National Reconstruction Authority
Thematic Presentation - Public infrastructures (Government Buildings, Health Buildings,
Integrated Settlements, and Old Palaces): Reconstruction Process and Technology
National Reconstruction Authority
Lila Khatiwada
2021
• Reconstruction Completed : 645 Government Buildings
including community buildings; 216 Security Buildings; 751
Health Buildings; 34 Integrated settlements
• Work Ongoing: 20 Government buildings; 45 Integrated
settlements; 388 health buildings
Government Buildings,
Health Buildings,
Integrated Settlements,
and Old Palaces -
Reconstruction Process
and Technology
Overview
2015, Gorkha Earthquake
• 7.6 magnitude Earthquake on April 25 and 6.8 magnitude
major aftershock on May 12
• Damage and losses: 2656 Government Buildings including
Security Buildings, Health buildings and others destroyed,
3622 partially damaged (PDRF report)
Challenges and constraints (1) Institutional / organisational
• Organizational structure and capacity in such large scale
reconstruction
• Policy documents and process
• Standards methods and confidence.
• Revision of design code as per current social and economic
perspective.
• Code and standard compliance reconstruction
Operational / practical
• Materials - methods and modality
• Geography - access and suitable land.
• Human Resources - both skilled and unskilled
• Quality - control and assurance
Challenges and constraints (2)
Retrofitting of Heritage Buildings
• Debate on Retrofitting vs. Reconstruction
• Availability of tested retrofitting technology
• Material selection and acceptability
• Implementation capacity (technical)
Integrated Settlements
• To connect original settlement, livelihoods with new
settlements
• Non-willingness of beneficiaries towards new settlements…
• Geography, accessibility and limited resources
Strategies
Institutional / organisational
• Principle: ‘Build Back Better’
• Revision of guidelines: procurement, environmental
assessment, land use and management
• Deployment of trained human resources
• Applications of current approach in Design and
implementation
• Quality control and assurance in design and
implementation
• Participatory approach to integrated settlement
Methods and
approaches (2)
• Detailed damage assessment and seismic vulnerability assessment
• Non-destructive and semi destructive tests (Push shear tests, flat
jack tests, timber decay tests, mortar tests, brick sample tests:
especially for masonry building) to obtain information on building
structural components
• Retrofitting Principle: preservation of original character and
materials, visual compactible, reversible materials techniques
• Design Principle: increased diaphragm rigidity, connection
improvement, place specific intervention
• Retrofitting Material: use of Archeologically accepted materials
Lessons learned (1)
Institutional and organisational
• Participatory approach: from planning to operations and
maintenance in integrated settlements
• Cost Optimization: uniformity in design, implementation,
operation and maintenance stages
• Documentation: For institutional memory and future disaster.
• Provision of operation/maintenance fund to make it well
condition.
Operational / human resources
• Knowledge/capacity of technical human resources
• Connect new settlement with social and livelihood.
• Adapting new methods, materials and capacity for old
structure.
• Best practices to be reflected in other areas
Lessons learned (2)
Key messages / takeaways 1. Built back better with current scenario
2. Make process competitive, transparent and
participatory
3. Ensure uniformity in design and
implementation
4. Preserve Important and Old Palaces with
appropriate technology
5. Ensure proper documentation and handover

More Related Content

Similar to ICNR thematic presentation 2021 Dec-7-9 :public infrastructure : thematic session 4 edit aw

project management for heritage.pptx
project management for heritage.pptxproject management for heritage.pptx
project management for heritage.pptx
DebopamRoy6
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
Hachnayen
 
Dhrumil pandya Maintance
Dhrumil pandya  Maintance  Dhrumil pandya  Maintance
Dhrumil pandya Maintance
Dhrumil Pandya
 
Community resilience modeling, field studies and implementation
Community resilience modeling, field studies and implementationCommunity resilience modeling, field studies and implementation
Community resilience modeling, field studies and implementation
Md.Asif Rahman
 
MSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdfMSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdf
ShanthaNimalBandaraA
 
MSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdfMSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdf
ShanthaNimalBandaraA
 
