SEMESTER 1

INTRODUCTION TO
CONSTRUCTION INDUSTRY
(FNBE0125)
PROJECT 2 – Project Brief

Name

Student ID no.

Hong SangWon

0314661

Chong Yee Ching

0316102

Danny Ho Boon Hue

0315848

Yvonne Chin Yun Miin

0315662

Liong Shun Qi

0315942

Herbert Liew Fung Zhean

0316133

Liew Jee Ying

0317174

Lee Kim Thiam

0310710

SP Setia Berhad 1
November 26, 2013

[@ LEISURELAX]

The Content
Content
1. Introduction

Page No.
3~5

1.1 Our Company Description

3~4

1.2 Company Timeline

4

1.3 Company visions/goals

5

2. Project introduction

6~7

2.1 project description

6

2.2 project objective

6

2.3 project output

7

2.4 benefit

7

3. Project Proposal

8~18

3.1 Oliveread Book Cafe

8~10

3.2 Rock Climbing

11~13

3.3 Leisurelax Tourism Center

14~15

3.4 Leisurelax Security Department

16~18

4. Project definition

19~23

4.1 budget

19

4.2 schedule

20~22

4.3 deliverable

22

4.4 constraint

22~23

5. Project plan

24~26

5.1 site analysis

24

5.2 out come

24

5.3 alternative plan

25~26

6. Project risk

27

7. Project organization

27

8. Interviews

28~32

8.1 Architect

28~29

8.2 Quantity Surveyor

30

8.3 Engineer

31~32

SP Setia Berhad 2
November 26, 2013

[@ LEISURELAX]

Introduction

1.1 Our Company Description
Company: S P Setia Berhad
Address: Setia Corporate Tower,
5A Jalan Setia Nusantara
U13/17, Setia Alam, 40170
Shah Alam, Selangor.
Tel: +6 03 – 3344 8800

S P Setia Berhad was incorporated in Malaysia on 8 August 1974 as a private limited
company principally involved in property development, construction, wood-based manufacturing
and investment holding. The Group earned its recognition as a reputable Developer and
Contractor after having completed over 30,000 units ranging from residential houses to high rise
condominiums as well as commercial and industrial buildings.
The Company was listed on the Second Board of the KLSE on 12 April 1993. S P Setia
Bhd successfully transferred its listing status from the Second Board to the Main Board of the
Kuala Lumpur Stock Exchange on 4 June 1996. S P Setia’s core business activity is focused on
mixed residential township development of affordable housing for the mass market. The majority
of our development consists of double storey terrace products comes from extensive
landscaping and emphasis on creating a healthy living environment in all our development
projects.
Besides that, as a general building contractor, S P Setia has been responsible for some
of the most iconic buildings in Malaysia, as well as a number of major infrastructure projects.
We have a distinct advantage over our competitors, as we not only bring an outstanding breadth
of industry experience and expertise to our projects, we also offer highly specialized capabilities
such as industrialized building system (IBS).

SP Setia Berhad 3
November 26, 2013

[@ LEISURELAX]

Furthermore, S P Setia is an award-winning public listed company and a market leader
in property development. We have built homes for thousands of Malaysians, from the Prime
Minister to the young couple setting up their first home together. Most important, we have
earned a reputation for integrity, quality and innovation.

1.2 Company Timeline
1974 Incorporated on 8 August
1992 Converted to public company on 2 September
1993 Listed on Second Board of the Kuala Lumpur Stock Exchange on 12 April
1994 Launched Pusat Bandar Puchong in August
1996 Transferred to Main Board of the Kuala Lumpur Stock Exchange on 4 June
1997 Entered Johor market with the launch of Bukit Indah in May
1999 Reclassified to property sector on 17 December
2001 Included as a component stock of the Kuala Lumpur Composite Index on 2 July
2004 Launched flagship township in the Klang Valley- Setia Alam, Shah Alam in April
2005 Unveiled Malaysia’s first eco concept development Setia Eco Park in Shah Alam in June
2007 Ventured into Penang with the launch of Setia Pearl Island in March
First overseas venture with Vietnam’s top state-owned conglomerate Becamex IDC Corp to
develop EcoLakes at MyPhuoc in June
2008 Launched first mixed-commercial development called SetiaWalk in Puchong
2009 Unveiled first luxury high-rise condominium, Setia Sky Residences, Kuala Lumpur in June
Second overseas venture to China in October
2010 In March, through a unique branding partnership with community airline Firefly, S P Setia
became the first Malaysian property developer to take marketing of properties to the sky.
One of the largest master-planned green city centres in the Klang Valley – Setia City in
Setia Alam, Shah Alam was unveiled in October
2011 The Setia App, a lifestyle application for smartphones and smart devices was launched in
March

SP Setia Berhad 4
November 26, 2013

[@ LEISURELAX]

1.3 Company Vision & Goal
Vision Statement
Our vision is to be the Market Leader with a strong and stable group of companies
sustained by dedicated staff, management and shareholders’ commitment to providing excellent
services and quality products to our customers through the most effective technologies and
techniques available.

Mission Statement
Our mission is to serve and fulfil our customers’ needs. Our products and services must
always be provided with speed and excellence, and must be trouble-free, and given with
integrity and assurance. To achieve this, we will develop a culture of excellence where each
employee takes pride in his/her work and where teamwork prevails to achieve continuous
improvement.

Awards

SP Setia Berhad 5
November 26, 2013

[@ LEISURELAX]

Project Introduction
2.1 Project Description
This project is named “LEISURELAX”, which is a combination of leisure and relax, as
seen from the project name, we can know that it is mostly about construction of a place to chill
and relax. The project involved location, design, funding and construction of a site consisting
book café, rock climbing, tourism information center and security.

2.2 Project Objective

• Improve the tourism for Janda Baik, Pahang.

• Improve the economics of the locals.

SP Setia Berhad 6
November 26, 2013

[@ LEISURELAX]

• Attract tourist and locals to pay a visit.

• Provide a nice spot for tourists and locals to have fun and relax at the same time.

• Provide a spot for the target group to enjoy the natural scenery which can be a
luxury in the city.

2.3 Project Output

SP Setia Berhad 7
November 26, 2013

[@ LEISURELAX]

To utilize the empty space around the waterfall to produce higher intricacy and
increase its attractiveness without disrupting the natural environment. By constructing a Book
Café, Rock Climing, Tourism Information Center and Security.

2.4 Project Benefit

The ‘LEISURELAX’ project needs to be able to achieve to the aims of the client and
should be able to reflect and deliver the following elements and characteristics:

• Provide comfortable space

SP Setia Berhad 8
November 26, 2013

[@ LEISURELAX]

• Make full use of the space

• Make use of ecological friendly building materials

• Do not cause any disturbance to the natural environment

• Does not harm the natural habita

t

SP Setia Berhad 9
November 26, 2013

[@ LEISURELAX]
much on technologies that they even

Project Proposals

have books online, in one click or one
touch on the tablet or computer you can
read

everything,

novels,

etc.,

like

these

news,

stories,

information

can

increase your knowledge but what if it’s
bad for your health, bad for your eyes.

3.1 Oliveread Book Café
Then it’s definitely a big No No. So in this
project,

our

company

promotes

environmental friendly and hopes that
everyone can enjoy the time close to the
nature since these greenery are luxury in

Introduction
big and busy cities.

‘Reading brings you everything’,
nowadays, people are depending too
SP Setia Berhad 10
November 26, 2013

[@ LEISURELAX]
incorporate

with

some

big

book

Book café is a kind of book

publishers like Scholastic, Bantam, etc.,

themed café where people can read

and also some magazine publishers to

books, buy books, have drinks and

sponsor

chitchat; it is very popular in other

magazines and journals in order to let the

countries like: Korea, Australia, UK, etc.

customers and readers to have more

nowadays, but it is still not popular in

choices since everyone have their own

Malaysia since its profit isn't high enough.

interest in selected fields or genres of

the

old

and

new

books,

books.

So,

for

project

“LEISURELAX”,

there will be a book café which is

The book café will be situated
right at the front of the waterfall so that
we can have a break there and enjoy the
scenery. There will be a staff of 18

SP Setia Berhad 11
November 26, 2013

[@ LEISURELAX]

employees just for the book café, 3
librarians, 4 cleaners, 4 bartenders, 5
waiters, a café manager and his assistant.
The working hours start from 7 in the
morning to 3 in the midnight because
people tend to read and talk until they
forget about the time. Since the book
café opens for such a long time, the
staffs will either be assigning to day shift
or night shift.

SP Setia Berhad 12
November 26, 2013

[@ LEISURELAX]

Objectives

• Free from technologies

• Enjoy the greenery

The role of the book café
• Ensure that the visitors can enjoy the

scenery while taking a break at the café

• Encourage reading

Details

• Provide meals

• Provide a comfortable reading area

SP Setia Berhad 13
November 26, 2013

[@ LEISURELAX]
white color and the banner will be in olive
green color. The flooring will be in
wooden tiles which it gives more intense
feeling

towards

nature.

