1Confidential 1
How to Implement a Spend Analytics
Program Using Machine Learning in 2020
January 15th, 2020
2
Speakers
Matt Holzapfel
Solutions Lead at Tamr
Leslie Bull
Head of Western U.S. Sales and Partner
Programs at Tamr
Sanjay Rajan
Strategic Sales Head,
Manufacturing/Industry 4.0 at Tamr
3
Agenda
1
Why Accurate
Spend is still a
Problem
What does your
Spend Analytics
Program look like?
2
Case Study
High Tech OEM
The ML Difference
4
How to Apply
Machine Learning
5
Q&A
63
44
Why is it difficult to achieve?
Accurate Direct Spend Analysis
5
What are you spending money on?
Who are you spending it with?
Lorem ipsum dolor sit amet at
nec at adipiscing03
● Donec risus dolor porta venenatis
● Pharetra luctus felis
● Proin in tellus felis volutpat
Lorem ipsum dolor sit amet at
nec at adipiscing01
● Donec risus dolor porta venenatis
● Pharetra luctus felis
● Proin in tellus felis volutpat
Who are my top suppliers in
any one spend category?03 ● Consolidate suppliers by category
● Savings of $0.02 to $0.09 per $ consolidated
What are my top spend
categories?01
● Actively manage your top categories
● Which categories are most impactful to bottom
line?
Lorem ipsum dolor sit amet at
nec at adipiscing03
● Donec risus dolor porta venenatis
● Pharetra luctus felis
● Proin in tellus felis volutpat
Lorem ipsum dolor sit amet at
nec at adipiscing02
● Donec risus dolor porta venenatis
● Pharetra luctus felis
● Proin in tellus felis volutpat
Lorem ipsum dolor sit amet at
nec at adipiscing01
● Donec risus dolor porta venenatis
● Pharetra luctus felis
● Proin in tellus felis volutpat
Do you have an “always
accurate” supplier master?06 ● If you haven’t mastered your suppliers, your
foundation for spend analytics is weak
Can you prevent creation of
duplicate parts?05
● Within and across business units how much part
proliferation exists?
● $10K per duplicate part in your system (ATK)
Can you identify maverick
purchasing?04 ● Are contracts negotiated for best price and terms
always being used?
02 ● Who do I have leverage with?
● Is it changing - $, Geography?
Who are my top suppliers?
02 ● Know who you have leverage with to capture the
best opportunity for best rates and discounts
6
What makes it difficult to answer the “What and Who”?
ERP
1
ERP
2
Acme Business
Systems
ABS AB Systems
Power Parts
Acme Speciality Inc.
subsidiaries
1. Duplicate Data
2. Inaccurate Data
3. Not Granular enough
4. Incomplete Data
5. Not Accessible
Duplicates dilute your
spend across different
entities
Are you spending twice
as much with a supplier
than you think?
XLS
7
What makes it difficult to answer the “What and Who”?
1. Incomplete Data
2. Duplicate Data
3. Inaccurate Data
4. Not Granular enough
5. Not Accessible Does not belong in
category
Correctly Classified
Missing - scattered
in other categories
$15M
$20M
$35M
Electrical Equipment
1. Duplicate Data
2. Inaccurate Data
3. Not Granular enough
4. Incomplete Data
5. Not Accessible
Even a small % of
misclassification in a
Top category means
millions in lost savings
Accuracy is all or
nothing
Spend
Categories
8
What makes it difficult to answer the “What and Who”?
1. Incomplete Data
2. Duplicate Data
3. Inaccurate Data
4. Not Granular enough
5. Not Accessible
1. Duplicate Data
2. Inaccurate Data
3. Not Granular enough
4. Incomplete Data
5. Not Accessible
Your classification
needs to represent
items you actually
source
Vague descriptions or
those that are not
directly actionable
represent wasted
savings opportunities
Heating and Air
Conditioning
Humidity Control
Heating
Equipment
Split
Exchanger
Heat
Exchanger
Finned Tubular
Exchanger
One Point
Exchange
Boilers
9
What makes it difficult to answer the “What and Who”?
1. Duplicate Data
2. Inaccurate Data
3. Not Granular enough
4. Incomplete Data
5. Not Accessible
P-card
Non-PO
One-time
buy
Stock
Materials
Recurring
Services
Capital
...
Source?
Visibility into “blank”
spend can unlock
potential savings
opportunities
10
What makes it difficult to answer the “What and Who”?
Mergers,
Acquisition
Business
Resource
constraint
Data is
scattered
across
systems
Other IT
projects
take
priority
?
1. Duplicate Data
2. Inaccurate Data
3. Not Granular enough
4. Incomplete Data
5. Not Accessible
Critical to get accurate
data into the hands of
those who can and will
leverage it
What is stalling your
data unification?
1111
What complicates it further?
12
Make Buy Sell - Supply Chain is complex
OEM
Supplier
Distributors
Manufacturer $
Hightech
Automotive
Industrial Equipment
Medical Device
Energy
Food and Beverage
Chemicals
…..
3PL
● Intermediate
products
● Sub assemblies
● Turnkey Products
● Raw Materials
● Tiered Mfg.
● Distribution
● Warehousing
● Fulfillment
● Inventory
● After Market
● Services
13
PartManufacturer Supplier
Supply Chain
Attributes
Supply ScheduleDemand Plan
Where Used
Unit Cost
Annual Spend
Annual Spend
MPN
Description
ERP PN
Description
VPN
Description
Annual SpendAlternate
Preferred
Substitute
Unit Price
Discount
Schedule
Lead Time
VMI
Consignment
Awards
Allocations
What to Make
When to Make
How Much
Where
Materials
Resources
How to Make
Capacity
Constraints
Priorities
Status Monitoring
Manage Change
Inventory
Status
Classification
Tier 1
Tier 2
Tier 3
SKU/Family
Product
Assembly
Sub-Assy
Part
Make/Buy
Lifecycle
CAD BoM
Configurations
Versions Revisions
Change Management
ECN
ECO
PCN
Affected Items
Disposition
New Product
Introductions
Milestones
Requirements
Simulations
Tests
Prototypes
Supplier
Quality
Audits
Scorecard
On Time
DeliveryQuality
Cost Variance
Product
Quality
FPY
Non Conformances
Outgoing Quality
Complex Web of Relationships
Distributor
DPN
Description
1414
What do companies typically do?
15
How are organizations coping?
Hire 3rd Party Services
(last 15+ years)
Integrate Applications
(last 10 years)
Employ Data Scientists
(last few years)
- Typically overseas resources
- Fixed budget project
- Fixes done to IT requirements
Typically poor ROI, one-time fix
- Most prevalent approach
- Takes Years before you see value
- High Startup Costs
- High maintenance costs
Does not Scale, and not Agile
- Focus on Big Data, Analytics
- Write Deterministic “Rules”
- Trial and Error, Iterative
- Add more Resources
Is it on time or under budget?
