IMS is the system of intelligent monitoring which is developed by the group of people achieved the prize of ‘Viet
Nam’s got talent 2011’. IMS integrates the centralized and intelligent monitoring control of operating data such
as electric energy, security, environment…from the telecommunication station, factory, warehouse, civil project…
update the state and warnings to management center by internet (using ADSL line, GSM/GPRS/3G, E1..).
Display the system’s state by in site LCD screen, save the events in case of losing connection.
GENERAL INTRODUCTION
B
E
C
D
A
Air-conditioning,
ventilation fan
Energy: AC, DC, battery, wind-&
solar , generator
illumination
IP- Camera
Security, environment
Development Process
SMU
v1.0
SMU
V1.4
VERSIONS
Development
SMU
V2.0
2008
2009
2010SMU
V3.0
2011SMU
V3.1
2012
Established Greetek and developed
IMS product line with functions of
managing, centralized and intelligent
monitoring
IMS
2013
There are more 3,000 devices operating through Viet Nam’s
telecommunication network!
2014
Upcoming emerge
ü  Monitor and warn the parameters of environment, temperature,
humidity
ü  Monitor and warn the fire.
ü  Monitor and warn the fire in site (fire-warning button in site)
ü  Monitor and warn the smoke.
ü  Monitor and warn the flood status.
ü  Monitor and warn the opening door.
ü  Monitor and warn the broken glass.
ü  Monitor and warn being broken into: Moving.
ü  Remote change in air-conditioning temperature, alternate the air-
conditioning’s operation, ventilation fan based on the
environment.
ü  Control, monitor and warn the status of DC ventilation fan
system: operate as the script.
ü  Control the alarm.
ü  Connection integration IP– Camera.
ü  Chap integration SIM GPRS.
In site monitoring
Monitoring, controlling and warning the parameters of
security, environment, energy: AC capacity, DC current, DC
voltage, Battery quality, operation of electric generator, air-
conditioning, ventilation fan…
I/O	
  BUS	
  
Đầu	
  báo	
  Cháy/Khói	
  
Đầu	
  báo	
  ngập	
  nước	
  
Đầu	
  báo	
  đột	
  nhập	
  
Đầu	
  báo	
  cửa	
  mở	
  
Nút	
  ấn	
  báo	
  cháy	
  tại	
  
chỗ	
  
Đầu	
  báo	
  chuyển	
  động	
  
Đầu	
  báo	
  sử	
  dụng	
  GEN	
  
Đầu	
  báo	
  mất	
  điện	
  
lưới	
  
Loa	
  báo	
  động	
  
Đèn	
  báo	
  cháy	
  
Quạt	
  thông	
  gió	
  (DC)	
  
