SlideShare a Scribd company logo
1
Integral Group
Sharing Wisdom and Wealth
๏ฝ 1989- Started as component manufacturer, supplying precision
machined parts to auto industries.
๏ฝ 2002- Management was taken over by new set of
entrepreneurs headed by Mr. K Elango and diversified into
SPM and Special Purpose Testing equipment manufacturing.
๏ฝ 2003-Till now- Manufactured over 200 Special purpose
machines, assembly lines and testing equipment's to various
leading automotive companies.
2
Integral Group
Sharing Wisdom and Wealth
๏ฝ 2007- Established sister concern, M/s Jaysen Engineering pvt
ltd at Jigani Industrial area, Bangalore, to expand
manufacturing facilities.
๏ฝ 2011-2012- Designed and Commissioned major processing
projects for ITC ltd-Mysore.
๏ฝ Group turnover โ€“ INR 80 million (2011-12)
3
Integral Group
Sharing Wisdom and Wealth
๏ฝ K Elango โ€“ Director (IAPL)
๏ฝ S Ravichandran โ€“ Director (IAPL, JEPL)
๏ฝ S Senthil Murugan โ€“ Director(JEPL)
4
Integral Group
Sharing Wisdom and Wealth
๏ƒ˜ Sharing knowledge ,wisdom to create wealth & employment
5
Integral Group
Sharing Wisdom and Wealth
To excel and sustainTo excel and sustain growth in the field of
manufacturing engineering and automation solutions, at most
competitive price, quality and service.
6
Integral Group
Sharing Wisdom and Wealth
INEL
Integral Group
Sharing Wisdom and Wealth
Our Clients
๏€ฟ
Strengths of IAPL
Structured Project Execution from Concept to
Commissioning 8
Integral Group
Sharing Wisdom and Wealth
๏ฝ Two industrial sheds of
total built up area of 12,000
sq ft at Bommasandra
industrial area.
๏ฝ 6000 sq ft at Jigani
industrial area
9
Integral Group
Sharing Wisdom and Wealth
๏ฝ Fully equipped machine
shop for supporting
SPM manufacturing
operational needs
(turning, milling,
boring, surface grinding
etc)
10
Integral Group
Sharing Wisdom and Wealth
๏ฝ Design office with experienced
engineers supported with
drafting software like
AutoCAD-2D and modeling
IronCAD-3D.
๏ฝ Trained and experienced
engineers to execute projects on
PLC, SCADA, HMI.
11
Integral Grup
Sharing Wisdom and Wealth
Integral Group
Sharing Wisdom and Wealth
Integral Automation pvt ltd provides
๏ƒ˜Strong Combination of Process and technology in identifying
right solution for automation.
๏ƒ˜Low cost solutions for improved quality and productivity.
๏ƒ˜Special purpose machines.
๏ƒ˜Custom built test rigs for testing auto components.
๏ƒ˜Professional after sale Service.
12
Integral Group
Sharing Wisdom and Wealth
Focus of Integral Groups
13
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
Butt Welding
Machine โ€ข Butt welding machine is used to
weld the strip of sheet to form basic
structure for rim.
โ€ข Sequence of operation is
controlled through a PLC system.
โ€ข Hydraulic actuators are used to
perform all movements.
โ€ข Pneumatically operated automatic
lubrication system is provided
wherever required
We have successfully executed more than 200 projects for
various industries across INDIA.
Conditioning Cylinder
Conditioning Cylinder of Stainless steel
is designed to add moisture and
temperature to the tobacco product of
capacity 7000 Kgs/Hr. The tobacco leaf
gets opened while tossing inside the
shell.
* Shell size of 1800mm X 7500mm lg
* Adjustable shell speed & Angle
* Auto Moisture & temperature Control.
* Noiseless drive system.
Features
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
15
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
The PC Based Stainless Steel Pellet
Coating Machine is designed for adding the
starch syrup and essence on to the pellet
(chewing gum) Spraying, Drying & pause
time are Programmable for each spray.
Coating capacity is 350 Kgs. This machine
is controlled through a highly reliable PC
based data acquisition system.
Features:
. No of spray & pan speed programmable
โ€ข Dosing syrup temperature controlled
โ€ข Hot air inlet & vapor outlet controlled.
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
Wheel Cylinder Piston Assembly Machine is a
SPM designed to assemble piston into the wheel
Cylinder body. Before assembling the piston into
wheel cylinder, seal assembly, removing debris,
Lubrication & identifying any damages to the
piston has been ensured. Sequence of operation
is controlled through a PLC.
Seal Assembly & Orientation ensured.
Forced Methanol washing on piston
Thin layer of grease applied on piston.
Piston passed through a gauge for
identifying any damages on the
piston.
Features
Wheel Cylinder Piston Assembly
Machine
16
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
TMC Assembly & Testing Machine
Tandem Master Cylinder assembly machine
consists of four different stations namely PP
assy, SP assy, TMC assy & testing and
Reservoir assy & Testing. This machine is used
to assemble the TMC assy of 3 models namely
auto, car and van.
Features
Height controlled screw tightening
Thread identification and piston assy.
Torque controlled screw tightening
Leak detection & vacuum test in the
