SlideShare a Scribd company logo
For further information, please email: newcastle.tech@manpower.co.uk
Identifying talent critical to success for the
energy market
Overview
Our client is a world-class supplier of engineering services, with vast experience in the
execution of engineering procurement construction projects; including the supply of main
equipment, civil works and electromechanical erection and commissioning works. A business
focused on overhead and underground transmission and distribution lines and substations,
this organisation works across both the public and private sectors in the UK and
internationally.
As part of a Spanish/UK international joint venture, awarded with a framework agreement by a
big six energy firm, and as part of an overall £1.1bn capital investment programme, our client
was tasked with the design and construction of a 400kV substation and 132kV substation to
supply the national grid connection for new renewable resources.
Challenge
A new entrant to the UK market, our client faced two main challenges to successfully deliver
this prestigious and high profile project. Firstly, to establish a project management team with
the talented engineering personnel capable of delivering the front end engineering design and
specification; secondly, to organise and execute the construction programme to their client’s
satisfaction, on time and to a set budget.
Our client’s senior management team encountered a number of challenges at the start of the
project. The two substations required individual technical design and specifications, and
where to be based in remote locations, with difficult terrain and subject to extreme weather
conditions. Furthermore our client had to comply with tight deadlines to complete the agreed
construction and commissioning works programme.
Therefore appointing a Senior Project Manager who was capable of leading the project
management team was key to the project. This individual had to combine engineering
excellence with commercial experience, and needed to have a proven track record in
completing other capital expenditure projects of a similar size and nature, on time and to
budget.
Solution
When Manpower received this brief, we responded by providing our client with a UK-
wide executive search and selection service, to identify and engage individuals with a
strong technical expertise, who were capable of undertaking the responsibilities of
this appointment.
Our objective was to provide a short list of five suitable candidates with the
correct profile - a qualified and senior Electrical Engineer, with industry
experience and located in, or willing to relocate, to the clients chosen area of
operation for the full three-year duration of this project.
We achieved this by mapping the UK market, using market intelligence,
industry contacts, and networking to draw up a long list of potential
candidates. We then established each potential candidate’s location and
their status as either passive or active (i.e. on the market, or in the
market).
For further information, please email: newcastle.tech@manpower.co.uk
We were then able to progress and fully qualify their capability and
competencies before submitting their application. This was followed up with further
support and coaching on interview techniques, negotiation of their employment
contract and compensation package, through to management of their resignation and
transition into their new position of employment. After their assignment commenced,
we offered continued support during their initial period of employment and induction
into their new employer.
Result
After identifying more than 100 potential candidates during the search phase, Manpower
worked tirelessly to overcome competition from other agencies to find and present the
successful candidate for this appointment.
Following this assignment Manpower have gone from strength to strength, with a succession
of senior permanent and interim appointments on a number of other high profile infrastructure
projects within the UK Energy market.
To find out how Manpower can provide your business with the same high caliber search and
selection service to help identify the talent critical to the success of your current or future
project, please contact us on:
T. 0191 221 2345
E. derek.woodhouse@manpower.co.uk.
manpower.co.uk

More Related Content

What's hot

10 Step By Step Marketing Plan
10 Step By Step Marketing Plan10 Step By Step Marketing Plan
10 Step By Step Marketing PlanSebastianMagpantay
 
Ron Young 1 page c.v.
Ron Young  1 page c.v.Ron Young  1 page c.v.
Ron Young 1 page c.v.Ron Young
 
Eng Khaled Adel
Eng Khaled Adel Eng Khaled Adel
Eng Khaled Adel Khaled adel
 
Mark Pepper CV - 2016 v0.1
Mark Pepper CV - 2016 v0.1Mark Pepper CV - 2016 v0.1
Mark Pepper CV - 2016 v0.1Mark Pepper
 
Nordisk tillvaxt - Your Partner in Europe - Capability Statement
Nordisk tillvaxt - Your Partner in Europe - Capability Statement  Nordisk tillvaxt - Your Partner in Europe - Capability Statement
Nordisk tillvaxt - Your Partner in Europe - Capability Statement
Nordisk Tillvaxt
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manageryasir arafath
 