Control, monitor and Centralized
management
ü Control the electricity generator, ventilation fan, air-conditioning remotely.
ü Recognize and warn the cheating: Consumed electric energy, electricity generation’s operation.
ü Monitor, centralized manage all the operating parameters on station.
ü Collect, make reports as required: Rate of consuming energy per day/quarter ́…
ü Send the emergency announcement to the boss/managers all the important parameters …
Central
surveillance
ACAC
DC
Air
con
Generator
Power
SecurityCamera
Fire
Access to the network
everywhere
Monitor and control the
equipments remotely
The managing capacity is
up to thousands of stations
Release the monitoring
parameters in excel
Make tables – Monitor the
visual parameters
centralized manage,
control and change the
parameters of remote
operation
Quản lý tập trung trên phần mềm web server
Logo Intelligent Monitoring System
Control, monitor and centralized
management
ü  Choose the good usage of energy sources: Grid electricity, electricity
generator and other electricity energy sources (wind, sun).
ü  Supervise, control online the current rate of consumed electricity,
collect the consumed rate per day, month, quarter ́…
ü  Warn the cheating: stealing electricity, running the electricity
generator without AC …
ü  Collect batteryrately the time of losing AC, running the electricity
generator.
Monitor and centralized manage the
consumed energy
Trạm 1 Trạm 2
Monitor the quality of battery string
ü  Measure charge and discharge current.
ü  Measure and compare the electric pressure of
battery string.
ü  Measure and warn the temperature of battery
string.
ü  Warn the quality of battery string.
Monitor and control the electricity generator
Regarding the electricity generator lines with electronic control board
chain, our solution can control and monitor almost the important
operating parameters without accessing to the hardware:
ü  Measure the line, pressure, phase, frequency.
ü  Monitor the fuel rate, viscid oil pressure, radiator’s temperature.
ü  Monitor two electricity generators which operate alternatively as the
script for stations of sea regions and no grid electricity …
ü  Control the electricity generator to operate as battery’s electricity
pressure (the electricity pressure which is below the threshold will
operate, up to the threshold will stop) or based on the time schedule
(How long does it operate without the electricity, how long does it
operate until it stops, how long does it stop until it operates again…)
ü  Status of automatic operation with periodic maintenance: ensure that
the electricity generator is always ready (especially the stations which
have the generators but do not lose the electricity regularly.
Combine the different energy sources
Be capable of combining the different energy sources such as
battery, sun, windy electricity, electricity generator,…
ü  Automatically change in using the other energy sources when
needed, take full advantage of supplying capacity.
ü  Automatically activate the auto mechanics when the electricity
goes out, establish the operating system of electric equipments in the
status of using the electricity generator: turn off the air-conditioning,
vase of hot water …
ü  The operating script combines the windy electricity, sun energy
and generator for stations in the sea regions …
Monitor and control the air-conditioning,
ventilation fan
Control the air-conditioning by the infrared eyes which
is integrated in the centralized control system:
ü Turn on/off, increase/decrease the temperature remotely.
ü Automatically run alternatively, run as the script (based
on the AC environmental temperature/electricity combines
with ventilation fan …).
ü Algorithm recognize the false air-conditioning/no
cooling : Give warnings and turn off the air-conditioning to
save the electricity.
Control the ventilation fan to operate well.
ü Automatically adjust to the temperature and environment’s humidity, machine
room’s temperature.
ü Automatically run the ventilation fan or air-conditioning when the machine
room’s temperature is high.
ü Automatically recognize the fault/ error: when the main fan is false, it will
automatically turns on the auxiliary one or air-conditioning …
Supervise the security, give alert
The security system of centralized supervision:
ü  Moving controller.
ü  Opening controller.
ü  Broken glass controller.
ü  Handgrip the control door by code and finger-
print.
ü  Warn the fire.
ü  Warn the smoke.
ü  Speaker / Alert light.
Web server
Control, record, manage the pictures:
ü Supervise online everywhere by using IP camera or
DVR IP.
ü Record the pictures 24/24 or based on each event (only
record when there is some warnings).
ü See the pictures again by each event.
centralized management: Warn the
fire’s location
The new function developed in 2013
ü  Meet Viet Nam’s standards – The fire warning system: TCVN -5738 -2001.
ü  Recognize the fire quickly.
ü  Be visual by describing the real location which helps to solve the problem
quickly.
ü  Transfer the fire-warning notices into the clear alert ones, not being
paralyzed partly or totally damaged by the fire before recognizing the fire.
Truth fire warning
ü  Mechanism of auto-recognizing the
break/broken line, false fire
warning.
ü  Software of centralized monitoring
and unify with IMS server software
by LAN, Internet, GPRS…
ü  Auto-activate the call when there is
any incident
ü  The center of fire warning is
integrated availably on IMS
equipment
Fake fire warning
Access Control
Allow to be integrated with the access control system
by LAN network :
ü Monitor and collect the centralized access based on the
access control’s functions of the third firm.
New function: (Version 2014)
ü Integrate the card-reading head to allow to monitor the
centralized access by GPRS, 3G…
ü  Decentralize/ allow online: Be suitable with the case of
giving license of random access or allow individuals to
access as their affairs ( help, maintenance..) not regularly.
IMS server
Apply widely, implement easily, large scale:
Apply the advanced technology, high customization capacity, be proactive
in technology such as design, chain production, development of
management/solution software.
ü Implementing becomes extremely easy …
ü The capacity of widening and upgrading is unlimited.
ü Being suitable with all models of telecommunication stations, data center,
warehouse, …
Apply the solution
Apply the solution: Structure
Hotline:
Mr Chung BT: Mobile 0902 26 39 26; Email: chungbt@greetek.com.vn
Mr Tuấn PA : Mobile 0936 99 06 40; Email: tuanpa@greetek.com.vn
Green Technology Development Investment
Company Limited
7th floor, Building SDU, km 10 Nguyen Trai Road, Ha Noi City, Viet Nam

