SlideShare a Scribd company logo
ELPIDIO VENIEGAS IBASCO
3-A 17
th
Avenue, Cubao, Quezon City, Philippines
Contact No.: 02912-2599 /Globe: 0916-4666549 / Sun: 0925-6868884
Email Address: elpidioibasco75@yahoo.com / joepids@gmail.com
Objective: To face challenges at work, to create self fulfillment in life, to
adhere and share all my knowledge and experiences in all Mechanical Engineering field of
work. To enrich my knowledge in working and also to surpass all difficulties and challenges
that will come in my profession.
WORK EXPERIENCES:
1. Position Assistant Manager
Duration: August 2015 - Present
Company: CAREMASTER INC.
Industry: Facility Maintenance Management
Location: Sta. Cruz, Manila, Philippines
Responsibilities:
 Group Head of South Area in Preventive Maintenance, Corrective Maintenance and Technical
Advice and Consultation of all branches in contract with the company.
 Assisting Personnel how to deal any problem encountered in branches served.
 Auditing the Job Order or report raised by Costumer either be Preventive Maintenance, Corrective
Maintenance, Technical Advice and Consultation or Scheduled Facility Audit of the Costumer
 Answering Technical Views of the costumer durin on Call Conversation.
 Reviewing the summary work done and costing of the work especially in Corrective Maintenance.
 Preparation of quotation based of the needed requirements by the costumer either be from Project
Team, Corrective Team and Preventive team.
 Advising co workers what is the focus and objective of the work that they are dealing especially to
the costumer.
 Equipment study for energy saving and improvement of quality of the equipment of costumers to
lessen the cost of energy they are paying.
 Comparative study of the costumers equipment versus the newly introduce product equipment.
2. Position HVAC (Heating, Ventilating and Air Conditioning)
Senior Maintenance Engineer
Duration: June 2014 – June 2015
Place: Infineon Technologies Melaka Malaysia Branch
Company: CHEN GUAN AIR CONDITIONING & ENGINEERING SDN BHD
Industry: Maintenance
Location: Melaka, Malaysia
Responsibilities:
 Scheduling and conducting Maintenance procedure implemented by the Infineon Technologies on
their standard procedures in Maintenance work in HVAC and Refrigeration.
 Routine checking of work in Preventive, Operation & Maintenance activities conducted by 40
personnel’s of CHENGUAN Engineering.
 Inputting system program for maintenance and repairing to the SAP system application and
closing finished work done by the Maintenance personnel.
 Answering the technical queries and alarms on the Six Sigma BAS Zeus application systems in
the plant of Infineon Technologies.
 Conducting Seminar or Training to Chenguan’s Supervisor & Technician the proper SOP
(Standard Operating Procedure) in working at the site including the Safety aspects of work.
 Head in the preparation of Audit Materials in Infineon and Chenguan.
 Provide Monthly report to Infineon Technologies on work done on the month.
 Implementation of ISO 9001:2008 & ISO 1400 in the Infineon Technologies wherein CHENGUAN
provide the services and accredited in the standard.
 Doing the required studies and analysis of equipment’s such as: Fish Bone Analysis, Total
Preventive Maintenance, Key Performance Indicator (KPI), Vibration Analysis of
Equipment’s, Failure Mode Equipment Analysis (FMEA), Root Cause Analysis and Reliability
Centered Maintenance (RCM).
 Provide timely feedback to Maintenance Head of Infineon Technologies the proposals, changes
and on call problems in Maintenance department.
 Giving some proposals and checking of the machine in the HVAC Field if the unit is capable, need
to change or to upgrade the unit.
 Provide leadership in the Preventive and Maintenance department. Utilize engineering knowledge
and experience to analyze, troubleshoot, and repair equipments & Analyze current programs and
establish other programs as needed in the predictive maintenance.
 Suggesting or implementation of Energy saving procedures conducted by Infineon Technologies.
 Recommend cost effective solutions to engineering or improvement of the Project site and also to
our company.
 Provide Daily meeting on the issues of the day which the Operation and Maintenance have done in
the day & also giving suggestion of knowledge to fellow technician/supervisor.
 Improve the performance of CHENGUAN by relinquish no NCN for the time of tenure of the
company.
 Repairing, Troubleshooting and PPM of 50 to 250 TONS of Air Cooled Chillers.
 Performing operation works on Seven Units (7) of 800 TONS and Five (5) 500 TONS of Centrifugal
Chillers.
 Repairing, Troubleshooting and Conducting PPM on all HVAC equipment’s at site such as Air
Cooled Chillers, Air Handling Unit (AHU), Fan Coil Unit (FCU), Package Air Conditioning Units,
Ventilation Equipment’s, Air Conditioning Split Units, Precision Air Conditioning Units, Pumps,
Cooling Towers, Plated Heat Exchangers (PHE), Air Scrubber, Cold Storage equipment’s, Exhaust
Ventilation and its parts and accessories of the Units
3. Position HVAC (Heating, Ventilating and Air Conditioning)
Operation and Maintenance Engineer
Duration: May 2012 – May 2014
Place: Qatar National Bank (Main Branch)
Company: COMO FMS WLL
Industry: Maintenance
Location: Doha, Qatar
Responsibilities:
 Designing PPM for all equipment’s needed in the project acquired by the company.
 Making PPM Planning/Scheduling of all the units in the project.
 Auditing of all HVAC equipment’s in the project and other sites.
