SlideShare a Scribd company logo
1 of 1
Download to read offline
HURST LANE PLACE
Proposed scheme
Public Space - Change 5
• High quality paving to enhance the appearance
of the footway with places to sit and rest while
visiting the area.
• New tree planting and additional grassed area
• Closure of a short length of the service road
fronting Farmfoods & McCarthy & Stone
apartments to create a safer environment for
pedestrians.
Morrisons Store access junction - Change 2
• A new raised mini roundabout junction to help improve traffic
flow & reduce vehicle speeds Junction will also provide access
to the service road.
• Build new access to the service road from the Chester Road
opposite Morrisons Store access.
Chester Road - Change 4 (between Hurst
Lane North and Hazelhurst Road junctions)
• Introduce central reservation/median between
the Hurst Lane North junction and
Morrisons Store.
• Introduce central refuge & pedestrian
crossing point in the vicinity of Morrisons
Petrol Station.
• To allow pedestrians crossing the road to
shelter on the central refuge area - will help
reduce vehicle speeds.
Service Road - Change 7
(along the north side of Chester Road)
• Create approximately 20 additional
parking spaces
• New dedicated loading area for delivery
vehicles.
• Maintain two way traffic flow but widen to
accommodate vehicles.
• Tree planting to enhance the area
• Shared use Cycleway along the footway
between the private area fronting the
shops/businesses and the service road
Hazelhurst Road junction - Change 3
• A new raised mini roundabout junction to
help improve traffic flow & reduce
vehicle speeds
Chester Road - Change 6
(between Hurst Lane North and Hazelhurst
Road junctions)
• Narrow Chester Road between Morrisons
store & Hazelhurst Road.
• Remove central right turn lanes
• New grass verges & tree planting
Chester Road / Hurst Lane North
Junction - Change 1
• Introduce additional push button pedestrian
crossing on the Hurst Lane North side of
main Chester Road/ Hurst Lane junction.
• Create two lanes for traffic approaching the
junction on both Hurst Lane and Hurst Lane
North to reduce congestion and delays
to traffic.
Shared use cycleway along north
side of Chester Road - Change 9
• Shared use cycleway through the area
• Shared use Cycleway along the footway
between the private area fronting the
shops/businesses and the service road
Traffic calming - Change 8
• Introduce traffic calming features - road
humps to help limit & control
vehicle speeds
Hurst Lane panels:Layout 1 24/1/14 13:48 Page 3

More Related Content

What's hot

VBHC Palmhaven - Upcoming Project Kengeri Bangalore
VBHC Palmhaven - Upcoming Project Kengeri Bangalore VBHC Palmhaven - Upcoming Project Kengeri Bangalore
VBHC Palmhaven - Upcoming Project Kengeri Bangalore hquaiser
 
Distribution Center Proposal, Acme Foods Project
Distribution Center Proposal, Acme Foods ProjectDistribution Center Proposal, Acme Foods Project
Distribution Center Proposal, Acme Foods ProjectJason Garza
 
MAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan Jop
MAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan JopMAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan Jop
MAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan JopMetropolitan Area Planning Council
 
Item #5 ppt Cambridge Lighting & Parking Agreement
Item #5   ppt Cambridge Lighting & Parking AgreementItem #5   ppt Cambridge Lighting & Parking Agreement
Item #5 ppt Cambridge Lighting & Parking Agreementahcitycouncil
 
The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008WhitneyWilson
 
process improvement logistic Rackin systems
 process improvement logistic Rackin systems process improvement logistic Rackin systems
process improvement logistic Rackin systemsThilina Senavirathna
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Planawweiss
 
30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lresMichelle Dudson
 
How to Improve the Public Space of Acorn Road
How to Improve the Public Space of Acorn RoadHow to Improve the Public Space of Acorn Road
How to Improve the Public Space of Acorn RoadNorthumbria University
 
140804_Leeman concept layout low res pdf
140804_Leeman concept layout low res pdf140804_Leeman concept layout low res pdf
140804_Leeman concept layout low res pdfMark Jumeaux
 