These

combinations will harmonize very well
together and matches the surroundings.
The book café will be in double storeys,
ground floor will be the nonsmoking area
which it will be air-conditioned with good
temperature with some relaxing and
The name of the book café will be

chilling

music

surrounding

the

‘OLIVEREAD', it’s a slang word for ‘I love

atmosphere inside the café. Moreover at

read’, no special intention, just simply

level one, there will be a nonsmoking and

love reading. For the buildings, the

smoking area which it will be an open

windows will be the full height glass panel

aired for smoking area but still smoking is

to let the visitors enjoy the scenery

not

clearly and paintings for the wall will be in

disturbance to the natural environment.

encouraged

as

it

might

cause

SP Setia Berhad 14
November 26, 2013

[@ LEISURELAX]

The height will be 7 meters, to be exact,

more noisy and active where for adults

each level will be 3.5 meters each and

might prefer more quieter space for them

the area will be 43.12m2.

to read a book with some cup of coffee.
Therefore there are special room for
small kids to read and stay calm, not
disturbing the others.

Targeted Users
Advantages

All the visitors are targeted to use
the book café services since there are
• A place to chill and relax
books and magazines with different
genres which are suitable for adults and
kids. The books will be categorize for kids
and adults, the zone for them to read are

Having a tea break, reading books,
drinking a cup of tea or coffee looking at

also different since kids might be a bit

SP Setia Berhad 15
November 26, 2013

[@ LEISURELAX]

all the greeneries, we can feel like we are

feeling of touching a book and flip it page

close to the nature.

by page.

• Encourage reading

• Provide meals

Nowadays, there are few people who will

People tends to get very hungry after

take his time to sit down and read a book,

having all the activities provided nearby

most of the people rather spend time

like:

using their smart phones, tablets or

waterfall, people will straight away come

laptops playing games or just getting

to the book café to have a small snacks

books online, but why not read a real

or meal which is situated nearby, it is

book instead, reading ebooks not only

convenient for all the users.

rock

climbing,

playing

by

harm your eyes, you do not have the real

SP Setia Berhad 16

the
November 26, 2013

[@ LEISURELAX]



Construction

Materials that will be used are:



Bricks



2. Steel bars



4. Cement



5. Timber



6. Paint – White (interior)



7. Full height glass panel



Glass sliding door

3. Stone

SP Setia Berhad 17
November 26, 2013

[@ LEISURELAX]

The duration for this book café will



Electrical wire



2. Fire Extinguisher



3. CCTV system



4. Alarm system



5. Light tube



6. Light bulb

probably takes about a year since its
situated nearby the waterfall, all the
installation and foundation need to be
very strong and stable and do not disrupt
the natural environment.

Installation

Materials that will be used are:

SP Setia Berhad 18
November 26, 2013

[@ LEISURELAX]

7. Home theatre system



Shelves



Desks



Bar tables



Canopy





Air conditione r

Furniture that will be used are:





Coffee tables

Chairs

3.2 Leisurelax Maxstream Sports
Rock Climbing Facility

There

are

many

sports

that

accommodate as extreme sports, and
one of the most common ones is rock
climbing. Rock climbing has been a

Introduction

great extreme sport for a long time and
SP Setia Berhad 19
November 26, 2013

[@ LEISURELAX]

it has never lost its touch of excitement

LeisureLax’s

Maxtreme

Sport’s

even till now. With a much more

main role is to ensure that visitors are

integrated rock climbing system, the

able to carry out rock climbing activities

sport can be much more exciting as well

without a single worry about safety

as be much safer at the same time.

issues. Safety Experts will be there to

The team that is responsible in
managing the rock climbing activities is
organised
company

by

an

referred

extreme
to

as

sports

Maxtreme

Sports. With LeisureLax’s Maxtreme
Sports team on duty, they will ensure
that visitor’s get to enjoy rock climbing to
the fullest without them having to worry
about safety.

assist and show guidelines about rock
climbing to visitors before they carry it
out. While visitors go rock climbing,
Supervisors will be around to watch out
for the safety gears to make sure
nothing goes wrong during the activity.
The Team Manager makes sure that the
whole department runs smoothly during
operational hours.

Maxtreme Sports of LeisureLax is a
sports integration team which consists
of close to seven people. This specific
team

has

Assistant

a

Team

Team

Manager,

Manager,

an
Main

Supervisor, two Safety Experts and two

Rock Climbing Department

Supervisors. The whole team is in
charge of the rock climbing department



which will operate for sixteen hours
every

day.

The

rock

climbing

department will be right next to the
waterfall,

where

the

rock

SPORTS


Colours for Logo: Green (Neon)
: Pitch Black (Out Line)

climbing

equipment and facilities will be installed.

Department’s Name: MAXTREME

: Yellow (Secondary Colour)


Height of Department: 4m =
4000mm


Objective

Height of Waterfall: 20m =
20000mm
SP Setia Berhad 20
November 26, 2013



[@ LEISURELAX]

Main Purpose: To provide extra

support as people will be using it to go

rock climbing gear for visitors who

up and down the sides of the waterfall.

might not have brought their own

For

equipment. It is also for the short

incorporated with the rock climbing

safety briefing to be carried out to

facilities, it will take at least three

visitors who will carry out the activity.

months to complete the foundation,

the

department

that

will

be

installing the doors, glass windows and
putting in the counter desks. Once

Targeted Users

everything

is

complete,

electrical

climbing

appliances will be laid out in the

experience is to put the adrenaline rush

department, which will take at least

in visitors so this department mainly

three months. This will total up to eleven

focuses on attracting younger or more

months

energetic visitors. Since many foreign

project is completed.

The

whole

rock

of

development before

tourists are usually fit, this would be a
perfect spot for foreigners to come enjoy
the view as well as the excitement from
rock climbing.

Approximate Duration of Project
To get the grip rocks installed onto
the sides of the waterfall would take at
least a month as the grip rocks have to
be secured tightly to avoid any future
casualties. After that, horizontal steel
columns should take about two months
to be properly mounted at the top of the
waterfall. It will take at least another two
more months to install a pulley and a
lever system to allow body weight

Materials for Construction
-

Bricks

-

Steel columns

-

Cement

-

Paint

-

Glass

-

Installation Materials

-

Lever System

-

Pulley System

-

Electrical wires
SP Setia Berhad 21

the
November 26, 2013

-

Glass doors.

-

[@ LEISURELAX]
-

Grip Rocks.

Counters.

SP Setia Berhad 22
November 26, 2013

[@ LEISURELAX]

3.3 Leisurelax Tourism Cente r



Introduction
We have chosen a vacant land at
Janda Baik, which is located beside the
waterfront. The land that we have chosen is

To provide information about
transportation to the people



To provide a place for people to rest



To provide toilets for people



To provide a place for visitor to buy
souvenirs

30m2 x 30m2. My group members and I
have decided to do a double-storeys
building at this vacant land. We have
discussed and decided to name our building
as ‘Leisurelax’, which is a combination of
“Leisure and Relax”. We can know that it is
mostly about construction of a place to chill
and relax. We have chosen to build tourist
information center, book café, rock climbing
and security in our building.

Details of the part

 Name of the part :
Tourist information center


Color : Blue, red and purple



Height : 5m



Area : 10m x 5m

I have chosen to do the tourist
information center at the ground floor. I

Targeted user

have done research on what are generally

Objective


To provide details for those who want to
visit Janda Baik



Resident at Janda Baik



appear in the tourist information center.

Visitor / Tourists

Advantage


It is located at a strategic place where
people will pass by.
SP Setia Berhad 23
November 26, 2013

[@ LEISURELAX]



It is near the entrance of the mall.



It is easy to find.



There are male and female toilets.



There has good view to the waterfront.





This area has shade and it is windy.

People can use the computer to check
information.



People can use to socialize or play
games.

Display area

Duration of the project
This project is dividing into four
stages. It would need 4 months to complete

People can take some booklet and have a
look about Janda Baik.

the foundation. After the foundation is



People can have a rest at here.

completed, the rof is then be built. The roof



People can know more about Janda

takes about 2 weeks to complete. After that,
the walls are built and the transparent glass
is placed at the entrance of the center.
Finally, the interior of center will be built. So,

Baik.
Souvenir area


Visitor can buy souvenir for their friends.

the center needs 6 months to finish, from
December 2013 till May 2014.

Materials for construction
Activities and benefits of tourist

Counter area


People can ask for the
information about Janda Baik.



Bricks



Cement



Paint



information center



Transparent glass



Light tube and light bulb

People can get information on
group visits to Janda Baik.



People can find accommodation
booking service.

Computer area

SP Setia Berhad 24
November 26, 2013

[@ LEISURELAX]

and

five

Security

Supervisors.

