Minescape Step by Step
1. Pendahuluan
a. Menjalankan Minescape
b. Membuat design file
c. Transfer data file dalam format lain ke design file (*.dgn)
d. Membuat Grid file
e. Memproses Grid file (dari design file)
f. Membuat Triangle file (dari design file)
g. Update triangle file
2. Stratmodel
a. Pembuatan surface topography
b. Pembuatan schema
c. Import data drillholes
d. Import data quality
3. Resgraphics
a. Mengaktifkan design file Block
b. Membuat garis block dan strip
c. Block - strip intersection
d. Reserve Block
e. Menentukan parameter quality
f. Mining reserve
g. Accumulate samples
h. Reformat samples
i. Penambahan kolom total O/B, S/R, warna
j. Reserve graphics
4. Generate solid
a. Penentuan side definition
b. Generate block - strip
c. Generate solid from batter block
d. Pit projection
5. Pit Design
a. Penentuan pit limit & drapping terhadap surface final design
b. Membuat side definition
c. Proyeksi pit design
d. Pembuatan bench spec
e. Intersect pit design terhadap surface topo
f. Triangulasi pit design
6. Mine Schedulling
a. Pembuatan database
b. Mine scheduling
c. Pembuatan ramp design
d. Pembuatan desain jalan
e. Pembuatan desain waste dump
A. Menjalankan Minescape
MineScape 114.lnk
Click icon bar exceed , kemudian click icon bar minescape . Di layar akan
muncul :
Click Create Project :
Diisi nama project, tempat project, origin global, serta dilakukan pengedikan unit sesuai dengan
yang dikehendaki. Origin global merupakan titik tengah dari project area.
Jalankan project dengan memilih application “Open Cut Coal” -- OK.
Minescape Step by Step Safrudin
25/10/2005
Memilih aplikasi minescape :
B. Membuat Design File
Click Open Write File --- click kanan pada nama design file
Beri nama pada design file
click
click kanan
& create
Click Open Write File --- buka design file yang baru dibuat
Pada layar yang muncul, beri nama Layer baru.
Ketik nama
layer baru
Minescape Step by Step Safrudin
25/10/2005
C. Transfer Ascii Data File ke Design File
Tempatkan data yang akan ditransfer pada folder D:ProjectsNama ProjectsData
Minescape Explorer – Design files – Import ---- pilih tab ascii
import
ascii
Design file edit format :
click kanan -pilih file
edit
Edit format “ob” dengan click kanan, lakukan pengeditan sesuai dengan spec format data ascii
yang akan ditransfer.
Minescape Step by Step Safrudin
25/10/2005
Format transfer :
sesuaikan dengan
posisi kolom
easting pada data
Untuk melihat tampilan ascii data yang akan ditransfer, pada data : click kanan – edit, dapat
dilihat tampilan ascii data file
Minescape Step by Step Safrudin
25/10/2005
Contoh tampilan graphis (design file) hasil transfer dari ascii data file.
Transfer DXF File ke Design File
Minescape Explorer – Design files – Import ----- pilih tab dxf
dxf
Minescape Step by Step Safrudin
25/10/2005
Membuat Table File
Menu : Minescape Explorer --- Table files --- Generic --- Create
D. Membuat Grid File
Menu : Minescape Explorer --- Grid Files --- Create
Grid spec dibuat dengan cara : click kanan --- create
create
Grids
file
Click kanan --
create
Minescape Step by Step Safrudin
25/10/2005
E. Memproses Grid File ( Dari Design File )
Menu : Model --- Grids --- Design
Poligon domain merupakan polygon yang melingkupi data yang akan diproses dalam grid. Untuk
data baru, pada controls aktifkan New/Replace, sedangkan untuk proses update pada controls
aktifkan Patch. Interpolator spec dipilih fem.
F. Membuat Triangle File (Dari Design File)
Menu : Model --- Triangles --- Design ----- aktifkan “create”
aktifkan
create
untuk
grid baru untuk
update
grid
fem
Minescape Step by Step Safrudin
25/10/2005
Convexity control diisi 5
G. Update Triangle File
Menu : Model --- Triangles --- Design ----- aktifkan “patch”
aktifkan
patch
Triangle yang
diupdate
Polygon
data baru
Polygon
keseluruhan
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
PENGENALAN STRATMODEL
Data yang diperlukan :
a. Topography ( dxf/dwg, grid, ascii, triangle )
b. Geology ( borehole, quality )
c. Pembuatan Quality Model, Key Quality, Quality Default, Quality Definitions melalui menu :
Minescape Explorer --- Quality
A. Pembuatan Surface Topography
Contoh dari “grid file” : Minescape Explorer ----- Surfaces ----- Grid ---- Create :
create
B. Pembuatan Schema
Siapkan nama-nama interval seam secara berurutan dari atas ke bawah berdasarkan data bor.
Minescape Step by Step Safrudin
25/10/2005
Buka modul stratmodel : Page --- Open Product --- Stratmodel
Pembuatan Schema : Schemas --- Create
Minescape Step by Step Safrudin
25/10/2005
C. Import Data Drillholes
Biasanya data drillhole merupakan data survey (posisi) titik bor dan data lithology titik bor. Survey (posisi)
titik bor berisi holename, easting, northing, elevasi, dan total depth. Lithology titik bor berisi
holename, from, to, interval/seam, dan lithology. Data-data tersebut disimpan dalam ascii data file.
Contoh ascii data posisi titik bor.
Minescape Step by Step Safrudin
25/10/2005
Contoh ascii data lithology titik bor.
Menu : Drill Holes --- Import
Diisikan nama survey data file drill holes & lithology data file drill holes. Format survey dan lithology diedit
dengan click kanan – edit, disesuaikan dengan ascii data file dari survey dan lithology drill holes tersebut.
Minescape Step by Step Safrudin
25/10/2005
Selanjutnya dilakukan proses build table & build grid : Schemas --- Process :
Untuk memudahkan, biasanya nama table & grid schema dibuat sama dengan nama schema. Grid Spec
dibuat dengan clik kanan --- create.
Setelah schema dibuat, maka dapat dibuat contour structure dari schema tersebut dengan menu :
Graphics --- Contour --- Multi
D. Import Data Quality