1616
Case Study: High Tech OEM
17
High Tech OEM with >$5B in Spend
High Tech
OEM
Supplier
(Foxconn)
Distributors
Manufacturer
(Intel)
● Parts
● Products
● Turnkey
Assemblies
● Sub-Assemblies
○ Mechanical
○ Electrical
$
3PL
Savings
Opportunity
Potential
Misclassification of
$3B value in
15,000 parts
19
As Is Process
- Manual hence Slow
- Resource Intensive
- Unreliable
- Expensive to Govern/Maintain
- Not Agile (ex: add new source)
Employ Data Engineers
and hire 3rd Party Services
20
Examples of the types of misclassification in results
● Potential Misclassification of $3B
value in 15,000 parts
● High Value parts in low value
categories
● Low Value parts in High Value
Categories
● “Tail Spend” category was among
the top 3 - knew this was wrong
● ….
Labels
Plastic Injection Molding
Printed Circuit Boards
Motherboards
Motherboards
Network Switch
Tape Drive
Microprocessors
Solid State Drives
21
Machine Learning Proof of Concept Results
Accuracy after just a few iterations of the model85%
Accuracy within the training data set95%
Records categorized by Tamr90%
Weeks to ingest data, train experts, and tune the ML model1.5
22
Actionable results in less than a week
Before Tamr
80 distinct
categories
After Tamr
66 distinct
categories
➔ 3.7X increase in parts
classified to
Microprocessors and SSDs
➔ 6X decrease to parts
classified under Computer
Accessory Kits
“We buy a lot more
of Microprocessors
and SSDs. This does
not make sense”
“Computer
Accessory Kits is not
granular enough”
25
Result - Unable to achieve Goals
Incorrect Info, Uncertainty and Gaps hinders accurate Analytics
Where Used (by Qty):
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● ?
● ?
● ?
Award History
Year Type Limit Unit $
2015 RFQ? 15% ?
2019 SS 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Spend Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 ?
Alternate Murata Elec... ?
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 ?
Alternate ?
Supplier:
Digikey
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Mfg. Part Description:
Supplier PN:
GRM0335C1H100JA01J
Category:
Passives >> ……….. >>................
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO ...
ERP
Fields:
MG, PL
Price History:
Supplier
?
Category Spend Supplier:
$310M ?
Annual Part Spend:
?
Category Spend Mfg.:
?
Annual Mfg. Spend:
?
Annual Supplier Spend:
$17M ?
Category Spend:
Murata vs Digi-Key
?
Spend Ranking:
Digikey
10?
26
Price History:
Supplier
Result of Accurate Data Unification at Scale
Drive Actionable Insights trapped in your Data Silos
Where Used (by Qty):
● PCA, SYS I/O, XL2x260w
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE DL325 Gen10 7351P 16G
8SFF….
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● PCA, Control SYS I/O XSLX ROHS...
● Click Here for 25 more
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Category:
Passives >> Capacitors >> Ceramic Capacitors
Category Spend Supplier:
$503M
Annual Part Spend:
$1.67M
Mfg. Part Description:
CAP CER 10PF 50V NP0 0201
Supplier:
Digi-Key
Supplier PN:
490-17811-1-ND
Category Spend Mfg.:
$42M
Annual Mfg. Spend:
$0.35M
Annual Supplier Spend:
$22M
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO CER ...
Award History
Year
Typ
e
Lim Unit $
2015 RFQ 15% $0.0015
2019 Sole 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no
Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard...
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no
Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1...
Category Spend:
Murata vs Digi-Key
Spend Ranking:
Digi-Key
6/207
27
Capture bottom line savings
Based on other clients and assuming $1B direct spend
80% decrease in
manual data prep &
technical support
$0.6M
40% improvement in
classification
accuracy drives
better negotiations
$3.5M
20% increase
in spend under
management
$1.1M
100% increase in
analytic adoption$2.0M
10% improvement in
RFP timing with
better supplier
intelligence
$0.6M
25% increase in
suppliers included in
each RFP
$1.1M
$8.9M
Total Benefits
per $1bn spend
$500M+ Savings
From Sourcing Analytics
Across Siloed Businesses
Testimonial
2828
The ML Difference
29
Example: Rules-only approach
Supplier
Transaction
description
Classification
rule
GRAINGER
1-3/4" Steel Crowfoot Socket
Wrench
If Supplier = Grainger then
Category = Tools
30
Example: Rules-only approach
Supplier
Transaction
description
Classification
rule
If Supplier = Grainger AND
Description = Tape then
Category = Adhesives
GRAINGER
3M DOUBLE SIDED TAPE
GRAINGER
1-3/4" Steel Crowfoot Socket
Wrench
If Supplier = Grainger then
Category = Tools
31
Example: Rules-only approach
Supplier
Transaction
description
Classification
rule
If Supplier = Grainger AND
Description = Tape Measure then
Category = Tools
GRAINGER
TAPE MEASURE
If Supplier = Grainger AND
Description = Tape then
Category = Adhesives
GRAINGER
1-3/4" Steel Crowfoot Socket
Wrench
If Supplier = Grainger then
Category = Tools
GRAINGER
3M DOUBLE SIDED TAPE
32
How many technical resources can you afford?
If Supplier = Grainger AND
Description = Tape then
Category = Adhesives
Supplier
Transaction
description
Classification
rule
GRAINGER
1-3/4" Steel Crowfoot Socket
Wrench
If Supplier = Grainger then
Category = Tools
GRAINGER
3M DOUBLE SIDED TAPE
If Supplier = Grainger AND
Description = Tape Measure then
Category = Tools
GRAINGER
TAPE MEASURE
Book of
classification rules
2020 edition
33
ML augments rules-systems to provide greater speed &
accuracy
Supplier GRAINGER
Item Name PLIERS
PO Subject TOOLS FOR
MOTORMAN
WORKSHOP
User category Tools
A user manually categorizes a
subset of transactions
ML learns the underlying
classification patterns
Pliers are classified as
Tools 100% of the time
Grainger is
usually, but
not always,
mechanical
hardware
The word
workshop
has no
significance
All other items, including new
items, are automatically
classified by ML’s knowledge
base
2018 POs (Human
classified)
...
2018 Invoices (ML
classified)
2020 Invoices (ML
classified)
34
When is ML needed?
High category variety
(any tier)
Many sources
(systems, users)
Lean organization Need for speed!
3535
How to apply Machine Learning?
36
Typical Rules-based
Process
- Manual = Slow
- Resource Intensive
- Unreliable
- Expensive to Govern/Maintain
- Not Agile (ex: add new source)
Employ Data Engineers
and hire 3rd Party Services
37
Human-Guided
Machine Learning
Leverage Human-Guided ML
(now)
- Probabilistic Model-based
- Expert-Guided, Less Resources
- Continuously Improves Results
- Fast time to value
- Scalability and Agility
38
Agile approach starts with the business question,
creates value incrementally
Analytic Outcome
BUSINESS VALUE
Catalog
Prepare
Analyze
Visualize
How many unique
suppliers do we
have?