Facilities Assessment Panel Presentation
Facilities Assessment Panel PresentationFacilities Assessment Panel Presentation
Facilities Assessment Panel Presentation
Meg Thompson
 
Appropriate material for sustainable building
Appropriate material for sustainable building Appropriate material for sustainable building
Appropriate material for sustainable building
Biya Girma Hirpo
 
GreenBuildingSustainableArchitecture.pdf
GreenBuildingSustainableArchitecture.pdfGreenBuildingSustainableArchitecture.pdf
GreenBuildingSustainableArchitecture.pdf
tanveerkhan78086
 
GreenBuildingSustainableArchitecture.ppt
GreenBuildingSustainableArchitecture.pptGreenBuildingSustainableArchitecture.ppt
GreenBuildingSustainableArchitecture.ppt
Amgad Fahmy
 
Heritage State College Workshop #2
Heritage State College Workshop #2Heritage State College Workshop #2
Heritage State College Workshop #2
Douglas Shontz
 
Module 2006 introduction
Module 2006 introductionModule 2006 introduction
Module 2006 introduction
Julian Swindell
 
CVnz - Andrew Nash
CVnz - Andrew NashCVnz - Andrew Nash
CVnz - Andrew Nash
Andrew Nash
 
Better Energy Communities 2014 workshop 18 2-14
Better Energy Communities 2014 workshop 18 2-14Better Energy Communities 2014 workshop 18 2-14
Better Energy Communities 2014 workshop 18 2-14
SustainableEnergyAut
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
ReenaRanaGCET
 
ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...
ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...
ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...
Virtual ULI
 
Critical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauCritical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - Thurnau
Meg Thompson
 
1. Architectural Design Studios 67I.pptx
1. Architectural Design Studios 67I.pptx1. Architectural Design Studios 67I.pptx
1. Architectural Design Studios 67I.pptx
BurkaDinka
 
الأستدامة
الأستدامةالأستدامة
الأستدامة
Abdullah Algaroushah
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
Jerry Yudelson
 

Similar to ICNR thematic presentation 2021 Dec-7-9 :public infrastructure : thematic session 4 edit aw (20)

project management for heritage.pptx
project management for heritage.pptxproject management for heritage.pptx
project management for heritage.pptx
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
 
Dhrumil pandya Maintance
Dhrumil pandya  Maintance  Dhrumil pandya  Maintance
Dhrumil pandya Maintance
 
Community resilience modeling, field studies and implementation
Community resilience modeling, field studies and implementationCommunity resilience modeling, field studies and implementation
Community resilience modeling, field studies and implementation
 
MSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdfMSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdf
 
MSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdfMSC Lec 06 - Construction Site Management.pdf
MSC Lec 06 - Construction Site Management.pdf
 
Facilities Assessment Panel Presentation
Facilities Assessment Panel PresentationFacilities Assessment Panel Presentation
Facilities Assessment Panel Presentation
 
Appropriate material for sustainable building
Appropriate material for sustainable building Appropriate material for sustainable building
Appropriate material for sustainable building
 
GreenBuildingSustainableArchitecture.pdf
GreenBuildingSustainableArchitecture.pdfGreenBuildingSustainableArchitecture.pdf
GreenBuildingSustainableArchitecture.pdf
 
GreenBuildingSustainableArchitecture.ppt
GreenBuildingSustainableArchitecture.pptGreenBuildingSustainableArchitecture.ppt
GreenBuildingSustainableArchitecture.ppt
 
Heritage State College Workshop #2
Heritage State College Workshop #2Heritage State College Workshop #2
Heritage State College Workshop #2
 
Module 2006 introduction
Module 2006 introductionModule 2006 introduction
Module 2006 introduction
 
CVnz - Andrew Nash
CVnz - Andrew NashCVnz - Andrew Nash
CVnz - Andrew Nash
 
Better Energy Communities 2014 workshop 18 2-14
Better Energy Communities 2014 workshop 18 2-14Better Energy Communities 2014 workshop 18 2-14
Better Energy Communities 2014 workshop 18 2-14
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
 
ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...
ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...
ULI in Action on Transportation and Infrastructure: A Catalyst for Sustainabl...
 