Security coverage for the centre is
scheduled on a 24-hour basis, 365 days a

3.4 Leisurelax Super Safe Security

year. Besides that, the storefront Security
Department is located at the subway
entrance of the center.

Objective
Introduction
While

The role of the Security Department
cameras,

alarms,

and

uniformed guards are still mainstays of
shopping mall security, these elements are

at LEISURELAX is to ensure every visitor
has

a

safe

and

enjoyable

shopping

experience.

now part of integrated security systems that
Security Officers constantly patrol

make it easier for security personnel to

the entire centre, oversees all aspects of

monitor activities and respond to incidents.

safety and security in the centre as well as
This Security Team is organized by

the exterior parking facilities.

a security company called Super Safe
Our Security Department is manned

Security. By patrolling and monitoring all
areas of the entertainment and relax centre,

by

the LEISURELAX Security Team makes

monitoring the shopping centre’s CCTV

certain that all visitors abide by the centre’s

camera system, receiving all incoming calls,

rules

dispatching Security Officers and providing

and

regulations

and

conduct

themselves in a manner that is conducive to

a

Security

Officer

responsible

customer assistance.

a safe and secure environment.
LEISURELAX

Security

is

a

proprietary security department with a staff
of

15

employees.

The

department,

managed by a Security Manager, Assistant

Details of Security Department


Name of the Security Department:
SUPER SAFE SECURITY ®

Security Manager, Security Administrator
SP Setia Berhad 25

for
November 26, 2013



[@ LEISURELAX]

Colour:

safety and convenience of the visitors and

a. Building

employees as they have spent their time

= Brown (Traditional, Bistre Chocolate)

and maybe few money to this centre.

=Grey (Original, Ash, Timberwolf)

Besides that, the location of this centre is
located in the rural places, where is Janda

= Black

Baik (Pahang), that is some far-off from the

b. Logo

city, therefore, there is some dangerous to

= Blue (Persian)

the visitors and employees and the Security

= Grey (Original, Timberwolf)

Department has the responsibility to protect

c. Logo Words

their safety. Lastly, the Security Department

= Grey (Charcoal)

is also providing customer assistance. They

= Blue (Steel)

will help the visitors to unload the goods or



Height: 3.5m = 3500mm

stuff from the vehicles and carry them to the



Area: (6.3m x 4.8m) + (4.6m x 2.8m) =

final destination. Other than that, they also

43.12m2 (6300mm x 4800mm) +

willing to help the visitors looking for the

(4600mm x 2800mm) = 4312mm2

losing item in the centre area.



Purpose:
a. Oversees the safety and security
b. Receiving all incoming calls
c. Providing customer assistance



Advantages of Security Department in a
Centre

Property of: Super Safe Security

1. Customer Service

company

Security guards can also be customer
service ambassadors. A guard may man
a front desk or act as a sentry to control

Targeted User
All

the

access to an area. This can mean that
visitors

and

staff

in

LEISURELAX are my targeted users of this
proposal. We must make sure that all

there

is

a

substantial

amount

of

interaction with customers and clients.
2. Handling Crime

visitors and employees have abide to the

Security guards can receive varying

centre’s rules and regulations to ensure that

levels of training when it comes to

all of them are under protection and in

actively responding to a crime. Some

safety situation. Furthermore, this Security

may simply take down details and

Department I propose is mainly for the

contact the police. Some may be able to
SP Setia Berhad 26
November 26, 2013

[@ LEISURELAX]

detain suspects. It is up to the security

also need another one and half months to

department to decide whether to have

complete. At last, we will need around one

an armed or unarmed guard, and what

week to check the safety of the building.

procedures should be in place for

Overall, the construction needs eleven

handling a suspect should a crime occur.

months and a week to complete the whole

3. Monitoring

building.

Not all security guards spend all their
time on active patrol of a business
property. A security professional may be
employed to monitor video surveillance,
check credentials, check for contraband
or restrict access to an area. These
monitoring duties take a lot of security

Materials for the Construction

responsibility off the shoulders of the



Bricks

business owner and employees, and



Steel bars

allow them to focus on their jobs.



Stone



Cement



Timber



Paint – Brown, Grey, Black



Normal and Long Glass Windows



Glass Sliding Window



Long Glass Sliding Door

Duration of Project
The estimation of duration for the
foundation of security house, it would need
about four months to do it. Because it would
be more safety if we spend more time to
build the foundation part. There are a total
of four pillars, each pillar will be built at each

Materials for the Installation

corner to sustain the whole building. Next,



Electrical wire

we carry on to build by the bricks, it may



Fire Extinguisher



Fire Hose



CCTV system



Alarm System



Light Tube



Light Bulb

take about total of six months to reach the
rooftop. After that, the installation of the
glass windows and door, electrical wire, fire
extinguisher system, alarm system, light
and CCTV connection between Security
House and all the centre departments will

SP Setia Berhad 27
November 26, 2013

[@ LEISURELAX]

Furniture for Security House


2 Long Desks



1 Long Table



Some Rolling Chairs



3 Smart TV

SP Setia Berhad 28
November 26, 2013

[@ LEISURELAX]

Project definition
2.1 Budget
Item

Estimated Cost (MYR)

Hard Construction (Budget within 250,000 MYR)


Earthwork

32,000



Foundation, Framing, Flooring

24,450



Fixtures, Furnishings and Equipment

25,154



Labor

25,000



Mechanical Services

24,000



Electrical Wiring and Water Piping

25,350



Landscaping Services

27,000



Site Work

20,500



Material Cost
(Bricks, Cement, Transparent Glass, etc)

209,959

Sub Total Hard Cost 413,413
Permit and License Cost
Soft Construction (Budget within 150,000 MYR)

38,450



Architect, Engineers and Quantity Surveyor

30,000



Rock Climbing, Tourist Information Center, Security and
Book Cafe Planning

45,000



Landscaping Designing

10,000



Legal Fees

10,000



Consultant Fees

30,000



Management Fees, Licensing Fees, Plan Check Fees,
Property Assessment Fees, Financing Fees, Sewage
and Water Connection Fees

10,000

Sub Total Soft Cost 135,000
Contingency

30,000
Total Estimated Cost 616,863

SP Setia Berhad 29
November 26, 2013

[@ LEISURELAX]

Total Estimating Cost : 616,863 MYR (within budget 700,000 MYR)
2.2 Schedule
#

Phase

1

Apply for
Permits
-

-

-

-

-

DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV
2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014

Submission
to Local
Authority
through
OSC
Obtain
Developme
t Order
(DO) from
Planning
Dept
Obtain
Water
Approval
Obtain
Hoarding &
Signboard
Approval
Obtain
RORO Bin
Approval
Request
Water
Clearance
Water
Inspection

-

Water
Report

-

Deposit
G1-G21
Forms and
F Form to
OSC
Deposit
G1-G21
Forms and
F Form to
Board of
Architect /
Engineer

-

SP Setia Berhad 30
November 26, 2013

[@ LEISURELAX]

Malaysia
Obtain
Water
Connection
- Obtain
Landscape
Approval
- Obtain
Building
Plan
Approval
Site
Preparation
-

2
3

4

Excavation and
Support
System
Footing

5

Foundation

6

Framework

7

Column and
Beam Erection

8

Concrete Slab

9

Power Supply
System

10

Air
Conditioning

11

13

Water Supply
and Sewerage
System
Computer and
Communication
Network
Roofing

14

Floor Finishes

12

SP Setia Berhad 31
November 26, 2013
15

Paint

16

Lanscaping

17

[@ LEISURELAX]

Cleaning

2.3 Deliverable
- A tourist information center, a center where people can get information to visit
Janda Baik and buy some souvenirs
- A book café, a kind of book themed café where people can read books, buy
books, have drinks and talk
- A security house, to ensure every visitor has a safe and enjoyable shopping
experience
- A rock climbing facility, an extra entertainment for the visitor and the resident of
Janda Baik

2.4 Constraints
Time

Tasks

Milestone

Approval from local authority
obtained

31st June 2014

Project planning and design
completed

10th July 2014

Execution

17th July 2014

Completion

31st May 2015

SP Setia Berhad 32
November 26, 2013

[@ LEISURELAX]

Financial
Minimum wages

Government funds

Workers minimum wages is MYR800.00
Government can only give 20 % subsidy of the
total cost

Resources
Human resources
Maximum working hours is 8 hours. Working
Working hour

overtime is due to the decision of workers
oneself.

Equipment
Usage time of electric power tool,
chain or circular saw, gas or air
compressor, pneumatic power tool,
hammer and any other impacting tool or

Monday to Friday: 8 am to 6pm.
Saturday: 8am to 2pm.

grinding equipment.