Data quality proximate drill holes berisi holename, interval, sample number, from, to, TM, IM, Ash,
VM, FC, TS, CV, RD.
Minescape Step by Step Safrudin
25/10/2005
Ascii data quality tersebut diimport dengan menu : Quality --- Import Quality, diimport dengan tabdesk
DH Load – User Defined. Kolom quality disesuaikan dengan ascii quality data file.
Minescape Step by Step Safrudin
25/10/2005
Kemudian dilakukan proses komposit dengan menu : Quality --- Composite --- Drill Holes
Minescape Step by Step Safrudin
25/10/2005
Dari table excel :
Holename East Noth Elevasi Totaldepth Holename From To Seam Litho
(untuk survey, untuk lithology, simpan masing2 sheet dlm excel format text delimeted)
Load drill hole data dari acii file, formatnya
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
Import quality
Sebelum prose tsb, dibuat dulu schemanya, namain aja table & gridnya, ketik masing2 seam nya, ikutin
schema yg sudah ada.
Setelah schema ada, lalu buat table dan grid schemanya.
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
membuat nulti kontur
Prediksi dari titik yg diinginkan untuk dipreiksikan kondidinya.
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
RESGRAPHIC
(Optimalisasi Penentuan Mineable Area Menggunakan Batter Blocks)
A. Masuk ke design file Blocks
Open
write file
B. Dilakukan penentuan potensial area yang biasanya dibatasi oleh garis strip & block. Garis strip biasanya
sejajar dengan trend outcrop dan mengarah ke down dip, garis block biasanya tegak lurus dengan trend
outcrop dan mengarah searah dengan strike batubara.
Minescape Step by Step Safrudin
25/10/2005
Pembuatan blocks dari garis block, dilanjutkan dengan pembuatan blocks dari garis strike (Strip_Design ---
Generate Strips)
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
C. Intersection Strip – Blocks ( Strip_Design --- Strip Intersection )
Mengisi primary & secondary blocks : klik kanan – filldown – clear – isi block * - filter
Blocks hasil proses intersect batter blocks
Minescape Step by Step Safrudin
25/10/2005
D. Reserve Blocks ( Reserve – Generate Samples from Polygons
setup
interval
Minescape Step by Step Safrudin
25/10/2005
surfsets
qualities
Note : sebelum melakukan proses reserve, terlebih dahulu kita membuat quality model, quality default, quality
definition dan key quality melalui minescape explorer -------- qualities.
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
E. Menentukan parameter quality
Maintain quality spec
Quality definition
Minescape Step by Step Safrudin
25/10/2005
Quality model
F. Mining Reserve ( Reserves – Evaluate Samples – Mining Reserves )
Minescape Step by Step Safrudin
25/10/2005
Quality default
G. Accumulate Samples ( Reserves – Accumulate Samples )
H. Reformat Samples ( Reserves – Reformat Samples -- Blocks )
Minescape Step by Step Safrudin
25/10/2005
I. Penambahan kolom Total_OB, SR, & Warna pada table hasil reformat.
Buka table reformat melalui minescape explorer :
Minescape Step by Step Safrudin
25/10/2005
Dari table : Edit – Colums -- Add
Mxl file untuk colum Total_OB & Warna dibuat melalui minescape explorer :
Minescape Step by Step Safrudin
25/10/2005
Gradasi warna Mincom adalah :
100 putih
200 merah
Semakin mendekati 200, akan semakin mendekati warna merah.
J. Reserve Graphics : Minescape Explorer – Actions – resgraphics :
Minescape Step by Step Safrudin
25/10/2005
Berdasarkan hasil proses resgraphics, maka dapat ditentukan batasan daerah yang SR sesuai dengan yang
dikehendaki, selanjutnya dapat ditentukan Pit Limit daerah yang dimaksud.
Minescape Step by Step Safrudin
25/10/2005
GENERATE SOLIDS
A. Pit limit diberikan side definition, hw dan lw.
Verteks poligon searah jarum jam.
B. Generate Blocks dan Strips
Side definition pada proses generate blocks dikosongkan, pada proses generate strips diisi
Minescape Step by Step Safrudin
25/10/2005
Side definition dikosongkan pada generate blocks
Generate strips
Minescape Step by Step Safrudin
25/10/2005
Side definition pada generate strips
C. Generate Solid dari Batter Blocks
Click kanan --
create
Minescape Step by Step Safrudin
25/10/2005
D. Pit Projection Rules
Solid dengan side definition pada start strip, interior strip dan end strip
Minescape Step by Step Safrudin
25/10/2005
PIT DESIGN
A. Masuk ke design file tempat pit limit line.
Drape pit limit terhadap floor target. ( Strip_Design – Drape )
Minescape Step by Step Safrudin
25/10/2005
Klick d (detail) elemen pit line, check z maksimum – minimum ( hal ini perlu dilakukan karena kadang kita
menemukan verteks yang tidak ada elevasinya, sehingga kita harus memberikan elevasi sendiri secara
manual ). Verteks pit limit line sebaiknya searah putaran jarum jam.
B. Memberikan “side definition” pada pit limit line.
Langkah ini diawali dengan pembuatan “side definition” ( Strip_Design – Tag Design Segments )
Minescape Step by Step Safrudin
25/10/2005
Kita bisa membuat “side definition” untuk highwall & lowwall, dan kemudian mendrapekannya kepada pit limit
line, daerah out crop merupakan lowwall dan bagian lainnya merupakan highwall.
C. Proyeksi Pit Design ( Strip_Design – Ramps – Projects and Offset )
Minescape Step by Step Safrudin
25/10/2005
D. Awal dari langkah ini adalah pembuatan “bench spec” terlebih dahulu : Bench Spec – click kanan – create.
Setelah bench spec terbentuk, maka selanjutnya adalah generates crest & toe dari elevasi terendah (floor)
hingga elevasi teringgi (topo) yang dianggap cukup.
Minescape Step by Step Safrudin
25/10/2005
Minescape Step by Step Safrudin
25/10/2005
E. Proses intersect pit design oleh surface topography.
Minescape Explorer – Design files – Process :
Buat “crest” terluar dengan menghubungkan “rays” terluar.