TMC body and Reservoir.
17
18
19
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
Frame Revising Machine-N40
Frame revising machine is a semi automatic
machine to measure Head pipe tilt & offset,
Shock absorber LHS & RHS and Tail lamp
mounting of the Bike chassis and it is revised
within the specified tolerance limit. Head pipe tilt
& offset, Shock absorber LHS & RHS and Tail
lamp mounting are measured and calculated
with the help of LVDTs interfaced to the DAQ
system.
Features
Deflect. of max. 3mm shall be revised
Revising accuracy is ยฑ0.4mm.
Servo hydraulics are used for revising
Machine sequence is controlled by
PLC & high speed DAQ system. The
operator interface is through highly
interactive GUI.
23
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
PP and SP Assembly Testing Machine
PP &SP machine designed to check 4nos of
holes presence, identify the model of piston,
Assemble the seal into the piston, automatic
screw tightening, piston sleeving & washing the
piston
Features
Piston height is measured using LVDT
4holes presence checking with air back
pressure principle.
Forced fluid removes debris on the
component
24
25
26
Washing Machine โ€“ Flywheel Cup
The Washing machine for Flywheel cup is a
SPM designed to remove the coolant oil and the
debris present in component after the machining
and pressing operations. Flywheel cup rotated
while washing and drying. Sequence of
operation is controlled through a PLC.
Features
Washing & Drying time is 18 Secs.
Washing solution Temperature is 80ยฐC
Moisture removed by compressed air.
Temperature & Water level is
controlled automatically. VFD is used
for varying washing & drying speed.
Integral Automation (Pvt.) Ltd.
28
29
Cutting Machine
Cutting machine designed to cut the braided and
formed rope as per the predefined distance.
Sequence of operation is controlled through a
PLC and pneumatic actuators perform all the
movements.
Features
Lead 4mm
Cycle time 5sec/cycle
Holding torque of 112kg/cm
Man machine interface is provided to set
the predefined counter value
Integral Automation (Pvt.) Ltd.
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
Caliper Housing Inspection Machine
Caliper housing final inspection machine is a
semi automatic machine to check thread of
M10x1, M10x1.5, Hole checking and twin bore
measurement within the specified tolerance limit.
Accepted components are soft marked using
marker pen. Sequence of the machine is
controlled by a PLC.
Features
Hole check by back pressure method
Bore measurement accuracy is ยฑ2ยต
Thread check by tapping attachment
Air electronic gauges are used to
check two bores simultaneously.
Floating mechanism to accept
dimensional variation of component
31
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
Latch Assembly Line
Latch assembly machine
is a special purpose
automated machine
designed to apply grease
for pawl, claw & rivet,
Riveting of pawl & claw
rivets, Height checking of
Retention plate & Back
plate assembly, Vision
inspection system to
identify the component
presence and Cable press
& Actuator assembly.
Latch assembly machine
is divided into three
control circuits namely
Retention plate assembly,
Vision Inspection machine
and Back plate assembly
machine.
32
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
Testing Machine
End Of Line Testing Machine
for Latch
33
34
Jaysen Engineering pvt ltd-Jigani
.
โ€ข Developing assembly lines for manufacturing
industries and custom built control panels for
Automation Industry.
โ€ข New business division is into Renewable Energy,
manufacturers and commission Micro Wind mills and
Hybrid Solar/Wind systems for Rural application.
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
๏ฝ Played a major role in erection and commissioning of entire plant for
processing tobacco for ITC ltd-Mysore. (2010-11)
๏ฝ Designed and manufactured Conveyors and Intermediate
processing machines.
35
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
๏ฝ Designed and Commissioned an entire conveyor line for baling of
metal scrap capacity 100 tons/day To M/s Toyota Kirloskar-Bidadi.
36
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
37
Renewable Energy division.
๏ฝ Designed and erected community street lighting system for rural
places with LED lights and Hybrid wind solar system
๏ฝ 1.5 kW Hybrid system feeding 20 street lamps of 12W LED
38
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
Thali โ€“ near Dankanikota, Tamilnadu (2011)
SPM division:
๏ฝ Integral Automation (Pvt) ltd
B-17, KSSIDC Industrial Estate
Bommasandra, Bangalore- 560099
Tele Fax : (91) โ€“ 080 โ€“ 2783 2398,
2783 5826
E-mail : iapl@vsnl.net
Website : www.iapl.net.in
Assembly line for automobile
industry:
๏ฝ Jaysen Engineering Pvt Ltd
Q4- KSSIDC Industrial Area
1st
main road, Jigani 2nd
phase
Bangalore โ€“ 562106
Tele Fax : (91) โ€“ 080 โ€“ 2782 5160 39
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
INTEGRA
L
Integral Group
Sharing Wisdom and Wealth
40
Thank you