Ims presentation v1 eng

  • 1.
    Intelligent Monitoring System INTELLIGENTMONITORING SYSTEM (IMS) ! Intelligent Management! Network Safety! Economical Efficiency!
  • 2.
    IMS is thesystem of intelligent monitoring which is developed by the group of people achieved the prize of ‘Viet Nam’s got talent 2011’. IMS integrates the centralized and intelligent monitoring control of operating data such as electric energy, security, environment…from the telecommunication station, factory, warehouse, civil project… update the state and warnings to management center by internet (using ADSL line, GSM/GPRS/3G, E1..). Display the system’s state by in site LCD screen, save the events in case of losing connection. GENERAL INTRODUCTION B E C D A Air-conditioning, ventilation fan Energy: AC, DC, battery, wind-& solar , generator illumination IP- Camera Security, environment
  • 3.
    Development Process SMU v1.0 SMU V1.4 VERSIONS Development SMU V2.0 2008 2009 2010SMU V3.0 2011SMU V3.1 2012 Established Greetekand developed IMS product line with functions of managing, centralized and intelligent monitoring IMS 2013 There are more 3,000 devices operating through Viet Nam’s telecommunication network! 2014 Upcoming emerge
  • 4.
    ü  Monitor andwarn the parameters of environment, temperature, humidity ü  Monitor and warn the fire. ü  Monitor and warn the fire in site (fire-warning button in site) ü  Monitor and warn the smoke. ü  Monitor and warn the flood status. ü  Monitor and warn the opening door. ü  Monitor and warn the broken glass. ü  Monitor and warn being broken into: Moving. ü  Remote change in air-conditioning temperature, alternate the air- conditioning’s operation, ventilation fan based on the environment. ü  Control, monitor and warn the status of DC ventilation fan system: operate as the script. ü  Control the alarm. ü  Connection integration IP– Camera. ü  Chap integration SIM GPRS. In site monitoring Monitoring, controlling and warning the parameters of security, environment, energy: AC capacity, DC current, DC voltage, Battery quality, operation of electric generator, air- conditioning, ventilation fan… I/O  BUS   Đầu  báo  Cháy/Khói   Đầu  báo  ngập  nước   Đầu  báo  đột  nhập   Đầu  báo  cửa  mở   Nút  ấn  báo  cháy  tại   chỗ   Đầu  báo  chuyển  động   Đầu  báo  sử  dụng  GEN   Đầu  báo  mất  điện   lưới   Loa  báo  động   Đèn  báo  cháy   Quạt  thông  gió  (DC)  
  • 5.
    Control, monitor andCentralized management ü Control the electricity generator, ventilation fan, air-conditioning remotely. ü Recognize and warn the cheating: Consumed electric energy, electricity generation’s operation. ü Monitor, centralized manage all the operating parameters on station. ü Collect, make reports as required: Rate of consuming energy per day/quarter ́… ü Send the emergency announcement to the boss/managers all the important parameters … Central surveillance ACAC DC Air con Generator Power SecurityCamera Fire
  • 6.
    Access to thenetwork everywhere Monitor and control the equipments remotely The managing capacity is up to thousands of stations Release the monitoring parameters in excel Make tables – Monitor the visual parameters centralized manage, control and change the parameters of remote operation Quản lý tập trung trên phần mềm web server Logo Intelligent Monitoring System Control, monitor and centralized management
  • 7.
    ü  Choose thegood usage of energy sources: Grid electricity, electricity generator and other electricity energy sources (wind, sun). ü  Supervise, control online the current rate of consumed electricity, collect the consumed rate per day, month, quarter ́… ü  Warn the cheating: stealing electricity, running the electricity generator without AC … ü  Collect batteryrately the time of losing AC, running the electricity generator. Monitor and centralized manage the consumed energy Trạm 1 Trạm 2
  • 8.
    Monitor the qualityof battery string ü  Measure charge and discharge current. ü  Measure and compare the electric pressure of battery string. ü  Measure and warn the temperature of battery string. ü  Warn the quality of battery string.
  • 9.