Minescape Step by Step Safrudin
25/10/2005
F. Proses triangulasi “pit design”.
Proses ini diawali dengan menambahkan floor structure seluas pit limit line.
Kemudian gabungan layer-layer tersebut ditriangulasi.
Proses triangulasi : Model – Triangle – Design :
Minescape Step by Step Safrudin
25/10/2005
Hasil triangulasi pit design
Reserve calculation daerah pit, dihitung OB & Coal berserta Qualitynya ( Reserve – Mining Reserve –
Accumulate ).
Unload table hasil proses reserve ke data file : Minescape Explorer – Table files – Generic – pilih nama
table -- export
Dari data files, table tersebut selanjutnya dapat dibuka dengan excel untuk kemudian diolah sesuai yang
dikehendaki.
Minescape Step by Step Safrudin
25/10/2005
MINE SCHEDULING
A. Pembuatan Database
a. Masuk ke Design File Blocks, refferenkan pit design.
b. Bagi daerah pit menjadi block-block ( ukuran block 100 m x 50 m ) menggunakan batter block.
Minescape Step by Step Safrudin
25/10/2005
c. Lakukan proses “reserve calculation” block per block level per level, sebelumnya dibuat file list block-block
tersebut. Reserve Calculation ( Reserve -- Mining Reserve – Accumulate ).
Subset ( level ) dalam proses reserve
Tampilan table hasil proses reserve
Minescape Step by Step Safrudin
25/10/2005
d. Lakukan proses transfer table file hasil reformat kedalam data file :
Minescape explorer – Table Files – Generik – pilih tablenya – Export – pilih tabdesk unload.
Transfer table dilakukan untuk overvolume, intervolume, rrmass, dan quality.
e. Proses pengolahan table-table tersebut di excel.
Buka masing-masing table file tersebut melalui excel, lakukan pengolahan sehingga dihasilkan database dari
pit design tersebut. Database tersebut berisi jumlah OB dan Coal serta Quality dari masing-masing block
setiap levelnya.
Minescape Step by Step Safrudin
25/10/2005
Pengertian “overvolume”, “intervolume”, “unassvolume”.
B. Mine Scheduling
Tahap awal dari mine scheduling di sini adalah pembuatan “master scheduling” yang merupakan development
bench yang bentuknya disesuaikan dengan block-block, elevasinya disesuaikan dengan perkiraan target
elevasi. Spesifikasi master scheduling ini adalah 100 m flat bench dan 10 m tinggi bench. Surface master
scheduling ini bentuknya tetap, elevasinya disesuaikan mengikuti schedule & target penambangan. Bentuk
design scheduling dari suatu periode merupakan hasil intersect antara “master scheduling” dengan
topography dan master pit design.
Master scheduling
Minescape Step by Step Safrudin
25/10/2005
Dalam pembuatan “master scheduling”, untuk memproyeksikan ke elevasi di atasnya dengan sudut tertentu
digunakan Draw – Projects
Sequence 1
Selanjutnya dilakukan proses perhitungan reserve OB & Coal serta Quality dari polygon hasil intersect
tersebut. OB & Coal serta Quality dapat juga dilihat dari database di atas.
Pembuatan mine sequence berikutnya tinggal menurunkan saja elevasi dari master scheduling, kemudian
dilakukan proses intersect antara master scheduling dengan topo dan dengan master pit design. Dalam
perhitungan reserve, surface atas dari mine sequence kedua ini merupakan surface bawah dari mine
sequence yang pertama, surface atas mine sequence ketiga merupakan surface bawah dari mine sequence
kedua, demikian seterusnya.
Minescape Step by Step Safrudin
25/10/2005
Sequence 2
Contoh konsep scheduling menggunakan surface “master scheduling”.
Minescape Step by Step Safrudin
25/10/2005
C. Pembuatan Ramp Design
a. Berikan side definition “highwall” pada toe mine scheduling design yang dikehendaki.
b. Insert ramp ( Strip_Design – Ramps – Insert Ramp ), ramp spec dibuat dengan klik kanan.
Minescape Step by Step Safrudin
25/10/2005
c. Menggunakan Projects and Offset, proyeksikan toe ramp ke elevasi berikutnya.
d. Edit Ramp
Minescape Step by Step Safrudin
25/10/2005
D. Pembuatan Design Jalan
Selengkapnya proses pembuatan “Road Design” akan dibahas bersama dalam modul “Haulage Road”. Dalam
latihan ini, design jalan merupakan proyeksi manual dengan sudut tertentu terhadap topography dari suatu
elevasi jalan yang ditentukan. Pembuatan design jalan dimulai dengan pembuatan as jalan (center line)
dengan grade tertentu, kemudian center line tersebut dioffset kiri-kanan sesuai dengan lebar jalan yang
dikehendaki.
Design jalan yang akan dibuat sebaiknya merupakan design jalan akhir (final road design/master road design),
sehingga untuk setiap design mine sequence tinggal melakukan proses intersect dari final design jalan
tersebut. Untuk jalan di luar pit, pembuatan final design jalan berdasarkan mine sequence awal. Untuk jalan di
dalam pit, pembuatan final design jalan berdasarkan mine sequence akhir. Faktor penting yang harus
dipertimbangkan dalam pembuatan design jalan ini antara lain adalah jarak, grade, cut & fill.
Contoh final design jalan dalam pit
Minescape Step by Step Safrudin
25/10/2005
Contoh design jalan dalam pit pada mine sequence tertentu
Contoh final design jalan di luar pit
Minescape Step by Step Safrudin
25/10/2005
Contoh design jalan di luar pit pada mine sequence tertentu
E. Pembuatan Design Waste Dump
Pada dasarnya proses pembuatan waste dump design adalah menutup daerah yang topographynya rendah
untuk dijadikan disposal area. Proses pembuatan waste dump design dapat dilakukan secara manual dengan
menu Draw – Project, serta menu Draw – Offset. Dengan menu project, dapat dilakukan proyeksi ke atas /
bawah terhadap elevasi tertentu dengan sudut tertentu (misalnya 400
). Dengan menu offset, dapat dilakukan
offset horizontal dengan jarak offset / lebar berm tertentu (misalnya 30 m).
Minescape Step by Step Safrudin
25/10/2005
Contoh design waste dump
Minescape Step by Step Safrudin
25/10/2005

