SlideShare a Scribd company logo
1 of 1
Download to read offline
HURST LANE PLACE
Scheme Aims and Objectives
The Council is planning as part of the Hurst Lane Place project
to invest in highway improvement works in the Chester Road /
Hurst Lane North area.
The Hurst Lane Place project aims to make visiting the area
more accessible and convenient, improve road safety -
particularly for pedestrians and vulnerable road users and
update the look of the area.
The wider objective of the scheme is to support the economy
and encourage additional investment in the area.
The specific scheme aims are to:
• Improve Road Safety, particularly for pedestrians
• Provide additional / improved on street parking
• Improve accessibility and comfort for pedestrians
• Improve and update the quality and look of the Public Realm
(Highway areas)
The Scheme
The scheme is located on the Chester Road at the Hurst Lane /
Hurst Lane North and Hazelhurst Road junctions in the Castle
Bromwich area of Solihull. It is limited to the areas of public
highway that are maintained by the Council within the area
shown on the plan. The other areas immediately in front of the
local shops / businesses, which are mainly used for parking, are
privately owned.
What we know about the area
In 2010 we asked local residents, road users and stakeholders what were the issues and concerns for the Chester Road.
This helped us understand how we could improve the area. The comments identified a number of opportunities for the
section of Chester Road centred on the local shopping area at Hurst Lane North.
The mains issues local people identified were:
• the area feels unattractive and at times unsafe
• provision for pedestrians and cyclists was poor, especially for pedestrians wanting to cross the road
• parking demand for the shops / businesses appears to exceed supply and can be inconsiderate
• traffic delays and speeds on the Chester Road and side roads.
HurstLaneNorth
Chester Road
Chester Road
HazelhurstRoad
Morrisons
Aldi Halfords
1
2
3
View 1 View 2 View 3
Hurst Lane panels:Layout 1 17/1/14 14:20 Page 1

More Related Content

What's hot

Info Sheet - Aug 2009 UMS
Info Sheet - Aug 2009 UMSInfo Sheet - Aug 2009 UMS
Info Sheet - Aug 2009 UMSKurt Hoffman
 
Dry ports integrated design
Dry ports   integrated designDry ports   integrated design
Dry ports integrated designManuel Retagi
 
Copy of NJ T Parking Shortfalls; NEC
Copy of NJ T Parking Shortfalls; NECCopy of NJ T Parking Shortfalls; NEC
Copy of NJ T Parking Shortfalls; NECSailor47
 
Project Efiase Presentation
Project Efiase PresentationProject Efiase Presentation
Project Efiase Presentationproject_efiase
 
Dry port logistics 2015
Dry port logistics 2015 Dry port logistics 2015
Dry port logistics 2015 Mehmet INANIR
 
Draft rehoboth beach reopening plan 14 may 2020
Draft rehoboth beach reopening plan   14 may 2020Draft rehoboth beach reopening plan   14 may 2020
Draft rehoboth beach reopening plan 14 may 2020rehobothbeachde
 
MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...
MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...
MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...Pan Baltic Scope / Baltic SCOPE
 
Powerpoint Wellman Logistics Center Latvia
Powerpoint Wellman Logistics  Center LatviaPowerpoint Wellman Logistics  Center Latvia
Powerpoint Wellman Logistics Center LatviaIvo Tahk
 
Mona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic EngineeringMona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic EngineeringJumpingJaq
 
Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...
Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...
Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...Pan Baltic Scope / Baltic SCOPE
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_awardSamat Jain
 
Item #5 ppt Cambridge Lighting & Parking Agreement
Item #5   ppt Cambridge Lighting & Parking AgreementItem #5   ppt Cambridge Lighting & Parking Agreement
Item #5 ppt Cambridge Lighting & Parking Agreementahcitycouncil
 
FWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, PiriouFWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, PiriouBluesign
 
Roundabout feasibility analysis
Roundabout feasibility analysisRoundabout feasibility analysis
Roundabout feasibility analysisAnna McCreery
 
FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire
FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-NazaireFWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire
FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-NazaireBluesign
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyTim Pheby
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...hisimp
 

What's hot (20)

Info Sheet - Aug 2009 UMS
Info Sheet - Aug 2009 UMSInfo Sheet - Aug 2009 UMS
Info Sheet - Aug 2009 UMS
 
Session1 rene meeuws nea
Session1 rene meeuws neaSession1 rene meeuws nea
Session1 rene meeuws nea
 
Dry ports integrated design
Dry ports   integrated designDry ports   integrated design
Dry ports integrated design
 
nw 12th street heft truck parking study
nw 12th street heft truck parking studynw 12th street heft truck parking study
nw 12th street heft truck parking study
 
Copy of NJ T Parking Shortfalls; NEC
Copy of NJ T Parking Shortfalls; NECCopy of NJ T Parking Shortfalls; NEC
Copy of NJ T Parking Shortfalls; NEC
 
Project Efiase Presentation
Project Efiase PresentationProject Efiase Presentation
Project Efiase Presentation
 
Dry port logistics 2015
Dry port logistics 2015 Dry port logistics 2015
Dry port logistics 2015
 
Draft rehoboth beach reopening plan 14 may 2020
Draft rehoboth beach reopening plan   14 may 2020Draft rehoboth beach reopening plan   14 may 2020
Draft rehoboth beach reopening plan 14 may 2020
 
MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...
MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...
MSP activities in Black sea area and achievements of MARSPLAN-BS project at t...
 