Analytic Outcome
BUSINESS VALUE
Catalog
Prepare
Analyze
Visualize
How much are we
spending on
“Mechanical”?Sprint 1
Sprint 2
● Each sprint limits the scope of
data to only what is required to
answer the analytic question
● Going end-to-end enables you to
understand bottlenecks
(resources & technology)
limiting analytic velocity, and
design strategies to enable data
operations (DataOps) to scale,
with minimal upfront investment
3939
Exclusive Offer
Spend Analytics Sprint
40
Exclusive Offer for Webinar Attendees: January 2020
Tamr Spend Analytics Sprint
A two week sprint to answer business-
critical questions about your spend
Identify gaps in your current spend
analytics processes and benchmark your
performance
Possible sprints:
● How many suppliers do we have?
● How much are we spending on a
specific category?
● How many parts do we have?
What’s included
● Discovery session to define high
impact questions you can answer
with your data
● Tamr-led analytic sprint that
combines Tamr software, domain
expertise, and analytics
● Analytic reports
● Custom insights & recommendations
Request a demo or email growth.team@tamr.com by the
end of January to get started
4141
Q&A
42
● Visit Tamr.com to learn more
● Get a Demo to talk to an expert
and see Tamr in action
● Read the Tamr Blog to gain
further insights
● Speak to Sanjay/Matt directly,
email sanjay.rajan@tamr.com or
matthew.holzapfel@tamr.com
Thank You For Joining Us!
43
Questions
1. We already have a MDM solution. How does ML work with our legacy MDM?
1. What kind of organizational and data prep do we need to do before you can leverage ML?
1. What level of expertise do you need in an organization to tune/maintain a ML model?
a. Fear that they may not have the expertise in the organization
1. What does a successful ML project look like from a timeline and resource standpoint?
Part 2 - What could delay a ML Project or worse what makes one fail ?
1. We have been building our own ML Model over the past year or so, what is the advantage of using Tamr?
a. It is a product - low maintenance, ease of use
b. ML may be “free” but productizing it is expensive - operationalizing it is difficult
c. Scaling
d. Agility
e. Extending it to other entities/use cases across your organization for Data Unification
4444
Appendix
4545
Beyond Spend Classification?
46
Result - Unable to achieve Goals
Incorrect Info, Uncertainty and Gaps hinders accurate Analytics
Where Used (by Qty):
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● ?
● ?
● ?
Award History
Year Type Limit Unit $
2015 RFQ? 15% ?
2019 SS 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Spend Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 ?
Alternate Murata Elec... ?
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 ?
Alternate ?
Supplier:
Digikey
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Mfg. Part Description:
Supplier PN:
GRM0335C1H100JA01J
Category:
Passives >> ……….. >>................
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO ...
ERP
Fields:
MG, PL
Price History:
Supplier
?
Category Spend Supplier:
$310M ?
Annual Part Spend:
?
Category Spend Mfg.:
?
Annual Mfg. Spend:
?
Annual Supplier Spend:
$17M ?
Category Spend:
Murata vs Digi-Key
?
Spend Ranking:
Digikey
10?
47
Category Spend Mfg.:
$42M
Price History:
Supplier
Example - Implement as a sequence of ML Projects
Drive Actionable Insights trapped in your Data Silos
Where Used (by Qty):
● PCA, SYS I/O, XL2x260w
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE DL325 Gen10 7351P 16G
8SFF….
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● PCA, Control SYS I/O XSLX ROHS...
● Click Here for 25 more
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Category:
Passives >> Capacitors >> Ceramic Capacitors
Category Spend Supplier:
$503M
Annual Part Spend:
$1.67M
Mfg. Part Description:
CAP CER 10PF 50V NP0 0201
Supplier:
Digi-Key
Supplier PN:
490-17811-1-ND
Annual Mfg. Spend:
$0.35M
Annual Supplier Spend:
$22M
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO CER ...
Award History
Year
Typ
e
Lim Unit $
2015 RFQ 15% $0.0015
2019 Sole 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no
Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard...
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no
Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1...
Category Spend:
Murata vs Digi-Key
Spend Ranking:
Digi-Key
6/207
BoM Mastering Master part descriptions
Identify Duplicates across all data
Match with Exploded
BoM Data
Part Classification
Accurate Categories
Spend Classification Master part descriptions
Match with AVL and Demand forecasts
Supplier
Classification
Match with RFQ and
Supplier Awards
Analytics
Part Mastering (Golden Records)
“Single Source of Truth” of Parts
48
Price History:
Supplier
Result of Accurate Data Unification at Scale
Drive Actionable Insights trapped in your Data Silos
Where Used (by Qty):
● PCA, SYS I/O, XL2x260w
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE DL325 Gen10 7351P 16G
8SFF….
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● PCA, Control SYS I/O XSLX ROHS...
● Click Here for 25 more
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Category:
Passives >> Capacitors >> Ceramic Capacitors
Category Spend Supplier:
$503M
Annual Part Spend:
$1.67M
Mfg. Part Description:
CAP CER 10PF 50V NP0 0201
Supplier:
Digi-Key
Supplier PN:
490-17811-1-ND
Category Spend Mfg.:
$42M
Annual Mfg. Spend:
$0.35M
Annual Supplier Spend:
$22M
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO CER ...
Award History
Year
Typ
e
Lim Unit $
2015 RFQ 15% $0.0015
2019 Sole 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no
Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard...
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no
Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1...
Category Spend:
Murata vs Digi-Key
Spend Ranking:
Digi-Key
6/207
50
Agenda
1
Why Accurate
Spend is still a
Problem
- Lifecycle of a Part
- Complex supply
chain
relationships
- Entity complexity
What does your
Spend Analytics
Program look like?
- How are you
coping today?
- What we hear
when we talk to
our customers
- Make versus Buy !
2
Case Study
High Tech OEM
- HPE use case but
talk about auto,
industrial examples
- Challenges,
impact of the
problem
- Setup the
problem with
meaningful
examples (parts,
products, bom etc.)
The ML Difference
- Why ML? Make
the case
- Contrast with
traditional MDM
- Point out how ML
solves specific
problems that
traditional
methods fail at
4
How to Apply
Machine Learning
- Sequence of
projects
- User workflow
- Production
implementation
5
What else is around
the corner?
- Steward
- ?