More Related Content

What's hot

Tugas tambang terbuka hubungan rumus bser dan sr tambang terbuka
Tugas tambang terbuka hubungan rumus bser dan sr tambang terbukaTugas tambang terbuka hubungan rumus bser dan sr tambang terbuka
Tugas tambang terbuka hubungan rumus bser dan sr tambang terbukaSylvester Saragih
 
Tugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat Berat
Tugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat BeratTugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat Berat
Tugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat BeratDebora Elluisa Manurung
 
Evaluasi cadangan itm
Evaluasi cadangan itmEvaluasi cadangan itm
Evaluasi cadangan itmNando Ltoruan
 
PRODUKSI PELEDAKAN MINE'13 UNIPA
PRODUKSI PELEDAKAN MINE'13 UNIPAPRODUKSI PELEDAKAN MINE'13 UNIPA
PRODUKSI PELEDAKAN MINE'13 UNIPAUNIVERSITY OF PAPUA
 
Teknik eksplorasi
Teknik eksplorasiTeknik eksplorasi
Teknik eksplorasioilandgas24
 
TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"
TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"
TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"MOSES HADUN
 
Ekonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli KusumawatiEkonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli Kusumawatiyulika usman
 
Metode jalan baru
Metode jalan baruMetode jalan baru
Metode jalan baruapa dawod
 
Pengertian dan Alat-alat Hauling
Pengertian dan Alat-alat HaulingPengertian dan Alat-alat Hauling
Pengertian dan Alat-alat HaulingArif Wicaksono
 
Metode pelaksanaan jalan
Metode pelaksanaan jalanMetode pelaksanaan jalan
Metode pelaksanaan jalanTri Hidayat
 
Rancangan Peledakan Underground
Rancangan Peledakan UndergroundRancangan Peledakan Underground
Rancangan Peledakan UndergroundMario Yuven
 
Perencanaan peledakan
Perencanaan peledakanPerencanaan peledakan
Perencanaan peledakanUDIN MUHRUDIN
 
Eksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianEksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianIpung Noor
 
Terminologi Pertambangan
Terminologi PertambanganTerminologi Pertambangan
Terminologi PertambanganReski Aprilia
 
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckestimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckevamanroe
 
PTM alat berat alat pengangkut material
PTM alat berat   alat pengangkut materialPTM alat berat   alat pengangkut material
PTM alat berat alat pengangkut materialOkitanawa Everrobert
 

What's hot (20)

Tugas tambang terbuka hubungan rumus bser dan sr tambang terbuka
Tugas tambang terbuka hubungan rumus bser dan sr tambang terbukaTugas tambang terbuka hubungan rumus bser dan sr tambang terbuka
Tugas tambang terbuka hubungan rumus bser dan sr tambang terbuka
 
Tugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat Berat
Tugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat BeratTugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat Berat
Tugas Perencanaan Pemindahan Tanah Mekanis dan Alat-Alat Berat
 
Evaluasi cadangan itm
Evaluasi cadangan itmEvaluasi cadangan itm
Evaluasi cadangan itm
 
PRODUKSI PELEDAKAN MINE'13 UNIPA
PRODUKSI PELEDAKAN MINE'13 UNIPAPRODUKSI PELEDAKAN MINE'13 UNIPA
PRODUKSI PELEDAKAN MINE'13 UNIPA
 
Mine plan
Mine planMine plan
Mine plan
 
Teknik eksplorasi
Teknik eksplorasiTeknik eksplorasi
Teknik eksplorasi
 
TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"
TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"
TEKNIK SIPIL : "METODE PELAKSANAAN PEMBANGUNAN JALAN BARU"
 
Ekonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli KusumawatiEkonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli Kusumawati
 
Komponen dan fungsi alatbor
Komponen dan fungsi alatborKomponen dan fungsi alatbor
Komponen dan fungsi alatbor
 
Metode jalan baru
Metode jalan baruMetode jalan baru
Metode jalan baru
 
Pengertian dan Alat-alat Hauling
Pengertian dan Alat-alat HaulingPengertian dan Alat-alat Hauling
Pengertian dan Alat-alat Hauling
 
Metode pelaksanaan jalan
Metode pelaksanaan jalanMetode pelaksanaan jalan
Metode pelaksanaan jalan
 
Rancangan Peledakan Underground
Rancangan Peledakan UndergroundRancangan Peledakan Underground
Rancangan Peledakan Underground
 