Boletin EURES mayo 2012
Boletin EURES mayo 2012Boletin EURES mayo 2012
Boletin EURES mayo 2012
formaciopuig
 
case study utc. - blind
case study utc. - blindcase study utc. - blind
case study utc. - blindEvan Willen
 
Graeme Barr CV 28.7.15
Graeme Barr CV 28.7.15Graeme Barr CV 28.7.15
Graeme Barr CV 28.7.15Graeme Barr
 

What's hot (15)

NEW CV
NEW CVNEW CV
NEW CV
 
10 Step By Step Marketing Plan
10 Step By Step Marketing Plan10 Step By Step Marketing Plan
10 Step By Step Marketing Plan
 
Ron Young 1 page c.v.
Ron Young  1 page c.v.Ron Young  1 page c.v.
Ron Young 1 page c.v.
 
Lourdes Carvajal CV
Lourdes Carvajal CVLourdes Carvajal CV
Lourdes Carvajal CV
 
Eng Khaled Adel
Eng Khaled Adel Eng Khaled Adel
Eng Khaled Adel
 
C.V R-016
C.V R-016C.V R-016
C.V R-016
 
CV SADA.1
CV SADA.1CV SADA.1
CV SADA.1
 
FJGD 2015
FJGD 2015FJGD 2015
FJGD 2015
 
Mark Pepper CV - 2016 v0.1
Mark Pepper CV - 2016 v0.1Mark Pepper CV - 2016 v0.1
Mark Pepper CV - 2016 v0.1
 
Nordisk tillvaxt - Your Partner in Europe - Capability Statement
Nordisk tillvaxt - Your Partner in Europe - Capability Statement  Nordisk tillvaxt - Your Partner in Europe - Capability Statement
Nordisk tillvaxt - Your Partner in Europe - Capability Statement
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manager
 
Boletin EURES mayo 2012
Boletin EURES mayo 2012Boletin EURES mayo 2012
Boletin EURES mayo 2012
 
CVclaversiegb7
CVclaversiegb7CVclaversiegb7
CVclaversiegb7
 
case study utc. - blind
case study utc. - blindcase study utc. - blind
case study utc. - blind
 
Graeme Barr CV 28.7.15
Graeme Barr CV 28.7.15Graeme Barr CV 28.7.15
Graeme Barr CV 28.7.15
 

Similar to Identifying talent critical to your success.

Power Recruitment
Power RecruitmentPower Recruitment
Power Recruitment
Vicki Codd,
 
Huxley Engineering Brochure
Huxley Engineering BrochureHuxley Engineering Brochure
Huxley Engineering BrochureMarith van Veen
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
FairFASST
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15Paul Jubb
 
Connect Resourcing Brochure
Connect Resourcing BrochureConnect Resourcing Brochure
Connect Resourcing BrochureBbowers
 
Construction & Trades
Construction & Trades  Construction & Trades
Construction & Trades
Christina Harris
 
ASTUTE - Power Generation Recruitment Specialists
ASTUTE - Power Generation Recruitment SpecialistsASTUTE - Power Generation Recruitment Specialists
ASTUTE - Power Generation Recruitment SpecialistsStuart Roberts FIRP Cert RP
 
Energy brochure
Energy brochureEnergy brochure
Energy brochure
Mimi Saunders
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015Phil Morris
 
Scantec Nuclear and Power Brochure 2015
Scantec Nuclear and Power Brochure 2015Scantec Nuclear and Power Brochure 2015
Scantec Nuclear and Power Brochure 2015Sarah Jane McGovern
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting BrochureDaniel Giles
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting BrochureSara Almeida
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting BrochureOliver Gelpke
 
Ardent 4
Ardent 4 Ardent 4
Ardent 4
Ben Andrzejewski
 
Ardent 4
Ardent 4Ardent 4

Similar to Identifying talent critical to your success. (20)

Power Recruitment
Power RecruitmentPower Recruitment
Power Recruitment
 
Huxley Engineering Brochure
Huxley Engineering BrochureHuxley Engineering Brochure
Huxley Engineering Brochure
 
HAE_Brochure
HAE_BrochureHAE_Brochure
HAE_Brochure
 
CV
CVCV
CV
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15
 
Connect Resourcing Brochure
Connect Resourcing BrochureConnect Resourcing Brochure
Connect Resourcing Brochure
 