63
52
Challenges
Suppliers Parts BoM
Duplication
Misclassification
Impact Cost
Inaccurate
classification of
products
Billions in mis-
classified products =
Lost leverage
Long lead time, and
error prone process
introduces noise into
the system
Hundreds of person-
hours to
integrate/curate
Struggle to support
standards-based
classification
Lost efficiency from
leveraging standards-
based info
Data unavailable to
support high multi-
million dollar
negotiations
Millions lost in
supply negotiations,
potential rebates, and
economies of scale
53
Price History:
Supplier
Result of Accurate Data Unification at Scale
Drive Actionable Insights trapped in your Data Silos
Where Used (by Qty):
● PCA, SYS I/O, XL2x260w
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE DL325 Gen10 7351P 16G
8SFF….
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● PCA, Control SYS I/O XSLX ROHS...
● Click Here for 25 more
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Category:
Passives >> Capacitors >> Ceramic Capacitors
Category Spend Supplier:
$503M
Annual Part Spend:
$1.67M
Mfg. Part Description:
CAP CER 10PF 50V NP0 0201
Supplier:
Digi-Key
Supplier PN:
490-17811-1-ND
Category Spend Mfg.:
$42M
Annual Mfg. Spend:
$0.35M
Annual Supplier Spend:
$22M
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO CER ...
Award History
Year
Typ
e
Lim Unit $
2015 RFQ 15% $0.0015
2019 Sole 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no
Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard...
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no
Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1...
Category Spend:
Murata vs Digi-Key
Spend Ranking:
Digi-Key
6/207
54
Result - Unable to achieve Goals
Incorrect Info, Uncertainty and Gaps hinders accurate Analytics
Where Used (by Qty):
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● ?
● ?
● ?
Award History
Year Type Limit Unit $
2015 RFQ? 15% ?
2019 SS 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Spend Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 ?
Alternate Murata Elec... ?
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 ?
Alternate ?
Supplier:
Digikey
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Mfg. Part Description:
Supplier PN:
GRM0335C1H100JA01J
Category:
Passives >> ……….. >>................
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO ...
ERP
Fields:
MG, PL
Price History:
Supplier
?
Category Spend Supplier:
$310M ?
Annual Part Spend:
?
Category Spend Mfg.:
?
Annual Mfg. Spend:
?
Annual Supplier Spend:
$17M ?
Category Spend:
Murata vs Digi-Key
?
Spend Ranking:
Digikey
10?
57
Machine Learning Proof of Concept Results
Goal: Categorize parts into USPSC taxonomy with at least 80% accuracy using source data
“as-is” - P/N, Description, Commodity Group, Product Line
Demonstrated a reduction in manual effort and time required to classify parts
✓ 1.5 weeks to build and train the model, which can be easily generalized to new data
✓ 87.2% of the data was categorized by Tamr’s machine learning capabilities
✓ 85% accuracy after just a few iterations
✓ With only a few hours of training by Subject Matter Experts
✓ Demonstrated the ability of Tamr to reliably classify parts with minimal feedback from SMEs
✓ Continued use of the system will yield further improvements in accuracy and reductions in SME effort
✓ Governed categorization workflow can be generalized to other use cases including BOM parts for
improved down stream predictive spend analytics
73Confidential 73
Executive Initiatives that Tamr Accelerates
● Consolidated View of Spend as a Negotiation Lever
● Improve Performance of Supply Chain with better
Convergence between Forecast, Plan and Schedule
● Accelerate Data Unification post M&A
● Innovate and Improve Design with Closed Loop Quality
74
Implementation Strategy
Parts Classification Down Stream
Analytics
BOM Parts Mastering
Supplier
Classification
75
Day in the Life: Data Pipeline Workflow
High confidence
Low confidence
Notification:
Manual Review
Push to MDM
Does the model need
to be retrained?
Yes No
300 - 400 new
SKUs per month
Down stream
analytics
Data analysts report
data quality issues
Additional:
Exploded BOMs,
new parts, new
product lines
76
Case Study: General Electric
Agile, multi-domain entity mastering drives $500M+ in Value
“We’ve seen firsthand the transformative
results that Tamr’s technology has on an
enterprise of GE’s scale. When the cost and
complexity of bringing together enterprise
datasets is massively reduced, the resulting
analytic breakthroughs create opportunities
that were previously inaccessible.”
Lisa Coca
Managing Director, GE Ventures
● < 6 months from pilot to globally
deployed data pipeline; 2M records
consolidated to 700k
● 25M reduced to 6.4M unique parts; 5-
tier analytic-ready classification
● Data from 3 acquisitions integrated
with GE’s in <2 weeks
Technical Outcome
● Suppliers: Build an integrated view
from 75+ ERP systems and 2M supplier
records
● Parts: 25M non-unique parts in
purchasing systems across 8 BUs
● M&A: Integrate data from acquired
entities with existing master views
Business Outcome
“The supplier data integration was a big
win.”
Bill Ruh
CEO GE Digital &
Chief Digital Officer at GE
● $80M savings in Year 1 from Tamr-
mastered unified supplier view
● $300M in annual savings identified
(0.5% reduction of direct spend)
● Supplier, purchasing, and customer
base opportunities quickly identified
● Suppliers: Get GE’s best terms with a
given supplier in every negotiation
● Parts: Optimize sourcing strategies to
most cost-effective suppliers
● M&A: Increase the velocity of realizing
synergies post-acquisition
Technical Challenge
Business Challenge
77
Price History:
Supplier
Result of Accurate Data Unification at Scale
Drive Actionable Insights trapped in your Data Silos
Where Used (by Qty):
● PCA, SYS I/O, XL2x260w
● Aruba IAP-224 (RW) Instant 3x3:3….
● HPE USB US Keyboard/Mouse Kit
● HPE DL325 Gen10 7351P 16G
8SFF….
● HPE ZApollo 4200 Gen10 48SFF
CTO..
● PCA, Control SYS I/O ZSCLR12…
● PCA, Control SYS I/O XSLX ROHS...
● Click Here for 25 more
Manufacturer:
Murata Electronics
MPN:
GRM0335C1H100JA01J
Category:
Passives >> Capacitors >> Ceramic Capacitors
Category Spend Supplier:
$503M
Annual Part Spend:
$1.67M
Mfg. Part Description:
CAP CER 10PF 50V NP0 0201
Supplier:
Digi-Key
Supplier PN:
490-17811-1-ND
Category Spend Mfg.:
$42M
Annual Mfg. Spend:
$0.35M
Annual Supplier Spend:
$22M
ERP PN
8601J-32
ERP Part Description:
CAP 50V 10pf C0G/NPO CER ...
Award History
Year
Typ
e
Lim Unit $
2015 RFQ 15% $0.0015
2019 Sole 30% $0.0012
Type P/N Desc. Supplier Unit $ Indirect Product
Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no
Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard...
Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no
Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1...