 Giving Circular works for all HVAC people concerning in the site.
 Instructing and training of all people in the site served.
 Giving technical knowledge on HVAC equipment’s to people under me.
 Supervising 30 persons in the all the HVAC equipment’s served.
 Training Safety requirements in servicing, troubleshooting and others towards work.
 Provide feedbacks and reports on the clients served.
 Recommend or propose cost effective solution on energy savings procedures on the client served.
 Providing SOP training and slides on servicing of all HVAC equipment served.
 Repairing, Troubleshooting and PPM of 50 to 500 TONS of Air Cooled Chillers.
 Repairing, Troubleshooting and conducting PPM on all HVAC equipment’s at site such as Air
Cooled Chillers, Air Handling Unit (AHU), Fan Coil Unit (FCU), Package Air Conditioning Units,
Ventilation Equipment’s, Air Conditioning Split Units, Precision Air Conditioning Units, Pumps and
its parts and accessories of the Units.
4. Position HVAC (Heating, Ventilating and Air Conditioning)
Head Maintenance Engineer
Duration: February 10, 2009 – July 10, 2011
Place: Infineon Technologies Melaka Malaysia Branch
Company: CHEN GUAN AIR CONDITIONING & ENGINEERING SDN BHD
Industry: Maintenance
Location: Melaka, Malaysia
Responsibilities:
 Scheduling and conducting Maintenance procedure implemented by the Infineon Technologies on
their standard procedures in Maintenance work in HVAC and Refrigeration.
 Routine checking of work in Preventive, Operation & Maintenance activities conducted by 40
personnel’s of CHENGUAN Engineering.
 Conducting Seminar or Training to Chenguan’s Supervisor & Technician the proper SOP
(Standard Operating Procedure) in working at the site including the Safety aspects of work.
 Head in the preparation of Audit Materials in Infineon and Chenguan.
 Provide Monthly report to Infineon Technologies on work done on the month.
 Implementation of ISO 9001:2008 & ISO 1400 in the Infineon Technologies wherein CHENGUAN
provide the services and accredited in the standard.
 Doing the required studies and analysis of equipment’s such as: Fish Bone Analysis, Total
Preventive Maintenance, Key Performance Indicator (KPI), Vibration Analysis of
Equipment’s, Failure Mode Equipment Analysis (FMEA), Root Cause Analysis and Reliability
Centered Maintenance (RCM).
 Provide timely feedback to Maintenance Head of Infineon Technologies the proposals, changes
and on call problems in Maintenance department.
 Giving some proposals and checking of the machine in the HVAC Field if the unit is capable, need
to change or to upgrade the unit.
 Provide leadership in the Preventive and Maintenance department. Utilize engineering knowledge
and experience to analyze, troubleshoot, and repair equipments & Analyze current programs and
establish other programs as needed in the predictive maintenance.
 Suggesting or implementation of Energy saving procedures conducted by Infineon Technologies.
 Recommend cost effective solutions to engineering or improvement of the Project site and also to
our company.
 Provide Daily meeting on the issues of the day which the Operation and Maintenance have done in
the day & also giving suggestion of knowledge to fellow technician/supervisor.
 Improve the performance of CHENGUAN by relinquish no NCN for the time of tenure of the
company.
 Repairing, Troubleshooting and PPM of 50 to 250 TONS of Air Cooled Chillers.
 Performing operation works on Seven Units (7) of 800 TONS and Five (5) 500 TONS of Centrifugal
Chillers.
 Repairing, Troubleshooting and Conducting PPM on all HVAC equipment’s at site such as Air
Cooled Chillers, Air Handling Unit (AHU), Fan Coil Unit (FCU), Package Air Conditioning Units,
Ventilation Equipment’s, Air Conditioning Split Units, Precision Air Conditioning Units, Pumps,
Cooling Towers, Plated Heat Exchangers (PHE), Air Scrubber, Cold Storage equipment’s, Exhaust
Ventilation and its parts and accessories of the Units
5. Position: PPM (Planning and Preventive Maintenance) Manager and
HVAC (Heating, Ventilating and Air Conditioning) Engineer
Duration: July 07, 2006 – July 07, 2008
Place: Ministry of Foreign Affairs (MOFA) Housing Project
Company: MANSOUR AL OBAID ESTABLISHMENT for Contracting
Industry: Maintenance
Location: Riyadh, Kingdom of Saudi Arabia
Responsibilities:
 Responsible in managing the Preventive Maintenance activities In MOFA Housing Project this
includes in the supervision of HVAC, Mechanical, Electrical and Civil Departments activities and
staff (30 employees- Preventive Maintenance technicians, Mechanical, Electrical, Civil Engineers
and Supervisors.
 This position will collaborate with the corrective maintenance Department and teams in
modification, improvement initiatives and as well as cost cutting on material and services.
 Provide leadership in all Preventive Maintenance Departments.
 Handle the Corrective maintenance in the HVAC Department for Twelve (12) months due to non
availability of HVAC Engineer.
 Endure effective communication to other departments of scheduling of Preventive Maintenance.
 Provide timely feedback to the Department Manager and also to the MOFA Ministry officers the
daily, quarterly, and yearly goals.
 Utilize engineering knowledge and experience to analyze, troubleshoot, and repair equipments
especially in the HVAC Department.
 Analyze current programs and establish other programs as needed in the predictive maintenance.
 Recommend cost effective solutions to engineering or improvement of the Project site and also to
our company.