Perencanaan peledakan
Perencanaan peledakanPerencanaan peledakan
Perencanaan peledakan
 
Eksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianEksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galian
 
Sistem Penambangan
Sistem PenambanganSistem Penambangan
Sistem Penambangan
 
Zero oxygen balance
Zero oxygen balanceZero oxygen balance
Zero oxygen balance
 
Terminologi Pertambangan
Terminologi PertambanganTerminologi Pertambangan
Terminologi Pertambangan
 
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckestimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
 
PTM alat berat alat pengangkut material
PTM alat berat   alat pengangkut materialPTM alat berat   alat pengangkut material
PTM alat berat alat pengangkut material
 

Viewers also liked

Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
Training mainscape
Training mainscapeTraining mainscape
Training mainscapeEdhet OanSly
 
Hal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey TambangHal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey TambangEdhis Triyono Hermawan
 
[Cv] tedy satria
[Cv]   tedy satria[Cv]   tedy satria
[Cv] tedy satriaTedy Satria
 
kalimatan timur, samarinda
kalimatan timur, samarindakalimatan timur, samarinda
kalimatan timur, samarindaALAM SEKITAR
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...Mario Yuven
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambangUVRI - UKDM
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...Mario Yuven
 
Buku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadangan
Buku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadanganBuku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadangan
Buku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadanganRio Anggara
 
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...Mario Yuven
 
4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]
4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]
4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]MetaKonten Media Monitoring
 
40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambang40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambangNurfirman Halwan
 

Viewers also liked (20)

Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Training mainscape
Training mainscapeTraining mainscape
Training mainscape
 
Open cut coal
Open cut coalOpen cut coal
Open cut coal
 
All , minescape
All , minescapeAll , minescape
All , minescape
 
Xpac for mining
Xpac for miningXpac for mining
Xpac for mining
 
Tahapan desain
Tahapan desainTahapan desain
Tahapan desain
 
Hal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey TambangHal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey Tambang
 
[Cv] tedy satria
[Cv]   tedy satria[Cv]   tedy satria
[Cv] tedy satria
 
kalimatan timur, samarinda
kalimatan timur, samarindakalimatan timur, samarinda
kalimatan timur, samarinda
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambang
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
 
Buku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadangan
Buku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadanganBuku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadangan
Buku panduan pelatihan geologi dasar, pemetaan dan perhitungan cadangan
 
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
 
9 pemantauan lereng
9 pemantauan lereng9 pemantauan lereng
9 pemantauan lereng
 
Isu-Isu Strategis dan Peraturan Subsektor Mineral dan Batubara
Isu-Isu Strategis dan Peraturan Subsektor Mineral dan BatubaraIsu-Isu Strategis dan Peraturan Subsektor Mineral dan Batubara
Isu-Isu Strategis dan Peraturan Subsektor Mineral dan Batubara
 
Mekanisme dan Kriteria Keberhasilan Reklamasi dan Pascatambang
Mekanisme dan Kriteria Keberhasilan Reklamasi dan PascatambangMekanisme dan Kriteria Keberhasilan Reklamasi dan Pascatambang
Mekanisme dan Kriteria Keberhasilan Reklamasi dan Pascatambang
 
4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]
4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]
4 peraturan reklamasi dan pascatambang bimtek redtop [compatibility mode]
 
40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambang40084299 analisis-investasi-tambang
40084299 analisis-investasi-tambang
 