Category Spend:
Murata vs Digi-Key
Spend Ranking:
Digi-Key
6/207
78
Tamr’s Focus - Power your Analytics and Applications
through Data Unification
BI / Data Viz /
Analytics
Data Wrangling
Sources UsesPeople, Process, Tools, Services, Data
Enterprise Data
Apps: APS, CRM,
ERP, SCM, Quality
Supply Chain Data
Logical Models – Tamr
Automation, Logging
Provenance
Movement
Feedback – Steward
Governance
Raw
Source
Catalog
Unified
Data
Hub
Multiple ERP
Multiple Excel:
RFQ, AVL,
Allocations
Multiple
Applications
Supplier ERP
Extracts
Inventory,
Quality,
Logistics….
Data
7979
Thank you!

How to Implement a Spend Analytics Program Using Machine Learning

  • 1.
    1Confidential 1 How toImplement a Spend Analytics Program Using Machine Learning in 2020 January 15th, 2020
  • 2.
    2 Speakers Matt Holzapfel Solutions Leadat Tamr Leslie Bull Head of Western U.S. Sales and Partner Programs at Tamr Sanjay Rajan Strategic Sales Head, Manufacturing/Industry 4.0 at Tamr
  • 3.
    3 Agenda 1 Why Accurate Spend isstill a Problem What does your Spend Analytics Program look like? 2 Case Study High Tech OEM The ML Difference 4 How to Apply Machine Learning 5 Q&A 63
  • 4.
    44 Why is itdifficult to achieve? Accurate Direct Spend Analysis
  • 5.
    5 What are youspending money on? Who are you spending it with? Lorem ipsum dolor sit amet at nec at adipiscing03 ● Donec risus dolor porta venenatis ● Pharetra luctus felis ● Proin in tellus felis volutpat Lorem ipsum dolor sit amet at nec at adipiscing01 ● Donec risus dolor porta venenatis ● Pharetra luctus felis ● Proin in tellus felis volutpat Who are my top suppliers in any one spend category?03 ● Consolidate suppliers by category ● Savings of $0.02 to $0.09 per $ consolidated What are my top spend categories?01 ● Actively manage your top categories ● Which categories are most impactful to bottom line? Lorem ipsum dolor sit amet at nec at adipiscing03 ● Donec risus dolor porta venenatis ● Pharetra luctus felis ● Proin in tellus felis volutpat Lorem ipsum dolor sit amet at nec at adipiscing02 ● Donec risus dolor porta venenatis ● Pharetra luctus felis ● Proin in tellus felis volutpat Lorem ipsum dolor sit amet at nec at adipiscing01 ● Donec risus dolor porta venenatis ● Pharetra luctus felis ● Proin in tellus felis volutpat Do you have an “always accurate” supplier master?06 ● If you haven’t mastered your suppliers, your foundation for spend analytics is weak Can you prevent creation of duplicate parts?05 ● Within and across business units how much part proliferation exists? ● $10K per duplicate part in your system (ATK) Can you identify maverick purchasing?04 ● Are contracts negotiated for best price and terms always being used? 02 ● Who do I have leverage with? ● Is it changing - $, Geography? Who are my top suppliers? 02 ● Know who you have leverage with to capture the best opportunity for best rates and discounts
  • 6.
    6 What makes itdifficult to answer the “What and Who”? ERP 1 ERP 2 Acme Business Systems ABS AB Systems Power Parts Acme Speciality Inc. subsidiaries 1. Duplicate Data 2. Inaccurate Data 3. Not Granular enough 4. Incomplete Data 5. Not Accessible Duplicates dilute your spend across different entities Are you spending twice as much with a supplier than you think? XLS
  • 7.
    7 What makes itdifficult to answer the “What and Who”? 1. Incomplete Data 2. Duplicate Data 3. Inaccurate Data 4. Not Granular enough 5. Not Accessible Does not belong in category Correctly Classified Missing - scattered in other categories $15M $20M $35M Electrical Equipment 1. Duplicate Data 2. Inaccurate Data 3. Not Granular enough 4. Incomplete Data 5. Not Accessible Even a small % of misclassification in a Top category means millions in lost savings Accuracy is all or nothing Spend Categories
  • 8.
    8 What makes itdifficult to answer the “What and Who”? 1. Incomplete Data 2. Duplicate Data 3. Inaccurate Data 4. Not Granular enough 5. Not Accessible 1. Duplicate Data 2. Inaccurate Data 3. Not Granular enough 4. Incomplete Data 5. Not Accessible Your classification needs to represent items you actually source Vague descriptions or those that are not directly actionable represent wasted savings opportunities Heating and Air Conditioning Humidity Control Heating Equipment Split Exchanger Heat Exchanger Finned Tubular Exchanger One Point Exchange Boilers
  • 9.
    9 What makes itdifficult to answer the “What and Who”? 1. Duplicate Data 2. Inaccurate Data 3. Not Granular enough 4. Incomplete Data 5. Not Accessible P-card Non-PO One-time buy Stock Materials Recurring Services Capital ... Source? Visibility into “blank” spend can unlock potential savings opportunities
  • 10.
    10 What makes itdifficult to answer the “What and Who”? Mergers, Acquisition Business Resource constraint Data is scattered across systems Other IT projects take priority ? 1. Duplicate Data 2. Inaccurate Data 3. Not Granular enough 4. Incomplete Data 5. Not Accessible Critical to get accurate data into the hands of those who can and will leverage it What is stalling your data unification?
  • 11.
  • 12.
    12 Make Buy Sell- Supply Chain is complex OEM Supplier Distributors Manufacturer $ Hightech Automotive Industrial Equipment Medical Device Energy Food and Beverage Chemicals ….. 3PL ● Intermediate products ● Sub assemblies ● Turnkey Products ● Raw Materials ● Tiered Mfg. ● Distribution ● Warehousing ● Fulfillment ● Inventory ● After Market ● Services
  • 13.
    13 PartManufacturer Supplier Supply Chain Attributes SupplyScheduleDemand Plan Where Used Unit Cost Annual Spend Annual Spend MPN Description ERP PN Description VPN Description Annual SpendAlternate Preferred Substitute Unit Price Discount Schedule Lead Time VMI Consignment Awards Allocations What to Make When to Make How Much Where Materials Resources How to Make Capacity Constraints Priorities Status Monitoring Manage Change Inventory Status Classification Tier 1 Tier 2 Tier 3 SKU/Family Product Assembly Sub-Assy Part Make/Buy Lifecycle CAD BoM Configurations Versions Revisions Change Management ECN ECO PCN Affected Items Disposition New Product Introductions Milestones Requirements Simulations Tests Prototypes Supplier Quality Audits Scorecard On Time DeliveryQuality Cost Variance Product Quality FPY Non Conformances Outgoing Quality Complex Web of Relationships Distributor DPN Description
  • 14.
  • 15.