Materials
Concrete, bricks, or comparable hard
surfacing material

Not allowed if the fall-height is more than 60cm
or more for equipment which causes a forced
movement of the user’s body
Does not contain CCA, a chemical used to

Pressure-treated wood

preserve wood, which possess harms towards
health

SP Setia Berhad 33
November 26, 2013

[@ LEISURELAX]

SP Setia Berhad 34
November 26, 2013

[@ LEISURELAX]

Project Plan
5.1 Site Analysis
Site Condition
Visual

Site Activities
Waterfall/ Pond/ Trees/
Grass/ Birds/ Rocks
Swimming/ relaxing/ chilling

Sound

Waterfall/ bird/ trees/

Smell

Vegetation/ forest

5.2 Out come


Upgrade the existing site by establishing the Leisurelax.



Construct Oliveread Book Café for the visitors to relax and chill by reading books with some
cup of coffee.



Create Leisurelax Rock Climbing for the visitors to explore the natural extreme sport



Produce a Leisurelax Tourism Center for the first time visitors to guide them the place with
well instructed information.



Set up a Security Department securing the site for 24 hours with high tech facilities and
installations.

SP Setia Berhad 35
November 26, 2013

[@ LEISURELAX]

5.3 Alternative Plan


Oliveread Book Café @ Leisurelax



Leisurelax Rock Climbing

SP Setia Berhad 36
November 26, 2013

[@ LEISURELAX]



Leisurelax Tourism Information Center



Leisurelax Super Safe Security

SP Setia Berhad 37
November 26, 2013

[@ LEISURELAX]

Project Risks
Risks
Failure in completing
the project within the
time set.

Impact
Very high

Probability
Low

Mitigation Techniques
The project plan will be
referred to weekly to avoid any
schedule setbacks.

Insufficient funds

High

Low

Budget planning will be
updated by quantity surveyors
along with advice on cheaper
materials usage.

Insufficient skilled
workers.

Average

Low

Most of these workers have
been cooperated with before.

Insufficient supply of
materials.

High

Low

Assign more sub-contractors.

Project Organization
Project Requestor

SP Setia Berhad

Project Sponsor

SP Setia Berhad

Project Owner

SP Setia Berhad

Project Manager

Hong SangWon

Team Members

Architect : Chong Yee Ching
: Yvonne Chin Yun Miin
: Liong Shun Qi
Contractor : Herbert Liew Fung Zhean
Quantity Surveyor : Danny Ho Boon Hue
: Liew Jee Ying
Engineer : Lee Kim Thiam

SP Setia Berhad 38
November 26, 2013

[@ LEISURELAX]

Interview

8. What is a good architect?

Architect

get distracted make researches

Must be relative in your profession, do not

<Ar. Victor Wong Kon Yu>
1. What is your current profession?
Chartered Architect
2. Where are you currently working at?
Malaysian Institute of Architects(MIA) /
Pertubuhan Akitek Malaysia (PAM) as the
Sabah Chapter Chairman
3. When did you start working as an
architect?
35 ears ago
4. Why did you choose this occupation?
Because of passion and interest
5. What is the working hour for an architect?
8

hours, 9am - 5pm, from Monday to
Friday

6. Approximately, how much do you earn
per month?
RM20k

9. How to differentiate between commercial
architect and professional architect?
Commercial architect only cares about
making fast money which might just simply
design and develop the buildings
Professional architect takes time to design
in details, ensuring it fulfills the needs of the
client with high expectation addition helping
the client to also gain profit from it
10. What does an architect like you do in
average day?
Holds the meeting of the project, discuss
matters of the building’s design with the
other professionals of the construction field,
inform the others of the the requirement of
the client in order to fulfill his requirement
11. Do you face any conflicts during the
meeting?
Yes. Everyone has different perspective.
There are also many conflicts about the
details of the building.

7. What are the duties of your career?
Design buildings that fulfill the needs of the
client

SP Setia Berhad 39
November 26, 2013

[@ LEISURELAX]

12. What is the role of an architect during a

16. What big project were you involve in?

meeting?

The KDCA in Sabah

Architects are important team player of the
whole construction team. We are only given

17. What is the benefit you get from being

a blank piece of paper. We have to crack

an architect?

our heads to think of ideas. We listen to

Capital investment is valid. We only need a

opinions and decide on which is better to be

pencil and your creativity. Terms of procfit

used.

very high as a professional.
18. What is needed in a project brief?
When we start a project, we first establish a

13. What kind of obstacles do you face

design brief consisting the statement of

currently?

what you need and budgeting. Schematic

The industrial field is lack of professions

design is included.

nowadays. The construction field is also
lack of draftsman and supervisors.

19. For our project brief, we were thinking of
having a mountain tram. What is your

14. How long does it take to complete a
project?
It depends on what project it is. If it is a
small project it can take 2 to 3 years. If it is
a large project it might take 3 to 5 years.
15. If a project has stopped halfway, what is
the cause of it? Is it due to end of approval
contract or the problem with the design of
the building?
Depends on the situation. But usually it
might be the problem of the developer who
did not pay for the construction.

opinion?
You must think in future whether does your
project earns any profit especially in such
area. But if you do not mind about the cost
you can stick with the idea to make a more
easy and convenient way for people to go
up the hill with the tram.
20. Our client is SP Setia and their motto is
to encourage green building designs. What
is

the

difference

between

eco-friendly

buildings and green buildings?
Eco-friendly buildings are usually designed
with less electrical application and use the
natural resources around the area.
Green buildings are energy saving buildings.

SP Setia Berhad 40
November 26, 2013

[@ LEISURELAX]

Quantity Surveyor
<Miss Jing Pin>
1. How did you become a QS?
I was a student in Universiti of Sains
Malaysia and was pursuing an
Architectural course. However, there
were many problems regarding my
application as a student after a year.
Right after that, I switch my course to
Quantity Surveying and finally
graduated from my Degree in Bachelor
of Science (Hons) Housing, Building &
Planning (HBP) in I was offered a job as
a quantity surveyor and worked in that
profession for 6 years and counting. I
have had thoughts of going back to
Architecture, but then I realized that
Quantity Surveying was a good
profession as I have learnt to grow fond
with it. I was interested in this profession
after a while and this made it easier to
continue my profession as a QS.
2. In your opinion, what makes a good
QS?
A proactive quantity surveyor with a
good a initiative in mind.
3. What are the precautions you would
consider as a QS if you were given a
project that would involve building a
building in the forest?
In my opinion, no matter where the
development is or will be located or
what type of development it will turn out
to be, the most important thing is to

understand the entire development in
detail which includes the client's need
With this being said, if the development
is to be in the forest, it all comes down
to whether the client is aiming for profit
or not. Otherwise, we will have a budget
written down but still lose money in the
end. Especially when it requires building
in a remote area.

4. What is your current rank as a QS?
I am currently ranked as a Senior
Project Coordinator

5. How long have you been a QS?
I have been a QS for more than 6 years.

6. In your opinion, how important is a
QS in a project?
A Quantity Surveyor is one of the core
characters in a single project
development, as he or she monitors the
contract and financial cash flow on
behalf of the client.

7. What are some of the projects you
have been involved in?
High rise hotels, Petrol stations and high
rise residential houses.

8. Why did you choose to become a QS?
It was because I wanted to make my
family proud with a well sustained

SP Setia Berhad 41
November 26, 2013

[@ LEISURELAX]

profession. Without their help, I would
not have been who I am today.

SP Setia Berhad 42
November 26, 2013

[@ LEISURELAX]
10. What is the most proud thing you
have accomplished?

Engineer (Environmental Eng.)
<Mr. Yap Siew Fah>

Contributed to the management of water
resources to the nation and state

1. What is your company's name?

11. Are there any similarities between
the different forms of engineer?

Department of Irrigation and Drainage

We all work with the forces of natural

2. What is your current position in your
company?

12. Do you face any conflict in your
career? How do you handle it?

Principal Senior Assistant Director

Different in opinion. Always seek the truth.

3. When did you start to work as an
engineer?

13. What does an engineer like you do
in average day?

1981

Attend meetings to provide expert technical
advice and oversee a group of engineers in
achieving the planned outputs

4.

Why do you choose this occupation?

Okay in Maths
5. What is the working hour of an
engineer?
8am - 5pm
6. Approximately, how much do you
earn per year?
RM 100k
7. The field of engineer is wide, what is
your expertise?
Water resources management
8.

What are the duties of your career

Water resources management
9. Did you made right choice being an
engineer?

14. How long have you been in the
engineering field?
Since 1981
15. What is your favorite part of being
an engineer?
See things in a logical manner
16. How does your company usually
get jobs? Is it by government or engineer
come to your company?
We serve the government
17. How long is the duration to
complete the project normally for houses
and buildings?
Depends on the size of the project. On
average, 1 - 5 years

Yes
SP Setia Berhad 43
November 26, 2013

[@ LEISURELAX]

18. What is the process that you need
to go through in order to complete the job?
Roughly, 1st. Project idea; 2nd. Planning,
3rd. Finance, 4th. Survey & Investigation,
4th. Design, 5th. Tender, 6th. Appointment
of contractor, 6th. Construction, 7th.
Inspection for full compliance and
8th. Handing over to the client.