OPTIMASI MINESCAPE

  • 1. Minescape Step by Step 1. Pendahuluan a. Menjalankan Minescape b. Membuat design file c. Transfer data file dalam format lain ke design file (*.dgn) d. Membuat Grid file e. Memproses Grid file (dari design file) f. Membuat Triangle file (dari design file) g. Update triangle file 2. Stratmodel a. Pembuatan surface topography b. Pembuatan schema c. Import data drillholes d. Import data quality 3. Resgraphics a. Mengaktifkan design file Block b. Membuat garis block dan strip c. Block - strip intersection d. Reserve Block e. Menentukan parameter quality f. Mining reserve g. Accumulate samples h. Reformat samples i. Penambahan kolom total O/B, S/R, warna j. Reserve graphics 4. Generate solid a. Penentuan side definition b. Generate block - strip c. Generate solid from batter block d. Pit projection
  • 2. 5. Pit Design a. Penentuan pit limit & drapping terhadap surface final design b. Membuat side definition c. Proyeksi pit design d. Pembuatan bench spec e. Intersect pit design terhadap surface topo f. Triangulasi pit design 6. Mine Schedulling a. Pembuatan database b. Mine scheduling c. Pembuatan ramp design d. Pembuatan desain jalan e. Pembuatan desain waste dump
  • 3. A. Menjalankan Minescape MineScape 114.lnk Click icon bar exceed , kemudian click icon bar minescape . Di layar akan muncul : Click Create Project : Diisi nama project, tempat project, origin global, serta dilakukan pengedikan unit sesuai dengan yang dikehendaki. Origin global merupakan titik tengah dari project area. Jalankan project dengan memilih application “Open Cut Coal” -- OK. Minescape Step by Step Safrudin 25/10/2005
  • 4. Memilih aplikasi minescape : B. Membuat Design File Click Open Write File --- click kanan pada nama design file Beri nama pada design file click click kanan & create Click Open Write File --- buka design file yang baru dibuat Pada layar yang muncul, beri nama Layer baru. Ketik nama layer baru Minescape Step by Step Safrudin 25/10/2005
  • 5. C. Transfer Ascii Data File ke Design File Tempatkan data yang akan ditransfer pada folder D:ProjectsNama ProjectsData Minescape Explorer – Design files – Import ---- pilih tab ascii import ascii Design file edit format : click kanan -pilih file edit Edit format “ob” dengan click kanan, lakukan pengeditan sesuai dengan spec format data ascii yang akan ditransfer. Minescape Step by Step Safrudin 25/10/2005
  • 6. Format transfer : sesuaikan dengan posisi kolom easting pada data Untuk melihat tampilan ascii data yang akan ditransfer, pada data : click kanan – edit, dapat dilihat tampilan ascii data file Minescape Step by Step Safrudin 25/10/2005
  • 7. Contoh tampilan graphis (design file) hasil transfer dari ascii data file. Transfer DXF File ke Design File Minescape Explorer – Design files – Import ----- pilih tab dxf dxf Minescape Step by Step Safrudin 25/10/2005
  • 8. Membuat Table File Menu : Minescape Explorer --- Table files --- Generic --- Create D. Membuat Grid File Menu : Minescape Explorer --- Grid Files --- Create Grid spec dibuat dengan cara : click kanan --- create create Grids file Click kanan -- create Minescape Step by Step Safrudin 25/10/2005
  • 9. E. Memproses Grid File ( Dari Design File ) Menu : Model --- Grids --- Design Poligon domain merupakan polygon yang melingkupi data yang akan diproses dalam grid. Untuk data baru, pada controls aktifkan New/Replace, sedangkan untuk proses update pada controls aktifkan Patch. Interpolator spec dipilih fem. F. Membuat Triangle File (Dari Design File) Menu : Model --- Triangles --- Design ----- aktifkan “create” aktifkan create untuk grid baru untuk update grid fem Minescape Step by Step Safrudin 25/10/2005
  • 10. Convexity control diisi 5 G. Update Triangle File Menu : Model --- Triangles --- Design ----- aktifkan “patch” aktifkan patch Triangle yang diupdate Polygon data baru Polygon keseluruhan Minescape Step by Step Safrudin 25/10/2005
  • 11. Minescape Step by Step Safrudin 25/10/2005
  • 12. Minescape Step by Step Safrudin 25/10/2005
  • 13. Minescape Step by Step Safrudin 25/10/2005
  • 14. Minescape Step by Step Safrudin 25/10/2005
  • 15. PENGENALAN STRATMODEL Data yang diperlukan : a. Topography ( dxf/dwg, grid, ascii, triangle ) b. Geology ( borehole, quality ) c. Pembuatan Quality Model, Key Quality, Quality Default, Quality Definitions melalui menu : Minescape Explorer --- Quality A. Pembuatan Surface Topography Contoh dari “grid file” : Minescape Explorer ----- Surfaces ----- Grid ---- Create : create B. Pembuatan Schema Siapkan nama-nama interval seam secara berurutan dari atas ke bawah berdasarkan data bor. Minescape Step by Step Safrudin 25/10/2005
  • 16. Buka modul stratmodel : Page --- Open Product --- Stratmodel Pembuatan Schema : Schemas --- Create Minescape Step by Step Safrudin 25/10/2005
  • 17. C. Import Data Drillholes Biasanya data drillhole merupakan data survey (posisi) titik bor dan data lithology titik bor. Survey (posisi) titik bor berisi holename, easting, northing, elevasi, dan total depth. Lithology titik bor berisi holename, from, to, interval/seam, dan lithology. Data-data tersebut disimpan dalam ascii data file. Contoh ascii data posisi titik bor. Minescape Step by Step Safrudin 25/10/2005
  • 18. Contoh ascii data lithology titik bor. Menu : Drill Holes --- Import Diisikan nama survey data file drill holes & lithology data file drill holes. Format survey dan lithology diedit dengan click kanan – edit, disesuaikan dengan ascii data file dari survey dan lithology drill holes tersebut. Minescape Step by Step Safrudin 25/10/2005
  • 19. Selanjutnya dilakukan proses build table & build grid : Schemas --- Process : Untuk memudahkan, biasanya nama table & grid schema dibuat sama dengan nama schema. Grid Spec dibuat dengan clik kanan --- create. Setelah schema dibuat, maka dapat dibuat contour structure dari schema tersebut dengan menu : Graphics --- Contour --- Multi D. Import Data Quality Data quality proximate drill holes berisi holename, interval, sample number, from, to, TM, IM, Ash, VM, FC, TS, CV, RD. Minescape Step by Step Safrudin 25/10/2005
