The Test Rig is Electro Hydraulic. Safety & user Friendliness are
the key features of the provided Test Rig. The Test Rig has been
designed to address all the requirements of the Design
Document.
 With this Test Rig, Operator can work independently.
 The entire Test as specified can be done on this Test Rig.
 Arrangement to carry out static pressure testing of pipe assemblies of
different sizes to a maximum pressure of 10000psi
 Digital gauges for pressure reading
 Timer for setting the test time duration.
 Pressure relief valve to hold a maximum pressure of 1000psi.
 Power and manual operated pumps are provided.
 Suitable cooling system is provided.
 A suitable safety HOOD is provided with focus light.
 QC/DC coupling is provided for pressure testing.
 All filters in the hydraulic circuit of Power Pack are provided with
clogging indication.
 Pressure Indicator: The maximum working pressure of the Rig is
10000 PSI. Two pressure transmitters are mounted one for return line
pressure (0-25 bar) and one for main line pressure (0-10000) PSI. Two
digital process indicators are mounted on panel.
 Fluid Level Indicators : A vertical fluid level indicator is mounted on
front of tank to permit visual monitoring of the level inside the Tank.
 3Filtration System: The filters are able to achieve the cleanliness in
the working fluid. All filters that are used in the system are clogging
indicators type. Once any of these filters get clogged the indication is
shown on the front panel.
Thank You

More Related Content

Similar to Hydraulic Pressure Testing Rig

Shilpa ppt thermal plant copy
Shilpa ppt thermal plant   copyShilpa ppt thermal plant   copy
Shilpa ppt thermal plant copy
Shilpa Shukla
 

Similar to Hydraulic Pressure Testing Rig (20)

DP Transmitter
DP TransmitterDP Transmitter
DP Transmitter
 
Combined control unit ppt
Combined control unit pptCombined control unit ppt
Combined control unit ppt
 
Hydraulic flushing rig ppt
Hydraulic flushing rig pptHydraulic flushing rig ppt
Hydraulic flushing rig ppt
 
Process control lab manual
Process control lab manualProcess control lab manual
Process control lab manual
 
Pressure measurement
Pressure measurement Pressure measurement
Pressure measurement
 
Down Pipe Liquid Level Sensor
Down Pipe Liquid Level SensorDown Pipe Liquid Level Sensor
Down Pipe Liquid Level Sensor
 
Downpipe Liquid Level Sensor Purge Control
Downpipe Liquid Level Sensor Purge ControlDownpipe Liquid Level Sensor Purge Control
Downpipe Liquid Level Sensor Purge Control
 
basicsinstrumentandcontrol-170425220125.pptx
basicsinstrumentandcontrol-170425220125.pptxbasicsinstrumentandcontrol-170425220125.pptx
basicsinstrumentandcontrol-170425220125.pptx
 
Hydraulic Turbine Flow Meters (flo-tech)
Hydraulic Turbine Flow Meters (flo-tech)Hydraulic Turbine Flow Meters (flo-tech)
Hydraulic Turbine Flow Meters (flo-tech)
 
Anaesthesia workstation
Anaesthesia workstationAnaesthesia workstation
Anaesthesia workstation
 
Submersible Hydrostatic Level Indicators
Submersible Hydrostatic Level IndicatorsSubmersible Hydrostatic Level Indicators
Submersible Hydrostatic Level Indicators
 
Rectangular & Cylindrical Horizontal Autoclave Manufacturer in India
Rectangular & Cylindrical Horizontal Autoclave Manufacturer in IndiaRectangular & Cylindrical Horizontal Autoclave Manufacturer in India
Rectangular & Cylindrical Horizontal Autoclave Manufacturer in India
 
Introduction to Boiler Control Systems
Introduction to Boiler Control SystemsIntroduction to Boiler Control Systems
Introduction to Boiler Control Systems
 
Dosing pump catalog
Dosing pump catalogDosing pump catalog
Dosing pump catalog
 
Hydraulic Control Valve Test Bench.pptx
Hydraulic Control Valve Test Bench.pptxHydraulic Control Valve Test Bench.pptx
Hydraulic Control Valve Test Bench.pptx
 
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
 
Shilpa ppt thermal plant copy
Shilpa ppt thermal plant   copyShilpa ppt thermal plant   copy
Shilpa ppt thermal plant copy
 
Converter station water-cooled pump vibration monitoring and condition assess...
Converter station water-cooled pump vibration monitoring and condition assess...Converter station water-cooled pump vibration monitoring and condition assess...
Converter station water-cooled pump vibration monitoring and condition assess...
 