    15 How are organizationscoping? Hire 3rd Party Services (last 15+ years) Integrate Applications (last 10 years) Employ Data Scientists (last few years) - Typically overseas resources - Fixed budget project - Fixes done to IT requirements Typically poor ROI, one-time fix - Most prevalent approach - Takes Years before you see value - High Startup Costs - High maintenance costs Does not Scale, and not Agile - Focus on Big Data, Analytics - Write Deterministic “Rules” - Trial and Error, Iterative - Add more Resources Is it on time or under budget?
  • 16.
  • 17.
    17 High Tech OEMwith >$5B in Spend High Tech OEM Supplier (Foxconn) Distributors Manufacturer (Intel) ● Parts ● Products ● Turnkey Assemblies ● Sub-Assemblies ○ Mechanical ○ Electrical $ 3PL Savings Opportunity Potential Misclassification of $3B value in 15,000 parts
  • 18.
    19 As Is Process -Manual hence Slow - Resource Intensive - Unreliable - Expensive to Govern/Maintain - Not Agile (ex: add new source) Employ Data Engineers and hire 3rd Party Services
  • 19.
    20 Examples of thetypes of misclassification in results ● Potential Misclassification of $3B value in 15,000 parts ● High Value parts in low value categories ● Low Value parts in High Value Categories ● “Tail Spend” category was among the top 3 - knew this was wrong ● …. Labels Plastic Injection Molding Printed Circuit Boards Motherboards Motherboards Network Switch Tape Drive Microprocessors Solid State Drives
  • 20.
    21 Machine Learning Proofof Concept Results Accuracy after just a few iterations of the model85% Accuracy within the training data set95% Records categorized by Tamr90% Weeks to ingest data, train experts, and tune the ML model1.5
  • 21.
    22 Actionable results inless than a week Before Tamr 80 distinct categories After Tamr 66 distinct categories ➔ 3.7X increase in parts classified to Microprocessors and SSDs ➔ 6X decrease to parts classified under Computer Accessory Kits “We buy a lot more of Microprocessors and SSDs. This does not make sense” “Computer Accessory Kits is not granular enough”
  • 22.
    25 Result - Unableto achieve Goals Incorrect Info, Uncertainty and Gaps hinders accurate Analytics Where Used (by Qty): ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● ? ● ? ● ? Award History Year Type Limit Unit $ 2015 RFQ? 15% ? 2019 SS 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Spend Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 ? Alternate Murata Elec... ? Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 ? Alternate ? Supplier: Digikey Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Mfg. Part Description: Supplier PN: GRM0335C1H100JA01J Category: Passives >> ……….. >>................ ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO ... ERP Fields: MG, PL Price History: Supplier ? Category Spend Supplier: $310M ? Annual Part Spend: ? Category Spend Mfg.: ? Annual Mfg. Spend: ? Annual Supplier Spend: $17M ? Category Spend: Murata vs Digi-Key ? Spend Ranking: Digikey 10?
  • 23.
    26 Price History: Supplier Result ofAccurate Data Unification at Scale Drive Actionable Insights trapped in your Data Silos Where Used (by Qty): ● PCA, SYS I/O, XL2x260w ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE DL325 Gen10 7351P 16G 8SFF…. ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● PCA, Control SYS I/O XSLX ROHS... ● Click Here for 25 more Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Category: Passives >> Capacitors >> Ceramic Capacitors Category Spend Supplier: $503M Annual Part Spend: $1.67M Mfg. Part Description: CAP CER 10PF 50V NP0 0201 Supplier: Digi-Key Supplier PN: 490-17811-1-ND Category Spend Mfg.: $42M Annual Mfg. Spend: $0.35M Annual Supplier Spend: $22M ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO CER ... Award History Year Typ e Lim Unit $ 2015 RFQ 15% $0.0015 2019 Sole 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard... Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1... Category Spend: Murata vs Digi-Key Spend Ranking: Digi-Key 6/207
  • 24.
    27 Capture bottom linesavings Based on other clients and assuming $1B direct spend 80% decrease in manual data prep & technical support $0.6M 40% improvement in classification accuracy drives better negotiations $3.5M 20% increase in spend under management $1.1M 100% increase in analytic adoption$2.0M 10% improvement in RFP timing with better supplier intelligence $0.6M 25% increase in suppliers included in each RFP $1.1M $8.9M Total Benefits per $1bn spend $500M+ Savings From Sourcing Analytics Across Siloed Businesses Testimonial
  • 25.
  • 26.
    29 Example: Rules-only approach Supplier Transaction description Classification rule GRAINGER 1-3/4"Steel Crowfoot Socket Wrench If Supplier = Grainger then Category = Tools
  • 27.
    30 Example: Rules-only approach Supplier Transaction description Classification rule IfSupplier = Grainger AND Description = Tape then Category = Adhesives GRAINGER 3M DOUBLE SIDED TAPE GRAINGER 1-3/4" Steel Crowfoot Socket Wrench If Supplier = Grainger then Category = Tools
  • 28.
    31 Example: Rules-only approach Supplier Transaction description Classification rule IfSupplier = Grainger AND Description = Tape Measure then Category = Tools GRAINGER TAPE MEASURE If Supplier = Grainger AND Description = Tape then Category = Adhesives GRAINGER 1-3/4" Steel Crowfoot Socket Wrench If Supplier = Grainger then Category = Tools GRAINGER 3M DOUBLE SIDED TAPE
  • 29.
    32 How many technicalresources can you afford? If Supplier = Grainger AND Description = Tape then Category = Adhesives Supplier Transaction description Classification rule GRAINGER 1-3/4" Steel Crowfoot Socket Wrench If Supplier = Grainger then Category = Tools GRAINGER 3M DOUBLE SIDED TAPE If Supplier = Grainger AND Description = Tape Measure then Category = Tools GRAINGER TAPE MEASURE Book of classification rules 2020 edition
  • 30.
    33 ML augments rules-systemsto provide greater speed & accuracy Supplier GRAINGER Item Name PLIERS PO Subject TOOLS FOR MOTORMAN WORKSHOP User category Tools A user manually categorizes a subset of transactions ML learns the underlying classification patterns Pliers are classified as Tools 100% of the time Grainger is usually, but not always, mechanical hardware The word workshop has no significance All other items, including new items, are automatically classified by ML’s knowledge base 2018 POs (Human classified) ... 2018 Invoices (ML classified) 2020 Invoices (ML classified)
  • 31.
    34 When is MLneeded? High category variety (any tier) Many sources (systems, users) Lean organization Need for speed!
  • 32.
    3535 How to applyMachine Learning?
  • 33.
    36 Typical Rules-based Process - Manual= Slow - Resource Intensive - Unreliable - Expensive to Govern/Maintain - Not Agile (ex: add new source) Employ Data Engineers and hire 3rd Party Services
  • 34.
    37 Human-Guided Machine Learning Leverage Human-GuidedML (now) - Probabilistic Model-based - Expert-Guided, Less Resources - Continuously Improves Results - Fast time to value - Scalability and Agility
  • 35.