 Endure that all the request of materials daily or monthly will be given at the exact date for material
purchasing.
 Ensure that the Accomplished Daily, Monthly and Yearly report of the maintenance will be given to
the Project Manager and the Ministry Authority at the specified time to be reported.
6. Position: PROPRIETOR
Duration: July 11, 2004 – December 2005
Company: ADAMS A/C REFRIGERATION SERVICES
Industry: Maintenance / Installation
Location: Poblacion, San Quintin Pangasinan
Responsibilities:
 Responsible in managing my own business in the maintenance and installation of Air Conditioning
and Industrial Refrigeration. Designing the proper equipment to be installed. Provide adequate
knowledge to the technician at the work site.
7. Position: TECHNICAL ENGINEER / INSTALLATION SUPERVISOR
Duration: February 27, 2001 – May 30, 2001
Company: UMC A/C & REFRIGERATION CONTRACTOR INC.
Industry: Contractor (Installation, Maintenance of A/C and Industrial Refrigeration)
Location: Espeleta St., Sat. Cruz, Manila, Philippines
Responsibilities:
 Responsible in the Heat Load Calculation, Selection and Designing of Refrigerant or Chilled Water
either be Commercial or Industrial Air Conditioning and Refrigeration of more than 5 TOR and more
and its equipments and parts.
 Ensure costumer on call with technical sharing in the equipment and parts to be installed in the
area to be used.
 Responsible in distribution of materials to the technician at the work site.
 Responsible of safety procedures to implement to the technician at the work site.
 Ensure that the technician are well properly advised and analyzed each possible problem that will
arise at the work site.
 Supervision on the installed equipment and technical sharing to fellow technicians.
8. Position: TECHNICAL ASSISTANT ENGINEER
Duration: September 1999 – May 2000
Company: UNITY MARKETING CORPORATION
Industry: Sales / Installation
Location: Espeleta St., Sat. Cruz, Manila, Philippines
Responsibilities:
 Responsible in the Heat Load Calculation, Selection and Designing of Refrigerant or Chilled Water
either be Commercial or Industrial Air Conditioning and Refrigeration of more than 5 TOR and more
and its equipments and parts.
 Ensure costumer on call with technical sharing in the equipment and parts to be installed in the
area to be used.
 Responsible in distribution of materials to the technician at the work site.
 Responsible of safety procedures to implement to the technician at the work site.
 Ensure that the technician are well properly advised and analyzed each possible problem that will
arise at the work site.
 Supervision on the installed equipment and technical sharing to fellow technicians.
9. Position: APPLICATION ENGINEER
Duration: November 18, 1998 – May 18, 1999
Company: DYNACOOL INDUSTRIAL CORPORATION
Industry: Sales / Miantenance (A/C and Dehumidifier Equipments and Parts)
Location: Espeleta St., Sat. Cruz, Manila, Philippines
Responsibilities:
 Responsible in the Heat Load Calculation, Selection and Designing of Refrigerant or Chilled Water
either be Commercial or Industrial Air Conditioning and Dehumidifier of more than 5 TOR and more
and its equipments and parts.
 Responsible in the proper designing of the required area to be dehumidified or cooled at the precise
RH of the area.
 Ensure that the technician have the proper safety in installing all such equipments.
 Ensure the proper handling and troubleshooting of the equipment to be commissioned.
 Ensure the proper cleanliness on or after finishing the installation work at the work site.
TRAININGS AND SEMINARS:
Date Topic/Course Title
1. March 13, 2000 MONITOWOC Field Service Seminar
Makati City, Philippines
2. December 1999 PSVAREE Exhibits and Seminars
Malate, Manila, Philippines
3. September 29 – 30, 1999 COPELAND and ALCO Compressor and
Controls Technology Training and Seminar
Mandarin Oriental Hotel, Manila, Philippines
4. May 2009 TIER (Technical Information and Emergency Response)
Introduction of CSPS in Infineon Technologies
(Safety Briefing)
Infineon Technologies Melaka Branch
5. June 2009 TIER (Technical Information and Emergency Response)
Safety Related Work in Enclosed Area
Infineon Technologies Melaka Branch
6. August 2009 Introduction of ISO 9001:2008 & ISO 1400 (Training)
CHENGUAN AIR CONDITIONING AND ENGINEERING SDN BHD
Head Office: Puchong, Selangor Malaysia
PERSONAL DATA:
Age: 40
Date of Birth: November 27, 1975
Gender: Male
Civil Status: Married
Height: 172 cm
Weight: 90 kg
Nationality: Filipino
Religion: Christian Catholic
Permanent Address: 3-A 17
th
Avenue, Cubao, Quezon City, Philippines
EDUCATION:
Course: B. S. in Mechanical Engineering
Education Level: Graduate
Education Field: Engineering
School/University: CENTRAL COLLEGES of the PHILIPPINES
Address: #52 Aurora Blvd, Quezon City, Philippines
Date: June 1995 – May 1998
REFERENCES:
1. Engr. Chai Khee Wah Operation Engineer CHENGUAN AIRCONDITIONING & ENGINEERING SDN BHD
(HEAD) Melaka Branch, Malaysia
2. Engr. Murali A/L UTILITY Engineer CHENGUAN AIRCONDITIONING & ENGINEERING SDN BHD
Govindasamy (HEAD) Melaka Branch, Malaysia
3. Engr. Tariq Baskh Technical Director Ministry of Foreign Affairs Housing Project (MOFA)
Riyadh, K. S. A.
4. Engr. Danilo Garcia Maintenance Supervisor Ministry of Transportation (MOT)
Riyadh, K. S. A.
5. Mr. Romy Guilas Vice CEO UMC A/C & REFRIGERATION CONTRACTOR INC.
Sta. Cruz, Manila, Philippines
I hereby attest that all above
Information listed is true and
beyond my knowledge and ability
______________________
Applicant’s Signature

