freight corridors are met with several challenges, such as acquiring land, obtaining environmental clearances, and securing sufficient funding for the projects.
  • 13. USA: - The North American Rail Network (NAR) is a proposed extensive freight corridor network that aims to connect major cities in the USA and Canada. - The NAR is in the planning stages, and it is projected to span 10,000 kilometers. - The estimated cost for the NAR project is an impressive $250 billion, reflecting the scale and significance of the network. - The expected completion date for the NAR is 2035, pending successful planning and execution. 1. Western Dedicated Freight Corridor (WDFC) - The WDFC is a major freight corridor spanning 1,504 kilometers, connecting Dadri in Uttar Pradesh to JNPT (Jawaharlal Nehru Port Trust) in Maharashtra. - The project's cost is estimated at ₹86,805 crore (approximately US$11.8 billion). - It is expected to be completed by 2023, significantly boosting freight transportation capacity in the western region of India. 2. Eastern Dedicated Freight Corridor (EDFC) - The EDFC is another crucial freight corridor covering 1,856 kilometers, linking Ludhiana in Punjab to Dankuni in West Bengal. - The project's estimated cost is ₹108,000 crore (around US$14.5 billion). - The EDFC's expected completion date is in 2024, enhancing freight connectivity in the eastern part of India.
  • 14. PREDICTED GROWTH OF INDIA AFTER COMPLETION OF DEDICATED FREIGHT CORRIDORS - The completion of dedicated freight corridors in India is expected to have a significant impact on the country's freight transportation sector. - It is projected that the share of railways in overall freight traffic will increase from 27% to 40% by 2030, demonstrating the effectiveness of the corridors in shifting freight traffic from other modes of transportation. - The World Bank has estimated that the dedicated freight corridor project will generate approximately ₹1.5 trillion (US$19 billion) in economic benefits over the next 30 years. - During the construction phase, the project is anticipated to create 2 million jobs, and during its operation, it will generate an additional 1 million jobs.