Milestone Asphalt Paving
Milestone Asphalt PavingMilestone Asphalt Paving
Milestone Asphalt Pavingcoreycarr
 
Church Hall Presentation to DAC
Church Hall Presentation to DACChurch Hall Presentation to DAC
Church Hall Presentation to DACsimonrundell
 
Shree Sai Pavers Presentation.pptx
Shree Sai Pavers Presentation.pptxShree Sai Pavers Presentation.pptx
Shree Sai Pavers Presentation.pptxshree sai pavers
 
Quad Access Matting
Quad Access MattingQuad Access Matting
Quad Access Mattingnathancorser
 

What's hot (20)

VBHC Palmhaven - Upcoming Project Kengeri Bangalore
VBHC Palmhaven - Upcoming Project Kengeri Bangalore VBHC Palmhaven - Upcoming Project Kengeri Bangalore
VBHC Palmhaven - Upcoming Project Kengeri Bangalore
 
Distribution Center Proposal, Acme Foods Project
Distribution Center Proposal, Acme Foods ProjectDistribution Center Proposal, Acme Foods Project
Distribution Center Proposal, Acme Foods Project
 
MAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan Jop
MAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan JopMAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan Jop
MAPC sPARKing New Ideas Parking Symposium: Presentation by Meghan Jop
 
Item #5 ppt Cambridge Lighting & Parking Agreement
Item #5   ppt Cambridge Lighting & Parking AgreementItem #5   ppt Cambridge Lighting & Parking Agreement
Item #5 ppt Cambridge Lighting & Parking Agreement
 
The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008
 
Pdf online
Pdf onlinePdf online
Pdf online
 
process improvement logistic Rackin systems
 process improvement logistic Rackin systems process improvement logistic Rackin systems
process improvement logistic Rackin systems
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
 
Interlocking pavement
Interlocking pavementInterlocking pavement
Interlocking pavement
 
30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lres
 
How to Improve the Public Space of Acorn Road
How to Improve the Public Space of Acorn RoadHow to Improve the Public Space of Acorn Road
How to Improve the Public Space of Acorn Road
 
140804_Leeman concept layout low res pdf
140804_Leeman concept layout low res pdf140804_Leeman concept layout low res pdf
140804_Leeman concept layout low res pdf
 
DengXin Cheng & Gary Hicks
DengXin Cheng & Gary HicksDengXin Cheng & Gary Hicks
DengXin Cheng & Gary Hicks
 
XiTRACK Brochure
XiTRACK BrochureXiTRACK Brochure
XiTRACK Brochure
 
Milestone Asphalt Paving
Milestone Asphalt PavingMilestone Asphalt Paving
Milestone Asphalt Paving
 
Church Hall Presentation to DAC
Church Hall Presentation to DACChurch Hall Presentation to DAC
Church Hall Presentation to DAC
 
Shree Sai Pavers Presentation.pptx
Shree Sai Pavers Presentation.pptxShree Sai Pavers Presentation.pptx
Shree Sai Pavers Presentation.pptx
 
Quad Access Matting
Quad Access MattingQuad Access Matting
Quad Access Matting
 
Gary rake presentation dv344 woden and dv345 mawson
Gary rake presentation dv344 woden and dv345 mawsonGary rake presentation dv344 woden and dv345 mawson
Gary rake presentation dv344 woden and dv345 mawson
 
Ici proposal
Ici proposalIci proposal
Ici proposal
 

Similar to hurst_lane_place_3

Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationCommunitiesbyDesign
 
May 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closureMay 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closureStittsvilleCentral.ca
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Design South East
 
94 full-size buses to run day routes, night routes, charters, training and ge...
94 full-size buses to run day routes, night routes, charters, training and ge...94 full-size buses to run day routes, night routes, charters, training and ge...
94 full-size buses to run day routes, night routes, charters, training and ge...designs10
 