More Related Content

What's hot

NEFS Presentation 2017
NEFS Presentation 2017NEFS Presentation 2017
NEFS Presentation 2017Dianna Weber
 
Mitchell Lee resume
Mitchell Lee resumeMitchell Lee resume
Mitchell Lee resumeMitchell Lee
 
Paul Farnsworth Resume Updated Oct 15 doc
Paul Farnsworth Resume Updated Oct 15 docPaul Farnsworth Resume Updated Oct 15 doc
Paul Farnsworth Resume Updated Oct 15 docPaul Farnsworth
 
CV_Tushar Bari__Aug 2015.txt
CV_Tushar Bari__Aug  2015.txtCV_Tushar Bari__Aug  2015.txt
CV_Tushar Bari__Aug 2015.txtTushar Bari
 
Kalpesh-Maintenance (BE-Mechanical)Press
Kalpesh-Maintenance (BE-Mechanical)Press Kalpesh-Maintenance (BE-Mechanical)Press
Kalpesh-Maintenance (BE-Mechanical)Press Kalpesh Parmar
 
Pragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master ClassMarcep Inc.
 
Resume.RaysonLascano PH
Resume.RaysonLascano PHResume.RaysonLascano PH
Resume.RaysonLascano PHRayson Lascano
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow controlhqdan
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerAhmed Helmy
 

What's hot (20)

Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
CV of Patrick McGrath
CV of Patrick McGrathCV of Patrick McGrath
CV of Patrick McGrath
 
CV_Sachin Lone
CV_Sachin LoneCV_Sachin Lone
CV_Sachin Lone
 
Md.Azharuddin CV
Md.Azharuddin CVMd.Azharuddin CV
Md.Azharuddin CV
 
NEFS Presentation 2017
NEFS Presentation 2017NEFS Presentation 2017
NEFS Presentation 2017
 
CV_Duran_NBM
CV_Duran_NBMCV_Duran_NBM
CV_Duran_NBM
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
Mitchell Lee resume
Mitchell Lee resumeMitchell Lee resume
Mitchell Lee resume
 
Paul Farnsworth Resume Updated Oct 15 doc
Paul Farnsworth Resume Updated Oct 15 docPaul Farnsworth Resume Updated Oct 15 doc
Paul Farnsworth Resume Updated Oct 15 doc
 
CV_Tushar Bari__Aug 2015.txt
CV_Tushar Bari__Aug  2015.txtCV_Tushar Bari__Aug  2015.txt
CV_Tushar Bari__Aug 2015.txt
 
Kalpesh-Maintenance (BE-Mechanical)Press
Kalpesh-Maintenance (BE-Mechanical)Press Kalpesh-Maintenance (BE-Mechanical)Press
Kalpesh-Maintenance (BE-Mechanical)Press
 
Pragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria resume planning
Pragnesh Gadaria resume planning
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Resume.RaysonLascano PH
Resume.RaysonLascano PHResume.RaysonLascano PH
Resume.RaysonLascano PH
 
CONDINO, JEM
CONDINO, JEMCONDINO, JEM
CONDINO, JEM
 
Alfred CV
Alfred CVAlfred CV
Alfred CV
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
 
CONDINO, JEM
CONDINO, JEMCONDINO, JEM
CONDINO, JEM
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments Engineer
 