More Related Content

Similar to Iapl presentation 26.6.2014 (2)

Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr gupta
kartik dogra
ย 
Original - Engineering and Design
Original - Engineering and DesignOriginal - Engineering and Design
Original - Engineering and DesignOriginal Ltd
ย 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenancevivekmsmech
ย 
Allison training report
Allison training reportAllison training report
Allison training reportInfosys
ย 
Tiger General Swab Master Rig
Tiger General Swab Master RigTiger General Swab Master Rig
Tiger General Swab Master Rig
Dick Brenneman
ย 
Industrial training
Industrial trainingIndustrial training
Industrial training
dsasad dfdfgfd
ย 
Internship report
Internship reportInternship report
Internship report
NKGKings
ย 
Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014aceyengindia
ย 
Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.MayankRohatgi
ย 
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGSKONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGSKesava S
ย 
Corporate_Pamphlet
Corporate_PamphletCorporate_Pamphlet
Corporate_PamphletManoj Rajagopal
ย 
Lite Resin Transfer Moulding at Bright Autoplast
Lite Resin Transfer Moulding at Bright AutoplastLite Resin Transfer Moulding at Bright Autoplast
Lite Resin Transfer Moulding at Bright Autoplast
Prashant Shrawak
ย 
Neel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship ReportNeel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship Report
Pradeep Yadav
ย 
Patri ppt2
Patri ppt2Patri ppt2
Patri ppt2
NISHANT552
ย 
A Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel DrumA Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel DrumAkshay Chhabria
ย 
CLRโ€™s Automotive Presentation
CLRโ€™s Automotive PresentationCLRโ€™s Automotive Presentation
CLRโ€™s Automotive Presentation
CLR Compaรฑรญa Levantina de Reductores
ย 
ROMERO ATV
ROMERO ATVROMERO ATV
ROMERO ATV
Proverbs16v25
ย 

Similar to Iapl presentation 26.6.2014 (2) (20)

Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr gupta
ย 
Original - Engineering and Design
Original - Engineering and DesignOriginal - Engineering and Design
Original - Engineering and Design
ย 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
ย 
Allison training report
Allison training reportAllison training report
Allison training report
ย 
Tiger General Swab Master Rig
Tiger General Swab Master RigTiger General Swab Master Rig
Tiger General Swab Master Rig
ย 
Resume
ResumeResume
Resume
ย 
Industrial training
Industrial trainingIndustrial training
Industrial training
ย 
Internship report
Internship reportInternship report
Internship report
ย 
Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014
ย 
Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.
ย 
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGSKONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
KONDA REDDY_R101276_IMPLEMENTATION DESIGN FOR INSPECTION OF O-RINGS
ย 
Corporate_Pamphlet
Corporate_PamphletCorporate_Pamphlet
Corporate_Pamphlet
ย 
Lite Resin Transfer Moulding at Bright Autoplast
Lite Resin Transfer Moulding at Bright AutoplastLite Resin Transfer Moulding at Bright Autoplast
Lite Resin Transfer Moulding at Bright Autoplast
ย 
Neel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship ReportNeel Auto Pvt. Ltd. Pantnagar Internship Report
Neel Auto Pvt. Ltd. Pantnagar Internship Report
ย 
Patri ppt2
Patri ppt2Patri ppt2
Patri ppt2
ย 
A Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel DrumA Project on manufacturing of Rear Wheel Drum
A Project on manufacturing of Rear Wheel Drum
ย 
CLRโ€™s Automotive Presentation
CLRโ€™s Automotive PresentationCLRโ€™s Automotive Presentation
CLRโ€™s Automotive Presentation
ย 
AKS
AKSAKS
AKS
ย 
Strategi ppt 23 sept 2014
Strategi ppt 23 sept 2014Strategi ppt 23 sept 2014
Strategi ppt 23 sept 2014
ย 
ROMERO ATV
ROMERO ATVROMERO ATV
ROMERO ATV
ย 

Recently uploaded

FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
ย 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
ย 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
ย 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
ย 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
ย 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
ย 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
ย 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
ย 

Recently uploaded (20)

FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
ย 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ย 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
ย 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
ย 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
ย 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
ย 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
ย 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
ย 

Iapl presentation 26.6.2014 (2)