    38 Agile approach startswith the business question, creates value incrementally Analytic Outcome BUSINESS VALUE Catalog Prepare Analyze Visualize How many unique suppliers do we have? Analytic Outcome BUSINESS VALUE Catalog Prepare Analyze Visualize How much are we spending on “Mechanical”?Sprint 1 Sprint 2 ● Each sprint limits the scope of data to only what is required to answer the analytic question ● Going end-to-end enables you to understand bottlenecks (resources & technology) limiting analytic velocity, and design strategies to enable data operations (DataOps) to scale, with minimal upfront investment
  • 36.
  • 37.
    40 Exclusive Offer forWebinar Attendees: January 2020 Tamr Spend Analytics Sprint A two week sprint to answer business- critical questions about your spend Identify gaps in your current spend analytics processes and benchmark your performance Possible sprints: ● How many suppliers do we have? ● How much are we spending on a specific category? ● How many parts do we have? What’s included ● Discovery session to define high impact questions you can answer with your data ● Tamr-led analytic sprint that combines Tamr software, domain expertise, and analytics ● Analytic reports ● Custom insights & recommendations Request a demo or email growth.team@tamr.com by the end of January to get started
  • 38.
  • 39.
    42 ● Visit Tamr.comto learn more ● Get a Demo to talk to an expert and see Tamr in action ● Read the Tamr Blog to gain further insights ● Speak to Sanjay/Matt directly, email sanjay.rajan@tamr.com or matthew.holzapfel@tamr.com Thank You For Joining Us!
  • 40.
    43 Questions 1. We alreadyhave a MDM solution. How does ML work with our legacy MDM? 1. What kind of organizational and data prep do we need to do before you can leverage ML? 1. What level of expertise do you need in an organization to tune/maintain a ML model? a. Fear that they may not have the expertise in the organization 1. What does a successful ML project look like from a timeline and resource standpoint? Part 2 - What could delay a ML Project or worse what makes one fail ? 1. We have been building our own ML Model over the past year or so, what is the advantage of using Tamr? a. It is a product - low maintenance, ease of use b. ML may be “free” but productizing it is expensive - operationalizing it is difficult c. Scaling d. Agility e. Extending it to other entities/use cases across your organization for Data Unification
  • 41.
  • 42.
  • 43.
    46 Result - Unableto achieve Goals Incorrect Info, Uncertainty and Gaps hinders accurate Analytics Where Used (by Qty): ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● ? ● ? ● ? Award History Year Type Limit Unit $ 2015 RFQ? 15% ? 2019 SS 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Spend Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 ? Alternate Murata Elec... ? Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 ? Alternate ? Supplier: Digikey Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Mfg. Part Description: Supplier PN: GRM0335C1H100JA01J Category: Passives >> ……….. >>................ ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO ... ERP Fields: MG, PL Price History: Supplier ? Category Spend Supplier: $310M ? Annual Part Spend: ? Category Spend Mfg.: ? Annual Mfg. Spend: ? Annual Supplier Spend: $17M ? Category Spend: Murata vs Digi-Key ? Spend Ranking: Digikey 10?
  • 44.
    47 Category Spend Mfg.: $42M PriceHistory: Supplier Example - Implement as a sequence of ML Projects Drive Actionable Insights trapped in your Data Silos Where Used (by Qty): ● PCA, SYS I/O, XL2x260w ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE DL325 Gen10 7351P 16G 8SFF…. ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● PCA, Control SYS I/O XSLX ROHS... ● Click Here for 25 more Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Category: Passives >> Capacitors >> Ceramic Capacitors Category Spend Supplier: $503M Annual Part Spend: $1.67M Mfg. Part Description: CAP CER 10PF 50V NP0 0201 Supplier: Digi-Key Supplier PN: 490-17811-1-ND Annual Mfg. Spend: $0.35M Annual Supplier Spend: $22M ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO CER ... Award History Year Typ e Lim Unit $ 2015 RFQ 15% $0.0015 2019 Sole 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard... Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1... Category Spend: Murata vs Digi-Key Spend Ranking: Digi-Key 6/207 BoM Mastering Master part descriptions Identify Duplicates across all data Match with Exploded BoM Data Part Classification Accurate Categories Spend Classification Master part descriptions Match with AVL and Demand forecasts Supplier Classification Match with RFQ and Supplier Awards Analytics Part Mastering (Golden Records) “Single Source of Truth” of Parts
  • 45.
    48 Price History: Supplier Result ofAccurate Data Unification at Scale Drive Actionable Insights trapped in your Data Silos Where Used (by Qty): ● PCA, SYS I/O, XL2x260w ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE DL325 Gen10 7351P 16G 8SFF…. ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● PCA, Control SYS I/O XSLX ROHS... ● Click Here for 25 more Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Category: Passives >> Capacitors >> Ceramic Capacitors Category Spend Supplier: $503M Annual Part Spend: $1.67M Mfg. Part Description: CAP CER 10PF 50V NP0 0201 Supplier: Digi-Key Supplier PN: 490-17811-1-ND Category Spend Mfg.: $42M Annual Mfg. Spend: $0.35M Annual Supplier Spend: $22M ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO CER ... Award History Year Typ e Lim Unit $ 2015 RFQ 15% $0.0015 2019 Sole 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard... Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1... Category Spend: Murata vs Digi-Key Spend Ranking: Digi-Key 6/207
  • 46.
    50 Agenda 1 Why Accurate Spend isstill a Problem - Lifecycle of a Part - Complex supply chain relationships - Entity complexity What does your Spend Analytics Program look like? - How are you coping today? - What we hear when we talk to our customers - Make versus Buy ! 2 Case Study High Tech OEM - HPE use case but talk about auto, industrial examples - Challenges, impact of the problem - Setup the problem with meaningful examples (parts, products, bom etc.) The ML Difference - Why ML? Make the case - Contrast with traditional MDM - Point out how ML solves specific problems that traditional methods fail at 4 How to Apply Machine Learning - Sequence of projects - User workflow - Production implementation 5 What else is around the corner? - Steward - ? 63
  • 47.
    52 Challenges Suppliers Parts BoM Duplication Misclassification ImpactCost Inaccurate classification of products Billions in mis- classified products = Lost leverage Long lead time, and error prone process introduces noise into the system Hundreds of person- hours to integrate/curate Struggle to support standards-based classification Lost efficiency from leveraging standards- based info Data unavailable to support high multi- million dollar negotiations Millions lost in supply negotiations, potential rebates, and economies of scale
  • 48.