Construction & Trades
Construction & Trades  Construction & Trades
Construction & Trades
 
ASTUTE - Power Generation Recruitment Specialists
ASTUTE - Power Generation Recruitment SpecialistsASTUTE - Power Generation Recruitment Specialists
ASTUTE - Power Generation Recruitment Specialists
 
Energy brochure
Energy brochureEnergy brochure
Energy brochure
 
Spencer Ogden
Spencer OgdenSpencer Ogden
Spencer Ogden
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015
 
JCC Company Profile
JCC Company ProfileJCC Company Profile
JCC Company Profile
 
Scantec Nuclear and Power Brochure 2015
Scantec Nuclear and Power Brochure 2015Scantec Nuclear and Power Brochure 2015
Scantec Nuclear and Power Brochure 2015
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting Brochure
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting Brochure
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting Brochure
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting Brochure
 
Ardent 4
Ardent 4 Ardent 4
Ardent 4
 
Ardent 4
Ardent 4Ardent 4
Ardent 4
 

Recently uploaded

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
Nettur Technical Training Foundation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 

Recently uploaded (20)

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 

Identifying talent critical to your success.

  • 1. For further information, please email: newcastle.tech@manpower.co.uk Identifying talent critical to success for the energy market Overview Our client is a world-class supplier of engineering services, with vast experience in the execution of engineering procurement construction projects; including the supply of main equipment, civil works and electromechanical erection and commissioning works. A business focused on overhead and underground transmission and distribution lines and substations, this organisation works across both the public and private sectors in the UK and internationally. As part of a Spanish/UK international joint venture, awarded with a framework agreement by a big six energy firm, and as part of an overall £1.1bn capital investment programme, our client was tasked with the design and construction of a 400kV substation and 132kV substation to supply the national grid connection for new renewable resources. Challenge A new entrant to the UK market, our client faced two main challenges to successfully deliver this prestigious and high profile project. Firstly, to establish a project management team with the talented engineering personnel capable of delivering the front end engineering design and specification; secondly, to organise and execute the construction programme to their client’s satisfaction, on time and to a set budget. Our client’s senior management team encountered a number of challenges at the start of the project. The two substations required individual technical design and specifications, and where to be based in remote locations, with difficult terrain and subject to extreme weather conditions. Furthermore our client had to comply with tight deadlines to complete the agreed construction and commissioning works programme. Therefore appointing a Senior Project Manager who was capable of leading the project management team was key to the project. This individual had to combine engineering excellence with commercial experience, and needed to have a proven track record in completing other capital expenditure projects of a similar size and nature, on time and to budget. Solution When Manpower received this brief, we responded by providing our client with a UK- wide executive search and selection service, to identify and engage individuals with a strong technical expertise, who were capable of undertaking the responsibilities of this appointment. Our objective was to provide a short list of five suitable candidates with the correct profile - a qualified and senior Electrical Engineer, with industry experience and located in, or willing to relocate, to the clients chosen area of operation for the full three-year duration of this project. We achieved this by mapping the UK market, using market intelligence, industry contacts, and networking to draw up a long list of potential candidates. We then established each potential candidate’s location and their status as either passive or active (i.e. on the market, or in the market).
  • 2. For further information, please email: newcastle.tech@manpower.co.uk We were then able to progress and fully qualify their capability and competencies before submitting their application. This was followed up with further support and coaching on interview techniques, negotiation of their employment contract and compensation package, through to management of their resignation and transition into their new position of employment. After their assignment commenced, we offered continued support during their initial period of employment and induction into their new employer. Result After identifying more than 100 potential candidates during the search phase, Manpower worked tirelessly to overcome competition from other agencies to find and present the successful candidate for this appointment. Following this assignment Manpower have gone from strength to strength, with a succession of senior permanent and interim appointments on a number of other high profile infrastructure projects within the UK Energy market. To find out how Manpower can provide your business with the same high caliber search and selection service to help identify the talent critical to the success of your current or future project, please contact us on: T. 0191 221 2345 E. derek.woodhouse@manpower.co.uk. manpower.co.uk