  • 2. ๏ฝ 1989- Started as component manufacturer, supplying precision machined parts to auto industries. ๏ฝ 2002- Management was taken over by new set of entrepreneurs headed by Mr. K Elango and diversified into SPM and Special Purpose Testing equipment manufacturing. ๏ฝ 2003-Till now- Manufactured over 200 Special purpose machines, assembly lines and testing equipment's to various leading automotive companies. 2 Integral Group Sharing Wisdom and Wealth
  • 3. ๏ฝ 2007- Established sister concern, M/s Jaysen Engineering pvt ltd at Jigani Industrial area, Bangalore, to expand manufacturing facilities. ๏ฝ 2011-2012- Designed and Commissioned major processing projects for ITC ltd-Mysore. ๏ฝ Group turnover โ€“ INR 80 million (2011-12) 3 Integral Group Sharing Wisdom and Wealth
  • 4. ๏ฝ K Elango โ€“ Director (IAPL) ๏ฝ S Ravichandran โ€“ Director (IAPL, JEPL) ๏ฝ S Senthil Murugan โ€“ Director(JEPL) 4 Integral Group Sharing Wisdom and Wealth
  • 5. ๏ƒ˜ Sharing knowledge ,wisdom to create wealth & employment 5 Integral Group Sharing Wisdom and Wealth
  • 6. To excel and sustainTo excel and sustain growth in the field of manufacturing engineering and automation solutions, at most competitive price, quality and service. 6 Integral Group Sharing Wisdom and Wealth
  • 7. INEL Integral Group Sharing Wisdom and Wealth Our Clients
  • 8. ๏€ฟ Strengths of IAPL Structured Project Execution from Concept to Commissioning 8 Integral Group Sharing Wisdom and Wealth
  • 9. ๏ฝ Two industrial sheds of total built up area of 12,000 sq ft at Bommasandra industrial area. ๏ฝ 6000 sq ft at Jigani industrial area 9 Integral Group Sharing Wisdom and Wealth
  • 10. ๏ฝ Fully equipped machine shop for supporting SPM manufacturing operational needs (turning, milling, boring, surface grinding etc) 10 Integral Group Sharing Wisdom and Wealth
  • 11. ๏ฝ Design office with experienced engineers supported with drafting software like AutoCAD-2D and modeling IronCAD-3D. ๏ฝ Trained and experienced engineers to execute projects on PLC, SCADA, HMI. 11 Integral Grup Sharing Wisdom and Wealth Integral Group Sharing Wisdom and Wealth
  • 12. Integral Automation pvt ltd provides ๏ƒ˜Strong Combination of Process and technology in identifying right solution for automation. ๏ƒ˜Low cost solutions for improved quality and productivity. ๏ƒ˜Special purpose machines. ๏ƒ˜Custom built test rigs for testing auto components. ๏ƒ˜Professional after sale Service. 12 Integral Group Sharing Wisdom and Wealth Focus of Integral Groups
  • 13. 13 INTEGRA L Integral Group Sharing Wisdom and Wealth Butt Welding Machine โ€ข Butt welding machine is used to weld the strip of sheet to form basic structure for rim. โ€ข Sequence of operation is controlled through a PLC system. โ€ข Hydraulic actuators are used to perform all movements. โ€ข Pneumatically operated automatic lubrication system is provided wherever required We have successfully executed more than 200 projects for various industries across INDIA.
  • 14. Conditioning Cylinder Conditioning Cylinder of Stainless steel is designed to add moisture and temperature to the tobacco product of capacity 7000 Kgs/Hr. The tobacco leaf gets opened while tossing inside the shell. * Shell size of 1800mm X 7500mm lg * Adjustable shell speed & Angle * Auto Moisture & temperature Control. * Noiseless drive system. Features INTEGRA L Integral Group Sharing Wisdom and Wealth
  • 15. 15 INTEGRA L Integral Group Sharing Wisdom and Wealth The PC Based Stainless Steel Pellet Coating Machine is designed for adding the starch syrup and essence on to the pellet (chewing gum) Spraying, Drying & pause time are Programmable for each spray. Coating capacity is 350 Kgs. This machine is controlled through a highly reliable PC based data acquisition system. Features: . No of spray & pan speed programmable โ€ข Dosing syrup temperature controlled โ€ข Hot air inlet & vapor outlet controlled.
  • 16. INTEGRA L Integral Group Sharing Wisdom and Wealth Wheel Cylinder Piston Assembly Machine is a SPM designed to assemble piston into the wheel Cylinder body. Before assembling the piston into wheel cylinder, seal assembly, removing debris, Lubrication & identifying any damages to the piston has been ensured. Sequence of operation is controlled through a PLC. Seal Assembly & Orientation ensured. Forced Methanol washing on piston Thin layer of grease applied on piston. Piston passed through a gauge for identifying any damages on the piston. Features Wheel Cylinder Piston Assembly Machine 16
  • 17. INTEGRA L Integral Group Sharing Wisdom and Wealth TMC Assembly & Testing Machine Tandem Master Cylinder assembly machine consists of four different stations namely PP assy, SP assy, TMC assy & testing and Reservoir assy & Testing. This machine is used to assemble the TMC assy of 3 models namely auto, car and van. Features Height controlled screw tightening Thread identification and piston assy. Torque controlled screw tightening Leak detection & vacuum test in the TMC body and Reservoir. 17
  • 18. 18
  • 19. 19
  • 20.
  • 21.