  • 20. Ascii data quality tersebut diimport dengan menu : Quality --- Import Quality, diimport dengan tabdesk DH Load – User Defined. Kolom quality disesuaikan dengan ascii quality data file. Minescape Step by Step Safrudin 25/10/2005
  • 21. Kemudian dilakukan proses komposit dengan menu : Quality --- Composite --- Drill Holes Minescape Step by Step Safrudin 25/10/2005
  • 22. Dari table excel : Holename East Noth Elevasi Totaldepth Holename From To Seam Litho (untuk survey, untuk lithology, simpan masing2 sheet dlm excel format text delimeted) Load drill hole data dari acii file, formatnya Minescape Step by Step Safrudin 25/10/2005
  • 23. Minescape Step by Step Safrudin 25/10/2005
  • 24. Minescape Step by Step Safrudin 25/10/2005 Import quality
  • 25. Sebelum prose tsb, dibuat dulu schemanya, namain aja table & gridnya, ketik masing2 seam nya, ikutin schema yg sudah ada. Setelah schema ada, lalu buat table dan grid schemanya. Minescape Step by Step Safrudin 25/10/2005
  • 26. Minescape Step by Step Safrudin 25/10/2005
  • 27. Minescape Step by Step Safrudin 25/10/2005
  • 28. membuat nulti kontur Prediksi dari titik yg diinginkan untuk dipreiksikan kondidinya. Minescape Step by Step Safrudin 25/10/2005
  • 29. Minescape Step by Step Safrudin 25/10/2005
  • 30. RESGRAPHIC (Optimalisasi Penentuan Mineable Area Menggunakan Batter Blocks) A. Masuk ke design file Blocks Open write file B. Dilakukan penentuan potensial area yang biasanya dibatasi oleh garis strip & block. Garis strip biasanya sejajar dengan trend outcrop dan mengarah ke down dip, garis block biasanya tegak lurus dengan trend outcrop dan mengarah searah dengan strike batubara. Minescape Step by Step Safrudin 25/10/2005
  • 31. Pembuatan blocks dari garis block, dilanjutkan dengan pembuatan blocks dari garis strike (Strip_Design --- Generate Strips) Minescape Step by Step Safrudin 25/10/2005
  • 32. Minescape Step by Step Safrudin 25/10/2005
  • 33. C. Intersection Strip – Blocks ( Strip_Design --- Strip Intersection ) Mengisi primary & secondary blocks : klik kanan – filldown – clear – isi block * - filter Blocks hasil proses intersect batter blocks Minescape Step by Step Safrudin 25/10/2005
  • 34. D. Reserve Blocks ( Reserve – Generate Samples from Polygons setup interval Minescape Step by Step Safrudin 25/10/2005
  • 35. surfsets qualities Note : sebelum melakukan proses reserve, terlebih dahulu kita membuat quality model, quality default, quality definition dan key quality melalui minescape explorer -------- qualities. Minescape Step by Step Safrudin 25/10/2005
  • 36. Minescape Step by Step Safrudin 25/10/2005 E. Menentukan parameter quality Maintain quality spec Quality definition
  • 37. Minescape Step by Step Safrudin 25/10/2005 Quality model
  • 38. F. Mining Reserve ( Reserves – Evaluate Samples – Mining Reserves ) Minescape Step by Step Safrudin 25/10/2005 Quality default
  • 39. G. Accumulate Samples ( Reserves – Accumulate Samples ) H. Reformat Samples ( Reserves – Reformat Samples -- Blocks ) Minescape Step by Step Safrudin 25/10/2005
  • 40. I. Penambahan kolom Total_OB, SR, & Warna pada table hasil reformat. Buka table reformat melalui minescape explorer : Minescape Step by Step Safrudin 25/10/2005
  • 41. Dari table : Edit – Colums -- Add Mxl file untuk colum Total_OB & Warna dibuat melalui minescape explorer : Minescape Step by Step Safrudin 25/10/2005
  • 42. Gradasi warna Mincom adalah : 100 putih 200 merah Semakin mendekati 200, akan semakin mendekati warna merah. J. Reserve Graphics : Minescape Explorer – Actions – resgraphics : Minescape Step by Step Safrudin 25/10/2005
  • 43. Berdasarkan hasil proses resgraphics, maka dapat ditentukan batasan daerah yang SR sesuai dengan yang dikehendaki, selanjutnya dapat ditentukan Pit Limit daerah yang dimaksud. Minescape Step by Step Safrudin 25/10/2005
  • 44. GENERATE SOLIDS A. Pit limit diberikan side definition, hw dan lw. Verteks poligon searah jarum jam. B. Generate Blocks dan Strips Side definition pada proses generate blocks dikosongkan, pada proses generate strips diisi Minescape Step by Step Safrudin 25/10/2005
  • 45. Side definition dikosongkan pada generate blocks Generate strips Minescape Step by Step Safrudin 25/10/2005
  • 46. Side definition pada generate strips C. Generate Solid dari Batter Blocks Click kanan -- create Minescape Step by Step Safrudin 25/10/2005
  • 47. D. Pit Projection Rules Solid dengan side definition pada start strip, interior strip dan end strip Minescape Step by Step Safrudin 25/10/2005
  • 48. PIT DESIGN A. Masuk ke design file tempat pit limit line. Drape pit limit terhadap floor target. ( Strip_Design – Drape ) Minescape Step by Step Safrudin 25/10/2005
  • 49. Klick d (detail) elemen pit line, check z maksimum – minimum ( hal ini perlu dilakukan karena kadang kita menemukan verteks yang tidak ada elevasinya, sehingga kita harus memberikan elevasi sendiri secara manual ). Verteks pit limit line sebaiknya searah putaran jarum jam. B. Memberikan “side definition” pada pit limit line. Langkah ini diawali dengan pembuatan “side definition” ( Strip_Design – Tag Design Segments ) Minescape Step by Step Safrudin 25/10/2005
  • 50. Kita bisa membuat “side definition” untuk highwall & lowwall, dan kemudian mendrapekannya kepada pit limit line, daerah out crop merupakan lowwall dan bagian lainnya merupakan highwall. C. Proyeksi Pit Design ( Strip_Design – Ramps – Projects and Offset ) Minescape Step by Step Safrudin 25/10/2005
  • 51. D. Awal dari langkah ini adalah pembuatan “bench spec” terlebih dahulu : Bench Spec – click kanan – create. Setelah bench spec terbentuk, maka selanjutnya adalah generates crest & toe dari elevasi terendah (floor) hingga elevasi teringgi (topo) yang dianggap cukup. Minescape Step by Step Safrudin 25/10/2005