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARSINDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
 
Bioreactor
BioreactorBioreactor
Bioreactor
 

More from Neometrix_Engineering_Pvt_Ltd

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Neometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptxNeometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptx
Neometrix_Engineering_Pvt_Ltd
 
Dynamometer Engine Test Rig for engines parameters RPM
Dynamometer Engine Test Rig  for engines parameters RPMDynamometer Engine Test Rig  for engines parameters RPM
Dynamometer Engine Test Rig for engines parameters RPM
Neometrix_Engineering_Pvt_Ltd
 
Portable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air forcePortable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air force
Neometrix_Engineering_Pvt_Ltd
 
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
Neometrix_Engineering_Pvt_Ltd
 
Test Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- NeometrixTest Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- Neometrix
Neometrix_Engineering_Pvt_Ltd
 
45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx
Neometrix_Engineering_Pvt_Ltd
 
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Neometrix_Engineering_Pvt_Ltd
 
Mobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix DefeneceMobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix Defenece
Neometrix_Engineering_Pvt_Ltd
 
universal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptxuniversal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptx
Neometrix_Engineering_Pvt_Ltd
 

More from Neometrix_Engineering_Pvt_Ltd (20)

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Neometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptxNeometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptx
 
Dynamometer Engine Test Rig for engines parameters RPM
Dynamometer Engine Test Rig  for engines parameters RPMDynamometer Engine Test Rig  for engines parameters RPM
Dynamometer Engine Test Rig for engines parameters RPM
 
Portable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air forcePortable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air force
 
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
 
Hydraulic Loading System - Neometrix Defence
Hydraulic Loading System - Neometrix DefenceHydraulic Loading System - Neometrix Defence
Hydraulic Loading System - Neometrix Defence
 
Test Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- NeometrixTest Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- Neometrix
 
Lock Loading Test Rig (ERU119 & ERU120) .pptx
Lock Loading Test Rig (ERU119 & ERU120) .pptxLock Loading Test Rig (ERU119 & ERU120) .pptx
Lock Loading Test Rig (ERU119 & ERU120) .pptx
 
starter-generator-test-bench-Catalog.pptx
starter-generator-test-bench-Catalog.pptxstarter-generator-test-bench-Catalog.pptx
starter-generator-test-bench-Catalog.pptx
 
45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx
 
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
 
Optical-test-bench-for-pcb-and-optic-testing.pptx
Optical-test-bench-for-pcb-and-optic-testing.pptxOptical-test-bench-for-pcb-and-optic-testing.pptx
Optical-test-bench-for-pcb-and-optic-testing.pptx
 
Printed circuit board (PCB) FUNCATIONAL TEST BENCH.pptx
Printed circuit board (PCB) FUNCATIONAL TEST BENCH.pptxPrinted circuit board (PCB) FUNCATIONAL TEST BENCH.pptx
Printed circuit board (PCB) FUNCATIONAL TEST BENCH.pptx
 
Mobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix DefeneceMobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix Defenece
 
modern-universal-automatic-test-equipment.pptx
modern-universal-automatic-test-equipment.pptxmodern-universal-automatic-test-equipment.pptx
modern-universal-automatic-test-equipment.pptx
 
drive-and-control-automation-system.pptx
drive-and-control-automation-system.pptxdrive-and-control-automation-system.pptx
drive-and-control-automation-system.pptx
 
HYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCE
HYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCEHYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCE
HYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCE
 
universal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptxuniversal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptx
 
Six Clamp Perfect Binding Machine
Six Clamp Perfect Binding MachineSix Clamp Perfect Binding Machine
Six Clamp Perfect Binding Machine
 

Recently uploaded

Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 

Hydraulic Pressure Testing Rig

  • 1.
  • 2.
  • 3. The Test Rig is Electro Hydraulic. Safety & user Friendliness are the key features of the provided Test Rig. The Test Rig has been designed to address all the requirements of the Design Document.  With this Test Rig, Operator can work independently.  The entire Test as specified can be done on this Test Rig.
  • 4.
  • 5.  Arrangement to carry out static pressure testing of pipe assemblies of different sizes to a maximum pressure of 10000psi  Digital gauges for pressure reading  Timer for setting the test time duration.  Pressure relief valve to hold a maximum pressure of 1000psi.  Power and manual operated pumps are provided.  Suitable cooling system is provided.  A suitable safety HOOD is provided with focus light.  QC/DC coupling is provided for pressure testing.  All filters in the hydraulic circuit of Power Pack are provided with clogging indication.
  • 6.
  • 7.
  • 8.
  • 9.  Pressure Indicator: The maximum working pressure of the Rig is 10000 PSI. Two pressure transmitters are mounted one for return line pressure (0-25 bar) and one for main line pressure (0-10000) PSI. Two digital process indicators are mounted on panel.  Fluid Level Indicators : A vertical fluid level indicator is mounted on front of tank to permit visual monitoring of the level inside the Tank.  3Filtration System: The filters are able to achieve the cleanliness in the working fluid. All filters that are used in the system are clogging indicators type. Once any of these filters get clogged the indication is shown on the front panel.
  • 10.