1. HUMAYUN KHAN
E&I Engineer
Cel l No : +92-3343359391
E-mail : humayunkhan60@gmail.com
Address : Flat#3E, Army flats, Defense officer colony university road Peshawar (Pakistan)
My Objective:
Make use of my dynamic and versatile abilities to cope with technical & economic challenges and serve as a benefi t the
organi zation with my determination & dedication to work with hones tly.
Qualification:
Bachelor of Electronics (74%) (2010)
Dawood College of Engineering &Technology, Karachi
F.Sc.(Pre-Engineering) (63%) (2004)
Qurtaba College Peshawar, Khyber Pakhtoonkhwa
Matriculation (Science) (72%) (2002)
Govt. High School Chapar Mishti, Orakzai Agency, FATA
Carrier Highlights:
Lead Project Engineer of 132Kv GIS at KE Project.
Team member for the Preparation of Proposal of Etihad Power Co. Gen (2 X 37MW).
Project Engineer (E & I) with DIPL (Descon Integrated Project Limited) at 404MW UCH-II Expansion Power Project.
Trainee Engineer in Royal Engineering Company (with Des con) at CCPP 225MW Bhikki HALMORE Power Plant.
Experience Detail
Descon Integrated Project Limited (DIPL) -
Des con integrated project Limited (formerly known as JGC Des con) i s an integrated engineering services and
manufacturing and EPC Company operating in Pakistan and the Middle East. Their business of delivering cl ient-speci fic
solutions for projects related to Energy, Infras tructure and Proces s indus try.
Korangi Town & Site Gas Turbine Power Station.
Lead Project Engineer: June 2014-to- Present
Lead Project Engineer of both projects .
Reviewing Des ign, Preparation of Execution Plans .
Procedural meetings with cl ient regarding project s chedule.
In touch with Head office on dai ly bas i s regarding s ite co-ordinations .
Site HSE implementa tion.
ETIHAD POWER CO.GEN(2X37MW) PROPOSAL:
Preparation of proposal of Etihad power
Preparation of electrical data sheets
Preparation of I/O l i s t of I&C
UCH-II Expansion Power Project.
Project Engineer: Nov 2011-to- Feb 2014
Responsibilities
Supervi s ion & management of Electrical activi ties of 404MW CCPP Plant
Reporting of dai ly progres s of electrical to project manager
2. Site coordination with other departments
Preparation of weekly & monthly progres s reports
Coordination with local vendors , HET, ABB, SIEMENS, URS& International power
220KV Switchyard:
Ins ta l lation of equipment l ike ci rcui t breakers , di s connector swi tches , CT’s , PT’s , insulators
Stringing of AAC 600mm AL conductor
Termination of control , telecom, UPS panel , protection and metering panel s
Interfacing between control room panel s with outdoor equipment
Loop tes ting &Tes ting of outdoor equipment
Pre commi s s ioning and commi s s ioning activi ty of 220kv swi tchyard with vendor (ABB)
Step-Up Transformers:
Ins ta l lation and as sembl ing of Power trans formers of GTG’s and STG
Tes ting of trans formers
Pre commi s s ioning and commi s s ioning of trans formers with vendor(Siemens )
MV and LV switchgears:
Ins ta l lation of MV/LV swi tchgears
Pre commi s s ioning and commi s s ioning
Tes ting of MV/LV motors through MV/LV Swi tchgear
Turbines (GTG & STG)
Ins ta l lation of PEECC
Cable laying, termination and loop tes ting
Pre commi s s ioning of s team turbine auxi l iaries and balance of plant
Commi s s ioning of s team turbine with vendor(Fuji )
Bhikki Halmore CCPP Power Plant:
Trainee Engineer: Augus t 2010 to October 2011
I have been worked as Trainee Engineer in Royal Engineering Company (with Descon) at CCPP 225MW Bhikki HALMORE
Power Plant.
Trainings
Certi fied competent person By UCH Power Plant Ltd (International Power GDF Suez)
of getting permits for safe work
Four weeks training in OGTI Islamabad
Four weeks training in Pakistan Steel Mills Karachi
Languages:
English, Urdu, Pashto
Personal Detail:
Fa the r’s Na me : Khial Wazir
Date of Birth : Apri l 2nd 1986
Mari tal s tatus : Married
C.N.I.C No : 14101-7694451-5
Rel igion : Is lam.
References:
Avai lable on request.