Critical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauCritical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - Thurnau
 
1. Architectural Design Studios 67I.pptx
1. Architectural Design Studios 67I.pptx1. Architectural Design Studios 67I.pptx
1. Architectural Design Studios 67I.pptx
 
الأستدامة
الأستدامةالأستدامة
الأستدامة
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 

Recently uploaded

Circular Economy implementation in the EU
Circular Economy implementation in the EUCircular Economy implementation in the EU
Circular Economy implementation in the EU
HasanHamdan9
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
yemqpj
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptxPAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS_Team
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
Energy for One World
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
Christina Parmionova
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
Texas Alliance of Groundwater Districts
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
yemqpj
 

Recently uploaded (20)

Circular Economy implementation in the EU
Circular Economy implementation in the EUCircular Economy implementation in the EU
Circular Economy implementation in the EU
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptxPAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
 

ICNR thematic presentation 2021 Dec-7-9 :public infrastructure : thematic session 4 edit aw

  • 1. National Reconstruction Authority Thematic Presentation - Public infrastructures (Government Buildings, Health Buildings, Integrated Settlements, and Old Palaces): Reconstruction Process and Technology National Reconstruction Authority Lila Khatiwada
  • 2. 2021 • Reconstruction Completed : 645 Government Buildings including community buildings; 216 Security Buildings; 751 Health Buildings; 34 Integrated settlements • Work Ongoing: 20 Government buildings; 45 Integrated settlements; 388 health buildings Government Buildings, Health Buildings, Integrated Settlements, and Old Palaces - Reconstruction Process and Technology Overview 2015, Gorkha Earthquake • 7.6 magnitude Earthquake on April 25 and 6.8 magnitude major aftershock on May 12 • Damage and losses: 2656 Government Buildings including Security Buildings, Health buildings and others destroyed, 3622 partially damaged (PDRF report)
  • 3. Challenges and constraints (1) Institutional / organisational • Organizational structure and capacity in such large scale reconstruction • Policy documents and process • Standards methods and confidence. • Revision of design code as per current social and economic perspective. • Code and standard compliance reconstruction Operational / practical • Materials - methods and modality • Geography - access and suitable land. • Human Resources - both skilled and unskilled • Quality - control and assurance
  • 4. Challenges and constraints (2) Retrofitting of Heritage Buildings • Debate on Retrofitting vs. Reconstruction • Availability of tested retrofitting technology • Material selection and acceptability • Implementation capacity (technical) Integrated Settlements • To connect original settlement, livelihoods with new settlements • Non-willingness of beneficiaries towards new settlements… • Geography, accessibility and limited resources
  • 5. Strategies Institutional / organisational • Principle: ‘Build Back Better’ • Revision of guidelines: procurement, environmental assessment, land use and management • Deployment of trained human resources • Applications of current approach in Design and implementation • Quality control and assurance in design and implementation • Participatory approach to integrated settlement
  • 6. Methods and approaches (2) • Detailed damage assessment and seismic vulnerability assessment • Non-destructive and semi destructive tests (Push shear tests, flat jack tests, timber decay tests, mortar tests, brick sample tests: especially for masonry building) to obtain information on building structural components • Retrofitting Principle: preservation of original character and materials, visual compactible, reversible materials techniques • Design Principle: increased diaphragm rigidity, connection improvement, place specific intervention • Retrofitting Material: use of Archeologically accepted materials
  • 7. Lessons learned (1) Institutional and organisational • Participatory approach: from planning to operations and maintenance in integrated settlements • Cost Optimization: uniformity in design, implementation, operation and maintenance stages • Documentation: For institutional memory and future disaster. • Provision of operation/maintenance fund to make it well condition.
  • 8. Operational / human resources • Knowledge/capacity of technical human resources • Connect new settlement with social and livelihood. • Adapting new methods, materials and capacity for old structure. • Best practices to be reflected in other areas Lessons learned (2)
  • 9. Key messages / takeaways 1. Built back better with current scenario 2. Make process competitive, transparent and participatory 3. Ensure uniformity in design and implementation 4. Preserve Important and Old Palaces with appropriate technology 5. Ensure proper documentation and handover