Viewers also liked

NTPC _Traning report_dhiraj
NTPC _Traning report_dhirajNTPC _Traning report_dhiraj
NTPC _Traning report_dhirajDhiraj Kumar
 
Reddi Rani_3yrs_Bangalore
Reddi Rani_3yrs_BangaloreReddi Rani_3yrs_Bangalore
Reddi Rani_3yrs_BangaloreReddi Rani
 
Data center optimization through event driven process automation
Data center optimization through event driven process automationData center optimization through event driven process automation
Data center optimization through event driven process automationRichard Page
 
Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...
Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...
Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...Unggul Wicaksono
 
Manual de publicaciones paso a paso en SQL2014
Manual de publicaciones paso a paso en SQL2014Manual de publicaciones paso a paso en SQL2014
Manual de publicaciones paso a paso en SQL2014fernandomarcocalles
 
Resume Sourabh Joshi
Resume Sourabh JoshiResume Sourabh Joshi
Resume Sourabh Joshisrj1985
 
Surepath labs company profile
Surepath labs company profileSurepath labs company profile
Surepath labs company profileHimanshu Sachdeva
 

Viewers also liked (10)

NTPC _Traning report_dhiraj
NTPC _Traning report_dhirajNTPC _Traning report_dhiraj
NTPC _Traning report_dhiraj
 
DC-September 2015 Resume
DC-September 2015 ResumeDC-September 2015 Resume
DC-September 2015 Resume
 
Reddi Rani_3yrs_Bangalore
Reddi Rani_3yrs_BangaloreReddi Rani_3yrs_Bangalore
Reddi Rani_3yrs_Bangalore
 
Data center optimization through event driven process automation
Data center optimization through event driven process automationData center optimization through event driven process automation
Data center optimization through event driven process automation
 
Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...
Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...
Leaflet Happy Tummy Council - Peran Ayah dalam Pengasuhan Mengoptimalkan Perk...
 
Manual de publicaciones paso a paso en SQL2014
Manual de publicaciones paso a paso en SQL2014Manual de publicaciones paso a paso en SQL2014
Manual de publicaciones paso a paso en SQL2014
 
Resume Sourabh Joshi
Resume Sourabh JoshiResume Sourabh Joshi
Resume Sourabh Joshi
 
Mohammed_Ibrash_C.V
Mohammed_Ibrash_C.VMohammed_Ibrash_C.V
Mohammed_Ibrash_C.V
 
Surepath labs company profile
Surepath labs company profileSurepath labs company profile
Surepath labs company profile
 
Rio 2 Condominio na Barra da Tijuca
Rio 2 Condominio na Barra da TijucaRio 2 Condominio na Barra da Tijuca
Rio 2 Condominio na Barra da Tijuca
 

Similar to IBASCO ELPIDIO RESUME PDF

Similar to IBASCO ELPIDIO RESUME PDF (20)

April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)
 
Robbie Stamper Resume 2016
Robbie Stamper Resume 2016Robbie Stamper Resume 2016
Robbie Stamper Resume 2016
 
CV
CVCV
CV
 
luai_cv
luai_cvluai_cv
luai_cv
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineer
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)
 
Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015
 
Anthony gachie c.v
Anthony gachie c.v Anthony gachie c.v
Anthony gachie c.v
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 
Mothe_Bojareddy_RESUME_Mechanic
Mothe_Bojareddy_RESUME_MechanicMothe_Bojareddy_RESUME_Mechanic
Mothe_Bojareddy_RESUME_Mechanic
 
Resume.
Resume.Resume.
Resume.
 
vishnu jinachandran
vishnu jinachandranvishnu jinachandran
vishnu jinachandran
 
Raj Gandhi
Raj GandhiRaj Gandhi
Raj Gandhi
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
Siswanto 30-05-2016
Siswanto 30-05-2016Siswanto 30-05-2016
Siswanto 30-05-2016
 