    53 Price History: Supplier Result ofAccurate Data Unification at Scale Drive Actionable Insights trapped in your Data Silos Where Used (by Qty): ● PCA, SYS I/O, XL2x260w ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE DL325 Gen10 7351P 16G 8SFF…. ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● PCA, Control SYS I/O XSLX ROHS... ● Click Here for 25 more Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Category: Passives >> Capacitors >> Ceramic Capacitors Category Spend Supplier: $503M Annual Part Spend: $1.67M Mfg. Part Description: CAP CER 10PF 50V NP0 0201 Supplier: Digi-Key Supplier PN: 490-17811-1-ND Category Spend Mfg.: $42M Annual Mfg. Spend: $0.35M Annual Supplier Spend: $22M ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO CER ... Award History Year Typ e Lim Unit $ 2015 RFQ 15% $0.0015 2019 Sole 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard... Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1... Category Spend: Murata vs Digi-Key Spend Ranking: Digi-Key 6/207
  • 49.
    54 Result - Unableto achieve Goals Incorrect Info, Uncertainty and Gaps hinders accurate Analytics Where Used (by Qty): ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● ? ● ? ● ? Award History Year Type Limit Unit $ 2015 RFQ? 15% ? 2019 SS 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Spend Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 ? Alternate Murata Elec... ? Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 ? Alternate ? Supplier: Digikey Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Mfg. Part Description: Supplier PN: GRM0335C1H100JA01J Category: Passives >> ……….. >>................ ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO ... ERP Fields: MG, PL Price History: Supplier ? Category Spend Supplier: $310M ? Annual Part Spend: ? Category Spend Mfg.: ? Annual Mfg. Spend: ? Annual Supplier Spend: $17M ? Category Spend: Murata vs Digi-Key ? Spend Ranking: Digikey 10?
  • 50.
    57 Machine Learning Proofof Concept Results Goal: Categorize parts into USPSC taxonomy with at least 80% accuracy using source data “as-is” - P/N, Description, Commodity Group, Product Line Demonstrated a reduction in manual effort and time required to classify parts ✓ 1.5 weeks to build and train the model, which can be easily generalized to new data ✓ 87.2% of the data was categorized by Tamr’s machine learning capabilities ✓ 85% accuracy after just a few iterations ✓ With only a few hours of training by Subject Matter Experts ✓ Demonstrated the ability of Tamr to reliably classify parts with minimal feedback from SMEs ✓ Continued use of the system will yield further improvements in accuracy and reductions in SME effort ✓ Governed categorization workflow can be generalized to other use cases including BOM parts for improved down stream predictive spend analytics
  • 51.
    73Confidential 73 Executive Initiativesthat Tamr Accelerates ● Consolidated View of Spend as a Negotiation Lever ● Improve Performance of Supply Chain with better Convergence between Forecast, Plan and Schedule ● Accelerate Data Unification post M&A ● Innovate and Improve Design with Closed Loop Quality
  • 52.
    74 Implementation Strategy Parts ClassificationDown Stream Analytics BOM Parts Mastering Supplier Classification
  • 53.
    75 Day in theLife: Data Pipeline Workflow High confidence Low confidence Notification: Manual Review Push to MDM Does the model need to be retrained? Yes No 300 - 400 new SKUs per month Down stream analytics Data analysts report data quality issues Additional: Exploded BOMs, new parts, new product lines
  • 54.
    76 Case Study: GeneralElectric Agile, multi-domain entity mastering drives $500M+ in Value “We’ve seen firsthand the transformative results that Tamr’s technology has on an enterprise of GE’s scale. When the cost and complexity of bringing together enterprise datasets is massively reduced, the resulting analytic breakthroughs create opportunities that were previously inaccessible.” Lisa Coca Managing Director, GE Ventures ● < 6 months from pilot to globally deployed data pipeline; 2M records consolidated to 700k ● 25M reduced to 6.4M unique parts; 5- tier analytic-ready classification ● Data from 3 acquisitions integrated with GE’s in <2 weeks Technical Outcome ● Suppliers: Build an integrated view from 75+ ERP systems and 2M supplier records ● Parts: 25M non-unique parts in purchasing systems across 8 BUs ● M&A: Integrate data from acquired entities with existing master views Business Outcome “The supplier data integration was a big win.” Bill Ruh CEO GE Digital & Chief Digital Officer at GE ● $80M savings in Year 1 from Tamr- mastered unified supplier view ● $300M in annual savings identified (0.5% reduction of direct spend) ● Supplier, purchasing, and customer base opportunities quickly identified ● Suppliers: Get GE’s best terms with a given supplier in every negotiation ● Parts: Optimize sourcing strategies to most cost-effective suppliers ● M&A: Increase the velocity of realizing synergies post-acquisition Technical Challenge Business Challenge
  • 55.
    77 Price History: Supplier Result ofAccurate Data Unification at Scale Drive Actionable Insights trapped in your Data Silos Where Used (by Qty): ● PCA, SYS I/O, XL2x260w ● Aruba IAP-224 (RW) Instant 3x3:3…. ● HPE USB US Keyboard/Mouse Kit ● HPE DL325 Gen10 7351P 16G 8SFF…. ● HPE ZApollo 4200 Gen10 48SFF CTO.. ● PCA, Control SYS I/O ZSCLR12… ● PCA, Control SYS I/O XSLX ROHS... ● Click Here for 25 more Manufacturer: Murata Electronics MPN: GRM0335C1H100JA01J Category: Passives >> Capacitors >> Ceramic Capacitors Category Spend Supplier: $503M Annual Part Spend: $1.67M Mfg. Part Description: CAP CER 10PF 50V NP0 0201 Supplier: Digi-Key Supplier PN: 490-17811-1-ND Category Spend Mfg.: $42M Annual Mfg. Spend: $0.35M Annual Supplier Spend: $22M ERP PN 8601J-32 ERP Part Description: CAP 50V 10pf C0G/NPO CER ... Award History Year Typ e Lim Unit $ 2015 RFQ 15% $0.0015 2019 Sole 30% $0.0012 Type P/N Desc. Supplier Unit $ Indirect Product Preferred 8601J-32 MLCC 50V 10pf Murata Elec... $0.0012 no Alternate 8601J-33 50V, 10PF, NP0, Multi…. Murata Elec... $0.0012 yes HPE USB US Keyboard... Alternate 78785-01 MLCC-SMD/SMT 50V…. Kemet $0.0015 no Alternate 8459X-05 SMD/SMT 50V10pF 201 AVX $0.0014 yes HPE ZApollo 4200Gen1... Category Spend: Murata vs Digi-Key Spend Ranking: Digi-Key 6/207
  • 56.
    78 Tamr’s Focus -Power your Analytics and Applications through Data Unification BI / Data Viz / Analytics Data Wrangling Sources UsesPeople, Process, Tools, Services, Data Enterprise Data Apps: APS, CRM, ERP, SCM, Quality Supply Chain Data Logical Models – Tamr Automation, Logging Provenance Movement Feedback – Steward Governance Raw Source Catalog Unified Data Hub Multiple ERP Multiple Excel: RFQ, AVL, Allocations Multiple Applications Supplier ERP Extracts Inventory, Quality, Logistics…. Data
  • 57.