More Related Content More from mkyong1996 (12) ICI.pdf2.
In this Introduction to Construction Industry project, we were asked to find a
specific empty land to initiate a small construction project. The size of the
land must be around 900 square meters to 1200 square meters. We had
been given some purposes for our proposal. For example, recreation area,
commercial area, industrial area, agricultural area, tourism area and
residential area. We had chosen our site which is located at Jalan Desa
Budiman, Bandar Sungai Long, Kajang, Selangor.
Purpose
The purpose of this project is to let us feel what it is like to be a city
planner, as well as testing our creativity. It also helps reflect our
personalities, whether if we care about the nature or we are a selfish bunch
of student. Beside that, it also let us learn mroe about the construction
industry, because we have to do research on how to propose our concept.
Concept
4. The concept is a 4storey, multirestaurant building, with the ground
floor being the Car park, Mcdonald’s in the 2nd floor, KFC in the 3rd floor
and Domino in the highest floor. Due to the small size of our site, we
decided to put the car park at the ground floor as we do not have to
dedicate a specific area for car park, which is impossible.
The multirestaurant concept is to provide more variety for the
residents nearby, which a drivethru located at the 2nd floor Mcdonalds’. In
order to pull off this 2nd floor drivethru concept, we designed a “bridge”
where the drivers can go up and drivethru, and underneath the bridge is
the entrance to the car park.
The building consists many gigantic glass pane to provide a modern
look as well as allowing natural sunlight into the building. By doing this, less
energy will be used to light up the building during the day, thus making this
building a green building.
We also decided to plant grass, as well as palm trees alongside the
road in front of the building. This creates a contrast between technology
and natural, providing a good scenery for the customers inside the building.
It also helps counterbalance the amount of carbon dioxide emitted from the
vehicles.
However, due to it being a restaurant, littering will be inevitable,
because you know, Malaysians. But, one way to solve this problem is to put
16. Building Department Nilai Council
Building Definition :
By Act 133, the Street, Drainage and Building, part 1 of section 3, 'The
building includes a house, hut, shed or roofed enclosure, whether
used for residential or otherwise such as wall, fence, platform, stage,
dendeng board, lancer place, dock, wharf, pier, jetty, landing stage or
bridge or any structure or foundation associated with the above
'Construct a building without prior written permission of the Council is a nd
offence and a fine of up to 20 X Payment for processing plan [ACT 133
STREET, DRAINAGE AND BUILDING 1976,
SECTION (70) SUB 13 & 14].
PLAN APPROVAL PROCEDURE
(RESIDENTIAL / COMMERCIAL
/INSTITUTIONAL)
Each application have to attach with below documents:
1. Application letter signed by the applicant’s Architect / Engineer
2. Form A (Certificate of building plan/structure).
3. Copy of Architects / Engineers Registration Certificate
4. Copies of Company Registration, MAA Form and Form 49.
20. Costing of the project
Item Description Unit Qty Amount
(RM)
Concrete Strong supportive material kg 20k 50000
Steel Strong supportive material kg 10k 100000
Glass Beautiful piece of material m² 5k 10000
Ceramic
Tiles
Beautiful piece of material m² 5k 25000
Cement Base material m3
20k
Palm
Tree
Softscape no. 12 180
Lawn
Grass
Softscape m² 100 15000
Lighting Equipment no. 50 5000
Table set Equipment no. 45 6750
Kitchen
Set
Equipment no. 3 10800
Fridge Equipment no. 18 90000
Trash can Equipment no. 100 2000