IBASCO ELPIDIO RESUME PDF

  • 1. ELPIDIO VENIEGAS IBASCO 3-A 17 th Avenue, Cubao, Quezon City, Philippines Contact No.: 02912-2599 /Globe: 0916-4666549 / Sun: 0925-6868884 Email Address: elpidioibasco75@yahoo.com / joepids@gmail.com Objective: To face challenges at work, to create self fulfillment in life, to adhere and share all my knowledge and experiences in all Mechanical Engineering field of work. To enrich my knowledge in working and also to surpass all difficulties and challenges that will come in my profession. WORK EXPERIENCES: 1. Position Assistant Manager Duration: August 2015 - Present Company: CAREMASTER INC. Industry: Facility Maintenance Management Location: Sta. Cruz, Manila, Philippines Responsibilities:  Group Head of South Area in Preventive Maintenance, Corrective Maintenance and Technical Advice and Consultation of all branches in contract with the company.  Assisting Personnel how to deal any problem encountered in branches served.  Auditing the Job Order or report raised by Costumer either be Preventive Maintenance, Corrective Maintenance, Technical Advice and Consultation or Scheduled Facility Audit of the Costumer  Answering Technical Views of the costumer durin on Call Conversation.  Reviewing the summary work done and costing of the work especially in Corrective Maintenance.  Preparation of quotation based of the needed requirements by the costumer either be from Project Team, Corrective Team and Preventive team.  Advising co workers what is the focus and objective of the work that they are dealing especially to the costumer.  Equipment study for energy saving and improvement of quality of the equipment of costumers to lessen the cost of energy they are paying.  Comparative study of the costumers equipment versus the newly introduce product equipment. 2. Position HVAC (Heating, Ventilating and Air Conditioning) Senior Maintenance Engineer Duration: June 2014 – June 2015 Place: Infineon Technologies Melaka Malaysia Branch Company: CHEN GUAN AIR CONDITIONING & ENGINEERING SDN BHD Industry: Maintenance Location: Melaka, Malaysia Responsibilities:  Scheduling and conducting Maintenance procedure implemented by the Infineon Technologies on their standard procedures in Maintenance work in HVAC and Refrigeration.  Routine checking of work in Preventive, Operation & Maintenance activities conducted by 40 personnel’s of CHENGUAN Engineering.  Inputting system program for maintenance and repairing to the SAP system application and closing finished work done by the Maintenance personnel.  Answering the technical queries and alarms on the Six Sigma BAS Zeus application systems in the plant of Infineon Technologies.  Conducting Seminar or Training to Chenguan’s Supervisor & Technician the proper SOP (Standard Operating Procedure) in working at the site including the Safety aspects of work.  Head in the preparation of Audit Materials in Infineon and Chenguan.  Provide Monthly report to Infineon Technologies on work done on the month.  Implementation of ISO 9001:2008 & ISO 1400 in the Infineon Technologies wherein CHENGUAN provide the services and accredited in the standard.  Doing the required studies and analysis of equipment’s such as: Fish Bone Analysis, Total Preventive Maintenance, Key Performance Indicator (KPI), Vibration Analysis of
  • 2. Equipment’s, Failure Mode Equipment Analysis (FMEA), Root Cause Analysis and Reliability Centered Maintenance (RCM).  Provide timely feedback to Maintenance Head of Infineon Technologies the proposals, changes and on call problems in Maintenance department.  Giving some proposals and checking of the machine in the HVAC Field if the unit is capable, need to change or to upgrade the unit.  Provide leadership in the Preventive and Maintenance department. Utilize engineering knowledge and experience to analyze, troubleshoot, and repair equipments & Analyze current programs and establish other programs as needed in the predictive maintenance.  Suggesting or implementation of Energy saving procedures conducted by Infineon Technologies.  Recommend cost effective solutions to engineering or improvement of the Project site and also to our company.  Provide Daily meeting on the issues of the day which the Operation and Maintenance have done in the day & also giving suggestion of knowledge to fellow technician/supervisor.  Improve the performance of CHENGUAN by relinquish no NCN for the time of tenure of the company.  Repairing, Troubleshooting and PPM of 50 to 250 TONS of Air Cooled Chillers.  Performing operation works on Seven Units (7) of 800 TONS and Five (5) 500 TONS of Centrifugal Chillers.  Repairing, Troubleshooting and Conducting PPM on all HVAC equipment’s at site such as Air Cooled Chillers, Air Handling Unit (AHU), Fan Coil Unit (FCU), Package Air Conditioning Units, Ventilation Equipment’s, Air Conditioning Split Units, Precision Air Conditioning Units, Pumps, Cooling Towers, Plated Heat Exchangers (PHE), Air Scrubber, Cold Storage equipment’s, Exhaust Ventilation and its parts and accessories of the Units 3. Position HVAC (Heating, Ventilating and Air Conditioning) Operation and Maintenance Engineer Duration: May 2012 – May 2014 Place: Qatar National Bank (Main Branch) Company: COMO FMS WLL Industry: Maintenance Location: Doha, Qatar Responsibilities:  Designing PPM for all equipment’s needed in the project acquired by the company.  Making PPM Planning/Scheduling of all the units in the project.  Auditing of all HVAC equipment’s in the project and other sites.  