    Monitor and controlthe electricity generator Regarding the electricity generator lines with electronic control board chain, our solution can control and monitor almost the important operating parameters without accessing to the hardware: ü  Measure the line, pressure, phase, frequency. ü  Monitor the fuel rate, viscid oil pressure, radiator’s temperature. ü  Monitor two electricity generators which operate alternatively as the script for stations of sea regions and no grid electricity … ü  Control the electricity generator to operate as battery’s electricity pressure (the electricity pressure which is below the threshold will operate, up to the threshold will stop) or based on the time schedule (How long does it operate without the electricity, how long does it operate until it stops, how long does it stop until it operates again…) ü  Status of automatic operation with periodic maintenance: ensure that the electricity generator is always ready (especially the stations which have the generators but do not lose the electricity regularly.
  • 10.
    Combine the differentenergy sources Be capable of combining the different energy sources such as battery, sun, windy electricity, electricity generator,… ü  Automatically change in using the other energy sources when needed, take full advantage of supplying capacity. ü  Automatically activate the auto mechanics when the electricity goes out, establish the operating system of electric equipments in the status of using the electricity generator: turn off the air-conditioning, vase of hot water … ü  The operating script combines the windy electricity, sun energy and generator for stations in the sea regions …
  • 11.
    Monitor and controlthe air-conditioning, ventilation fan Control the air-conditioning by the infrared eyes which is integrated in the centralized control system: ü Turn on/off, increase/decrease the temperature remotely. ü Automatically run alternatively, run as the script (based on the AC environmental temperature/electricity combines with ventilation fan …). ü Algorithm recognize the false air-conditioning/no cooling : Give warnings and turn off the air-conditioning to save the electricity. Control the ventilation fan to operate well. ü Automatically adjust to the temperature and environment’s humidity, machine room’s temperature. ü Automatically run the ventilation fan or air-conditioning when the machine room’s temperature is high. ü Automatically recognize the fault/ error: when the main fan is false, it will automatically turns on the auxiliary one or air-conditioning …
  • 12.
    Supervise the security,give alert The security system of centralized supervision: ü  Moving controller. ü  Opening controller. ü  Broken glass controller. ü  Handgrip the control door by code and finger- print. ü  Warn the fire. ü  Warn the smoke. ü  Speaker / Alert light. Web server Control, record, manage the pictures: ü Supervise online everywhere by using IP camera or DVR IP. ü Record the pictures 24/24 or based on each event (only record when there is some warnings). ü See the pictures again by each event.
  • 13.
    centralized management: Warnthe fire’s location The new function developed in 2013 ü  Meet Viet Nam’s standards – The fire warning system: TCVN -5738 -2001. ü  Recognize the fire quickly. ü  Be visual by describing the real location which helps to solve the problem quickly. ü  Transfer the fire-warning notices into the clear alert ones, not being paralyzed partly or totally damaged by the fire before recognizing the fire. Truth fire warning ü  Mechanism of auto-recognizing the break/broken line, false fire warning. ü  Software of centralized monitoring and unify with IMS server software by LAN, Internet, GPRS… ü  Auto-activate the call when there is any incident ü  The center of fire warning is integrated availably on IMS equipment Fake fire warning
  • 14.
    Access Control Allow tobe integrated with the access control system by LAN network : ü Monitor and collect the centralized access based on the access control’s functions of the third firm. New function: (Version 2014) ü Integrate the card-reading head to allow to monitor the centralized access by GPRS, 3G… ü  Decentralize/ allow online: Be suitable with the case of giving license of random access or allow individuals to access as their affairs ( help, maintenance..) not regularly. IMS server
  • 15.
    Apply widely, implementeasily, large scale: Apply the advanced technology, high customization capacity, be proactive in technology such as design, chain production, development of management/solution software. ü Implementing becomes extremely easy … ü The capacity of widening and upgrading is unlimited. ü Being suitable with all models of telecommunication stations, data center, warehouse, … Apply the solution
  • 16.
  • 17.
    Hotline: Mr Chung BT:Mobile 0902 26 39 26; Email: chungbt@greetek.com.vn Mr Tuấn PA : Mobile 0936 99 06 40; Email: tuanpa@greetek.com.vn Green Technology Development Investment Company Limited 7th floor, Building SDU, km 10 Nguyen Trai Road, Ha Noi City, Viet Nam