Capacity building to staff (positive attitude
and skill)
22. What personal characteristics do you
feel are necessary to be a successful
engineer?
Never take things for granted

19. What advice would you give to the
student who is planning to enter this career
line?

23. Tell me About your experience in
dealing with routine engineering work. How
do you keep from getting bored ?

Be an expert in one of the field and able to
work as a team.

Learn from nature which is the best
engineer

20. What do you enjoy most /least about
engineering ?

24. How has your present or last
engineering job changed while you've held
it ?

Enjoy most is that you can be
innovative/enjoy least is that you have to
solve others stupid mistake
21. In your last engineering position, what
were some of the things that you spent the
most time on?

More involve in non-structural solution than
structural one. Example: Build more dams
or use less water?
25. What single technical skill or ability is
your best asset?
Seeing the big picture

SP Setia Berhad 44

ICI Project Brief

  • 1.
    November 26, 2013 [@LEISURELAX] FOUNDATION IN NATURAL & BUILDING ENVIRONMENT JULY INTAKE 2013 SEMESTER 1 INTRODUCTION TO CONSTRUCTION INDUSTRY (FNBE0125) PROJECT 2 – Project Brief Name Student ID no. Hong SangWon 0314661 Chong Yee Ching 0316102 Danny Ho Boon Hue 0315848 Yvonne Chin Yun Miin 0315662 Liong Shun Qi 0315942 Herbert Liew Fung Zhean 0316133 Liew Jee Ying 0317174 Lee Kim Thiam 0310710 SP Setia Berhad 1
  • 2.
    November 26, 2013 [@LEISURELAX] The Content Content 1. Introduction Page No. 3~5 1.1 Our Company Description 3~4 1.2 Company Timeline 4 1.3 Company visions/goals 5 2. Project introduction 6~7 2.1 project description 6 2.2 project objective 6 2.3 project output 7 2.4 benefit 7 3. Project Proposal 8~18 3.1 Oliveread Book Cafe 8~10 3.2 Rock Climbing 11~13 3.3 Leisurelax Tourism Center 14~15 3.4 Leisurelax Security Department 16~18 4. Project definition 19~23 4.1 budget 19 4.2 schedule 20~22 4.3 deliverable 22 4.4 constraint 22~23 5. Project plan 24~26 5.1 site analysis 24 5.2 out come 24 5.3 alternative plan 25~26 6. Project risk 27 7. Project organization 27 8. Interviews 28~32 8.1 Architect 28~29 8.2 Quantity Surveyor 30 8.3 Engineer 31~32 SP Setia Berhad 2
  • 3.
    November 26, 2013 [@LEISURELAX] Introduction 1.1 Our Company Description Company: S P Setia Berhad Address: Setia Corporate Tower, 5A Jalan Setia Nusantara U13/17, Setia Alam, 40170 Shah Alam, Selangor. Tel: +6 03 – 3344 8800 S P Setia Berhad was incorporated in Malaysia on 8 August 1974 as a private limited company principally involved in property development, construction, wood-based manufacturing and investment holding. The Group earned its recognition as a reputable Developer and Contractor after having completed over 30,000 units ranging from residential houses to high rise condominiums as well as commercial and industrial buildings. The Company was listed on the Second Board of the KLSE on 12 April 1993. S P Setia Bhd successfully transferred its listing status from the Second Board to the Main Board of the Kuala Lumpur Stock Exchange on 4 June 1996. S P Setia’s core business activity is focused on mixed residential township development of affordable housing for the mass market. The majority of our development consists of double storey terrace products comes from extensive landscaping and emphasis on creating a healthy living environment in all our development projects. Besides that, as a general building contractor, S P Setia has been responsible for some of the most iconic buildings in Malaysia, as well as a number of major infrastructure projects. We have a distinct advantage over our competitors, as we not only bring an outstanding breadth of industry experience and expertise to our projects, we also offer highly specialized capabilities such as industrialized building system (IBS). SP Setia Berhad 3
  • 4.
    November 26, 2013 [@LEISURELAX] Furthermore, S P Setia is an award-winning public listed company and a market leader in property development. We have built homes for thousands of Malaysians, from the Prime Minister to the young couple setting up their first home together. Most important, we have earned a reputation for integrity, quality and innovation. 1.2 Company Timeline 1974 Incorporated on 8 August 1992 Converted to public company on 2 September 1993 Listed on Second Board of the Kuala Lumpur Stock Exchange on 12 April 1994 Launched Pusat Bandar Puchong in August 1996 Transferred to Main Board of the Kuala Lumpur Stock Exchange on 4 June 1997 Entered Johor market with the launch of Bukit Indah in May 1999 Reclassified to property sector on 17 December 2001 Included as a component stock of the Kuala Lumpur Composite Index on 2 July 2004 Launched flagship township in the Klang Valley- Setia Alam, Shah Alam in April 2005 Unveiled Malaysia’s first eco concept development Setia Eco Park in Shah Alam in June 2007 Ventured into Penang with the launch of Setia Pearl Island in March First overseas venture with Vietnam’s top state-owned conglomerate Becamex IDC Corp to develop EcoLakes at MyPhuoc in June 2008 Launched first mixed-commercial development called SetiaWalk in Puchong 2009 Unveiled first luxury high-rise condominium, Setia Sky Residences, Kuala Lumpur in June Second overseas venture to China in October 2010 In March, through a unique branding partnership with community airline Firefly, S P Setia became the first Malaysian property developer to take marketing of properties to the sky. One of the largest master-planned green city centres in the Klang Valley – Setia City in Setia Alam, Shah Alam was unveiled in October 2011 The Setia App, a lifestyle application for smartphones and smart devices was launched in March SP Setia Berhad 4
  • 5.
    November 26, 2013 [@LEISURELAX] 1.3 Company Vision & Goal Vision Statement Our vision is to be the Market Leader with a strong and stable group of companies sustained by dedicated staff, management and shareholders’ commitment to providing excellent services and quality products to our customers through the most effective technologies and techniques available. Mission Statement Our mission is to serve and fulfil our customers’ needs. Our products and services must always be provided with speed and excellence, and must be trouble-free, and given with integrity and assurance. To achieve this, we will develop a culture of excellence where each employee takes pride in his/her work and where teamwork prevails to achieve continuous improvement. Awards SP Setia Berhad 5
  • 6.
    November 26, 2013 [@LEISURELAX] Project Introduction 2.1 Project Description This project is named “LEISURELAX”, which is a combination of leisure and relax, as seen from the project name, we can know that it is mostly about construction of a place to chill and relax. The project involved location, design, funding and construction of a site consisting book café, rock climbing, tourism information center and security. 2.2 Project Objective • Improve the tourism for Janda Baik, Pahang. • Improve the economics of the locals. SP Setia Berhad 6
  • 7.
    November 26, 2013 [@LEISURELAX] • Attract tourist and locals to pay a visit. • Provide a nice spot for tourists and locals to have fun and relax at the same time. • Provide a spot for the target group to enjoy the natural scenery which can be a luxury in the city. 2.3 Project Output SP Setia Berhad 7
  • 8.
    November 26, 2013 [@LEISURELAX] To utilize the empty space around the waterfall to produce higher intricacy and increase its attractiveness without disrupting the natural environment. By constructing a Book Café, Rock Climing, Tourism Information Center and Security. 2.4 Project Benefit The ‘LEISURELAX’ project needs to be able to achieve to the aims of the client and should be able to reflect and deliver the following elements and characteristics: • Provide comfortable space SP Setia Berhad 8
  • 9.
    November 26, 2013 [@LEISURELAX] • Make full use of the space • Make use of ecological friendly building materials • Do not cause any disturbance to the natural environment • Does not harm the natural habita t SP Setia Berhad 9
  • 10.
    November 26, 2013 [@LEISURELAX] much on technologies that they even Project Proposals have books online, in one click or one touch on the tablet or computer you can read everything, novels, etc., like these news, stories, information can increase your knowledge but what if it’s bad for your health, bad for your eyes. 3.1 Oliveread Book Café Then it’s definitely a big No No. So in this project, our company promotes environmental friendly and hopes that everyone can enjoy the time close to the nature since these greenery are luxury in Introduction big and busy cities. ‘Reading brings you everything’, nowadays, people are depending too SP Setia Berhad 10
  • 11.
    November 26, 2013 [@LEISURELAX] incorporate with some big book Book café is a kind of book publishers like Scholastic, Bantam, etc., themed café where people can read and also some magazine publishers to books, buy books, have drinks and sponsor chitchat; it is very popular in other magazines and journals in order to let the countries like: Korea, Australia, UK, etc. customers and readers to have more nowadays, but it is still not popular in choices since everyone have their own Malaysia since its profit isn't high enough. interest in selected fields or genres of the old and new books, books. So, for project “LEISURELAX”, there will be a book café which is The book café will be situated right at the front of the waterfall so that we can have a break there and enjoy the scenery. There will be a staff of 18 SP Setia Berhad 11
  • 12.
    November 26, 2013 [@LEISURELAX] employees just for the book café, 3 librarians, 4 cleaners, 4 bartenders, 5 waiters, a café manager and his assistant. The working hours start from 7 in the morning to 3 in the midnight because people tend to read and talk until they forget about the time. Since the book café opens for such a long time, the staffs will either be assigning to day shift or night shift. SP Setia Berhad 12