Giving Circular works for all HVAC people concerning in the site.  Instructing and training of all people in the site served.  Giving technical knowledge on HVAC equipment’s to people under me.  Supervising 30 persons in the all the HVAC equipment’s served.  Training Safety requirements in servicing, troubleshooting and others towards work.  Provide feedbacks and reports on the clients served.  Recommend or propose cost effective solution on energy savings procedures on the client served.  Providing SOP training and slides on servicing of all HVAC equipment served.  Repairing, Troubleshooting and PPM of 50 to 500 TONS of Air Cooled Chillers.  Repairing, Troubleshooting and conducting PPM on all HVAC equipment’s at site such as Air Cooled Chillers, Air Handling Unit (AHU), Fan Coil Unit (FCU), Package Air Conditioning Units, Ventilation Equipment’s, Air Conditioning Split Units, Precision Air Conditioning Units, Pumps and its parts and accessories of the Units.
  • 3. 4. Position HVAC (Heating, Ventilating and Air Conditioning) Head Maintenance Engineer Duration: February 10, 2009 – July 10, 2011 Place: Infineon Technologies Melaka Malaysia Branch Company: CHEN GUAN AIR CONDITIONING & ENGINEERING SDN BHD Industry: Maintenance Location: Melaka, Malaysia Responsibilities:  Scheduling and conducting Maintenance procedure implemented by the Infineon Technologies on their standard procedures in Maintenance work in HVAC and Refrigeration.  Routine checking of work in Preventive, Operation & Maintenance activities conducted by 40 personnel’s of CHENGUAN Engineering.  Conducting Seminar or Training to Chenguan’s Supervisor & Technician the proper SOP (Standard Operating Procedure) in working at the site including the Safety aspects of work.  Head in the preparation of Audit Materials in Infineon and Chenguan.  Provide Monthly report to Infineon Technologies on work done on the month.  Implementation of ISO 9001:2008 & ISO 1400 in the Infineon Technologies wherein CHENGUAN provide the services and accredited in the standard.  Doing the required studies and analysis of equipment’s such as: Fish Bone Analysis, Total Preventive Maintenance, Key Performance Indicator (KPI), Vibration Analysis of Equipment’s, Failure Mode Equipment Analysis (FMEA), Root Cause Analysis and Reliability Centered Maintenance (RCM).  Provide timely feedback to Maintenance Head of Infineon Technologies the proposals, changes and on call problems in Maintenance department.  Giving some proposals and checking of the machine in the HVAC Field if the unit is capable, need to change or to upgrade the unit.  Provide leadership in the Preventive and Maintenance department. Utilize engineering knowledge and experience to analyze, troubleshoot, and repair equipments & Analyze current programs and establish other programs as needed in the predictive maintenance.  Suggesting or implementation of Energy saving procedures conducted by Infineon Technologies.  Recommend cost effective solutions to engineering or improvement of the Project site and also to our company.  Provide Daily meeting on the issues of the day which the Operation and Maintenance have done in the day & also giving suggestion of knowledge to fellow technician/supervisor.  Improve the performance of CHENGUAN by relinquish no NCN for the time of tenure of the company.  Repairing, Troubleshooting and PPM of 50 to 250 TONS of Air Cooled Chillers.  Performing operation works on Seven Units (7) of 800 TONS and Five (5) 500 TONS of Centrifugal Chillers.  Repairing, Troubleshooting and Conducting PPM on all HVAC equipment’s at site such as Air Cooled Chillers, Air Handling Unit (AHU), Fan Coil Unit (FCU), Package Air Conditioning Units, Ventilation Equipment’s, Air Conditioning Split Units, Precision Air Conditioning Units, Pumps, Cooling Towers, Plated Heat Exchangers (PHE), Air Scrubber, Cold Storage equipment’s, Exhaust Ventilation and its parts and accessories of the Units 5. Position: PPM (Planning and Preventive Maintenance) Manager and HVAC (Heating, Ventilating and Air Conditioning) Engineer Duration: July 07, 2006 – July 07, 2008 Place: Ministry of Foreign Affairs (MOFA) Housing Project Company: MANSOUR AL OBAID ESTABLISHMENT for Contracting Industry: Maintenance Location: Riyadh, Kingdom of Saudi Arabia Responsibilities:  Responsible in managing the Preventive Maintenance activities In MOFA Housing Project this includes in the supervision of HVAC, Mechanical, Electrical and Civil Departments activities and staff (30 employees- Preventive Maintenance technicians, Mechanical, Electrical, Civil Engineers and Supervisors.  This position will collaborate with the corrective maintenance Department and teams in modification, improvement initiatives and as well as cost cutting on material and services.  Provide leadership in all Preventive Maintenance Departments.