Powerpoint Wellman Logistics Center Latvia
Powerpoint Wellman Logistics  Center LatviaPowerpoint Wellman Logistics  Center Latvia
Powerpoint Wellman Logistics Center Latvia
 
Mona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic EngineeringMona Vale Town Centre - Balancing Place Making and Traffic Engineering
Mona Vale Town Centre - Balancing Place Making and Traffic Engineering
 
Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...
Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...
Resources on MSP from the Baltic Sea at the 2nd Baltic Maritime Spatial Plann...
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 
Item #5 ppt Cambridge Lighting & Parking Agreement
Item #5   ppt Cambridge Lighting & Parking AgreementItem #5   ppt Cambridge Lighting & Parking Agreement
Item #5 ppt Cambridge Lighting & Parking Agreement
 
Ubitec presentation3
Ubitec presentation3Ubitec presentation3
Ubitec presentation3
 
FWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, PiriouFWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, Piriou
 
Roundabout feasibility analysis
Roundabout feasibility analysisRoundabout feasibility analysis
Roundabout feasibility analysis
 
FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire
FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-NazaireFWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire
FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...
 

Similar to hurst_lane_place_1

Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxfordshireCC
 
James Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder
 
Deanhill Road LTN response
Deanhill Road LTN responseDeanhill Road LTN response
Deanhill Road LTN responseTim Lennon
 
PCC Sustainable Transport funding success
PCC Sustainable Transport funding successPCC Sustainable Transport funding success
PCC Sustainable Transport funding successJohn Smith
 
Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationCommunitiesbyDesign
 
Group_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfGroup_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfAarthiR54
 
Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street
Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street
Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street APA-NJ
 
Glasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentationGlasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentationSTEP_scotland
 
Planning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric LumsdenPlanning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric LumsdenEngineers Australia
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)liquorstud
 
Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentationTim Lennon
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Design South East
 
Supporting Document – Stage 1 Consultation Summary
Supporting Document – Stage 1 Consultation SummarySupporting Document – Stage 1 Consultation Summary
Supporting Document – Stage 1 Consultation SummaryLoren Lawford
 
Hawksburn stage 1 consultation summary
Hawksburn stage 1 consultation summaryHawksburn stage 1 consultation summary
Hawksburn stage 1 consultation summaryStonnington
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentationJumpingJaq
 

Similar to hurst_lane_place_1 (20)

Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
James Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility Review
 
hurst_lane_place_3
hurst_lane_place_3hurst_lane_place_3
hurst_lane_place_3
 
Deanhill Road LTN response
Deanhill Road LTN responseDeanhill Road LTN response
Deanhill Road LTN response
 
PCC Sustainable Transport funding success
PCC Sustainable Transport funding successPCC Sustainable Transport funding success
PCC Sustainable Transport funding success
 
Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT Presentation
 
Group_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfGroup_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdf
 
Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street
Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street
Jewish Renaissance Foundation – Reinvigorating Perth Amboy’s Smith Street
 
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
 
Glasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentationGlasgow City Centre Transport Strategy presentation
Glasgow City Centre Transport Strategy presentation
 
Planning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric LumsdenPlanning for the South West Corridor by Eric Lumsden
Planning for the South West Corridor by Eric Lumsden
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
 
Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentation
 
NZC - Hendee
NZC - HendeeNZC - Hendee
NZC - Hendee
 
Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
 
Supporting Document – Stage 1 Consultation Summary
Supporting Document – Stage 1 Consultation SummarySupporting Document – Stage 1 Consultation Summary
Supporting Document – Stage 1 Consultation Summary
 
Hawksburn stage 1 consultation summary
Hawksburn stage 1 consultation summaryHawksburn stage 1 consultation summary
Hawksburn stage 1 consultation summary
 
Andy cameron wsp-removing the roadblocks tpf perth 10 june 2010
Andy cameron wsp-removing the roadblocks tpf perth 10 june 2010Andy cameron wsp-removing the roadblocks tpf perth 10 june 2010
Andy cameron wsp-removing the roadblocks tpf perth 10 june 2010
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentation
 

hurst_lane_place_1

  • 1. HURST LANE PLACE Scheme Aims and Objectives The Council is planning as part of the Hurst Lane Place project to invest in highway improvement works in the Chester Road / Hurst Lane North area. The Hurst Lane Place project aims to make visiting the area more accessible and convenient, improve road safety - particularly for pedestrians and vulnerable road users and update the look of the area. The wider objective of the scheme is to support the economy and encourage additional investment in the area. The specific scheme aims are to: • Improve Road Safety, particularly for pedestrians • Provide additional / improved on street parking • Improve accessibility and comfort for pedestrians • Improve and update the quality and look of the Public Realm (Highway areas) The Scheme The scheme is located on the Chester Road at the Hurst Lane / Hurst Lane North and Hazelhurst Road junctions in the Castle Bromwich area of Solihull. It is limited to the areas of public highway that are maintained by the Council within the area shown on the plan. The other areas immediately in front of the local shops / businesses, which are mainly used for parking, are privately owned. What we know about the area In 2010 we asked local residents, road users and stakeholders what were the issues and concerns for the Chester Road. This helped us understand how we could improve the area. The comments identified a number of opportunities for the section of Chester Road centred on the local shopping area at Hurst Lane North. The mains issues local people identified were: • the area feels unattractive and at times unsafe • provision for pedestrians and cyclists was poor, especially for pedestrians wanting to cross the road • parking demand for the shops / businesses appears to exceed supply and can be inconsiderate • traffic delays and speeds on the Chester Road and side roads. HurstLaneNorth Chester Road Chester Road HazelhurstRoad Morrisons Aldi Halfords 1 2 3 View 1 View 2 View 3 Hurst Lane panels:Layout 1 17/1/14 14:20 Page 1