  • 13.
    November 26, 2013 [@LEISURELAX] Objectives • Free from technologies • Enjoy the greenery The role of the book café • Ensure that the visitors can enjoy the scenery while taking a break at the café • Encourage reading Details • Provide meals • Provide a comfortable reading area SP Setia Berhad 13
  • 14.
    November 26, 2013 [@LEISURELAX] white color and the banner will be in olive green color. The flooring will be in wooden tiles which it gives more intense feeling towards nature. These combinations will harmonize very well together and matches the surroundings. The book café will be in double storeys, ground floor will be the nonsmoking area which it will be air-conditioned with good temperature with some relaxing and The name of the book café will be chilling music surrounding the ‘OLIVEREAD', it’s a slang word for ‘I love atmosphere inside the café. Moreover at read’, no special intention, just simply level one, there will be a nonsmoking and love reading. For the buildings, the smoking area which it will be an open windows will be the full height glass panel aired for smoking area but still smoking is to let the visitors enjoy the scenery not clearly and paintings for the wall will be in disturbance to the natural environment. encouraged as it might cause SP Setia Berhad 14
  • 15.
    November 26, 2013 [@LEISURELAX] The height will be 7 meters, to be exact, more noisy and active where for adults each level will be 3.5 meters each and might prefer more quieter space for them the area will be 43.12m2. to read a book with some cup of coffee. Therefore there are special room for small kids to read and stay calm, not disturbing the others. Targeted Users Advantages All the visitors are targeted to use the book café services since there are • A place to chill and relax books and magazines with different genres which are suitable for adults and kids. The books will be categorize for kids and adults, the zone for them to read are Having a tea break, reading books, drinking a cup of tea or coffee looking at also different since kids might be a bit SP Setia Berhad 15
  • 16.
    November 26, 2013 [@LEISURELAX] all the greeneries, we can feel like we are feeling of touching a book and flip it page close to the nature. by page. • Encourage reading • Provide meals Nowadays, there are few people who will People tends to get very hungry after take his time to sit down and read a book, having all the activities provided nearby most of the people rather spend time like: using their smart phones, tablets or waterfall, people will straight away come laptops playing games or just getting to the book café to have a small snacks books online, but why not read a real or meal which is situated nearby, it is book instead, reading ebooks not only convenient for all the users. rock climbing, playing by harm your eyes, you do not have the real SP Setia Berhad 16 the
  • 17.
    November 26, 2013 [@LEISURELAX]  Construction Materials that will be used are:  Bricks  2. Steel bars  4. Cement  5. Timber  6. Paint – White (interior)  7. Full height glass panel  Glass sliding door 3. Stone SP Setia Berhad 17
  • 18.
    November 26, 2013 [@LEISURELAX] The duration for this book café will  Electrical wire  2. Fire Extinguisher  3. CCTV system  4. Alarm system  5. Light tube  6. Light bulb probably takes about a year since its situated nearby the waterfall, all the installation and foundation need to be very strong and stable and do not disrupt the natural environment. Installation Materials that will be used are: SP Setia Berhad 18
  • 19.
    November 26, 2013 [@LEISURELAX] 7. Home theatre system  Shelves  Desks  Bar tables  Canopy   Air conditione r Furniture that will be used are:   Coffee tables Chairs 3.2 Leisurelax Maxstream Sports Rock Climbing Facility There are many sports that accommodate as extreme sports, and one of the most common ones is rock climbing. Rock climbing has been a Introduction great extreme sport for a long time and SP Setia Berhad 19
  • 20.
    November 26, 2013 [@LEISURELAX] it has never lost its touch of excitement LeisureLax’s Maxtreme Sport’s even till now. With a much more main role is to ensure that visitors are integrated rock climbing system, the able to carry out rock climbing activities sport can be much more exciting as well without a single worry about safety as be much safer at the same time. issues. Safety Experts will be there to The team that is responsible in managing the rock climbing activities is organised company by an referred extreme to as sports Maxtreme Sports. With LeisureLax’s Maxtreme Sports team on duty, they will ensure that visitor’s get to enjoy rock climbing to the fullest without them having to worry about safety. assist and show guidelines about rock climbing to visitors before they carry it out. While visitors go rock climbing, Supervisors will be around to watch out for the safety gears to make sure nothing goes wrong during the activity. The Team Manager makes sure that the whole department runs smoothly during operational hours. Maxtreme Sports of LeisureLax is a sports integration team which consists of close to seven people. This specific team has Assistant a Team Team Manager, Manager, an Main Supervisor, two Safety Experts and two Rock Climbing Department Supervisors. The whole team is in charge of the rock climbing department  which will operate for sixteen hours every day. The rock climbing department will be right next to the waterfall, where the rock SPORTS  Colours for Logo: Green (Neon) : Pitch Black (Out Line) climbing equipment and facilities will be installed. Department’s Name: MAXTREME : Yellow (Secondary Colour)  Height of Department: 4m = 4000mm  Objective Height of Waterfall: 20m = 20000mm SP Setia Berhad 20
  • 21.
    November 26, 2013  [@LEISURELAX] Main Purpose: To provide extra support as people will be using it to go rock climbing gear for visitors who up and down the sides of the waterfall. might not have brought their own For equipment. It is also for the short incorporated with the rock climbing safety briefing to be carried out to facilities, it will take at least three visitors who will carry out the activity. months to complete the foundation, the department that will be installing the doors, glass windows and putting in the counter desks. Once Targeted Users everything is complete, electrical climbing appliances will be laid out in the experience is to put the adrenaline rush department, which will take at least in visitors so this department mainly three months. This will total up to eleven focuses on attracting younger or more months energetic visitors. Since many foreign project is completed. The whole rock of development before tourists are usually fit, this would be a perfect spot for foreigners to come enjoy the view as well as the excitement from rock climbing. Approximate Duration of Project To get the grip rocks installed onto the sides of the waterfall would take at least a month as the grip rocks have to be secured tightly to avoid any future casualties. After that, horizontal steel columns should take about two months to be properly mounted at the top of the waterfall. It will take at least another two more months to install a pulley and a lever system to allow body weight Materials for Construction - Bricks - Steel columns - Cement - Paint - Glass - Installation Materials - Lever System - Pulley System - Electrical wires SP Setia Berhad 21 the
  • 22.
    November 26, 2013 - Glassdoors. - [@ LEISURELAX] - Grip Rocks. Counters. SP Setia Berhad 22
  • 23.
    November 26, 2013 [@LEISURELAX] 3.3 Leisurelax Tourism Cente r  Introduction We have chosen a vacant land at Janda Baik, which is located beside the waterfront. The land that we have chosen is To provide information about transportation to the people  To provide a place for people to rest  To provide toilets for people  To provide a place for visitor to buy souvenirs 30m2 x 30m2. My group members and I have decided to do a double-storeys building at this vacant land. We have discussed and decided to name our building as ‘Leisurelax’, which is a combination of “Leisure and Relax”. We can know that it is mostly about construction of a place to chill and relax. We have chosen to build tourist information center, book café, rock climbing and security in our building. Details of the part  Name of the part : Tourist information center  Color : Blue, red and purple  Height : 5m  Area : 10m x 5m I have chosen to do the tourist information center at the ground floor. I Targeted user have done research on what are generally Objective  To provide details for those who want to visit Janda Baik  Resident at Janda Baik  appear in the tourist information center. Visitor / Tourists Advantage  It is located at a strategic place where people will pass by. SP Setia Berhad 23
  • 24.
    November 26, 2013 [@LEISURELAX]  It is near the entrance of the mall.  It is easy to find.  There are male and female toilets.  There has good view to the waterfront.   This area has shade and it is windy. People can use the computer to check information.  People can use to socialize or play games. Display area Duration of the project This project is dividing into four stages. It would need 4 months to complete People can take some booklet and have a look about Janda Baik. the foundation. After the foundation is  People can have a rest at here. completed, the rof is then be built. The roof  People can know more about Janda takes about 2 weeks to complete. After that, the walls are built and the transparent glass is placed at the entrance of the center. Finally, the interior of center will be built. So, Baik. Souvenir area  Visitor can buy souvenir for their friends. the center needs 6 months to finish, from December 2013 till May 2014. Materials for construction Activities and benefits of tourist Counter area  People can ask for the information about Janda Baik.  Bricks  Cement  Paint  information center  Transparent glass  Light tube and light bulb People can get information on group visits to Janda Baik.  People can find accommodation booking service. Computer area SP Setia Berhad 24