Nethermayne Site Planning Application
Nethermayne Site Planning ApplicationNethermayne Site Planning Application
Nethermayne Site Planning Applicationheppellf
 
Bod 7.3 sk_09-06-18_final
Bod 7.3 sk_09-06-18_finalBod 7.3 sk_09-06-18_final
Bod 7.3 sk_09-06-18_finalBrent Pearse
 
Gm20151102 updatemeeting finaledited
Gm20151102 updatemeeting finaleditedGm20151102 updatemeeting finaledited
Gm20151102 updatemeeting finaleditedtransformplaces
 
James Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder
 
Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentationTim Lennon
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014West Central Association
 

Similar to hurst_lane_place_3 (13)

hurst_lane_place_1
hurst_lane_place_1hurst_lane_place_1
hurst_lane_place_1
 
Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT Presentation
 
May 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closureMay 4 presentation re: Johnwoods closure
May 4 presentation re: Johnwoods closure
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
 
94 full-size buses to run day routes, night routes, charters, training and ge...
94 full-size buses to run day routes, night routes, charters, training and ge...94 full-size buses to run day routes, night routes, charters, training and ge...
94 full-size buses to run day routes, night routes, charters, training and ge...
 
Nethermayne Site Planning Application
Nethermayne Site Planning ApplicationNethermayne Site Planning Application
Nethermayne Site Planning Application
 
Bod 7.3 sk_09-06-18_final
Bod 7.3 sk_09-06-18_finalBod 7.3 sk_09-06-18_final
Bod 7.3 sk_09-06-18_final
 
Gm20151102 updatemeeting finaledited
Gm20151102 updatemeeting finaleditedGm20151102 updatemeeting finaledited
Gm20151102 updatemeeting finaledited
 
James Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility Review
 
Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentation
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 

hurst_lane_place_3

  • 1. HURST LANE PLACE Proposed scheme Public Space - Change 5 • High quality paving to enhance the appearance of the footway with places to sit and rest while visiting the area. • New tree planting and additional grassed area • Closure of a short length of the service road fronting Farmfoods & McCarthy & Stone apartments to create a safer environment for pedestrians. Morrisons Store access junction - Change 2 • A new raised mini roundabout junction to help improve traffic flow & reduce vehicle speeds Junction will also provide access to the service road. • Build new access to the service road from the Chester Road opposite Morrisons Store access. Chester Road - Change 4 (between Hurst Lane North and Hazelhurst Road junctions) • Introduce central reservation/median between the Hurst Lane North junction and Morrisons Store. • Introduce central refuge & pedestrian crossing point in the vicinity of Morrisons Petrol Station. • To allow pedestrians crossing the road to shelter on the central refuge area - will help reduce vehicle speeds. Service Road - Change 7 (along the north side of Chester Road) • Create approximately 20 additional parking spaces • New dedicated loading area for delivery vehicles. • Maintain two way traffic flow but widen to accommodate vehicles. • Tree planting to enhance the area • Shared use Cycleway along the footway between the private area fronting the shops/businesses and the service road Hazelhurst Road junction - Change 3 • A new raised mini roundabout junction to help improve traffic flow & reduce vehicle speeds Chester Road - Change 6 (between Hurst Lane North and Hazelhurst Road junctions) • Narrow Chester Road between Morrisons store & Hazelhurst Road. • Remove central right turn lanes • New grass verges & tree planting Chester Road / Hurst Lane North Junction - Change 1 • Introduce additional push button pedestrian crossing on the Hurst Lane North side of main Chester Road/ Hurst Lane junction. • Create two lanes for traffic approaching the junction on both Hurst Lane and Hurst Lane North to reduce congestion and delays to traffic. Shared use cycleway along north side of Chester Road - Change 9 • Shared use cycleway through the area • Shared use Cycleway along the footway between the private area fronting the shops/businesses and the service road Traffic calming - Change 8 • Introduce traffic calming features - road humps to help limit & control vehicle speeds Hurst Lane panels:Layout 1 24/1/14 13:48 Page 3