  • 4.  Handle the Corrective maintenance in the HVAC Department for Twelve (12) months due to non availability of HVAC Engineer.  Endure effective communication to other departments of scheduling of Preventive Maintenance.  Provide timely feedback to the Department Manager and also to the MOFA Ministry officers the daily, quarterly, and yearly goals.  Utilize engineering knowledge and experience to analyze, troubleshoot, and repair equipments especially in the HVAC Department.  Analyze current programs and establish other programs as needed in the predictive maintenance.  Recommend cost effective solutions to engineering or improvement of the Project site and also to our company.  Endure that all the request of materials daily or monthly will be given at the exact date for material purchasing.  Ensure that the Accomplished Daily, Monthly and Yearly report of the maintenance will be given to the Project Manager and the Ministry Authority at the specified time to be reported. 6. Position: PROPRIETOR Duration: July 11, 2004 – December 2005 Company: ADAMS A/C REFRIGERATION SERVICES Industry: Maintenance / Installation Location: Poblacion, San Quintin Pangasinan Responsibilities:  Responsible in managing my own business in the maintenance and installation of Air Conditioning and Industrial Refrigeration. Designing the proper equipment to be installed. Provide adequate knowledge to the technician at the work site. 7. Position: TECHNICAL ENGINEER / INSTALLATION SUPERVISOR Duration: February 27, 2001 – May 30, 2001 Company: UMC A/C & REFRIGERATION CONTRACTOR INC. Industry: Contractor (Installation, Maintenance of A/C and Industrial Refrigeration) Location: Espeleta St., Sat. Cruz, Manila, Philippines Responsibilities:  Responsible in the Heat Load Calculation, Selection and Designing of Refrigerant or Chilled Water either be Commercial or Industrial Air Conditioning and Refrigeration of more than 5 TOR and more and its equipments and parts.  Ensure costumer on call with technical sharing in the equipment and parts to be installed in the area to be used.  Responsible in distribution of materials to the technician at the work site.  Responsible of safety procedures to implement to the technician at the work site.  Ensure that the technician are well properly advised and analyzed each possible problem that will arise at the work site.  Supervision on the installed equipment and technical sharing to fellow technicians. 8. Position: TECHNICAL ASSISTANT ENGINEER Duration: September 1999 – May 2000 Company: UNITY MARKETING CORPORATION Industry: Sales / Installation Location: Espeleta St., Sat. Cruz, Manila, Philippines Responsibilities:  Responsible in the Heat Load Calculation, Selection and Designing of Refrigerant or Chilled Water either be Commercial or Industrial Air Conditioning and Refrigeration of more than 5 TOR and more and its equipments and parts.  Ensure costumer on call with technical sharing in the equipment and parts to be installed in the area to be used.  Responsible in distribution of materials to the technician at the work site.  Responsible of safety procedures to implement to the technician at the work site.  Ensure that the technician are well properly advised and analyzed each possible problem that will arise at the work site.  Supervision on the installed equipment and technical sharing to fellow technicians.
  • 5. 9. Position: APPLICATION ENGINEER Duration: November 18, 1998 – May 18, 1999 Company: DYNACOOL INDUSTRIAL CORPORATION Industry: Sales / Miantenance (A/C and Dehumidifier Equipments and Parts) Location: Espeleta St., Sat. Cruz, Manila, Philippines Responsibilities:  Responsible in the Heat Load Calculation, Selection and Designing of Refrigerant or Chilled Water either be Commercial or Industrial Air Conditioning and Dehumidifier of more than 5 TOR and more and its equipments and parts.  Responsible in the proper designing of the required area to be dehumidified or cooled at the precise RH of the area.  Ensure that the technician have the proper safety in installing all such equipments.  Ensure the proper handling and troubleshooting of the equipment to be commissioned.  Ensure the proper cleanliness on or after finishing the installation work at the work site. TRAININGS AND SEMINARS: Date Topic/Course Title 1. March 13, 2000 MONITOWOC Field Service Seminar Makati City, Philippines 2. December 1999 PSVAREE Exhibits and Seminars Malate, Manila, Philippines 3. September 29 – 30, 1999 COPELAND and ALCO Compressor and Controls Technology Training and Seminar Mandarin Oriental Hotel, Manila, Philippines 4. May 2009 TIER (Technical Information and Emergency Response) Introduction of CSPS in Infineon Technologies (Safety Briefing) Infineon Technologies Melaka Branch 5. June 2009 TIER (Technical Information and Emergency Response) Safety Related Work in Enclosed Area Infineon Technologies Melaka Branch 6. August 2009 Introduction of ISO 9001:2008 & ISO 1400 (Training) CHENGUAN AIR CONDITIONING AND ENGINEERING SDN BHD Head Office: Puchong, Selangor Malaysia PERSONAL DATA: Age: 40 Date of Birth: November 27, 1975 Gender: Male Civil Status: Married Height: 172 cm Weight: 90 kg Nationality: Filipino Religion: Christian Catholic Permanent Address: 3-A 17 th Avenue, Cubao, Quezon City, Philippines
  • 6. EDUCATION: Course: B. S. in Mechanical Engineering Education Level: Graduate Education Field: Engineering School/University: CENTRAL COLLEGES of the PHILIPPINES Address: #52 Aurora Blvd, Quezon City, Philippines Date: June 1995 – May 1998 REFERENCES: 1. Engr. Chai Khee Wah Operation Engineer CHENGUAN AIRCONDITIONING & ENGINEERING SDN BHD (HEAD) Melaka Branch, Malaysia 2. Engr. Murali A/L UTILITY Engineer CHENGUAN AIRCONDITIONING & ENGINEERING SDN BHD Govindasamy (HEAD) Melaka Branch, Malaysia 3. Engr. Tariq Baskh Technical Director Ministry of Foreign Affairs Housing Project (MOFA) Riyadh, K. S. A. 4. Engr. Danilo Garcia Maintenance Supervisor Ministry of Transportation (MOT) Riyadh, K. S. A. 5. Mr. Romy Guilas Vice CEO UMC A/C & REFRIGERATION CONTRACTOR INC. Sta. Cruz, Manila, Philippines I hereby attest that all above Information listed is true and beyond my knowledge and ability ______________________ Applicant’s Signature