  • 22.
  • 23. INTEGRA L Integral Group Sharing Wisdom and Wealth Frame Revising Machine-N40 Frame revising machine is a semi automatic machine to measure Head pipe tilt & offset, Shock absorber LHS & RHS and Tail lamp mounting of the Bike chassis and it is revised within the specified tolerance limit. Head pipe tilt & offset, Shock absorber LHS & RHS and Tail lamp mounting are measured and calculated with the help of LVDTs interfaced to the DAQ system. Features Deflect. of max. 3mm shall be revised Revising accuracy is ยฑ0.4mm. Servo hydraulics are used for revising Machine sequence is controlled by PLC & high speed DAQ system. The operator interface is through highly interactive GUI. 23
  • 24. INTEGRA L Integral Group Sharing Wisdom and Wealth PP and SP Assembly Testing Machine PP &SP machine designed to check 4nos of holes presence, identify the model of piston, Assemble the seal into the piston, automatic screw tightening, piston sleeving & washing the piston Features Piston height is measured using LVDT 4holes presence checking with air back pressure principle. Forced fluid removes debris on the component 24
  • 25. 25
  • 26. 26
  • 27. Washing Machine โ€“ Flywheel Cup The Washing machine for Flywheel cup is a SPM designed to remove the coolant oil and the debris present in component after the machining and pressing operations. Flywheel cup rotated while washing and drying. Sequence of operation is controlled through a PLC. Features Washing & Drying time is 18 Secs. Washing solution Temperature is 80ยฐC Moisture removed by compressed air. Temperature & Water level is controlled automatically. VFD is used for varying washing & drying speed. Integral Automation (Pvt.) Ltd.
  • 28. 28
  • 29. 29
  • 30. Cutting Machine Cutting machine designed to cut the braided and formed rope as per the predefined distance. Sequence of operation is controlled through a PLC and pneumatic actuators perform all the movements. Features Lead 4mm Cycle time 5sec/cycle Holding torque of 112kg/cm Man machine interface is provided to set the predefined counter value Integral Automation (Pvt.) Ltd.
  • 31. INTEGRA L Integral Group Sharing Wisdom and Wealth Caliper Housing Inspection Machine Caliper housing final inspection machine is a semi automatic machine to check thread of M10x1, M10x1.5, Hole checking and twin bore measurement within the specified tolerance limit. Accepted components are soft marked using marker pen. Sequence of the machine is controlled by a PLC. Features Hole check by back pressure method Bore measurement accuracy is ยฑ2ยต Thread check by tapping attachment Air electronic gauges are used to check two bores simultaneously. Floating mechanism to accept dimensional variation of component 31
  • 32. INTEGRA L Integral Group Sharing Wisdom and Wealth Latch Assembly Line Latch assembly machine is a special purpose automated machine designed to apply grease for pawl, claw & rivet, Riveting of pawl & claw rivets, Height checking of Retention plate & Back plate assembly, Vision inspection system to identify the component presence and Cable press & Actuator assembly. Latch assembly machine is divided into three control circuits namely Retention plate assembly, Vision Inspection machine and Back plate assembly machine. 32
  • 33. INTEGRA L Integral Group Sharing Wisdom and Wealth Testing Machine End Of Line Testing Machine for Latch 33
  • 34. 34 Jaysen Engineering pvt ltd-Jigani . โ€ข Developing assembly lines for manufacturing industries and custom built control panels for Automation Industry. โ€ข New business division is into Renewable Energy, manufacturers and commission Micro Wind mills and Hybrid Solar/Wind systems for Rural application. INTEGRA L Integral Group Sharing Wisdom and Wealth
  • 35. ๏ฝ Played a major role in erection and commissioning of entire plant for processing tobacco for ITC ltd-Mysore. (2010-11) ๏ฝ Designed and manufactured Conveyors and Intermediate processing machines. 35 INTEGRA L Integral Group Sharing Wisdom and Wealth
  • 36. ๏ฝ Designed and Commissioned an entire conveyor line for baling of metal scrap capacity 100 tons/day To M/s Toyota Kirloskar-Bidadi. 36 INTEGRA L Integral Group Sharing Wisdom and Wealth
  • 37. 37
  • 38. Renewable Energy division. ๏ฝ Designed and erected community street lighting system for rural places with LED lights and Hybrid wind solar system ๏ฝ 1.5 kW Hybrid system feeding 20 street lamps of 12W LED 38 INTEGRA L Integral Group Sharing Wisdom and Wealth Thali โ€“ near Dankanikota, Tamilnadu (2011)
  • 39. SPM division: ๏ฝ Integral Automation (Pvt) ltd B-17, KSSIDC Industrial Estate Bommasandra, Bangalore- 560099 Tele Fax : (91) โ€“ 080 โ€“ 2783 2398, 2783 5826 E-mail : iapl@vsnl.net Website : www.iapl.net.in Assembly line for automobile industry: ๏ฝ Jaysen Engineering Pvt Ltd Q4- KSSIDC Industrial Area 1st main road, Jigani 2nd phase Bangalore โ€“ 562106 Tele Fax : (91) โ€“ 080 โ€“ 2782 5160 39 INTEGRA L Integral Group Sharing Wisdom and Wealth
  • 40. INTEGRA L Integral Group Sharing Wisdom and Wealth 40 Thank you