  • 25.
    November 26, 2013 [@LEISURELAX] and five Security Supervisors. Security coverage for the centre is scheduled on a 24-hour basis, 365 days a 3.4 Leisurelax Super Safe Security year. Besides that, the storefront Security Department is located at the subway entrance of the center. Objective Introduction While The role of the Security Department cameras, alarms, and uniformed guards are still mainstays of shopping mall security, these elements are at LEISURELAX is to ensure every visitor has a safe and enjoyable shopping experience. now part of integrated security systems that Security Officers constantly patrol make it easier for security personnel to the entire centre, oversees all aspects of monitor activities and respond to incidents. safety and security in the centre as well as This Security Team is organized by the exterior parking facilities. a security company called Super Safe Our Security Department is manned Security. By patrolling and monitoring all areas of the entertainment and relax centre, by the LEISURELAX Security Team makes monitoring the shopping centre’s CCTV certain that all visitors abide by the centre’s camera system, receiving all incoming calls, rules dispatching Security Officers and providing and regulations and conduct themselves in a manner that is conducive to a Security Officer responsible customer assistance. a safe and secure environment. LEISURELAX Security is a proprietary security department with a staff of 15 employees. The department, managed by a Security Manager, Assistant Details of Security Department  Name of the Security Department: SUPER SAFE SECURITY ® Security Manager, Security Administrator SP Setia Berhad 25 for
  • 26.
    November 26, 2013  [@LEISURELAX] Colour: safety and convenience of the visitors and a. Building employees as they have spent their time = Brown (Traditional, Bistre Chocolate) and maybe few money to this centre. =Grey (Original, Ash, Timberwolf) Besides that, the location of this centre is located in the rural places, where is Janda = Black Baik (Pahang), that is some far-off from the b. Logo city, therefore, there is some dangerous to = Blue (Persian) the visitors and employees and the Security = Grey (Original, Timberwolf) Department has the responsibility to protect c. Logo Words their safety. Lastly, the Security Department = Grey (Charcoal) is also providing customer assistance. They = Blue (Steel) will help the visitors to unload the goods or  Height: 3.5m = 3500mm stuff from the vehicles and carry them to the  Area: (6.3m x 4.8m) + (4.6m x 2.8m) = final destination. Other than that, they also 43.12m2 (6300mm x 4800mm) + willing to help the visitors looking for the (4600mm x 2800mm) = 4312mm2 losing item in the centre area.  Purpose: a. Oversees the safety and security b. Receiving all incoming calls c. Providing customer assistance  Advantages of Security Department in a Centre Property of: Super Safe Security 1. Customer Service company Security guards can also be customer service ambassadors. A guard may man a front desk or act as a sentry to control Targeted User All the access to an area. This can mean that visitors and staff in LEISURELAX are my targeted users of this proposal. We must make sure that all there is a substantial amount of interaction with customers and clients. 2. Handling Crime visitors and employees have abide to the Security guards can receive varying centre’s rules and regulations to ensure that levels of training when it comes to all of them are under protection and in actively responding to a crime. Some safety situation. Furthermore, this Security may simply take down details and Department I propose is mainly for the contact the police. Some may be able to SP Setia Berhad 26
  • 27.
    November 26, 2013 [@LEISURELAX] detain suspects. It is up to the security also need another one and half months to department to decide whether to have complete. At last, we will need around one an armed or unarmed guard, and what week to check the safety of the building. procedures should be in place for Overall, the construction needs eleven handling a suspect should a crime occur. months and a week to complete the whole 3. Monitoring building. Not all security guards spend all their time on active patrol of a business property. A security professional may be employed to monitor video surveillance, check credentials, check for contraband or restrict access to an area. These monitoring duties take a lot of security Materials for the Construction responsibility off the shoulders of the  Bricks business owner and employees, and  Steel bars allow them to focus on their jobs.  Stone  Cement  Timber  Paint – Brown, Grey, Black  Normal and Long Glass Windows  Glass Sliding Window  Long Glass Sliding Door Duration of Project The estimation of duration for the foundation of security house, it would need about four months to do it. Because it would be more safety if we spend more time to build the foundation part. There are a total of four pillars, each pillar will be built at each Materials for the Installation corner to sustain the whole building. Next,  Electrical wire we carry on to build by the bricks, it may  Fire Extinguisher  Fire Hose  CCTV system  Alarm System  Light Tube  Light Bulb take about total of six months to reach the rooftop. After that, the installation of the glass windows and door, electrical wire, fire extinguisher system, alarm system, light and CCTV connection between Security House and all the centre departments will SP Setia Berhad 27
  • 28.
    November 26, 2013 [@LEISURELAX] Furniture for Security House  2 Long Desks  1 Long Table  Some Rolling Chairs  3 Smart TV SP Setia Berhad 28
  • 29.
    November 26, 2013 [@LEISURELAX] Project definition 2.1 Budget Item Estimated Cost (MYR) Hard Construction (Budget within 250,000 MYR)  Earthwork 32,000  Foundation, Framing, Flooring 24,450  Fixtures, Furnishings and Equipment 25,154  Labor 25,000  Mechanical Services 24,000  Electrical Wiring and Water Piping 25,350  Landscaping Services 27,000  Site Work 20,500  Material Cost (Bricks, Cement, Transparent Glass, etc) 209,959 Sub Total Hard Cost 413,413 Permit and License Cost Soft Construction (Budget within 150,000 MYR) 38,450  Architect, Engineers and Quantity Surveyor 30,000  Rock Climbing, Tourist Information Center, Security and Book Cafe Planning 45,000  Landscaping Designing 10,000  Legal Fees 10,000  Consultant Fees 30,000  Management Fees, Licensing Fees, Plan Check Fees, Property Assessment Fees, Financing Fees, Sewage and Water Connection Fees 10,000 Sub Total Soft Cost 135,000 Contingency 30,000 Total Estimated Cost 616,863 SP Setia Berhad 29
  • 30.
    November 26, 2013 [@LEISURELAX] Total Estimating Cost : 616,863 MYR (within budget 700,000 MYR) 2.2 Schedule # Phase 1 Apply for Permits - - - - - DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 Submission to Local Authority through OSC Obtain Developme t Order (DO) from Planning Dept Obtain Water Approval Obtain Hoarding & Signboard Approval Obtain RORO Bin Approval Request Water Clearance Water Inspection - Water Report - Deposit G1-G21 Forms and F Form to OSC Deposit G1-G21 Forms and F Form to Board of Architect / Engineer - SP Setia Berhad 30
  • 31.
    November 26, 2013 [@LEISURELAX] Malaysia Obtain Water Connection - Obtain Landscape Approval - Obtain Building Plan Approval Site Preparation - 2 3 4 Excavation and Support System Footing 5 Foundation 6 Framework 7 Column and Beam Erection 8 Concrete Slab 9 Power Supply System 10 Air Conditioning 11 13 Water Supply and Sewerage System Computer and Communication Network Roofing 14 Floor Finishes 12 SP Setia Berhad 31
  • 32.
    November 26, 2013 15 Paint 16 Lanscaping 17 [@LEISURELAX] Cleaning 2.3 Deliverable - A tourist information center, a center where people can get information to visit Janda Baik and buy some souvenirs - A book café, a kind of book themed café where people can read books, buy books, have drinks and talk - A security house, to ensure every visitor has a safe and enjoyable shopping experience - A rock climbing facility, an extra entertainment for the visitor and the resident of Janda Baik 2.4 Constraints Time Tasks Milestone Approval from local authority obtained 31st June 2014 Project planning and design completed 10th July 2014 Execution 17th July 2014 Completion 31st May 2015 SP Setia Berhad 32
  • 33.
    November 26, 2013 [@LEISURELAX] Financial Minimum wages Government funds Workers minimum wages is MYR800.00 Government can only give 20 % subsidy of the total cost Resources Human resources Maximum working hours is 8 hours. Working Working hour overtime is due to the decision of workers oneself. Equipment Usage time of electric power tool, chain or circular saw, gas or air compressor, pneumatic power tool, hammer and any other impacting tool or Monday to Friday: 8 am to 6pm. Saturday: 8am to 2pm. grinding equipment. Materials Concrete, bricks, or comparable hard surfacing material Not allowed if the fall-height is more than 60cm or more for equipment which causes a forced movement of the user’s body Does not contain CCA, a chemical used to Pressure-treated wood preserve wood, which possess harms towards health SP Setia Berhad 33
  • 34.
    November 26, 2013 [@LEISURELAX] SP Setia Berhad 34
  • 35.
    November 26, 2013 [@LEISURELAX] Project Plan 5.1 Site Analysis Site Condition Visual Site Activities Waterfall/ Pond/ Trees/ Grass/ Birds/ Rocks Swimming/ relaxing/ chilling Sound Waterfall/ bird/ trees/ Smell Vegetation/ forest 5.2 Out come  Upgrade the existing site by establishing the Leisurelax.  Construct Oliveread Book Café for the visitors to relax and chill by reading books with some cup of coffee.  Create Leisurelax Rock Climbing for the visitors to explore the natural extreme sport  Produce a Leisurelax Tourism Center for the first time visitors to guide them the place with well instructed information.  Set up a Security Department securing the site for 24 hours with high tech facilities and installations. SP Setia Berhad 35
  • 36.