  • 52. Minescape Step by Step Safrudin 25/10/2005
  • 53. E. Proses intersect pit design oleh surface topography. Minescape Explorer – Design files – Process : Buat “crest” terluar dengan menghubungkan “rays” terluar. Minescape Step by Step Safrudin 25/10/2005
  • 54. F. Proses triangulasi “pit design”. Proses ini diawali dengan menambahkan floor structure seluas pit limit line. Kemudian gabungan layer-layer tersebut ditriangulasi. Proses triangulasi : Model – Triangle – Design : Minescape Step by Step Safrudin 25/10/2005
  • 55. Hasil triangulasi pit design Reserve calculation daerah pit, dihitung OB & Coal berserta Qualitynya ( Reserve – Mining Reserve – Accumulate ). Unload table hasil proses reserve ke data file : Minescape Explorer – Table files – Generic – pilih nama table -- export Dari data files, table tersebut selanjutnya dapat dibuka dengan excel untuk kemudian diolah sesuai yang dikehendaki. Minescape Step by Step Safrudin 25/10/2005
  • 56. MINE SCHEDULING A. Pembuatan Database a. Masuk ke Design File Blocks, refferenkan pit design. b. Bagi daerah pit menjadi block-block ( ukuran block 100 m x 50 m ) menggunakan batter block. Minescape Step by Step Safrudin 25/10/2005
  • 57. c. Lakukan proses “reserve calculation” block per block level per level, sebelumnya dibuat file list block-block tersebut. Reserve Calculation ( Reserve -- Mining Reserve – Accumulate ). Subset ( level ) dalam proses reserve Tampilan table hasil proses reserve Minescape Step by Step Safrudin 25/10/2005
  • 58. d. Lakukan proses transfer table file hasil reformat kedalam data file : Minescape explorer – Table Files – Generik – pilih tablenya – Export – pilih tabdesk unload. Transfer table dilakukan untuk overvolume, intervolume, rrmass, dan quality. e. Proses pengolahan table-table tersebut di excel. Buka masing-masing table file tersebut melalui excel, lakukan pengolahan sehingga dihasilkan database dari pit design tersebut. Database tersebut berisi jumlah OB dan Coal serta Quality dari masing-masing block setiap levelnya. Minescape Step by Step Safrudin 25/10/2005
  • 59. Pengertian “overvolume”, “intervolume”, “unassvolume”. B. Mine Scheduling Tahap awal dari mine scheduling di sini adalah pembuatan “master scheduling” yang merupakan development bench yang bentuknya disesuaikan dengan block-block, elevasinya disesuaikan dengan perkiraan target elevasi. Spesifikasi master scheduling ini adalah 100 m flat bench dan 10 m tinggi bench. Surface master scheduling ini bentuknya tetap, elevasinya disesuaikan mengikuti schedule & target penambangan. Bentuk design scheduling dari suatu periode merupakan hasil intersect antara “master scheduling” dengan topography dan master pit design. Master scheduling Minescape Step by Step Safrudin 25/10/2005
  • 60. Dalam pembuatan “master scheduling”, untuk memproyeksikan ke elevasi di atasnya dengan sudut tertentu digunakan Draw – Projects Sequence 1 Selanjutnya dilakukan proses perhitungan reserve OB & Coal serta Quality dari polygon hasil intersect tersebut. OB & Coal serta Quality dapat juga dilihat dari database di atas. Pembuatan mine sequence berikutnya tinggal menurunkan saja elevasi dari master scheduling, kemudian dilakukan proses intersect antara master scheduling dengan topo dan dengan master pit design. Dalam perhitungan reserve, surface atas dari mine sequence kedua ini merupakan surface bawah dari mine sequence yang pertama, surface atas mine sequence ketiga merupakan surface bawah dari mine sequence kedua, demikian seterusnya. Minescape Step by Step Safrudin 25/10/2005
  • 61. Sequence 2 Contoh konsep scheduling menggunakan surface “master scheduling”. Minescape Step by Step Safrudin 25/10/2005
  • 62. C. Pembuatan Ramp Design a. Berikan side definition “highwall” pada toe mine scheduling design yang dikehendaki. b. Insert ramp ( Strip_Design – Ramps – Insert Ramp ), ramp spec dibuat dengan klik kanan. Minescape Step by Step Safrudin 25/10/2005
  • 63. c. Menggunakan Projects and Offset, proyeksikan toe ramp ke elevasi berikutnya. d. Edit Ramp Minescape Step by Step Safrudin 25/10/2005
  • 64. D. Pembuatan Design Jalan Selengkapnya proses pembuatan “Road Design” akan dibahas bersama dalam modul “Haulage Road”. Dalam latihan ini, design jalan merupakan proyeksi manual dengan sudut tertentu terhadap topography dari suatu elevasi jalan yang ditentukan. Pembuatan design jalan dimulai dengan pembuatan as jalan (center line) dengan grade tertentu, kemudian center line tersebut dioffset kiri-kanan sesuai dengan lebar jalan yang dikehendaki. Design jalan yang akan dibuat sebaiknya merupakan design jalan akhir (final road design/master road design), sehingga untuk setiap design mine sequence tinggal melakukan proses intersect dari final design jalan tersebut. Untuk jalan di luar pit, pembuatan final design jalan berdasarkan mine sequence awal. Untuk jalan di dalam pit, pembuatan final design jalan berdasarkan mine sequence akhir. Faktor penting yang harus dipertimbangkan dalam pembuatan design jalan ini antara lain adalah jarak, grade, cut & fill. Contoh final design jalan dalam pit Minescape Step by Step Safrudin 25/10/2005
  • 65. Contoh design jalan dalam pit pada mine sequence tertentu Contoh final design jalan di luar pit Minescape Step by Step Safrudin 25/10/2005
  • 66. Contoh design jalan di luar pit pada mine sequence tertentu E. Pembuatan Design Waste Dump Pada dasarnya proses pembuatan waste dump design adalah menutup daerah yang topographynya rendah untuk dijadikan disposal area. Proses pembuatan waste dump design dapat dilakukan secara manual dengan menu Draw – Project, serta menu Draw – Offset. Dengan menu project, dapat dilakukan proyeksi ke atas / bawah terhadap elevasi tertentu dengan sudut tertentu (misalnya 400 ). Dengan menu offset, dapat dilakukan offset horizontal dengan jarak offset / lebar berm tertentu (misalnya 30 m). Minescape Step by Step Safrudin 25/10/2005
  • 67. Contoh design waste dump Minescape Step by Step Safrudin 25/10/2005