    November 26, 2013 [@LEISURELAX] 5.3 Alternative Plan  Oliveread Book Café @ Leisurelax  Leisurelax Rock Climbing SP Setia Berhad 36
  • 37.
    November 26, 2013 [@LEISURELAX]  Leisurelax Tourism Information Center  Leisurelax Super Safe Security SP Setia Berhad 37
  • 38.
    November 26, 2013 [@LEISURELAX] Project Risks Risks Failure in completing the project within the time set. Impact Very high Probability Low Mitigation Techniques The project plan will be referred to weekly to avoid any schedule setbacks. Insufficient funds High Low Budget planning will be updated by quantity surveyors along with advice on cheaper materials usage. Insufficient skilled workers. Average Low Most of these workers have been cooperated with before. Insufficient supply of materials. High Low Assign more sub-contractors. Project Organization Project Requestor SP Setia Berhad Project Sponsor SP Setia Berhad Project Owner SP Setia Berhad Project Manager Hong SangWon Team Members Architect : Chong Yee Ching : Yvonne Chin Yun Miin : Liong Shun Qi Contractor : Herbert Liew Fung Zhean Quantity Surveyor : Danny Ho Boon Hue : Liew Jee Ying Engineer : Lee Kim Thiam SP Setia Berhad 38
  • 39.
    November 26, 2013 [@LEISURELAX] Interview 8. What is a good architect? Architect get distracted make researches Must be relative in your profession, do not <Ar. Victor Wong Kon Yu> 1. What is your current profession? Chartered Architect 2. Where are you currently working at? Malaysian Institute of Architects(MIA) / Pertubuhan Akitek Malaysia (PAM) as the Sabah Chapter Chairman 3. When did you start working as an architect? 35 ears ago 4. Why did you choose this occupation? Because of passion and interest 5. What is the working hour for an architect? 8 hours, 9am - 5pm, from Monday to Friday 6. Approximately, how much do you earn per month? RM20k 9. How to differentiate between commercial architect and professional architect? Commercial architect only cares about making fast money which might just simply design and develop the buildings Professional architect takes time to design in details, ensuring it fulfills the needs of the client with high expectation addition helping the client to also gain profit from it 10. What does an architect like you do in average day? Holds the meeting of the project, discuss matters of the building’s design with the other professionals of the construction field, inform the others of the the requirement of the client in order to fulfill his requirement 11. Do you face any conflicts during the meeting? Yes. Everyone has different perspective. There are also many conflicts about the details of the building. 7. What are the duties of your career? Design buildings that fulfill the needs of the client SP Setia Berhad 39
  • 40.
    November 26, 2013 [@LEISURELAX] 12. What is the role of an architect during a 16. What big project were you involve in? meeting? The KDCA in Sabah Architects are important team player of the whole construction team. We are only given 17. What is the benefit you get from being a blank piece of paper. We have to crack an architect? our heads to think of ideas. We listen to Capital investment is valid. We only need a opinions and decide on which is better to be pencil and your creativity. Terms of procfit used. very high as a professional. 18. What is needed in a project brief? When we start a project, we first establish a 13. What kind of obstacles do you face design brief consisting the statement of currently? what you need and budgeting. Schematic The industrial field is lack of professions design is included. nowadays. The construction field is also lack of draftsman and supervisors. 19. For our project brief, we were thinking of having a mountain tram. What is your 14. How long does it take to complete a project? It depends on what project it is. If it is a small project it can take 2 to 3 years. If it is a large project it might take 3 to 5 years. 15. If a project has stopped halfway, what is the cause of it? Is it due to end of approval contract or the problem with the design of the building? Depends on the situation. But usually it might be the problem of the developer who did not pay for the construction. opinion? You must think in future whether does your project earns any profit especially in such area. But if you do not mind about the cost you can stick with the idea to make a more easy and convenient way for people to go up the hill with the tram. 20. Our client is SP Setia and their motto is to encourage green building designs. What is the difference between eco-friendly buildings and green buildings? Eco-friendly buildings are usually designed with less electrical application and use the natural resources around the area. Green buildings are energy saving buildings. SP Setia Berhad 40
  • 41.
    November 26, 2013 [@LEISURELAX] Quantity Surveyor <Miss Jing Pin> 1. How did you become a QS? I was a student in Universiti of Sains Malaysia and was pursuing an Architectural course. However, there were many problems regarding my application as a student after a year. Right after that, I switch my course to Quantity Surveying and finally graduated from my Degree in Bachelor of Science (Hons) Housing, Building & Planning (HBP) in I was offered a job as a quantity surveyor and worked in that profession for 6 years and counting. I have had thoughts of going back to Architecture, but then I realized that Quantity Surveying was a good profession as I have learnt to grow fond with it. I was interested in this profession after a while and this made it easier to continue my profession as a QS. 2. In your opinion, what makes a good QS? A proactive quantity surveyor with a good a initiative in mind. 3. What are the precautions you would consider as a QS if you were given a project that would involve building a building in the forest? In my opinion, no matter where the development is or will be located or what type of development it will turn out to be, the most important thing is to understand the entire development in detail which includes the client's need With this being said, if the development is to be in the forest, it all comes down to whether the client is aiming for profit or not. Otherwise, we will have a budget written down but still lose money in the end. Especially when it requires building in a remote area. 4. What is your current rank as a QS? I am currently ranked as a Senior Project Coordinator 5. How long have you been a QS? I have been a QS for more than 6 years. 6. In your opinion, how important is a QS in a project? A Quantity Surveyor is one of the core characters in a single project development, as he or she monitors the contract and financial cash flow on behalf of the client. 7. What are some of the projects you have been involved in? High rise hotels, Petrol stations and high rise residential houses. 8. Why did you choose to become a QS? It was because I wanted to make my family proud with a well sustained SP Setia Berhad 41
  • 42.
    November 26, 2013 [@LEISURELAX] profession. Without their help, I would not have been who I am today. SP Setia Berhad 42
  • 43.
    November 26, 2013 [@LEISURELAX] 10. What is the most proud thing you have accomplished? Engineer (Environmental Eng.) <Mr. Yap Siew Fah> Contributed to the management of water resources to the nation and state 1. What is your company's name? 11. Are there any similarities between the different forms of engineer? Department of Irrigation and Drainage We all work with the forces of natural 2. What is your current position in your company? 12. Do you face any conflict in your career? How do you handle it? Principal Senior Assistant Director Different in opinion. Always seek the truth. 3. When did you start to work as an engineer? 13. What does an engineer like you do in average day? 1981 Attend meetings to provide expert technical advice and oversee a group of engineers in achieving the planned outputs 4. Why do you choose this occupation? Okay in Maths 5. What is the working hour of an engineer? 8am - 5pm 6. Approximately, how much do you earn per year? RM 100k 7. The field of engineer is wide, what is your expertise? Water resources management 8. What are the duties of your career Water resources management 9. Did you made right choice being an engineer? 14. How long have you been in the engineering field? Since 1981 15. What is your favorite part of being an engineer? See things in a logical manner 16. How does your company usually get jobs? Is it by government or engineer come to your company? We serve the government 17. How long is the duration to complete the project normally for houses and buildings? Depends on the size of the project. On average, 1 - 5 years Yes SP Setia Berhad 43
  • 44.
    November 26, 2013 [@LEISURELAX] 18. What is the process that you need to go through in order to complete the job? Roughly, 1st. Project idea; 2nd. Planning, 3rd. Finance, 4th. Survey & Investigation, 4th. Design, 5th. Tender, 6th. Appointment of contractor, 6th. Construction, 7th. Inspection for full compliance and 8th. Handing over to the client. Capacity building to staff (positive attitude and skill) 22. What personal characteristics do you feel are necessary to be a successful engineer? Never take things for granted 19. What advice would you give to the student who is planning to enter this career line? 23. Tell me About your experience in dealing with routine engineering work. How do you keep from getting bored ? Be an expert in one of the field and able to work as a team. Learn from nature which is the best engineer 20. What do you enjoy most /least about engineering ? 24. How has your present or last engineering job changed while you've held it ? Enjoy most is that you can be innovative/enjoy least is that you have to solve others stupid mistake 21. In your last engineering position, what were some of the things that you spent the most time on? More involve in non-structural solution than structural one. Example: Build more dams or use less water? 25. What single technical skill or ability is your best asset? Seeing the big picture SP Setia Berhad 44